This document provides details for a project to retrofit and strengthen an existing bridge along Manila North Road in Pasuquin, Ilocos Norte. The project involves Permanent Bridge 1 (B04886LZ) from station K0510+744.00 to K0510+756.80, which has a net length of 12.80 linear meters. The document was submitted and recommended for approval by officials from the Department of Public Works and Highways Regional Office 1.

Uploaded by

Dyeri Flores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views16 pages

CP - Caruan BR

This document provides details for a project to retrofit and strengthen an existing bridge along Manila North Road in Pasuquin, Ilocos Norte. The project involves Permanent Bridge 1 (B04886LZ) from station K0510+744.00 to K0510+756.80, which has a net length of 12.80 linear meters. The document was submitted and recommended for approval by officials from the Department of Public Works and Highways Regional Office 1.

Uploaded by

Dyeri Flores
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE I
SAN FERNANDO CITY, LA UNION

C.Y. 2024 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, CARUAN BR. 1
(B04886LZ) ALONG MANILA NORTH ROAD
LOCATION: PASUQUIN, ILOCOS NORTE
STATION: K0510 + 744.00 - K0510 + 756.80
NET LENGTH: 12.80 L.M.
BRIDGE ID: B04803LZ

SUBMITTED: RECOMMENDED: APPROVED:

ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: DATE: DATE:


BALAOI

INDEX OF DRAWINGS BURAAN


PAGUDPUD
BURAYOC

PASALENG

BADUANG
PASALENG BAY

TO CAGAYAN
BINDAY

BANGUI
SHEET NO. SHEET CONTENTS BURGOS DUMALNEG
MASINI

DAVILA ADAMS
DIVI DARISDIS
AGAGA TUNGEL

1 TITLE PAGE DILAVO


PAREDES
AIR STATION
BATO
MT. PAO

LIPAY

2 INDEX OF DRAWINGS, SUMMARY OF QUANTITIES, VICINITY MAP, LOCATION MAP KARUSQUIS

PASUQUIN ILOCOS NORTE 1st


ALSEM AMIN

BACARRA MT. AGANMATA

3 GENERAL NOTES NABUTAS

VINTAR
VINTAR DAM
MT. MASADSADAC

LAOAG
LA PAZ
CITY
4 GENERAL PLAN, GENERAL ELEVATION GABU
SAN NICOLAS PIDDIG
CARASI
UBOG
SARRAT
MANGITATAYU

DINGRAS
5 BRIDGE UNDERDECK VIEW PAOAY
LUMBAO

BIDDING
SOLSONA
BATAC
MARCOS
PADONG
CURRIMAO
6 TYPICAL CROSS SECTION, TYPICAL GIRDER PLAN, CORBEL DETAIL QUIOM
ILOCOS NORTE 2nd
MT. SICAPDO

PORT CURRIMAO QUIOM (BANNA) ESPIRITU


PINILI BALLAAG
BINGAO

7 PATCHING DETAILS, GENERAL NOTES AND SPECIFICATIONS FOR PATCHING BADOC ISLAND
SULAT POINT
BADOC MADUPAYOS
NAGREBSAN NUEVA ERA
STO. TOMAS

NASSADAO

SINAIT

8 EPOXY INJECTION DETAIL, GENERAL NOTES AND SPECIFICATIONS FOR EPOXY INJECTION BALACBAC

KAPAKAK

DACLABANO
SALAMAGUE 1
CABUGAO

CARBON FIBER SHEET/PLATE BONDING TO GIRDER DETAIL, GENERAL NOTES AND SPECIFICATIONS FOR CARBON FIBER SHEET/PLATE BONDING
SALAMAGUE

9 LAPOG BAY SAN JUAN


ILOCOS SUR 1st

10 CARBON FIBER SHEET BONDING TO DECKSLAB DETAILS, GENERAL NOTES AND SPECIFICATION FOR CARBON FIBER SHEET BONDING PINGET ISLAND
CASILI
MAGSINGAL
PATONG

STO. DOMINGO

11 PROTECTIVE COATING DETAILS, GENERAL NOTES AND SPECIFICATIONS FOR PROTECTIVE COATING SAN VICENTE
SANTA CATALINA
SAN ILDEFONSO
BANTAY

VIGAN CITY
REGIONAL MAP of REGION I
CAOAYAN SHOWING NATIONAL ROADS
12 ASPHALTIC PLUG JOINT DETAILS, GENERAL NOTES AND SPECIFICATIONS FOR ASPHALTIC PLUG JOINTS SANTA
TO ABRA
AND DISTRICT BOUNDARIES
SULVEC PT.
NAGBUKEL
13 TRAFFIC MANAGEMENT PLAN NARVACAN

STA. MARIA

14 TRAFFIC SIGNS AND HAZARD MARKERS SAN ESTEBAN


BURGOS
SANTIAGO BAYANGGUI

15 TRAFFIC SIGNS AND HAZARD MARKERS, NOTES ON TEMPORARY SIGNAGES AND SAFETY VEST DAN-AR LIDLIDDA
BANAYOYO
CANDON CITY SAN EMILIO

16 STANDARD PROJECT BILLBOARD DETAIL GALIMUYOD


SALCEDO QUIRINO
STA. LUCIA
G. DEL PILAR
QUINIBU
STA. CRUZ
DILI SIGAY

ILOCOS SUR 2nd


CERVANTES
KIMPUSA
SUYO
DARDARAT BUTAC
TAGUDIN CABUGAO

ALILEM
BANGAR TO BENGUET
SUDIPEN
RIMOS
LUNA CASTRO SUGPON
BALAOAN

SANTOL

LA UNION 1st
BACNOTAN

SUMMARY OF QUANTITIES SAN JUAN


SAN FERNANDO PORT

PORO POINT
LUBING
SAN GABRIEL
STO. ROSARIO

NAGYUBUYUBAN

BAGULIN
THIS SITE
SAN FERNANDO CITY

ITEM NO. ITEM DESCRIPTION UNIT QUANTITIES REMARKS NAGUILIAN


BURGOS
BAUANG
BAGUIO-NAGUILIAN

B.5 PROJECT BILLBOARD/ SIGNBOARD (FOR DPWH) ea. 2.00 FOR PROJECT SIGNBOARD LA UNION 2nd
CABA

Santiago Island SAN ANTONIO


ARINGAY
BOLINAO
B.5 PROJECT BILLBOARD/ SIGNBOARD (FOR COA) ea. 1.00 FOR PROJECT SIGNBOARD TUBAO
PUGO
MARCOS HIGHWAY
AGOO
ANDA

B.24 GENERAL SCAFFOLDING AND SHORING l.s. 1.00 FOR UNDERDECK RETROFITTING WORKS STO. TOMAS

DAMORTIS ROSARIO TO BAGUIO


TO BAGUIO
Hundred Islands
BANI RABON ESPERANZA
ARTACHO

101(3)c1 REMOVAL OF ACTUAL STRUCTURES/OBSTRUCTION (ACP-50mm THICK) sq.m. 198.00 REMOVAL OF OBRSTRUCTION MABILAO
BOLASI
SISON
LABAYUG
ALAMINOS CITY NUEVA VISCAYA
AGNO SAN FABIAN POZZOROBIO
SAN ROQUE SAN ROQUE

SAN JACINTO SAN NICOLAS


302(2) EMULSIFIED ASPHALT sq.m. 2,875.10 FOR DECKSLAB AND APPROACHES BURGOS
MABINI
SUAL DAGUPAN CITY MANGALDAN LAOAC
SAN MANUEL
NATIVIDAD
BINALONAN
LINGAYEN MANAOAG
MAPANDAN ASINGAN TAYUG
LABRADOR
BINMALEY CALASIAO STA. BARBARA
310(1)c BITUMINOUS CONCRETE SURFACE WEARING COURSE (50mm THICK) sq.m. 2,875.10 FOR DECKSLAB AND APPROACHES DASOL
BUGALLON PANGASINAN SUB
STA MARIA SAN QUINTIN
URDANETA CITY
PANGASINAN 3rd
PANGASINAN 1st SAN CARLOS CITY UMINGAN
MALASIQUI VILLASIS
BALUNGAO
405(5) SEAL CONCRETE cu.m. 1.38 FOR CONCRETE SPALLING
AGUILAR
BASISTA
STO TOMAS
ROSALES
NUEVA ECIJA

INFANTA URBIZTONDO ALCALA


PANGASINAN 2nd BAYAMBANG BAUTISTA
413(6)b ASPHALTIC PLUG JOINTS (APJ) FOR BRIDGE l.m. 31.40 FOR BRIDGE EXPANSION GAPS TO ZAMBALES MANGATAREM
TO TARLAC

TO TARLAC

416(1)a CARBON FIBER, SHEET, 1 LAYER sq.m. 138.00 FOR UNDER DECKSLAB

416(1)b CARBON FIBER, SHEET, 2 LAYERS sq.m. 115.20 FOR GIRDER

416(2) CARBON FIBER, PLATE sq.m. 9.60 FOR GIRDER 2 LOCATION MAP
628(3) EPOXY INJECTION ON CRACK l.m. 11.23 FOR CRACK REPAIRS
S-02 SCALE NOT TO SCALE

628(12) PROTECTIVE COATING FOR CONCRETE STRUCTURES sq.m. 374.40 FOR MEMBER PROTECTIVE COATING

506(1) STONE MASONRY cu.m. 96.00 FOR SLOPE PROTECTION

612(1) REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS (WHITE) sq.m. 53.94 FOR PAVEMENT MARKINGS

NOTE: ALL QUANTITIES SHALL BE VERIFIED PRIOR TO THE START OF CONSTRUCTION.

