DESCRIPTION BED TYPE
SINGLE DOUBLE PLATFORM BED LEG RAILING
A-01 4 4
A-02 1
A-03 7 4
A-04 3
A-05 7 4
A-06 7
A-07 7
A-08 7 4
A-09 7
A-10 7 4
A-11 7 4
A-12 7 4
64 35
TOTAL 99 135 192 99
DESCRIPTION SIZE NO L W H QTY UNIT
Light Stand round pipe 40mm 15 2.5 38 MTR
Stand Base C Channel 50X100 30 0.5 15 MTR
L Angle Stand 65X65 6 1.4 8 MTR
65X65 6 0.8 5 MTR
L Angle Stand Leg 65X65 8 0.28 2 MTR
P&M Workshop & FOL Store
Ceiling Pipe 40MM 9 12.5 113 MTR
Pipe Ceiling 50X100 5 5.7 29 MTR
L Angle 40X40 2 6.1 12 MTR
L Angle 40X40 2 4.3 9 MTR
L Angle 40X40 2 5 10 MTR
Vertical Pipe 80X160 6 2.8 17 MTR
Vertical Pipe 80X160 7 2.7 19 MTR
Metal Rack vertical L channel 8 2 16 MTR
Self Upper Area 11 0.9 0.46 5 sqm
Self Down Area 11 0.9 0.46 5 sqm
Rope Ring Small 50 0.075 4 MTR
Rope Ring Big 78 0.1 8 MTR
Big Size Lock 5 0.15 1 MTR
Small Size Lock 27 0.1 3 MTR
Window Side L Angle 40X40 2 1.4 3 MTR
Door L Angle 40X40 2 1.9 4 MTR
40X40 2 0.93 2 MTR
Door Upper L Angle 40X40 2 0.95 2 MTR
FOL store L Angle 40X40 2 4.2 8 MTR
FOL store L Angle 40X40 4 6.2 25 MTR
Oil Measuring Jar NOS 13 NOS
Drum 600 10 0.9 NOS
Construction Site Gate
Site Gate Pipe 60X60 6 2.16 13 MTR
Site Gate Pipe 60X60 8 2.9 23 MTR
Gate Side C Channel 150X100 2 3 6 MTR
Small Gate Frame Angle 70x70 1 2.14 2 MTR
Door Frame C Channel 100x50 2 2.14 4 MTR
Small Door Side C Channel 100x50 2 3 6 MTR
Small Door L Angle (V) 40x40 2 2.1 4 MTR
Small Door L Angle (H) 40x40 3 1.24 4 MTR
Big Door Side C Channel 200x150 1 3.2 3 MTR
Big Door Side C Channel 100x50 1 2.6 3 MTR
Big Door Side L Angle 40x40 3 3.4 10 MTR
Shuttring Material Room
Round Pipe Ceiling 50mm 8 13 104 MTR
C channel Ceiling 100x50 5 6.7 34 MTR
Vertical C Channel 100x50 5 3.2 16 MTR
Vertical C Channel 100x50 5 2.9 15 MTR
Inside Horizontal Round Pipe 50mm 6 12 72 MTR
Inside Horizontal Round Pipe 50mm 6 6 36 MTR
Door L Angle 40x40 3 2 6 MTR
Door L Angle 40x40 4 2 8 MTR
Concrete Cube Testing Room
Ceiling Round Pipe 40mm 5 9.4 47 MTR
Ceiling C Channel 100x50 4 3.5 14 MTR
Vertical C Channel 100x50 3 3.3 10 MTR
Horizontal Round Pipe 40mm 3 5 15 MTR
Horizontal Round Pipe 40mm 3 3.2 10 MTR
2 Door Framing pipe(H) 40mm 6 1 6 MTR
2 Door Framing pipe(V) 40mm 4 2 8 MTR
Room Parta Paint 2 7 3.3 46 sqm
Room Parta Paint 3 3.2 3.3 32 sqm
Cylinder Storage Box
1 Box 1 3 2 2.4 14 sqm
2 Box 1 3 2.5 2.4 18 sqm
Concrete Bucket Paint 1 NOS
Safty Park
Wooden Barricade 66 0.9 0.16 10 sqm
Vertical C Channel 100x50 2 3.2 6 MTR
Square Pipe (H) 40x40 2 3.86 8 MTR
Square Pipe (H) 40x40 2 3.93 8 MTR
Square Pipe (V) 40x40 4 0.6 2 MTR
