Water Intake Pump House#2 and Effluent Discharge                                                                                                                        APPENDIX- I, Rev.1
      i   Bored Pile
          Bored Pile Ø 600 mm, L=11m Inclu Test
          Pile
          - Drill Bored Pile Dia 600 mm, using Bentonite    m'        385,00                              386.014                          148.615.335       148.615.335
          - Rebar                                          kg       13.986,05      10.500,00           1.619,64        146.853.550          22.652.369       169.505.918
          - Concrete K-350                                 m³          108,86     815.742,96          61.861,19         88.798.667           6.733.974        95.532.640
          - Soil Disposal                                  m³          108,86                         21.532,71                              2.343.969         2.343.969
          - Pile Head Cutting and exposing
                                                           nos         35,00                          82.481,59                              2.886.856           2.886.856
          Reinforcement, for Pilecap
          - PDA Test                                       nos           1,00                     11.135.015,09                             11.135.015        11.135.015
          Pile Integrity Test                              nos           7,00                        907.297,53                              6.351.083         6.351.083
          Kentledge Compression Pile test, incuding all
                                                           nos           1,00                   310.130.790,53                             310.130.791       310.130.791
          preparations
          Lateral Pile Test, including all preparations    nos           1,00                     12.372.238,98                             12.372.239        12.372.239
     ii   Foundation
          Pilecap
          - Lean Concrete 50mm THK                         m3            2,09     761.305,11          61.861,19          1.589.605             129.166         1.718.771
          - Formwork                                       m2          106,96      78.934,88          45.364,88          8.442.807           4.852.188        13.294.995
          - Rebar                                          kg        2.316,03      10.500,00           1.619,64         24.318.305           3.751.133        28.069.438
          - Concrete K.350                                 m3           35,96     815.742,96          61.861,19         29.335.639           2.224.644        31.560.283
19/09/2023                                                                                 Page 2 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                                         APPENDIX- I, Rev.1
    iv    RCC Column
          - Formwork                                       m2          344,50      126.241,94          45.364,88          43.490.350        15.628.200        59.118.550
          - Rebar                                          kg        9.139,66       10.500,00           1.619,64          95.966.476        14.802.965       110.769.442
          - Concrete K.350                                 m3           35,29      815.742,96          61.861,19          28.787.569         2.183.082        30.970.651
          - Grouting                                       m3            0,10    7.133.008,18          61.861,19             691.902             6.001           697.902
     v    RCC Beam
          - Formwork                                       m2          448,20     101.841,90           45.364,88          45.645.029        20.332.311        65.977.340
          - Rebar                                          kg        8.400,99      10.500,00            1.619,64          88.210.370        13.606.575       101.816.945
          - Concrete K.350                                 m3           47,86     815.742,96           61.861,19          39.039.663         2.960.541        42.000.204
    ix    RCC Trench
          - Lean Concrete 50mm THK                         m3            5,69     761.305,11           61.861,19           4.329.059           351.765         4.680.824
          - Formwork                                       m2          113,73     136.814,62           45.364,88          15.559.812         5.159.309        20.719.121
          - Rebar                                          kg        3.297,69      10.500,00            1.619,64          34.625.709         5.341.065        39.966.773
          - Concrete K.350                                 m3           29,73     815.742,96           61.861,19          24.250.953         1.839.051        26.090.004
     x    Trench Cover
          Corner Protection, L.50.50.5                      kg        747,97       12.372,24               6.276,10        9.254.039         4.694.323        13.948.362
          Lugs (Ø-8)                                        kg         39,11       10.500,00               6.276,10          410.603           245.427           656.029
          Steel Grating (Including Supply, fabrication &
                                                           m2          93,80      722.538,76          101.155,43          67.774.135         9.488.379        77.262.514
          Erection)
    xi    Steel Structure
          Steel Profiles                                            84.802,64      18.636,72               6.276,10    1.580.442.789       532.230.046      2.112.672.835
19/09/2023                                                                                  Page 3 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                             APPENDIX- I, Rev.1
   xiv    Waterstop
          PVC Waterstop (width 250mm minimum)       m'        917,99      167.850,04          10.207,10        154.084.962           9.370.031      163.454.994
          Uditch U-650