THIS SITE

1 VICINITY MAP
S-02 SCALE NOT TO SCALE

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT INDEX OF DRAWINGS


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1 SUMMARY OF QUANTITIES
REGIONAL OFFICE I LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 2
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD VICINITY MAP ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
LOCATION MAP WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
4. SITE PREPARATION
GENERAL ALL EXISTING WORKS WHICH WILL INTERFERE WITH THE WORK SHALL BE Item 505 - GROUTED RIPRAP & Item 506 - STONE MASONRY
COMPLETELY REMOVED AND DISPOSED OFF SITE BY THE CONTRACTOR. ALL
IN THE INTERPRETATION OF DRAWINGS, INDICATED DIMENSIONS SHALL GOVERN. ALL SALVAGEABLE MATERIALS SHALL BE PROPERLY AND CAREFULLY DISMANTLED AND 2a. STONE
DIMENSIONS, DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTION PURPOSES. DEPOSITED ON A CONVENIENT SITE AS INSTRUCTED BY THE ENGINEER. HOWEVER, IF THE STONE FOR GROUTED RIPRAP AND STONE MASONRY SHALL BE SOUND, TOUGH,
SUCH PERMANENT WORKS ARE DESIGNATED TO REMAIN BUT WILL BE DEMOLISHED DURABLE, DENSE, RESISTANT TO THE ACTION OF AIR AND WATER, AND SUITABLE IN ALL
UNLESS OTHERWISE INDICATED, ALL DIMENSION ARE IN MILLIMETERS, ELEVATION ARE IN BY THE CONTRACTOR FOR THE NECESSARY EXECUTION OF THE WORKS, THESE RESPECTS FOR THE PURPOSED INTENDED.
METERS AND STATIONING ARE IN KILOMETERS PLUS METERS BASED ON THE DATA DEMOLISHED PERMANENT WORKS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR
ORIGINAL CONDITION. 2b. MORTAR FOR GROUTED RIPRAP
FURNISHED BY THE HIGHWAY AND SURVEY TEAM OF THE DPWH, REGIONAL OFFICE 1.
THE MORTAR FOR GROUTED RIPRAP SHALL BE MIXED INTHE PROPORTION OF ONE PART
5. PUBLIC UTILITIES/FACILITIES CEMENT TO THREE PARTS SAND BY VOLUME, AND SUFFICIENT WATER TO OBTAIN THE
ALL DIMENSIONS OF EXISTING STRUCTURE SHALL BE VERIFIED BY THE CONTRACTOR REFER TO THE SPECIAL PROVISION REQUIRED DENSITY CONSISTENCY
BEFORE THE START OF CONSTRUCTION.
6. TRAFFIC MANAGEMENT 2c. MORTAR FOR STONE MASONRY
THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL REPAIR METHOD TO BE THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING AND MAINTAINING AN THE MORTAR FOR MASONRY SHALL BE COMPOSED OF ONE PART OF PORTLAND CEMENT AND
APPROVED BY THE ENGINEER. EFFECTIVE TRAFFIC CONTROL IN ACCORDANCE WITH THE SPECIAL PROVISIONS TWO PARTS OF FINE AGGREGATE BY VOLUME AND SUFFICIENT WATER TO MAKE THE
SUBJECT TO THE APPROVAL OF THE ENGINEER AND THE CORRESPONDING LOCAL MORTAR OF SUCH CONSISTENCY THAT IT CAN BE HANDLED EASILY AND SPREAD WITH A
AUTHORITIES. TROWEL.
REPAIR SPECIFICATIONS 7. REINFORCED CONCRETE

STANDARD SPECIFICATIONS FOR THIS PROJECT SHALL BE APPLIED BASED ON AASHTO,


a. CONCRETE MIX AND PLACING
1. DESIGN OF CONCRETE MIX SHALL MEET THE DESIGN CONCRETE STRENGTH
SYMBOLS IDENTIFICATION
SYMBOL
ASTM. JIS AND EQUIVALENT. EACH REPAIR METHOD SHALL CONFORM TO THE BRIDGE REPAIR GIVEN UNDER ITEM 1 OF MATERIALS.
LINE OF SYMMETRY
2 TITLE TARGET
MANUAL 2008, AND TO THE DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES, OR SIMILARITY BS-2
AIRPORTS, VOLUME II 2013 EDITION. 2. CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH
THE SPECIFICATIONS.
N SHEET No.

3. THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL PLACING


MATERIALS SEQUENCES FOR ALL CONCRETE WORKS NORTH ARROW 2a SUB-TITLE TARGET
b. BAR BENDING, SPLICING AND PLACING BS-2
1. CONCRETE 1.THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR APPROVAL SHOP
UNLESS INDICATED OTHERWISE, THE CONCRETE CLASS AND STRENGTH SHALL BE DRAWING INDICATING THE BENDING, CUTTING, SPLICING AND INSTALLATION OF
AS FOLLOWS ALL REINFORCING STEEL BARS. INDICATION OF ELEVATION
2a
2. BARS SHALL BE BENT COLD. BARS PARTIALLY EMBEDDED IN LIMITS OF DIMENSION SECTION TARGET
28-DAY CYLINDER STRENGTH MAX. SIZE OF COARSE BS-2
STRUCTURAL MEMBER CLASS AGGREGATES mm (in.) CONCRETE SHALL NOT BE FIELD BENT UNLESS PERMITTED BY THE ENGINEER.
psi MPa SECTION IN WATER
3. BAR SPLICING NOT INDICATED IN THE DRAWINGS SHALL BE SUBJECT TO THE DETAIL REFERENCE
CORBEL, END/ SHEAR BLOCKS A (MOD) 4000 27.60 20.00 (3/4)
SECTION IN EARTH 2a
APPROVAL OF THE ENGINEER. TARGET
BS-2