Door(H) 40x40 2 0.9 2 MTR
Door(V) 40x40 3 0.6 2 MTR
Vertical Pipe 40mm 2 3.35 7 MTR
Concrete Painting 1 1.6 1.6 0.23 1 sqm
Concrete Painting 1 1.3 0.36 0.2 0 sqm
Store Room
Wall Paint 3 6.5 2.4 47 sqm
Wall Paint 4 3 2.4 29 sqm
Ceiling Paint 6.5 3 20 sqm
Door Deduction -1 1.04 2.26 -2 sqm
Window Deduction -1 0.78 0.76 -1 sqm
Window Deduction -1 1.26 1.03 -1 sqm
Window Deduction -1 1.14 0.83 -1 sqm
90 sqm
Ceiling C Channel 100x50 5 3 15 MTR
Ceiling C Channel 100x50 3 6.5 20 MTR
Opp. Store Room
Round Pipe Ceiling 40mm 6 3.6 22 MTR
Round Pipe Ceiling 40mm 2 3.2 6 MTR
Horizontal Round Pipe 40mm 4 3 12 MTR
Horizontal Round Pipe 40mm 4 3.2 13 MTR
Main Gate Security Cabin
Metal Rack vertical L channel 4 2 8 MTR
Self Upper Area 5 0.9 0.46 2 sqm
Self Down Area 5 0.9 0.46 2 sqm
Cupboard 2 0.76 1.5 2 sqm
Cupboard 2 0.43 1.5 1 sqm
Cupboard Top 1 0.76 0.43 0 sqm
Locker 2 0.9 2 4 sqm
Locker 2 0.5 2 2 sqm
Locker Top 1 0.9 0.5 0 sqm
Mandir Paint 2 0.5 1 1 sqm
1 0.8 1 1 sqm
16 sqm
Site Plan Board L angle 40x40 2 1.8 4 MTR
Site Plan Board L angle 40x40 2 1.3 3 MTR
2 Container between pipe 40mm 2 2.5 5 MTR
2 Container between pipe 40mm 4 1.5 6 MTR
2 Container between ply 1 1 2.65 3 sqm
L Angle 60x60 3 2.8 8 MTR
L Angle 60x60 3 1.1 3 MTR
2 Container between pipe 40mm 3 2.6 8 MTR
2 Container between pipe 40mm 3 0.6 2 MTR
Play Ground Pipe 40mm 2 2 4 MTR
L&T Container Front Area
C channel Ceiling 100x50 12 3.6 43 MTR
C channel Vertical 100x50 12 2.5 30 MTR
Ceiling Pipe 40mm 8 27.3 218 MTR
2 Container between patra 1.9 2.4 5 sqm
2 Container between patra 0.4 2.4 1 sqm
Document Room
Metal Rack vertical L channel 12 2 24 MTR
Self Upper Area 15 0.9 0.46 6 sqm
Self Down Area 15 0.9 0.46 6 sqm
Security Room
Metal Rack vertical L channel 8 2 16 MTR
Self Upper Area 10 0.9 0.46 4 sqm
Self Down Area 10 0.9 0.46 4 sqm
Kitchen
Metal Rack vertical L channel 4 2 8 MTR
Self Upper Area 5 0.9 0.46 2 sqm
Self Down Area 5 0.9 0.46 2 sqm
Bathroom Side Area
Vertical C Channel 100x50 6 1.8 11 MTR
Ceiling Pipe 40mm 9 14 126 MTR
Ceiling C Channel 75x50 6 5.2 31 MTR
square pipe for mirror 40x40 4 3.9 16 MTR
6 0.43 3 MTR
4 0.6 2 MTR
2 0.2 0 MTR
Labour Colony Gate
Square Pipe 60x60 6 2.5 15 MTR
6 2.38 14 MTR
Side Support Pipe 150x150 1 3.2 3 MTR
Side Patra Pipe 40mm 3 3.2 10 MTR
C Channel 100x50 1 3.2 3 MTR
DESCRIPTION SIZE NO L QTY Nos. Qty. UNIT NO Total Qty UNIT
G FLOOR ROOM 1,2,3,4,5,6
Vertical Pipe Post 2.8
2.8
Ceiling Truss L Angle 40x40 24 0.5 12 16 192 MTR 16 192 MTR
Ceiling Truss C Channel 80x40 9 0.32 2.88 MTR 16 46 MTR
Ceiling C Channel 80x40 2 6 12 MTR 16 192 MTR