          - Lean Concrete 50mm THK                 m3            2,89     761.305,11          61.861,19          2.198.268             178.624        2.376.893
          - Formwork                               m2          193,70     136.814,62          45.364,88         26.500.555           8.787.031       35.287.586
          - Rebar                                  kg        1.743,00      10.500,00           1.619,64         18.301.489           2.823.031       21.124.520
          - Concrete K.350                         m3           21,13     815.742,96          61.861,19         17.234.414           1.306.958       18.541.371
19/09/2023                                                                         Page 4 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                                     APPENDIX- I, Rev.1
     ii   PAINTING
          Exterior                                     m2         973,00      31.128,55               9.174,21       30.287.959           8.926.473        39.214.433
          Ceiling                                      m2          13,88      27.482,87               9.174,21          381.325             127.292           508.617
          Interior                                     m2       2.258,98      27.482,87               9.174,21       62.083.262          20.724.369        82.807.631
    iii   FLOORING
          Floorhardener                                m2       1.893,10      18.970,77           24.294,60          35.913.558          45.992.105        81.905.663
          Ceramic Tile 600x600 (Roman)                 m2          13,88     218.473,12           41.240,80           3.031.315             572.216         3.603.531
          Non Homogeneous Tile 300x300 Unpolished
                                                       m2           5,40     145.283,90           41.240,80            784.533             222.700            1.007.233
          (Roman)
    iv    FALSE CEILING
          Gypsum Board Panel (600x1200x12 mm Thk)      m2           5,40      70.109,35           37.116,72            378.591             200.430             579.021
Gypsum Board Panel (600x1200x9 mm Thk) m2 8,48 61.861,19 37.116,72 524.274 314.564 838.838
     v    BUILDING ROOFING
          Single Metal Sheet Roofing, Thk 0.45mm       m2         731,81     173.211,35           20.620,40         126.757.449          15.090.172       141.847.621
          Screed Concrete Finishing                    m2         551,25      19.093,50           59.686,71          10.525.291          32.902.300        43.427.591
          Waterproof Membrane Sheet (Bitumen, 3mm
                                                       m2         551,25     169.087,27           37.116,72          93.209.355          20.460.590       113.669.946
          thk minimum)
19/09/2023                                                                             Page 5 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                                         APPENDIX- I, Rev.1
      i   Concrete Work
          Excavation                                       m3        1.530,00                           25.852,17                            39.553.826       39.553.826
          - Formwork                                       m2          635,25      136.814,62           45.364,88          86.911.449        28.818.024      115.729.473
          - Rebar                                          kg       13.591,67       10.500,00            1.619,64         142.712.492        22.013.604      164.726.096
          - Concrete K.350                                 m3           79,04      815.742,96           61.861,19          64.475.997         4.889.484       69.365.481
      i   Bored Pile
          Bored Pile Ø 300 mm, L=5m
          - Drill Bored Pile Dia 300 mm, using Bentonite    m'        180,00                           386.013,86                            69.482.494       69.482.494
          - Rebar                                          kg        3.785,92       10.500,00            1.619,64          39.752.196         6.131.833       45.884.029
          - Concrete K-350                                 m³           12,72      815.742,96           61.861,19          10.379.065           787.088       11.166.153
          - Soil Disposal                                  m³           12,72                           21.532,71                               273.970          273.970
          - Pile Head Cutting and exposing
                                                           nos         36,00                            82.481,59                             2.969.337           2.969.337
          Reinforcement, for Pilecap
          - PDA Test                                       nos           1,00                       11.135.015,09                            11.135.015       11.135.015
          - Pile Integrity Test                            nos           7,00                          907.297,53                             6.351.083        6.351.083
iv RCC Slab
19/09/2023                                                                                   Page 6 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                          APPENDIX- I, Rev.1
     v    RCC Wall
          - Formwork                              m2          67,43     136.814,62          45.364,88       9.225.328          3.058.926       12.284.254
          - Rebar                                 kg         734,98      10.500,00           1.619,64       7.717.322          1.190.408        8.907.730
          - Concrete K.350                        m3           9,07     815.742,96          61.861,19       7.397.232            560.963        7.958.195
19/09/2023                                                                       Page 7 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                                        APPENDIX- I, Rev.1
    vi    Barbed Wire