4. WELDED SPLICES, IF APPROVED BY THE ENGINEER, SHALL DEVELOP IN SECTION IN STRUCTURAL


2. REINFORCING STEEL STEEL
TENSION AT LEAST 125% OF THE SPECIFIED YIELD STRENGTH OF THE BAR.
a. UNLESS INDICATED OTHERWISE, REINFORCING STEEL SHALL CONFORM TO
AASHTO M31 (ASTM A615) SECTION IN CONCRETE
5. NOT MORE THAN 50% BARS AT ANY ONE SECTION SHALL BE SPLICED, UNLESS BUNDLED BARS
Ø <= 16mm GRADE 40 (fy = 276MPa) , DEFORMED SPECIFICALLY INDICATED.
Ø > 16mm GRADE 60 (fy = 414MPa) , DEFORMED SECTION IN EXISTING
CONCRETE STRUCTURE Ø ROUND
b. REINFORCING STEEL SHALL BE FREE OF EXCESSIVE RUST, OIL OR ANY c. CONCRETE COVER REINFORCEMENT
SUBSTANCES WHICH WILL WEAKEN THE BOND WITH CONCRETE. CONCRETE COVER TO REINFORCEMENT SHALL BE 50mm UNLESS SHOWN SQUARE
ELASTOMERIC BEARING PAD
OTHERWISE IN THE DRAWINGS.
3. STRUCTURAL STEEL BITUMINOUS WEARING @ AT
d. CONSTRUCTION JOINT SURFACE ON BRIDGES
a. UNLESS INDICATED OTHERWISE, STRUCTURAL STEEL SHALL CONFORM TO & AND
1. THE POSITION AND FORM OF ANY CONSTRUCTION JOINT SHALL BE AS SHOWN
AASHTO M31 (ASTM A615) IN THE DRAWINGS OR AS AGREED WITH THE ENGINEER.
- STEEL PLATES AND SECTIONS USE A36 PLAN VIEW AND ELEVATION CL CENTERLINE
OF CUT AND FILL SLOPES
- CONNECTION BOLTS USE A325 2. THE INTERFACE BETWEEN FIRST AND SECOND POUR CONCRETE AND PL PLATE
BETWEEN EXISTING AND NEW CONCRETE SHALL BE ROUGHENED WITH AN PLAN VIEW OF SLOPE
4. DRILL AND BOND DOWELS AMPLITUDE OF 6mm WITH EPOXY ADHESIVE FOR GREAT BONDING. PROTECTION L ANGLE SHAPE
THIS REFERS TO THE USE OF NET EPOXY MADE UP OF RESIN AND HARDENER
e. CHIPPING OF CONCRETE PLAN VIEW OF GROUTED C/C, C to C CENTER TO CENTER
WITHOUT THE ADDITION OF SAND.
REFER TO SPECIAL PROVISION. RIPRAP ON SLOPE
5. OTHERS f. FALSEWORK BENCHMARK BOREHOLE LOCATION
OTHER MATERIALS SHALL CONFORM TO THE BRIDGES REPAIR MANUAL 2008, AND ALL FALSEWORK SHALL BE DESIGNED BY THE CONTRACTOR SUBJECT TO THE
THE DPWH STANDARD SPECIFICATION FOR HIGHWAYS, BRIDGES AND AIRPORTS, VOLUME II APPROVAL BY THE ENGINEER. CONSTRUCTION JOINT
2013 EDITION.
4.1 TACK COAT g. FORMWORK
4.2 BITUMINOUS CONCRETE SURFACE COURSE FORMWORKS SHALL BE CONSTRUCTED SUCH THAT IT WILL NOT YIELD UNDER THE
LOAD AND SHALL BE SUCH AS TO AVOID THE FORMATION OF FINS. ALL CORNERS OF
4.3 EPOXY MATERIALS
4.4 ASPHALTIC PLUG JOINT
CONCRETE SHALL BE CHAMFERED TO 20mm UNLESS NOTED OTHERWISE IN
DRAWINGS. STRIPPING OF FORMS AND SHORES SHALL BE AS DESIGNATED BY THE ABBREVIATIONS
4.5 EXPANSION JOINT (FINGER TYPE) ENGINEER. THE FOLLOWING MAY BE USED AS A GUIDE ABT ABOUT EL/ELEV ELEVATION
4.6 ELASTOMERIC BEARING PADS ABUT ABUTMENT FTG FOOTING
BEG BEGINNING kPa KILOPASCAL
SHORING UNDER GIRDERS, BEAMS, FRAMES ----------------------- 14 DAYS
BET BETWEEN m METER
DECK SLAB ----------------------- 14 DAYS
BOTT BOTTOM mm MILLIMETER
CONSTRUCTION/REPAIR WALLS ----------------------- 2 DAYS
BR BRIDGE MAX MAXIMUM
COLUMNS ----------------------- 2 DAYS
BRG BEARING M.F.W.L MAX. FLOOD WATER LEVEL
SIDE OF BEAMS AND ALL OTHER VERTICAL ----------------------- 2 DAYS MIN MINIMUM
C
L CENTERLINE
2. CONSTRUCTION/REPAIR SPECIFICATIONS CLR CLEAR MO MIDDLE ORDINATE
ALL CONSTRUCTION REPAIR SHALL CONFORM TO: 8. EXTENSION OF BEARING SEAT AND ADDITION OF BEARINGS MPa MEGAPASCAL
cm CENTIMETER
EXTENSION OF BEARING SEATS SHALL BE PROVIDED AT THE COPING OF EACH N NEWTON
A. CONDITION OF CONTRACT COL COLUMN
ABUTMENTS AND PIERS NEAR THE LOCATION OF THE ADDITIONAL BEARING. NF NEAR FACE
B. THE SPECIAL PROVISION CONC CONCRETE
CONST CONSTRUCTION No. NUMBER
C. THE DPWH STANDARD SPECIFICATION FOR HIGHWAYS, BRIDGES AND O.C. ON CENTERS
CONT CONTINUOUS
AIRPORTS, VOLUME II 2013 EDITION OWL ORDINARY WATER LEVEL
CTR CENTER
D. BRIDGE REPAIR MANUAL 2014 (DPWH-JICA TCP) DET DETAIL PEJ PREMOULDED EXPANSION JOINT
D.F.L DESIGN FLOOD LEVEL PVC POLYVINYL CHLORIDE
3. SETTING OUT DIAM DIAMETER PVI POINT OF VERTICAL INTERSECTION
DIAPH DIAPHRAGM QTY QUANTITY
THE SETTING OUT AND THE ELEVATION OF THE DIFFERENT COMPONENTS OF THE
DWG DRAWING R RADIUS
STRUCTURE SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE START OF EA EACH RC REINFORCED CONCRETE
CONSTRUCTION WORKS. EF EACH FACE RDWY ROADWAY
TYP. TYPICAL
4. CONSTRUCTION LIMITS VER. VERIFY
THE CONTRACTOR SHALL VERIFY AND WORK WITHIN THE CONSTRUCTION LIMITS
OR EASEMENT OF THE BRIDGE STRUCTURE. HE SHALL HOWEVER PROVIDE FOR
AREAS HE MAY REQUIRE FOR HIS OWN USE. IT IS THE INTENT OF THE PLANS TO NOTE:
LEAVE UNDISTURBED EVERYTHING WHICH DOES NOT ADVERSELY AFFECT THE BEFORE THE START OF ACTUAL CONSTRUCTION, THE AS-STAKED PLAN SHALL BE SUBMITTED TO
THE REGIONAL OFFICE IN ORDER THAT IMMEDIATE STEPS MAY BE UNDERTAKEN TO CORRECT/ ADJUST
FINISHED WORK. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED WHATEVER APPRECIABLE DEVIATION THERE MAY BE FROM THE ORIGINAL PLAN. THE REFERENCE FOR
TO ITS ORIGINAL CONDITION AS DIRECTED BY THE ENGINEER. IMPLEMENTATION SHALL BE THE AS-STAKED PLAN.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I GENERAL NOTES LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 3
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
A B
CL OF ABUTMENT
12000

BEG. OF BRIDGE BEG. OF BRIDGE


BACK OF BACKWALL BACK OF BACKWALL
K0 510 + 744.00 K0 510 + 756.80

TO MANILA TO PAGUDPUD
15700

1 GENERAL ELEVATION
S-03 SCALE 1:125 MTS

A B SCOPE OF WORK:
1 EPOXY INJECTION ON CRACKS ON DECKSLAB
CL OF ABUTMENT CL OF ABUTMENT *NOTE: ACTUAL LOCATION TO BE VERIFIED BY THE PROJECT ENGINEER
12000 2 PATCHING OF DAMAGED CONCRETE ON DECKSLAB
*NOTE: ACTUAL LOCATION TO BE VERIFIED BY THE PROJECT ENGINEER

3 CARBON FIBER, PLATE


TO MANILA TO PAGUDPUD
4 CARBON FIBER SHEET, 1-LAYER

5 CARBON FIBER SHEET, 2-LAYERS


5
6 PROTECTIVE COATING

3
7 ASPHALTIC PLUG JOINT
4

2 GENERAL ELEVATION
S-03 SCALE 1:125 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1 GENERAL PLAN
REGIONAL OFFICE I LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 4
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD GENERAL ELEVATION ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
A B A B
12000 12000
CL OF ABUTMENT CL OF ABUTMENT CL OF ABUTMENT CL OF ABUTMENT

BEG. OF BRIDGE BEG. OF BRIDGE BEG. OF BRIDGE BEG. OF BRIDGE


BACK OF BACKWALL BACK OF BACKWALL BACK OF BACKWALL BACK OF BACKWALL
K0 510 + 744.00 K0 510 + 756.80 K0 510 + 744.00 K0 510 + 756.80

TO MANILA TO PAGUDPUD
15700

15700
7 7

2 2

4 4

5 5

1 BRIDGE UNDERDECK VIEW (CFS ON DECKSLAB) 2 BRIDGE UNDERDECK VIEW (CFS & CFP ON GIRDER)
S-04 SCALE 1 : 125 Mts. S-04 SCALE 1:125 MTS

SCOPE OF WORK:
1 EPOXY INJECTION ON CRACKS ON DECKSLAB
*NOTE: ACTUAL LOCATION TO BE VERIFIED BY THE PROJECT ENGINEER

2 PATCHING OF DAMAGED CONCRETE ON DECKSLAB


*NOTE: ACTUAL LOCATION TO BE VERIFIED BY THE PROJECT ENGINEER
1:125 MTS
3 CARBON FIBER, PLATE

4 CARBON FIBER SHEET, 1-LAYER

5 CARBON FIBER SHEET, 2-LAYERS

6 PROTECTIVE COATING

7 ASPHALTIC PLUG JOINT

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I BRIDGE UNDERDECK VIEW LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 5
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
CL