Ceiling C Channel 80x40 16 32 512 MTR 32
Ceiling L Angle 40x40 30 2.6 78 1 78 MTR 4+6+6+6+6+2
Room 01 Side C Channel 80x40 1 6 6 MTR
Door Frame 6
G FLOOR ROOM 7,8,910,11,12
Vertical Pipe Post 2.8
2.8
Ceiling Truss L Angle 40x40 24 0.5 12 16 192 MTR 16 192 MTR
Ceiling Truss C Channel 80x40 9 0.32 2.88 MTR 16 46 MTR
Ceiling C Channel 80x40 2 6 12 MTR 16 192 MTR
Ceiling C Channel 80x40 16 32 512 MTR 32
Ceiling L Angle 40x40 30 2.6 78 1 78 MTR 4+6+6+6+6+2
Room 06 & 12 Side C Channel 80x40 2 6 12 MTR Truss Level
Door Frame 6
FIRST FLOOR ROOM 1,2,3,4,5,6
Vertical Pipe Post 2.8
2.8
Ceiling Truss L Angle 40x40 24 0.5 12 16 192 MTR 16 192 MTR
Ceiling Truss C Channel 80x40 9 0.32 2.88 MTR 16 46 MTR
Ceiling C Channel 80x40 2 6 12 MTR 16 192 MTR
Ceiling C Channel 80x40 16 32 512 MTR 32
Ceiling L Angle 40x40 30 2.6 78 1 78 MTR 4+6+6+6+6+2
Room 07 & 12 Side C Channel 80x40 2 6 12 MTR Truss Level
Door Frame 6
SECOND FLOOR ROOM 1,2,3,4,5,6
Vertical Pipe Post 4
2.9 1.1+1+0.9+0.75+0.6
Ceiling Truss L Angle Vertical 40x40 2 5.28 10.56 1 10.56 +0.48+0.3+0.15
16 10.56 168.96 MTR
Ceiling Truss L Angle Cross 80x40 1 7.58 7.58 7.58
16 7.58 121.28 MTR
Ceiling C Channel 80x40 16 6.1 97.6 MTR
Ceiling C Channel 80x40 16 6 96 MTR
Ceiling L Angle 40x40 30 2.6 78 1 78 MTR
Room 06 & 1 Side C Channel 80x40 3 6 18 MTR
Door Frame 6
Staircase
Staircase Support Pipe Front
Side 100x100 4 4.2 17 MTR
C Channel 100x50 8 0.88 7 MTR
Staircase Midle Support 100x50 4 3 12 MTR
L&T Office Right Side Staircase Front
Tappa Side Support C Channel150x75 2 5 10 MTR
Tappa Side Support C Channel150x75 2 5.4 11 MTR
Tappa Bottom L Angle 65x65 14 2.24 31 MTR
Midlanding Bottom 1 1 1.3 1 sqm
Midlanding Bottom C Channel150x75 5 1 5 MTR
Vertical Pipe Railing 40x40 15 0.97 15 MTR
Midlanding Horizontal Pipe 40x40 8 1 8 MTR
Tappa Railing Pipe 40x40 4 5.4 22 MTR
Midlanding Horizontal Pipe 40x40 2 0.7 1 MTR
Tappa Railing Pipe 40x40 4 5 20 MTR
Staircase
Staircase Support Pipe Front
Side 100x100 4 4.2 17 MTR
C Channel 100x50 4 0.88 4 MTR
Staircase Midle Support 100x50 4 3 12 MTR
Square Pipe 40x40 5 0.83 4 MTR
Square Pipe 40x40 1 1.43 1 MTR
Square Pipe 40x40 1 0.86 1 MTR
Square Pipe 60x60 1 0.85 1 MTR
C Channel 100x50 1 1.07 1 MTR
C Channel 100x50 1 0.5 1 MTR
C Channel 100x50 1 0.96 1 MTR
L Angle 50x50 1 0.6 1 MTR
Right Side Staircase Back
Tappa Side Support C Channel150x75 2 5 10 MTR
Tappa Side Support C Channel150x75 2 5.4 11 MTR
Tappa Bottom L Angle 65x65 14 2.24 31 MTR
Midlanding Bottom 1 1 1.3 1 sqm
Midlanding Bottom C Channel150x75 6 1 6 MTR