          Steel Post (L.45.45.5)                            kg      1.292,85      12.372,24               6.276,10        15.995.449         8.114.059       24.109.508
          Wire Net                                                                      0,00                      0
   viii   PAINTING
          Exterior                                         m2          12,76      31.128,55               9.174,21          397.200           117.063             514.263
    ix    FLOORING
          Paving Block                                     m2           6,57     117.288,83           20.620,40             770.588           135.476             906.064
     x    DOORS
          Entrance Gate Sliding 1900 x 8300 mm
          (Including supply, erection, painting, sliding
                                                           nos          1,00   84.547.757,14         247.444,78           84.547.757          247.445        84.795.202
          rails and wheels, Locking arrangement all
          complete)
          Entrance Gate Swing 1800 x 900 mm
          (Including supply, erection, painting, Locking   nos          1,00    8.685.311,77         247.444,78            8.685.312          247.445            8.932.757
          arrangement all complete)
19/09/2023                                                                                 Page 8 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                                       APPENDIX- I, Rev.1
    iv    RCC Column
          - Formwork                                      m2          12,80     126.241,94          45.364,88           1.615.897          580.670              2.196.567
          - Rebar                                         kg         226,08      10.500,00           1.619,64           2.373.864          366.172              2.740.036
          - Concrete K.350                                m3           0,64     815.742,96          61.861,19             522.075           39.591                561.667
   viii   PAINTING
          Exterior                                        m2          15,29      31.128,55              9.174,21         475.887           140.254                616.141
          Interior                                        m2          31,64      27.482,87              9.174,21         869.662           290.307              1.159.969
          Ceiling                                         m2           6,84      27.482,87              9.174,21         187.983            62.752                250.734
    ix    FLOORING
          Ceramic Tile 600x600 (Roman)                    m2          22,84     218.473,12          41.240,80           4.989.926          941.940              5.931.866
          Non Homogeneous Tile 300x300 Unpolished
                                                          m2           2,16     145.283,90          41.240,80            313.813               89.080            402.893
          (Roman)
     x    FALSE CEILING
          Gypsum Board Panel (600x1200x12 mm Thk)         m2           2,16      70.109,35          37.116,72            151.436               80.172            231.608
Gypsum Board Panel (600x1200x9 mm Thk) m2 4,68 61.861,19 37.116,72 289.510 173.706 463.217
19/09/2023                                                                               Page 9 of 10
Water Intake Pump House#2 and Effluent Discharge                                                                                                                             APPENDIX- I, Rev.1
    xii   SANITARY
          Water Closet (Sitting type)                  nos           1,00    2.599.819,82         217.751,41              2.599.820              217.751              2.817.571
          Floordrain                                   nos           1,00      255.692,94          28.868,56                255.693               28.869                284.561
          Roofdrain                                    nos           4,00      309.305,97          78.357,51              1.237.224              313.430              1.550.654
   xiii   ROOFING
          Concrete Roof                                m2          25,00      365.650,80            51.607,12             9.141.270             1.290.178           10.431.448
          Waterproofing Membran Sheet installation     m2          25,00      169.087,27            37.116,72             4.227.182               927.918            5.155.100
     ii   Grass
          Rumput Gajah (Axonopus Compresus) *          m2       10.484,27      21.445,21                4.124,08        224.837.309            43.237.944         268.075.253
                                                                                                                                      TOTAL                  43.100.047.616
                                                                                                                                      VAT 11%                 4.741.005.238
                                                                                                                                      TOTAL + VAT            47.841.052.853
                                                                                                                                      GRAND TOTAL            47.841.052.853
                                                                                                                                      ROUNDED                47.841.052.900
                                                                                                                                      USD (@14,000)               3.417.219
           (Nihar)                   (Frendy)
          (Engineer)                (Engineer)                                                                                                                    Budiantoro
                                                                                                                                                                Direktur Utama