1150 15700 1150


F1
500 300

400
F3

300
F2
1000

1000

1000

1000

1000

1000

1000

1000
SECTION
SCALE 1:40 MTS
300

F1

400 400 400 400 400 400 400 400

CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER,
SHEET, 2-LAYERS SHEET, 1-LAYER SHEET, 1-LAYER SHEET, 1-LAYER SHEET, 1-LAYER SHEET, 1-LAYER SHEET, 1-LAYER SHEET, 2-LAYERS F3
(DECKSLAB) (DECKSLAB) (DECKSLAB) (DECKSLAB) (DECKSLAB) (DECKSLAB)

700
(GIRDER) (GIRDER)
CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER,
SHEET, 2-LAYERS SHEET, 2-LAYERS SHEET, 2-LAYERS SHEET, 2-LAYERS SHEET, 2-LAYERS SHEET, 2-LAYERS
(GIRDER) (GIRDER) (GIRDER) (GIRDER) (GIRDER) (GIRDER)

CROSS SECTION AT L/4 SECTION PLAN


SCALE 1:40 MTS

1a TYPICAL CROSS SECTION


S-06 SCALE 1 : 50 Mts. 2 CORBEL DETAILS
S-06 SCALE AS SHOWN

CL REINFORCEMENT SCHEDULE AND ESTIMATED QUANTITIES FOR ONE CORBEL


REINFORCEMENT CONCRETE
LENGTH TOTAL UNIT TOTAL WEIGHT, kg.
BAR BAR DIMENSIONS (mm) VOLUME
1150 15700 1150 STRUCTURE
BAR
MARK
BAR SIZE
(mm)
QTY SPACING
(mm) SHAPE a b c e
EACH BAR LENGTH WEIGHT
(m3)
d f (mm) (m) (kg/m) GRADE 40 GRADE 60

F1 25 3 AS SHOWN B 250 800 - - - - 1050 3.150 3.853 -- 12

CORBEL F2 25 3 AS SHOWN A 250 990 - - - - 1240 3.720 3.853 -- 14 0.1925

F3 12 8 50 C 600 460 150 - - - 2420 19.360 0.888 17 --

BENDING DIAGRAM
a c
b b
a
b
a

A B C

NOTES:
1000

1000

1000

1000

1000

1000

1000

1000
1. CHIP OFF THE CONCRETE OF EXISTING COPING TO ROUGHEN
SURFACE.

2. DRILL HOLES CAREFULLY IN ORDER TO AVOID DAMAGING


CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER, CARBON FIBER,
EXISTING COPING REINFORCEMENTS.
PLATE, 50mm WIDTH PLATE, 50mm WIDTH PLATE, 50mm WIDTH CARBON FIBER, PLATE, 50mm WIDTH PLATE, 50mm WIDTH PLATE, 50mm WIDTH PLATE, 50mm WIDTH
PLATE, 50mm WIDTH 3. DRILLED HOLE SHALL BE FILLED WITH EPOXY ADHESIVE BEFORE
1b
400 400 400 400 400 400 400 400 COMPLETELY PLACING REQUIRED ANCHOR BARS.
S-06
4. APPLY BONDING AGENT ON THE CHIPPED SURFACE TO RECEIVE
NEW CONCRETE.
PROTECTIVE COATING PROTECTIVE COATING PROTECTIVE COATING PROTECTIVE COATING PROTECTIVE COATING PROTECTIVE COATING

CROSS SECTION AT L/2 SECTION


SCALE 1:40 MTS

1b TYPICAL CROSS SECTION


S-06 SCALE 1 : 50 Mts.

L/4 L/2 L/4

CARBON FIBER, PLATE (50mm WIDTH x L/4)


EPOXY ADHESIVE
CFS WRAPPED AROUND THE
EPOXY PRIMER
PERIMETER OF THE GIRDER

CARBON FIBER, CARBON FIBER, CARBON FIBER,


SHEET, 2-LAYERS PLATE, 50mm WIDTH SHEET, 2-LAYERS

2 TYPICAL GIRDER PLAN (SHOWING CFP)


S-08 SCALE 1:100 MTS
3a DETAIL SHOWING CFS 3b DETAIL SHOWING CFP
S-06 SCALE 1:10 MTS S-08 SCALE 1:10 MTS

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1 TYPICAL CROSS SECTION
REGIONAL OFFICE I TYPICAL GIRDER PLAN LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 6
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
CORBEL DETAILS ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
PATCHING
DESCRIPTION OF REPAIR METHOD
SPECIFICATIONS
PATCH REPAIR IS PERFORMED TO RESTORE SMALL AREAS WHERE CONCRETE IS DAMAGED BY SPALLING, SCALING, AND IMPACT. THIS
METHOD OF REPAIR IS GENERALLY APPLIED USING TROWEL AND REQUIRE NONE OR MINIMUM FORMWORKS. THE PATCH THICKNESS IS
PORTLAND CEMENT MORTAR SHALL CONFORM TO THE REQUIREMENTS OF ITEM 405, STRUCTURAL CONCRETE, DPWH STANDARD W
LIMITED TO A MAXIMUM OF 100mm DEPTH OF HOLLOW SURFACE.
SPECIFICATIONS. STRENGTH TEST FOR PORTLAND CEMENT MORTAR SHALL BE BASED ON ASTM C.
TYPE A PATCHING IS FOR USED FOR DEFECTS WITHOUT EXPOSED REBAR WHILE TYPE B PATCHING IS APPLIED TO SURFACES WITH
THE POLYMER CEMENT MORTAR SHALL CONFORM TO THE REQUIREMENTS TO THE SPECIFICATIONS AS FOLLOWS:
EXPOSED REBAR.
PATCH REPAIRS MAY BE COMPOSED OF PORTLAND CEMENT MORTARS OR NON-SHRINKAGE CEMENT MORTAR, DEPENDING ON THE PROPERTY TEST METHOD UNIT SPECIFICATION

W
TYPE OF PATCHING, LOCATION, AND EXTENT OF DAMAGE.
COMPRESSIVE STRENGTH JHS 416 / ASTM C39 N/mm² AT 28 DAYS: ≥ 25

CONSTRUCTION REQUIREMENT BONDING STRENGTH TO CONCRETE JHS 416 / ASTM D7234 N/mm² ≥ 1.5 DAMAGED AREA

BLEEDING RATE JHS 416 / ASTM C39 IN % 0


1. REMOVAL OF DAMAGED CONCRETE
OLD CONCRETE WITHIN MARKET OUT AREAS SHALL BE REMOVED USING LIGHT MECHANICAL BREAKERS OR HAMMER AND CHISEL. CUT
THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
THE EXPOSED REINFORCEMENT AND DETERMINE SOUNDNESS CONCRETE SUBSTRATE TO THE SATISFACTION OF THE ENGINEER, WITHOUT
BREAKING THE CONCRETE BEHIND THE REINFORCEMENT. CUTTING LINE
THE EPOXY BONDING PRIMER TO CONCRETE SHALL CONFORM TO THE SPECIFICATIONS AS FOLLOWS:

2. PREPARATION OF CONCRETE SURFACE PROPERTY TEST METHOD UNIT SPECIFICATION


ALL CONCRETE SURFACES THAT ARE TO RECEIVE REPAIR MORTAR SHALL BE PREPARED BY MECHANICAL SCRUBBING TO REMOVE
COMPRESSIVE STRENGTH JIS K 7208 / ASTM D695M N/mm² 75 SECTION LOSS
LOOSE MATERIALS, SURFACE LAITANCE, ORGANIC CONTAMINANTS AND MOSS, AND THEN COATED WITH BONDING PRIMER. CARE SHALL BE
TAKEN TO ENSURE THAT VIBRATION FROM THE METHOD OR PREPARATIONS DOES NOT CAUSE DELAMINATION OF ADJACENT MATERIALS OR FLEXURAL STRENGTH JIS K 6911 / ASTM D790M N/mm² 40
CONCRETE.
TENSILE STRENGTH JIS K 7113 / ASTM D638M N/mm² 30