Vertical Pipe Railing 40x40 15 0.97 15 MTR
Midlanding Horizontal Pipe 40x40 8 1 8 MTR
Tappa Railing Pipe 40x40 4 5.4 22 MTR
Midlanding Horizontal Pipe 40x40 12 0.23 3 MTR
Tappa Railing Pipe 40x40 4 5 20 MTR
Staircase
Staircase Support Pipe Front
Side 100x100 4 4.2 17 MTR
Staircase Support Pipe Front
Side 100x50 4 5.9 24 MTR
L&T Left Side Staircase Front
Tappa Side Support C Channel200x60 2 2.5 5 MTR
Tappa Side Support C Channel200x60 2 2.8 6 MTR
Tappa Side Support C Channel200x60 2 2.6 5 MTR
Tappa Side Support C Channel200x60 2 2.8 6 MTR
Tappa Bottom 35 0.45 0.85 13 sqm
Midlanding Bottom 4 2.3 1.2 11 sqm
Midlanding Bottom C Channel200x60 16 0.93 15 MTR
Midlanding Bottom C Channel200x60 8 2.12 17 MTR
Vertical Pipe Railing 40x40 63 0.93 59 MTR
Railing Horizontal Pipe 40x40 2 2.3 5 MTR
Railing Horizontal Pipe 40x40 6 1.1 7 MTR
Railing Horizontal Pipe 40x40 2 0.3 1 MTR
Railing Horizontal Pipe 40x40 4 2.8 11 MTR
Railing Horizontal Pipe 40x40 6 1.2 7 MTR
Railing Horizontal Pipe 40x40 2 2 4 MTR
Railing Horizontal Pipe 40x40 4 2.6 10 MTR
Railing Horizontal Pipe 40x40 3 3.3 10 MTR
Railing Horizontal Pipe 40x40 4 2.8 11 MTR
Railing Horizontal Pipe 40x40 6 1.1 7 MTR
Railing Horizontal Pipe 40x40 2 2 4 MTR
Railing Horizontal Pipe 40x40 4 2.5 10 MTR
Staircase
Staircase Support Pipe Front
Side 100x100 4 4.2 17 MTR
Staircase Support Pipe Front
Side 100x50 4 5.9 24 MTR
Left Side Staircase Back
Tappa Side Support C Channel200x60 2 2.5 5 MTR
Tappa Side Support C Channel200x60 2 2.8 6 MTR
Tappa Side Support C Channel200x60 2 2.6 5 MTR
Tappa Side Support C Channel200x60 2 2.8 6 MTR
Tappa Bottom 35 0.45 0.85 13 sqm
Midlanding Bottom 4 2.3 1.2 11 sqm
Midlanding Bottom C Channel200x60 16 0.93 15 MTR
Midlanding Bottom C Channel200x60 8 2.12 17 MTR
Vertical Pipe Railing 40x40 63 0.93 59 MTR
Railing Horizontal Pipe 40x40 2 2.3 5 MTR
Railing Horizontal Pipe 40x40 6 1.1 7 MTR
Railing Horizontal Pipe 40x40 2 0.3 1 MTR
Railing Horizontal Pipe 40x40 4 2.8 11 MTR
Railing Horizontal Pipe 40x40 6 1.2 7 MTR
Railing Horizontal Pipe 40x40 2 2 4 MTR
Railing Horizontal Pipe 40x40 4 2.6 10 MTR
Railing Horizontal Pipe 40x40 3 3.3 10 MTR
Railing Horizontal Pipe 40x40 4 2.8 11 MTR
Railing Horizontal Pipe 40x40 6 1.1 7 MTR
Railing Horizontal Pipe 40x40 2 2 4 MTR
Railing Horizontal Pipe 40x40 4 2.5 10 MTR
Colony Room Pathway Front Side
Pathway Bottom 4 34 1 136 sqm
Pathway Bottom C Channel 100x50 12 34 408 MTR
Pathway Bottom C Channel 100x50 72 1 72 MTR
Hand Railing Horizontal Pipe 40x40 4 1.92 7.68 68 522 MTR
Hand Railing Vertical L Angle 40x40 2 0.96 1.92 68 131 MTR
