0% found this document useful (0 votes)
56 views4 pages

LHB Spring Failure Report Form

The document provides details about a failed primary spring on a bogie of a coach. It includes information like the coach number, date of failure, location of failure, visual inspection findings of other components, photographs of failure and any other relevant information. An investigation was conducted and clearances were found to be outside limits which need rectification before clearing the coach.

Uploaded by

sselhbbpl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views4 pages

LHB Spring Failure Report Form

The document provides details about a failed primary spring on a bogie of a coach. It includes information like the coach number, date of failure, location of failure, visual inspection findings of other components, photographs of failure and any other relevant information. An investigation was conducted and clearances were found to be outside limits which need rectification before clearing the coach.

Uploaded by

sselhbbpl
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Aterdacd in TotH p on

To6-22

AMNEXJRE-B
SPRIIG
PROFORMA FOR REPORTING BROKENFAILED PRIMARY LHB
TO RDSO

O1663 RIDt- 9)2y


CuscltNo. l83/00ahsporiation (cd, LwWAccN Trar. N.
Dale ut Faure G-6-22 Primary Dypol RKM.
RkMe Ir6a2 Da- RKmp 22-222
Sched dePcuters. Dn
Deledet Cumm Majnturance -RUuIe F l l r e . M i

Bagu No CE- 18 1375

A Spring data:
R-6
2 lake ofthn sop,.CM ESK
CmESKO531-oSn0&S

B. Faied Conto. (lun boituti)


b Falgu i Sucriern tatre.Faugy
otectitn,OK
i: Candilice ePaint 5urace

9, Dala at Fitment Locadonof Gpring:


i0RNot OKi DK
W, Orisnlstuti ut weÃzutiya prirry spóng

Autbe Pad oKgBoNY).


Q.

4PnTzy eitcat Campur catili:


CDamper entto CAs for Teshng

Ser or Secton Eraar (CaW) 1.0


C. Investigation at othor locatlons of bogle:
DK
1. Visual Conditionsof other dampers of bagle (OK/Nol OK): ..MK
2. Primary Bump stop gap.
3. Whether Proper coupling of secondery spr OK..
4. Laleral clerance (bolsler atid cross membor: 30... a4
24 m
5. Longitudinal clearanca (bulsler and crogs member): ..

D. Photograph showing failure section of spring:

chellng fbund in K6 DISK.


E. Any other relevant informatlon:. Wheet

Nole: clearances ndliced have to be replaced rectified


1. Deleclive componentsImproper
belere giving fitness to-lha coach.
2 Itsadvised that in the oBowingoasps shows lIhat coac wasimarkad sick
a) where caach sick.marking hlstory teleled dafect, ot
earller irn iast Bnpnths due to bogieIr:enroute-coachdetachment.
spring braakega resuled
b) j2rimary prnNary verticl damper at failurelocalon (B4)
primary depots iay replaCe ha
pre-lested unllechange daper.and sendhu coplaced darmper lo this
nli a
lesting. The damper lat report, should also ba enclosed wilth
worksiop lar
proforma.

Sen-or Section Enginoer (Ca)i.0.i


Cant Ry, Bhopai
WCR
Dote
|0-6-22

83100 - LwACeN. WC.

Rlbt- ql2y
D3 - |6.22 RKmp
22-2-22 RKm
01663 aof - PeV - MCE I
NPEV - MOC &1376
I1275
lo-6-22
iy

&66
Pev

Senor Secion E gneer (C&NV)


West Cenral Rv. I.0...
Bhopal
date-10-06
Test
Rebound
Max
g80
Kg
-55
Kg
Max.
compression
Tabular
Report 80.2
Kg 543.5
Kg
Serial
no 290
Escorts 398
Escorts
DI83100-Lwgeywe
DAMPERDAMPER
Date-10-06-2022
Current
Current
Time-12:45:19
Shocker
type VT VT
PRMY PRMY
Status
KG KG
2022 425FAIL 425FAIL

You might also like