Work Schedule

The document provides a schedule of works for various CAD department projects with descriptions and assignees. For the Highlands Phase 1 project, sewer line plans and other site plans are to be reflected on and submitted for costing. Other projects include Arcenas Highlands Residences, Condo Homes, offices, a sales lounge, Triangle Lot, and Anytime Fitness Gym with various drawings and plans required and deadlines provided. Assignees are noted for each item.

Uploaded by

Pathy Amores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views6 pages

Work Schedule

The document provides a schedule of works for various CAD department projects with descriptions and assignees. For the Highlands Phase 1 project, sewer line plans and other site plans are to be reflected on and submitted for costing. Other projects include Arcenas Highlands Residences, Condo Homes, offices, a sales lounge, Triangle Lot, and Anytime Fitness Gym with various drawings and plans required and deadlines provided. Assignees are noted for each item.

Uploaded by

Pathy Amores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

CAD DEPARTMENT

Schedule of Works

No. Description To do
Highlands Phase 1

Reflect on Site Plan and Submit to Ma'am Weng for


1.0 Sewer Line Plans
Costing.

2.0 MRF Location


Reflect on Site plan for New Location of MRF,
Waste Water Treatment Facility and Club House
3.0 Coordinate to Sir Val for Possible Location and
Waste Water Treatment Facility
Submit to Ma'am Weng for Costing.
4.0
Club House
Highlands Phase 2

Reflect on Site Plan and Submit to Ma'am Weng for


1.0 Sewer Line Plans
Costing.

Shop Drawing For Costing (Provide section for


2.0 Retaining Wall Height
Heighest to Lowest Point of Retaining Wall)

Arcenas Highlands Residences

Provide Architectural, Structural, Electrical and


1.0 FCD Drawings Plumbing Plans base on Standard Drawing File of
CASA 8 for Costing.

Coordinate with Sir Val for latest Site Development


2.0 Final Site Development
Plan.

Condo Homes
Provide Architectural, Structural, Electrical and
1.0 FCD Drawings Plumbing Plans base on Standard Drawing File of
CASA 8 for Costing.

Coordinate with Sir Val for latest Site Development


2.0 Final Site Development
Plan.

Offices
Provide Copies to Ma'am Weng with Permiting
1.0 Rural Net
Plans
2.0 Main Office Provide Floor Plan to maam Weng
1830 South
1.0 Facade Renovation Provide Elevation and plans to Maam Weng
Provide Plans to Ma'am Weng for Costing of
2.0 Toilet of Ground Floor and Second Floor
Renovation Works
Provide Schedule to Ma'am Weng for Possible
3.0 Window Schedule
Change of Window Schedule
Sales Lounge

1.0 Elevation and Floor Plan for Costing Provide shop drawing for Ma'am Weng for costing.

Triangle Lot

Provide Material Specification base on approved


specs by Ma'am Rosiel and provide to Ma'am Weng
for Costing
1.0 Material Specification
Put Comments on the PDF file with material specs
base on approve material by Ma'am Rosiel. And for
checking, after approved, send back copy to
Ar.Rene.

2.0 Toilet Plan and Elevation For Costing by Ma'am Weng

3.0 Perspective Provide Copy to Ma'am Weng

For Shop Drawing and Provide Copy to Ma'am


4.0 Perimeter Fence Section Layout
Weng and Engr. Ar2x
5.0 Sewer and water line layout Provide Copy to Ma'am Weng
Anytime Fitness Gym

Ongoing Design drawings (for costing by Ma'am


1.0 Plans & Elevations
Weng)

Utility Area at Quijano Lot

2.0 Plans and Layout Provide Shop drawing For Costing by Ma'am Weng

Area 3 Commercial Building

1.0 Building Plan And Elevation Provide Printed Copy to Ma'am Weng for Meeting

Talisay Lot
Provide Shop Drawing for Permit requirements
1.0 FCD DRAWING
Includes: AR/ST/EE/PL
For DRA
For Junie & Jerome, include in cad plans the ff:
1) legend w/ symbols of furnitures w/ dimensions
such as regular work tables & chairs
2) for larger tables, cabinets w/ multiple lengths,
place dimensions in the cad drawings
3) in the large rooms with many occupants, put the
number of occupants/chairs beside the area mark
per room
4) in the pantry areas of both sides sa main & rnet
offices, pls include location of the fire exit stairs
1.0 Main Office at 1830 South
that go to the roof of Concentrix main bldg
5) pls confirm my memory that the pantry areas’
roof will be location of aircon condenser units
6) all rooms’ dimensions must be included in cad
drawings before they are laid out sa factory area
( including cubicles, stockroom, all sides of all
rooms incl vault, server room, etc
7) There should be separate mechanical plan
together w/ location of condenser units.
8) Reflect Powersupply of ACU on Electrical Plans.

2.0 Quijano Lot For presentation with Sir Danny


Done
ASAP

Deadline Path/File Assignee


ase 1

Z:\02 PRODUCTION\05 LAND DEVELOPMENT\05 Arcenas Highlands\11 Incoming\2022 0712 ARCENAS HIG

JVR/JOSP
TBA

nds Phase 2

Z:\02 PRODUCTION\05 LAND DEVELOPMENT\05 Arcenas Highlands\11 Incoming\2022 0712 ARCENAS HIG

TBA JVR/JOSP

hlands Residences

06/21/2023 Z:\02 PRODUCTION\05 LAND DEVELOPMENT\05 Arcenas Highlands\00 Land Development Plan\2023 0519

JVR/JOMZ

06/21/2023 Z:\02 PRODUCTION\05 LAND DEVELOPMENT\05 Arcenas Highlands\00 Land Development Plan\2023 0516

es

07/21/2023
Z:\02 PRODUCTION\04 RESIDENTIAL MID RISE\02 Condo Home\01 Schematics\2020 1202 Sala Condo Hom
PATHY/EM2X

07/21/2023 Z:\02 PRODUCTION\05 LAND DEVELOPMENT\05 Arcenas Highlands\00 Land Development Plan\2023 0516

ASAP
Z:\02 PRODUCTION\03 OFFICES\04 HDC Main Office\RURAL NET OFFICE UPDATED PLANS

h
JVR/JOSP

TBA
JVR/JOSP

TBA

es Lounge

ASAP Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04


JVR/EM2X Shop Drawings\AREA 2\2018 1115 Are

\\hdc-pc\backup2020\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04 Shop Drawings\AR

Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04 Shop Drawings\AREA 1\2023 0523 AR

ASAP Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\10


JVR/EM2X Incoming\01 INTERCASA\2023 0508 A

\\hdc-pc\backup2020\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\10 Incoming\01 INTE

e Fitness Gym

TBA Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04


JVR/EM2X Shop Drawings\AREA 1\2023 0519 AR

a at Quijano Lot

TBA Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04


JVR Shop Drawings\AREA 1\2023 0519 AR

mmercial Building

ASAP Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04


JVR/EM2X Shop Drawings\AREA 3\2022 0603 AR

lisay Lot
JVR/EM2X/
2 weeks Z:\02 PRODUCTION\05 LAND DEVELOPMENT\12 TALISAY LOT\TALISAY LOT
JOSP
or DRA
JVR/EM2X/
For Update Z:\02 PRODUCTION\03 OFFICES\04 HDC Main Office\RURAL NET OFFICE UPDATED PLANS
JOSP

For Update Z:\02 PRODUCTION\02 COMMERCIAL\01 Commercial Expansion\04


JVR/EM2X Shop Drawings\AREA 1\2023 0522 AR