Hand Railing Vertical C Channel80x40 68 1 68 MTR
Extra Vertical Support for MS Jali40x40 78 0.76 59 MTR
G floor Pipe Support 40mm 5 2.9 15 MTR
Pathway Bottom triangle 40x40 72 2.77 1+0.6+1.17 199 MTR
Support C Channel
Second Floor Pathway
Triangle Support Langle 40x40 36 2.36 1+1.1+0.26 85
Description Loc. Type Dim. Length Unit Wt. Thickness Actual Weight
Ceiling L Angle Colony Angle 40x40 312.0 2.4 4 748.80
Ceiling Truss L Angle Colony Angle 40x40 576.0 2.4 4 1,382.40
Ceiling Truss L Angle Vertical Colony Angle 40x40 10.6 2.4 4 25.34
Extra Vertical Support for MS Jali Colony Angle 40x40 59.3 2.4 4 142.27
Hand Railing Horizontal Pipe Colony Sq Pipe 40x40 522.2 3.43 3 1,791.28
Hand Railing Vertical L Angle Colony Angle 40x40 130.6 2.4 4 313.34
Midlanding Horizontal Pipe Colony Sq Pipe 40x40 20.2 3.43 3 69.15
Pathway Bottom triangle Support C Channel Colony Channel 40x40 199.4 3.50 4 698.04
Railing Horizontal Pipe Colony Sq Pipe 40x40 172.6 3.43 3 592.02
Second Floor Pathway Triangle Support Colony Angle 40x40 85.0 2.4 4 203.90
Square Pipe Colony Sq Pipe 40x40 6.4 3.43 3 22.09
Tappa Railing Pipe Colony Sq Pipe 40x40 83.2 3.43 3 285.38
Vertical Pipe Railing Colony Sq Pipe 40x40 146.3 3.43 3 501.74
Staircase Support Pipe Front Side Colony Sq Pipe 100X100 67.2 12.13 4 815.14
C Channel Colony Channel 100x50 564.3 7.44 4 4,198.32
Tappa Side Support C Channel Colony Channel 150x75 52.6 11.35 5 597.01
Tappa Side Support C Channel Colony Channel 200x60 106.5 14.48 5 1,541.40
G floor Pipe Support Colony Round 40mm 14.5 13.7 2 198.65
L Angle Colony Angle 50x50 0.6 3 4 1.80
Square Pipe Colony Sq Pipe 60x60 0.9 5.41 3 4.60
Tappa Bottom L Angle Colony Angle 65x65 62.7 4.9 5 307.33
Ceiling Truss C Channel Colony Channel 80x40 2,567.4 4.70 4 12,066.87
Door Frame C Channel Site Channel 100x50 228.9 7.44 4 1,702.87
Gate Side C Channel Site Channel 150X100 6.0 13.32 5 79.90
Side Support Pipe Site Sq Pipe 150x150 3.2 18.33 4 58.66
Big Door Side C Channel Site Channel 200x150 3.2 22.90 6 73.28
Ceiling Pipe Site Round 40MM 673.7 13.7 2 9,229.69
L Angle Site Angle 40X40 231.5 2.4 4 555.52
Round Pipe Ceiling Site Round 50mm 212.0 17.25 3 3,657.00
Stand Base C Channel Site Channel 50X100 43.5 7.44 4 323.64
Site Gate Pipe Site Sq Pipe 60X60 51.2 5.41 3 276.78
L Angle Site Angle 60x60 11.7 4.5 5 52.65
L Angle Stand Site Angle 65X65 15.4 4.9 5 75.66
Small Gate Frame Angle Site Angle 70x70 2.1 5.3 5 11.34
Ceiling C Channel Site Channel 75x50 31.2 5.23 4 163.24
Vertical Pipe Site Sq Pipe 80X160 35.7 13.67 4 488.02
43,255.11