Stefano Cervidi - ABB S.p.A. PPHV   Santiago de Chile – J.T.
ABB Chile 14-15 de Abril 2015
PASS - Plug and Switch System
Subestaciones con tecnologìa hibrida
PASS
ABB in Lodi - History
Long heritage based on innovation
                             1926 – Established
                                    Oil insulated Current Transformers for more than 50 years.
                                                                    1981 – SF6 Stand-alone Current Transformers
                                                                                                   2005 – New Focus Factory for High Voltage Power Products
                                                                                                          Worldwide success
                                    GIS Technology - 1974
                                                              Pioneering Spirit – late 1990’s
                                                   Inventors the Hybrid Switchgear
© ABB Group
Month DD, Year   | Slide 2
Factory Background
Introduction
                             Focus Factory for ABB
                             Factory Portfolio:
                                   SF6 Instrument Transformers
                                   COMPASS - Hybrid Modules
                                   PASS – Hybrid Modules
                                   MFM – Customer Tailored Solutions
                             PASS HYBRID
© ABB Group
Month DD, Year   | Slide 3
Agenda
                            Schedule
                         What is PASS
                         PASS benefits
                         Success Stories and references
© ABB Group
May 14, 2015 | Slide 4
PASS – The ABB Hybrid Module
Overall Description
                                                                                       GIS
              high
                         Functional integration                                        Circuit Breaker
                                                                 Hybrid Modules        Current Transformer
                                                                                       Voltage Transformer
                                                                 Circuit Breaker
                                                                                       Disconnector
                                                                 Current Transformer
                                                                                       Earthing Switch
                                                                 Voltage Transformer
                                                                                       Busbar / Busducts
                                                                 Disconnector
                                                                 Earthing Switch
              medium
                                           DTB
                                           Circuit Breaker
                         LTB               Current Transformer
                         Circuit Breaker
              low
                                                                                                   Encapsulation
© ABB Group              no                                            partial                               full
May 14, 2015 | Slide 5
PASS – The ABB Hybrid Module
Portfolio
          PASS M00             PASS M0          PASS M0S      NEW PASS M0 H
   Up to 100 kV          Up to 170 kV      252 and 420 kV   Up to 170 kV
   50 / 60 Hz            50 / 60 Hz        50 / 60 Hz       50 / 60 Hz
   2000 / 3150 A         3150 A            Up to 5000 A     2000 / 3150 A
   31,5 / 40 kA          40 / 50 / 63 kA   50/ 63 kA        31,5 / 40 kA
© ABB Group
May 14, 2015 | Slide 6
PASS – Plug And Switch System
Components
                                                     1
                                                      2
                                 1
                                                          3
                                 2
                                                                   4
                             3
                                                 6            1.   Stud for HV connection
                         8                                    2.   Bushing
                                                              3.   Current transformer
                                                              4.   SF6 Voltage transformer
                                         7   5
                                                                   inductive type
                                                              5.   DS/ES Operating drive
                                                                   mechanism
                                                              6.   Circuit breaker
                                     9                        7.   Combined
                                                                   Disconnector/Earthing switch
                                                              8.   BLK – Spring-type circuit
                                                                   breaker operating mechanism
                                                              9.   Local control cubicle
© ABB Group
May 14, 2015 | Slide 7
PASS – Plug And Switch System
Circuit breaker
                         Self-blast or Auto-puffer™
                         Arc-assisted pressure
                         generation leads to less need
                         of interrupting energy
                           Smaller operating
                           mechanism
                           Lower stresses on
                           mechanical components
© ABB Group
May 14, 2015 | Slide 8
PASS – Plug And Switch System
BLK spring drive
                         BLK spring drive
                         Simple optimized spring drive
                         designs, based on years of
                         experience: first delivery
                         1990.
                           Extremely reliable
                           Low power consumption
                           Precise and stable
                           operating times
© ABB Group
May 14, 2015 | Slide 9
PASS – Plug And Switch System
Motor Drive
                              PASS M0 can be equipped as
                              request with the innovative Motor
                              Drive.