3. ADDITIONAL CONCRETE BREAKOUT TENSILE SHEAR BOND TO STEEL JIS K 6850 / ASTM D1002 N/mm² 10

H
WHERE THE BREAKOUT INDICATES THAT THE EXPOSED REINFORCEMENT IS FURTHER CORRODED OR THE SURROUNDING CONCRETE
SLANT SHEAR BOND TO MORTAR JIS K 6852 / ASTM C882 N/mm² 15
IS NOT SOUND, THE CONTRACTOR SHALL BE INFORMED AND AN ENLARGED AREA IS AGREED TO THE SATISFACTION OF THE ENGINEER.
30D DAMAGED LENGTH 30D
THE CONTRACTOR SHALL TEST THE CONCRETE FOR DEPTH OF CARBONATION AT THE REINFORCEMENT DEPTH AT HIS OWN EXPENSE.
THE DEPTH OF BREAKOUT IN CLEARLY DEFINED AREAS CAN BE INCREASED BASED ON WRITTEN INSTRUCTIONS FROM THE ENGINEER, IN THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
ORDER TO REMOVE ALL CARBONATED CONCRETE. THE ADDITIONAL CONCRETE BREAKOUT SHALL NOT EXTEND TO MORE THAN 20mm BEHING
THE BOTTOM LAYER MAIN REINFORCEMENT. DURING BREAKOUT, CARE SHALL BE TAKEN TO MINIMIZE DAMAGE TO EXISTING REINFORCEMENT. THE ZINC-RICH PRIMER TO BE APPLIED TO REBAR SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AS FOLLOWS: H SHOULD BE ATLEAST 20mm
D MEANS DIAMETER OF THE BAR

WORK SEQUENCE PROPERTY TEST METHOD UNIT SPECIFICATION

GLOSS @ 60° ANGLE ASTM D 523 - Flat


1. REMOVAL OF DEFECTIVE CONCRETE ADHESION ASTM D 3359 - Minimum 3 A W
REMOVE ALL DEFECTIVE, UNSOUND AND CONTAMINATED CONCRETE AND PREPARE THE EDGES FOR THE PATCH AREA. IF LOCAL SALT SPRAY RESISTANCE ASTM D 117 - Excellent
CORROSION IN REINFORCEMENT WITH SECTION LOSS IS FOUND, WHICH WOULD REQUIRE ADDITIONAL BARS, REMOVE ONLY THE DAMAGED %ZINC BY WEIGHT IN DRIED

H
- IN % 87.5 ± 2
AREA OF CONCRETE INCLUDING THE LENGTH NEEDED TO BIND THE NEW REINFORCEMENT. FILM TEST
THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
2. CLEANING OF CONCRETE AND REBAR
REMOVE LOOSE PARTICLES AND DUST USING HIGH PRESSURE WATER OR VACUUM CLEANER. CONCRETE SURFACES TO BE
BONDED MUST BE FREE FROM DIRT, OIL, GREASE, ASPHALT. CORROSION MUST BE REMOVED BEFORE PLACING THE NEW CONCRETE. IF W & H SHOULD BE ATLEAST 20mm
DETERIORATION IS DUE TO CHLORIDE CONTAMINATION OR IF THE REINFORCEMENT IS COVERED WITH LOOSE CORROSIVE ELEMENTS AND CUTTING LINE
HAS DEVELOPED PITS, USE WATER ABRASIVE BLASTING UNTIL ALL THE RUST ARE REMOVED.

3. APPLYING BONDING COATS TO CONCRETE AND REBAR


EPOXY BONDING COATS ARE APPLIED TO DRY AND CLEAN CONCRETE SURFACES TO BOND FIRMLY. SPECIALLY FORMULATED RESINS
1 PATCHING DETAILS
ARE ALSO AVAILABLE FOR DAMP SURFACES. APPLY THE SELECTED BONDING COAT TO STEL BARS WITH A BRUSH WORKING VIGOROUSLY TO S-7 SCALE NOT TO SCALE
ENSURE THAT THEY ARE EVENLY COVERED ALL AROUND.

4. PLACING OF MORTAR
THE MORTAR SHOULD BE PLACED IN LAYERS OF ABOUT 20mm THICK. COMPACT EACH LAYER THOROUGHLY OVER THE ENTIRE
SURFACE USING A WOODEN TROWEL OR HAMMER. GENERALLY, THERE SHOULD BE BO TIME DELAYS BETWEEN THE PLACING AND
COMPACTING OF LAYERS.

5. CURING
ALL TYPES OF CEMENT REPAIRS NEED THOROUGH AND CONTINUOUS CURING TO DEVELOP THE DESIRABLE STRENGTH AND
IMPERMEABILITY, AND TO MINIMIZE DRYING SHRINKAGE WHILE BOND STRENGTH IS DEVELOPING.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PATCHING DETAILS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I
GENERAL NOTES AND SPECIFICATIONS LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 7
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
FOR PATCHING ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
EPOXY INJECTION
DESCRIPTION OF REPAIR METHOD 3. SEALING OF CRACKS AT THE SURFACE
USING A 5cm WIDTH STRAP, EPOXY SEALANT IS APPLIED ON THE AREA AROUND THE PIPE FITTING AND CRACKS, ALLOWING IT TO HARDEN.
THIS METHOD INVOLVES CRACK REPAIRS TO CONCRETE STRUCTURES, PARTICULARLY TO DECK SLAB. THE WORKS INCLUDE PREPARATION
4. FITTING OF INJECTOR
OF CONCRETE SURFACE, INSERTION OF PIPE FITTINGS BONDED WITH ADHESIVE, INJECTION OF EPOXY, CURING, AND CONDUCTING PERFORMANCE
CONNECT THE TERMINAL OF THE INJECTOR TO THE PIPE FITTINGS.
TEST.
EPOXY INJECTION FOR CONCRETE CRACKS REQUIRES HIGHLY SKILLED PROCESS AND ITS EFFECTIVENESS DEPENDS MOSTLY ON THE
5. INJECTION OF EPOXY
PROFICIENCY OF THE CERTIFIED APPLICATOR. SAID PERSON SHOULD BE QUALIFIED BASED ON HIS PREVIOUS WORK RECORDS, AND APPROVED BY
EPOXY SHALL BE INJECTED USING AIR-ACTIVATED EPOXY INJECTION GUNS. INJECTION IS PERFORMED ON THE PIPE FITTING. DURATION OF
THE ENGINEER.
THE INJECTION OPERATION SHALL BE IN ACCORDANCE WITH THE SUPPLIER'S INSTRUCTION.
MATERIALS AND INJECTION TOOLS DEVELOPED BY THE SUPPLIER OR MANUFACTURER SHALL BE IN CONFORMITY WITH JIS, ASTM
IF THE CRACK IS VERTICAL, COMMENCE THE INJECTION OF EPOXY AT THE LOWEST PIPE FITTING, UNTIL THE EPOXY EXUDES FROM THE PIPE
STANDARDS OR EQUIVALENT.
FITTING ABOVE. FOR HORIZONTAL CRACKS, EPOXY INJECTION IS CARRIED OUT FROM ONE END OF THE CRACK.
CRACK
CONSTRUCTION REQUIREMENT 6. CURING ON INJECTED MATERIAL
AFTER THE CRACK HAS BEEN SEALED, REMOVE THE PROJECTING PIPE FITTINGS AND FILL HOLES WITH AN EPOXY PATCHING COMPOUND.
1. CONCRETE PREPARATION SURFACE COATING WILL BE APPLIED, WHEN REQUIRED IN THE PROCESS.
THE INTENTION OF THIS WORK IS TO FILL AND SEAL THESE CRACKS, PARTICULARLY THOSE FOUND ON CONCRETE BRIDGES. THE EXTENT OF
THE CRACKS SHALL BE INDICATED BY THE CONTRACTOR AND SHOWN ON THE DRAWINGS, AS STATED IN THE BRIDGE INSPECTION MANUAL OF BMS. SPECIFICATIONS INJECTION PIPE SEALANT
THE DETAIL OF QUANTITIES SHALL BE MARKED OUT ON THE CONCRETE ELEMENTS, AND CONFIRMED BY THE DESIGNATED ENGINEER PRIOR TO
CRACKS WITH MORE THAN 0.30mm UP TO 3.0mm WIDTHS
EPOXY APPLICATION. THE ENGINEER MAY ADJUST THE EXTENT OF THE WORK AS THE PROJECT PROCEEDS, BASED ON ACTUAL CONDITIONS.
1. TYPE-A (EPOXY INJECTION)
THE EPOXY INJECTION MATERIAL SHALL BE COMPATIBLE WITH THE HOST CONCRETE AND SHALL HAVE THE PROPERTIES AS FOLLOWS:
2. PIPE FITTING ADHESION
THE PIPE FITTINGS SHALL BE FIXED AT INTERVALS ALONG THE LENGTH OF EACH CRACK. THE DISTANCE BETWEEN EACH FITTING SHALL BE PROPERTY TEST METHOD UNIT SPECIFICATION
1 EPOXY INJECTION DETAILS
AS SHOWN ON THE DRAWINGS, CONSIDERING THE WIDTH AND DEPTH OF CRACK. FOR APPROVAL OF THE ENGINEER. THE SURFACE SEALANT SHALL VISCOSITY JIS K 6833 / ASTM D2393 mPa-s ≤ 1000
BE MOISTURE TOLERANT PUTTY WITH GOOD ADHESION TO CONCRETE. S-8 SCALE NOT TO SCALE
POTLIFE - minute 60
SPECIFIC GRAVITY JIS K 7112 / ASTM D792 - 1.15 ± 0.10
3. EPOXY INJECTION
COMPRESSIVE STRENGTH JIS K 7208 / ASTM D695 N/mm² ≥ 50
EACH CRACK SHALL BE TREATED IN A SINGLE, CONTINUOUS OPERATION. SUFFICIENT MATERIALS SHALL THEREFORE BE READILY AVAILABLE
FLEXURAL STRENGTH JIS K 7203 / ASTM D790M N/mm² ≥ 40
PRIOR TO THE COMMENCEMENT OF WORK. THE PREPARATION, MIXING, AND APPLICATION OF THE MATERIALS SHALL BE UNDERTAKEN IN STRICT
COMPLIANCE WITH THE MANUFACTURER'S RECOMMENDATION, APPROVED BY THE ENGINEER. BEFORE THE WORKS COMMENCE, THE CONTRACTOR TENSILE SHEAR BOND JIS K6850 / ASTM D1002 N/mm² ≥ 10