                              A motor drive is a digitally controlled
                              motor that directly moves the circuit-
                              breaker contacts. ABB has
                              developed a servomotor system with
                              digital control, able to directly drive
                              the circuit breaker contacts in a
                              highly accurate and reliable way.
                                The motor drive is type tested in
                                accordance with IEC and ANSI
                                Standards.
                                Each motor drive is pre-tested
                                and shipped to the installation site
                                in the form of a few pre-
                                assembled units.
© ABB Group
Month DD, Year   | Slide 10
PASS – Plug And Switch System
Combined disconnector and earthing switch
                          Integrated DS\ES
                          The mechanism has a minimal
                          number of mechanical
                          components, it is reliable and
                          maintenance-free.
                          The position of the combined
                          disconnector/earthing switch is
                          clearly shown by an indicator
                          mechanically coupled to the
                          shaft. Moreover, visual
                          confirmation can be obtained by
                          means of an inspection window
                          in the enclosure. The
                          disconnector/earthing switch can
                          also be operated manually by
                          means of a crank.
© ABB Group
May 14, 2015 | Slide 11
PASS – Plug And Switch System
Portholes for safe earthing
© ABB Group
May 14, 2015 | Slide 12
PASS – Plug And Switch System
DS\ES drive indicator for safety
                          Common operating mechanism for combined DS/ES with red/green
                          flags on the drive.
© ABB Group
May 14, 2015 | Slide 13
PASS – Plug And Switch System
Gas density control
                          Density monitor
                          Since the dielectrical strenght of
                          the switchgear and the breaking
                          capacity of the SF6 circuit-
                          breaker depend on the density
                          of the SF6 gas, a gas density
                          relay is installed to control gas
                          density and detect leakage.
© ABB Group
May 14, 2015 | Slide 14
PASS – Plug And Switch System
Current Transformers
                          Cast-resin insulated ring
                          type
                          Several cores can be installed, to
                          suit the end customers’
                          specifications. The transformer is
                          generally fitted to the front
                          bushing, but can also be installed
                          on the rear one or on both to
                          comply with specific requirements.
© ABB Group
May 14, 2015 | Slide 15
PASS – Plug And Switch System
Voltage Transformers and Surge Arresters
                          SF6 Insulated Voltage
                          transformers
                          PASS can be equipped as
                          request with conventional GIS
                          inductive voltage transformers.
                          Similarly to Current
                          Transformers, several
                          combinations of windings for
                          protection and measurements
                          with different loads are available.
© ABB Group
May 14, 2015 | Slide 16
PASS – Plug And Switch System
Bushings
                                                   Explosion proof
                                                   Maximum safety of personnel and
                          Glass fiber reinforced   equipment
                          epoxy resin tube         Non-brittle
                                                   Reduced handling damage risk
                                                   Low weight
                                                   Easier handling and reduced
                          Silicone rubber sheds    foundation loads
                                                   Maintenance free
                                                   No cleaning in polluted
                                                   environments
                                                   Outstanding seismic
                                                   performance
                          Aluminum end fitting     For best safety and reliability
© ABB Group
May 14, 2015 | Slide 17
Agenda
                             Schedule
                          What is PASS
                          PASS benefits
                          Success Stories and references
© ABB Group
May 14, 2015 | Slide 18
Why Innovative Switchgear
Advantages
       Philosophy           PASS Main Features:
     pre-fabricated
        pre-tested
      transportable
                             Each PASS module is
  no HV-test on site
                             equivalent to a complete
                             switchgear bay
                             High customizability yet
                             short delivery time, due to
                             the modular design
                             Fast erection and
                             commissioning, due to fully-
                             assembled modules
                             delivered from factory.