SHOULD ENSURE THAT ALL NECESSARY TOOLS AND EQUIPMENT ARE ON SITE. SLANT SHEAR BOND STRENGTH TO CONCRETE JIS K 6852 / ASTM C882 N/mm² 15 / ABOVE
BOND STRENGTH TO CONCRETE DRY/WET JIS K 5400 / ASTM D7234 N/mm² ≥ 1.5 CF
4. CURING
THE EPOXY SYSTEM SHALL BE ALLOWED TO CURE UNDISTURBED FOR TWENTY FOUR (24) HOURS. THE PIPE FITTINGS AND BANDS OF *CF - CONCRETE FAILURE
SURFACE SEALANT SHALL THEN BE REMOVED . ANY DAMAGED AREAS SHALL BE MADE GOOD TO THE SATISFACTION OF THE ENGINEER. THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.

2. SEALANT
5. PERFORMANCE TEST
THE EPOXY-BASED SEALANT MATERIAL SHALL BE COMPATIBLE WITH THE INJECTION MATERIAL AND SHALL HAVE THE PROPERTIES AS FOLLOWS:
LOW FREQUENCY PULSE VELOCITY ULTRASONIC INSPECTION WILL BE DETERMINED IF THE EPOXY RESIN HAS PENETRATED TO THE FULL
DEPTH OF THE CRACK. IF INCOMPLETE PENETRATION IS REVEALED BY INSPECTION, SUCH CONDITIONS SHALL BE REWORKED AT THE
CONTRACTOR'S EXPENSE. PROPERTY TEST METHOD UNIT SPECIFICATION

SPECIFIC GRAVITY JIS K 7112 / ASTM D792 - 1.15 ± 0.30


COMPRESSIVE STRENGTH JIS K 7208 / ASTM D695 N/mm² ≥ 50
WORK SEQUENCE FLEXURAL STRENGTH JIS K 7203 / ASTM D790M N/mm² ≥ 15
TENSILE SHEAR BOND STRENGTH JIS K6850 / ASTM D1002 N/mm² ≥ 10
1. CLEANING OF CRACKS
BOND STRENGTH TO CONCRETE DRY/WET JIS K 5400 / ASTM D7234 N/mm² ≥ 1.5 CF
ALL LOOSE DEBRIS SUCH AS DIRT, CONCRETE FINE PARTICLES AND CONTAMINANTS (OIL, GREASE, ETC.) SHOULD BE REMOVED FROM THE
*CF - CONCRETE FAILURE
CRACKS USING HIGH-PRESSURE WATER, OR SPECIAL AND EFFECTIVE SOLVENT. REMOVE THE RESIDUAL WATER, OR SPECIAL AND EFFECTIVE THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
SOLVENT. REMOVE THE RESIDUAL WATER OR SOLVENT IN THE CRACK WITH FILTERED (DUST AND OIL FREE) COMPRESSED AIR AND ALLOW
ADEQUATE TIME FOR DRYING.

2. BONDING OF FITTING PIPE


PIPE FITTINGS ARE BONDED WITH THE ADHESIVE TO THE CRACK CENTER FOR INJECTING EPOXY. SPACING OF THE PIPES VARIES BETWEEN
150mm TO 500mm, DEPENDING ON THE WIDTH AND DEPTH OF THE CRACKS. THE FIRST AND LAST PIPE FITTING ARE SET AT OR NEAR THE BOTTOM
AND TOP, RESPECTIVELY.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS EPOXY INJECTION DETAILS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I
GENERAL NOTES AND SPECIFICATIONS LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 8
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
FOR EPOXY INJECTION ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
CARBON FIBER SHEET / PLATE BONDING TO GIRDER
DESCRIPTION OF REPAIR METHOD THE REPAIR WORKS. A MINIMUM OF TWO PULL-OFF TESTS PER SYSTEM (SPAN) SHALL BE PERFORMED. THE TEST SPECIFICATIONS
SHALL BE COMPLETED PRIOR TO THE APPLICATION OF THE PROTECTIVE TOP COAT ON THE CFS AND CFP.
CARBON FIBER SHEET/PLATE FOR REINFORCED CONCRETE REPAIRS AND STRENGTHENING SYSTEMS CONSISTS OF A COMBINATION
THE CFS SHALL CONFORM TO THE REQUIREMENTS OF THE SPECIFICATIONS AS SHOWN:
OF CARBON FIBER REINFORCING MATERIAL AND ADHESIVE RESIN SUCH AS EPOXIES AND OTHER MATERIALS. THIS COMPOSITE PRODUCT
PROPERTY TEST METHOD UNIT SPECIFICATION
IS INTENDED TO ENHANCE THE CAPACITY OF THE CONCRETE STRUCTURE. THE ROLE OF THE RESIN IS TO SERVE AS AN ADHESIVE BOND
ONTO THE CONCRETE SURFACE AND FACILITATE THE TRANSFER OF STRESSES TO AND FROM THE CARBON FIBER SHEET.
WORK SEQUENCE CARBON FIBER WEIGHT JIS K 7071 g/m² 200
FOR CFS: TENSILE STRENGTH JIS K 7073 / ASTM D3039 N/mm² ≥ 3400
1. PREPARATION OF CONCRETE
CONSTRUCTION REQUIREMENT OVERLAP TENSILE STRENGTH JIS K 7073 / ASTM D3039 N/mm² ≥ 3400
DISC GRINDER OR ABRASIVE SANDBLASTING IS USED TO CLEAN AND SMOOTHEN THE CONCRETE SURFACE. TENSILE BOND TO CONCRETE
JIS K 5400 / ASTM D7234 N/mm² ≥ 1.50 CF
(DRY/WET)
1. SURFACE PREPARATION
ALL CONCRETE SURFACES SHALL BE CLEAN, SOUND AND FREE FROM SURFACE MOISTURE. CRACK SEALING OR WATER PROOFING *CF - CONCRETE FAILURE
2. APPLICATION OF PRIMER THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
SHALL BE PROVIDED PRIOR TO CONCRETE SURFACE RESTORATION. IF WATER LEAKS THROUGH CRACKS ON CONCRETE SURFACE TO BE
THE SURFACE IS COATED WITH A PRIMER RESIN TO INCREASE THE STRENGTH OF CONCRETE SURFACE AND
COVERED WITH CFS, SURFACE PREPARATION AND APPLICATION OF THE CFS SHALL BE IN ACCORDANCE WITH THE APPROVED
IMPROVE ITS BONDING WITH CFS. THE CFP SHALL CONFORM TO THE SPECIFICATIONS AS FOLLOWS:
MANUFACTURER'S SPECIFICATIONS. BOTH THE CONTRACTOR AND MANUFACTURER'S TECHNICAL REPRESENTATIVE MUST VERIFY
SUITABILITY OF ANY CHANGES TO THE APPLICATION METHODS PROPOSED BY THE ENGINEER. CRACKS LARGER THAN 0.30mm SHALL BE PROPERTY TEST METHOD UNIT SPECIFICATION
3. ADJUSTMENT OF UNEVENNESS WITH PUTTY
INJECTED WITH EPOXY USING A SYSTEM/METHOD APPROVED BY THE ENGINEER. g/m²
ANY CONCAVE, PORES, GAPS ON THE CONCRETE SURFACE MUST BE SMOOTHED USING EPOXY PUTTY. CARBON FIBER PLATE WEIGHT JIS R 7603 1200