                             Lower life cycle cost
                             compared to traditional
                             technologies
© ABB Group
May 14, 2015 | Slide 19
Why Innovative Switchgear
Flexibility
                            Single bus bar
                            Double bus bar
© ABB Group
May 14, 2015 | Slide 20
Why Innovative Switchgear
Flexibility
                                                   2 PASS DCB are equivalent to 4
                          Double circuit breaker
                                                      complete switchgear bays
© ABB Group
May 14, 2015 | Slide 21
Why Innovative Switchgear
Flexibility
                          Cable terminal   In-out SS
© ABB Group
May 14, 2015 | Slide 22
145 kV H5 Substation Layout
Top View comparison
                 PASS solution: 18,5 m x 25, 5m   AIS solution: 35,1 m x 38,8 m
© ABB Group
May 14, 2015 | Slide 23
145 kV H5 Substation Layout
3d Comparison
  AIS
  PASS M0
© ABB Group
May 14, 2015 | Slide 24
145 kV H5 Substation Layout
Chart and benefits
                                              Space Comparison
                          PASS
                              AIS
                                    0              500              1000             1500
                          •   Save in Land Acquisition thanks to reduced number of
                              components
                          •   Save time for burocracy related to Land Acquisition
                          •   Reduces Civil Works for founding and basements
                          •   Faster Erection & Commissioning
© ABB Group
May 14, 2015 | Slide 25
245 kV H3 Substation Layout
Top View comparison
                     PASS solution: 25 m x 28 m   AIS solution: 63,7 m x 74,5 m
© ABB Group
May 14, 2015 | Slide 26
245 kV H3 Substation Layout
Chart and benefits
                                              Space Comparison
                          PASS
                              AIS
                                    0       1000      2000       3000      4000      5000
                          •   Save in Land Acquisition thanks to reduced number of
                              components
                          •   Save time for burocracy related to Land Acquisition
                          •   Reduces Civil Works for founding and basements
                          •   Faster Erection & Commissioning
© ABB Group
May 14, 2015 | Slide 27
Innovation with PASS
PASS M0H module – Multifunctional Module
Pre-fabricated            PASS M0H, H4-type
Pretested
Transportable
No high voltage
test on site
                           Advantages:
                           •   Civil works reduced to the minimum
                           •   Transportation fully assembled
                           •   Electromechanical installation activities limited to the HV and LV
                               connection and SF6 filling only
                           •   Minimized site testing
                           •   Reduced risks related to installation activities
© ABB Group
May 14, 2015 | Slide 28
Innovation with PASS
PASS M0H module – Multifunctional Module
Pre-fabricated
Pretested
Transportable
No high voltage
test on site
© ABB Group
May 14, 2015 | Slide 29
Why Innovative Switchgear
Space Saving
                                H4 145 kV Footprint comparison in
                                         square meters
                          800
                                21x33 sqm
                          700
                          600
                          500
                                             21x18,5 sqm
                          400
                                                            21x13,5 sqm
                          300
                          200
                                                                          15x5 sqm
                          100
                            0
                                  AIS       PASS SBB       PASS DCB PASS M0 H
© ABB Group
May 14, 2015 | Slide 30
Why Innovative Switchgear
Easy transportability
                              PASS M00 and M0 in a container
© ABB Group
Month DD, Year   | Slide 31
Why Innovative Switchgear
Easy transportability
  Transport
  configuration
  Service
  configuration
© ABB Group
Month DD, Year   | Slide 32
Why Innovative Switchgear
Erection & Commissioning
                                                                      Service position
                          Total: 16 hours   Unloading &                                   Rotation of
                                             unpacking                                      poles
                                                                            Erection on
                                                                              support
                                                                             structure
                                                          Transport
                                                           module
© ABB Group
May 14, 2015 | Slide 33
Why Innovative Switchgear
Economical comparison
                            20% saving compared to AIS
© ABB Group
May 14, 2015 | Slide 34
Agenda
                             Schedule
                          What is PASS
                          PASS benefits
                          Success Stories and references
© ABB Group
May 14, 2015 | Slide 35
 Success Story
 PASS M0 145 kV – Retrofitting Tauron Welnowiec PL
Pre-fabricated               Customer need
Pretested
                             Old substation that needs to
Transportable
                             be retrofitted
No high voltage
test on site
                             ABB response
                             Substation H4 on the roof of
                             the building made with 2
                             PASS M0 DCB, minimising
                             switchyard space.
                             Customer benefit
                             Significant cost, time and risk
                             reduction in Substation
                             extension.