TENSILE STRENGTH JIS K 7073 / ASTM D3039 N/mm² ≥ 2400


2. MATERIAL HANDLING
4.APPLICATION OF EPOXY RESIN FOR UNDERCOAT BOND STRENGTH TO CONCRETE JIS K 5400 / ASTM D7234 N/mm² ≥ 1.50 CF
THE CARBON FIBER COMPONENTS SHALL BE DELIVERED IN AN ORIGINAL, UNOPENED (EXCEPT CARBON FABRIC OR STRIPS)
USING ROLLER, EPOXY RESIN IS APPLIED TO THE CONCRETE AS ADHESIVE TO BOND WITH THE CFS. IT
CONTAINERS CLEARLY MARKED WITH THE MANUFACTURER'S NAME, PRODUCT IDENTIFICATION, AND BATCH NUMBERS. STORAGE AND
FORMS A MOLDED COMPOSITE BY PERMEATING INTO THE CFS. THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
HANDLING OF THE VARIOUS RELATED PRODUCTS SHALL BE IN CONFORMANCE WITH MANUFACTURER'S RECOMMENDATIONS AND
INSTRUCTIONS. THE EPOXY ADHESIVE FOR BONDING CFS SHALL CONFORM TO THE SPECIFICATIONS AS SHOWN:
5. INSTALLATION OF CFS (FIRST LAYER)
PROPERLY ALIGNED CFS STRIPS ARE INSTALLED TO THE RESIN COATED CONCRETE SURFACE TO PROPERTY TEST METHOD UNIT PRIMER EPOXY PUTTY PRIMER
3. PRIME COAT
STRENGTHEN THE SECTION. VISCOSITY JIS K 6833 / ASTM D2393 mPa-s ≤ 1000 PASTE-LIKE 15,000±5000
CONTACT SURFACE SHALL BE DRY BEFORE COATING WITH PRIMER. THE PRIMER SHOULD BE FORMULATED AND COMPATIBLE TO
PRESS THE CARBON FIBER SHEET BY USING DEFORMED ROLLER STARTING FROM THE CENTER TOWARD
THE CARBON FIBER MATERIAL AND SHOULD NOT BE APPLIED WHEN RAINING, STORMING, OR AIR IS MISTY OR WHEN CONDITION REMAINS TENSILE STRENGTH JIS K 7113 / ASTM D638M N/mm² ≥ 15 - ≥ 30
THE EDGE.
UNSATISFACTORY IN THE OPINION OF THE ENGINEER. FLEXURAL STRENGTH JIS K 7203 / ASTM D790M N/mm² ≥ 20 ≥ 15 ≥ 40
APPLICATION RATE SHALL BE SUCH AS TO ENSURE COMPLETE SATURATION OF THE CONTACT SURFACE. PRIMER SHOULD BE COMPRESSIVE STRENGTH JIS K 7208 / ASTM D695M N/mm² ≥ 20 ≥ 40 ≥ 50
6. SQUEEZING OUT OF ENTRAPPED AIR
CURED BETWEEN 2-3 HOURS BEFORE PROCEEDING TO THE NEXT STEP.
FOR COMPLETE FUSION, ENTRAPPED AIR IS SQUEEZED OUT OF THE SHEETS USING ROLLER, BEFORE THE MODULUS OF ELASTICITY JIS K 7208 / ASTM D695M N/mm² ≥ 1500 ≥ 1500 ≥ 1500
ADHESIVE SETS. SLANT SHEAR BOND TO CONCRETE ASTM C882 N/mm² ≥ 15 ≥ 15 ≥ 15
4. PUTTY APPLICATION
THIS WORK INVOLVES APPLICATION OF EPOXY PUTTY ONTO THE PRIMER COATED CONCRETE SURFACE, USING TROWEL OR ADHESIVE STRENGTH (DRY/WET) JIS K 5400 / ASTM D7234 N/mm² ≥ 1.5 ≥ 1.5 ≥ 1.5
7. OVER COATING RESIN APPLICATION
SPATULA, TO SMOOTHEN THE SURFACE. THE PUTTY IS APPLIED WHEN THE PRIMER IS ALREADY TACK-FREE. THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
EPOXY RESIN IS ROLLER-APPLIED TO THE 1ST LAYER OF CFS AS ADHESIVE TO BOND THE 2ND LAYER, AND
TO FORM A MOLDED COMPOSITE BY PERMEATING INTO THE CFS.
5. APPLICATION OF EPOXY RESIN FOR UNDERCOAT THE EPOXY ADHESIVE FOR BONDING CFP SHALL CONFORM TO THE SPECIFICATIONS AS SHOWN:
FOR CFS:
8.INSTALLATION OF CFS (SECOND LAYER) PROPERTY TEST METHOD UNIT SPECIFICATION
PRIOR TO UNDERCOATING EPOXY RESIN ADHESIVE, AMBIENT TEMPERATURE AT THE WORK SITE SHALL BE CHECKED TO CONFIRM
PROPERLY ALIGNED CFS STRIPS(2ND LAYER) ARE INSTALLED TO THE RESIN OVER COATED SURFACE TO
THE CURING CONDITIONS FOR APPLYING THE RESIN. THE CONTRACTOR SHALL CHECK AND CONFIRM THAT THE PRIMER AND PUTTY HAVE SPECIFIC GRAVITY JIS K 7112 / ASTM D792 - 1.7±0.20
FURTHER STRENGTHEN THE SECTION.
BECOME TACK-FREE AND THAT NO CLAY AND DUST EXIST ON THE CONCRETE SURFACE PRIOR TO ENGINEER'S INSPECTION. IF THERE IS A FLEXURAL STRENGTH JIS K 7203 / ASTM D790M N/mm² ≥ 40
PRESS THE CFS USING DEFORMED ROLLER STARTING FROM THE CENTER TOWARD THE EDGES.
TIME INTERVAL OF LONGER THAN 3 DAYS AFTER THE PRIMER AND PUTTY APPLICATION, THE COATED SURFACE SHOULD BE ROUGHENED COMPRESSIVE STRENGTH JIS K 7208 / ASTM D695M N/mm² ≥ 70
9. SURFACE PREPARATION
WITH SANDPAPER AND CLEANED BEFORE THE RESIN APPLICATION. MODULUS OF ELASTICITY JIS K 7208 / ASTM D695M N/mm² ≥ 4000
FOR SAFETY PURPOSES, FIRE PROOF PROTECTION MAY BE APPLIED TO THE FINISHED SURFACE.
FOR CFP: TENSILE STRENGTH JIS K 7113 / ASTM D638M N/mm² ≥ 25
THE CONTRACTOR SHALL SUBMIT FOR ENGINEER'S APPROVAL, HIS PROPOSED METHOD OF APPLICATION OF EPOXY RESIN FOR CFP: TENSILE SHEAR BOND JIS K 6850 / ASTM D1002 N/mm² ≥ 10
UNDERCOAT, IN ACCORDANCE WITH APPROVED MANUFACTURER'S SPECIFICATIONS FOR THE CFP SYSTEM. 1. PREPARATION OF CONCRETE BOND STRENGTH TO CFP & CONCRETE JIS K 5400 / ASTM D72534 N/mm² ≥ 3.5