© ABB Group
June 22, 2012   | Slide 36
 Success Story
 PASS M0 145 kV Saudi Aramco - Shaybah e Abquaiq SA
Pre-fabricated
                             Customer need
Pre-tested
Trasportable
                             Refurbishment of two old AIS S/S minimizing the
No HV test on site
                             outage and installation time
                             Utilize pre-existing bus bar system and AIS
                             equipments (PT, SA)
                             ABB response
                             ABB supplied 10 completed HV bays optimizing
                             the PASS for harsh environmental condition
                             (Desert storm, +52 °C, Extreme solar radiation)
                             Customer benefits
                             Costs and time saving during erection and
                             commissioning
                             Reduced outage time during S/S revamping
© ABB Group
May 14, 2015 | Slide 37
 Success Story
 PASS M0S 245 kV - Tenaris Co-generation plant IT
Pre-fabricated               Customer need
Pretested
                             Sub-station solution with
Transportable
                             limited space availability at a
No high voltage
test on site                 hazardous material deposit
                             ABB response
                             Outdoor substation made
                             with PASS M0S DCB in a
                             small area between two
                             trafos
                             Customer benefit
                             Space and environmental
                             saving using a different area
                             far from deposit
© ABB Group
June 22, 2012   | Slide 38
 Success Story
 PASS M00 DCB 72,5 kV – Qatar Steel via Air Liquide FR
                             Customer need
Pre-fabricated
                             Double-breaker connection to
Pretested
                             two new PTR to supply two new
Transportable
                             steel mills. Limited space
No high voltage              availability inside the plant in a
test on site
                             desert and marine environment.
                             ABB response
                             Containerized solution made
                             with PASS M00 DCB with bay
                             P&C system integrated.
                             Customer benefit
                             Compact and higly reliable
                             substation with a 2-day
                             energization time.
                             Environmentally protected from
                             corrosive salinity and
                             sandstorms.
© ABB Group
June 22, 2012   | Slide 39
 Success Story
 PASS M00H 72,5 kV – Russein Axpo Hydro PP - CH
Pre-fabricated                Customer need
Pretested
                              Complete refurbishment of a 70-
Transportable                 year old AIS substation at 1000m
No high voltage               asl. Not enough space available
test on site                  for AIS or conventional hybrid.
                              Energization to be done before
                              onset of the winter weather.
                              ABB response
                              4-bay prefabricated substation
                              completely transportable
                              (8500x2800x3100mm)
                              Customer benefit
                              Fast energization due to a 36-
                              hours time erection and
                              commissioning. Minimum civil
                              works on site. See Video
© ABB Group
June 22, 2012   | Slide 40
 Success Story
 PASS M0S 420kV - Con Edison East 13th St. NYC – USA
                                                 Customer need:
                                                 In Lower Manhattan, close to the Financial
                                                 District, Con Edison was looking to increase
                                                 flexibility and reliability after the substation
                                                 was damaged by “superstorm” Sandy in
                                                 2012.
                                                 ABB response:
                                                 5 PASS M0S 420kV designed for special
                                                 platform application 9m above the ground,
                                                 providing line and transformer protection.
                                     E 13th St
                                                 Customer Benefit:
                                                 Increased flexibility and reliability from a
                                                 compact outdoor solution without any HV
                                                 equipment relocation minimizing cost, time
                                                 and risk.
                          Wall St.               IEC 61850 9-2 LE P&C system integrated
                                                 inside the Local Control Cubicle of PASS
© ABB Group
May 14, 2015 | Slide 41
PASS – Plug And Switch System
Reference list in Chile – 72,5 to 245kV (Apr- 2015)
© ABB Group
May 14, 2015 | Slide 42
PASS Hybrid
Reference
*
•   SBB = 1 bay equivalent
•   DBB = 1,5 bay equivalent   More than 6500 modules installed at February 2015
•   DCB = 2 bays equivalent    More than 8500 equivalent bays*
© ABB Group
Month DD, Year   | Slide 43
Conclusion
Why Innovative Switchgear
      Philosophy
     pre-fabricated           Question time
       pre-tested
     transportable
  no HV-test on site
© ABB Group
Month DD, Year   | Slide 44