DISC GRINDER OR ABRASIVE SANDBLASTING IS USED TO CLEAN AND SMOOTHEN THE CONCRETE SURFACE. THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL CERTIFICATE OF THE SUPPLIER.
6. CFS APPLICATION (FIRST LAYER)
FOR CFS:
THE STANDARD LENGTH OF CARBON SHEET WILL BE CUT TO 4 TO 6m. IF STANDARD CUT LENGTH IS EXCEEDED, WRINKLES WILL 2. APPLICATION OF PRIMER
APPEAR AND INSTALLATION BECOMES MORE DIFFICULT. THE SURFACE IS COATED WITH A PRIMER RESIN TO INCREASE THE STRENGTH OF CONCRETE SURFACE AND
IMPROVE ITS BONDING WITH CFP. L
FOR CFP:
CFP SHALL BE CUT TO 4 TO 6m LENGTH AND APPLIED. 3. ADJUSTMENT OF UNEVENNESS WITH PUTTY L/4 L/2 L/4
ANY CONCAVE, PORES, GAPS ON THE CONCRETE SURFACE MUST BE SMOOTHED USING EPOXY PUTTY.
7. OVER COATING RESIN APPLICATION
FOR CFS: 4. APPLICATION OF EPOXY RESIN ON CFP
VERIFICATION AND CONFIRMATION OF RESIN MIXING AND APPLICATION PROCEDURE SHALL BE EXECUTED SIMILAR TO THAT OF THE IN ORDER TO REDUCE THE FORMATION OF VOIDS, EPOXY BASED ADHESIVE IS APPLIED TO THE CFP WITH
UNDER-COATING SYSTEM. THE STANDARD QUANTITY OF OVER-COATING RESIN IS 0.2-0.3 KG/M2. THE ACTUAL QUANTITY SHOULD BE MOLDER TO BOND, FORMING A CURVED PROFILE MEASURING APPROXIMATELY 3mm IN THE CENTER AND 1mm ON CARBON FIBER SHEET (CFS)
DETERMINED IN CONSIDERATION WITH AMBIENT TEMPERATURE AND MANUFACTURER'S RECOMMENDATION IN THE WORK SITE, SUBJECT THE EDGES. CARBON FIBER PLATE (CFP)
TO ENGINEER'S APPROVAL.
FOR CFP: 5. INSTALLATION OF CFP TYPICAL GIRDER ELEVATION
NO OVER COATING IS REQUIRED FOR CFP SINCE NO SECOND LAYER IS USUALLY REQUIRED. PROPERLY ALIGNED CFP IS INSTALLED LONGITUDINALLY TO THE ADHESIVE COATED CONCRETE SURFACE.
PRESS THE CARBON FIBER PLATE MANUALLY USING DEFORMED ROLLER, STARTING FROM THE CENTER
8. CARBON FIBER SHEET/PLATE APPLICATION (SECOND LAYER)
TOWARDS TO EDGES.
REPEAT THE STEPS FOR THE FIRST LAYER CFS APPLICATION, EXCEPT THAT THE SHEET WILL BE PLACED IN THE OPPOSITE
(TRANSVERSE) DIRECTION.
6. SQUEEZING OUT OF ENTRAPPED AIR
FOR COMPLETE IMPREGNATION, ENTRAPPED AIR IS SQUEEZED OUT OF THE CFP USING ROLLER, BEFORE
9. QUALITY CONTROL AND INSPECTION
THE ADHESIVE SETS.
THE CONTRACTOR SHALL CONDUCT A QUALITY CONTROL PROGRAM THAT INCLUDES, BUT NOT LIMITED TO, THE FOLLOWING:

GIRDER DEPTH
-INSPECTION OF ALL MATERIALS TO ENSURE CONFORMITY WITH CONTRACT REQUIREMENTS, AND THAT ALL MATERIALS ARE NEW
7. PRESSURE ATTACHMENT OF CFP
AND UNDAMAGED.
SET AT POSITION OF THE GIRDER, THEN PRESS USING WOODEN ANCHOR FRAME AND SET BOLTS FOR
-INSPECTION OF ALL SURFACE PREPARATION SHALL BE CARRIED OUT PRIOR TO CFS APPLICATION.
CURING.
-INSPECTION OF ALL WORK IN PROGRESS TO ENSURE THE WORK IS BEING DONE IS IN ACCORDANCE WITH THE DPWH STANDARDS
AND SPECIFICATION AND MANUFACTURER'S SPECIFICATIONS.
-INSPECTION OF ALL COMPLETED WORKS INCLUDING VERIFICATION OF ALL REPAIRS FOR DEBONDING, AND CORRECTION OF ANY
DEFICIT WORK. CFP STRIPS, 50mm WIDTH x L/2

10. QUALITY CONTROL AND INSPECTION


AFTER ALLOWING AT LEAST 24 HOURS FOR INITIAL RESIN SATURATE TO CURE, THE CONTRACTOR SHALL PERFORM A VISUAL AND
ACOUSTIC TAP TEST INSPECTION OF THE LAYERED SURFACE. ALL VOIDS, BUBBLES, AND DELAMINATIONS SHALL BE REPAIRED IN
ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. THE CONTRACTOR SHALL CONDUCT ADHESION TESTING OF THE FULLY
GIRDER WIDTH
CURED CFS AND CFP INSTALLATION USING DIRECT PULL-OFF TESTS, AT LOCATIONS DETERMINED BY THE ENGINEER.
CFS LAYOUT CFP STRIPS ARRANGEMENT
FAILURE AT THE BOND LINE AT TENSILE STRESS BELOW 14 KGF/CM2 (200 PSI) SHALL BE CAUSE FOR REJECTING

1 CARBON FIBER SHEET/ PLATE ARRANGEMENT


S-9 SCALE NOT TO SCALE

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CARBON FIBER SHEET/PLATE BONDING
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I TO GIRDER DETAILS LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 9
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
GENERAL NOTES AND SPECIFICATION FOR ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
CARBON FIBER SHEET/PLATE BONDING DATE: DATE: DATE:
PASUQUIN, ILOCOS NORTE
CARBON FIBER SHEET BONDING TO DECKSLAB
DESCRIPTION OF REPAIR METHOD THERE IS A TIME INTERVAL OF LONGER THAN 3 DAYS AFTER THE 4. APPLICATION OF EPOXY RESIN FOR UNDERCOAT
PRIMER AND PUTTY APPLICATION, THE COATED SURFACE SHOULD BE WHEN THE EPOXY PUTTY BECOMES TACK-FREE, EPOXY RESIN IS
ROUGHENED WITH SANDPAPER AND CLEANED BEFORE THE RESIN APPLIED TO THE CONCRETE, ACTING AS ADHESIVE TO BOND THE CFS.
CARBON FIBER SHEET FOR REINFORCED CONCRETE REPAIRS
APPLICATION. THE MOLDED COMPOSITE IS ACHIEVED AS THE RESIN PERMEATES
AND STRENGTHENING SYSTEMS CONSISTS OF A COMBINATION OF
INTO THE CFS.
CARBON FIBER REINFORCING MATERIAL AND ADHESIVE RESIN SUCH
AS EPOXIES AND OTHER MATERIALS. THIS COMPOSITE PRODUCT IS 6. CFS APPLICATION (LONGITUDINAL DIRECTION)
5. INSTALLATION OF LONGITUDINAL LAYER CFS
INTENDED TO ENHANCE THE CAPACITY OF THE CONCRETE DECK SLAB THE STANDARD LENGTH OF CARBON SHEET WILL BE CUT TO 4
PROPERLY ALIGNED CFS STRIPS ARE INSTALLED IN
AND EXTEND ITS SERVICE LIFE. THE FUNCTION OF THE RESIN IS TO TO 6m. IF STANDARD CUT LENGTH IS EXCEEDED, WRINKLES WILL
LONGITUDINAL DIRECTION TO THE ADHESIVE COATED CONCRETE
SERVE AS AN ADHESIVE BOND ONTO THE CONCRETE SURFACE AND APPEAR AND INSTALLATION BECOMES MORE DIFFICULT.
SURFACE.
FACILITATE THE TRANSFER OF STRESSES TO AND FROM THE CARBON
PRESS THE CARBON FIBER SHEET BY USING PLASTIC ROLLER
FIBER SHEET. 7. OVER COATING RESIN APPLICATION
STARTING FROM THE CENTER TOWARD THE EDGE.
THE WORKS SHALL CONSIST OF FURNISHING AND INSTALLING MIXING AND APPLICATION PROCEDURE FOR THE OVER COAT
TWO TYPES OF CARBON FIBER SHEET, CONTINUOUS ARRANGEMENT SHALL BE SIMILAR TO THAT OF THE UNDER-COATING RESIN. THE
6. INSTALLATION OF TRANSVERSAL LAYER CFS
AND GRID ARRANGEMENT, FOR CONCRETE STRENGTHENING SYSTEMS STANDARD QUANTITY OF OVER-COATING RESIN IS 0.20 KG/M2. THE
PROPERLY ALIGNED CFS STRIPS ARE INSTALLED IN
IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. THE ACTUAL QUANTITY SHOULD BE DETERMINED IN CONSIDERATION WITH
TRANSVERSAL DIRECTION TO THE ADHESIVE COATED CONCRETE
SYSTEMS SHALL BE DESIGNED TO STRENGTHEN AND STIFFEN AMBIENT TEMPERATURE AND MANUFACTURER'S RECOMMENDATION IN
SURFACE.
CONCRETE BRIDGE DECK SLAB AND TESTED BY THE ENGINEER TO THE WORK SITE, SUBJECT TO ENGINEER'S APPROVAL.
PRESS THE CARBON FIBER SHEET BY USING PLASTIC ROLLER
VERIFY PERFORMANCE.
STARTING FROM THE CENTER TOWARDS THE EDGE.
8. CFS APPLICATION (TRANSVERSAL DIRECTION)
AFTER ALL LONGITUDINAL LAYER CFS APPLICATION, THE
CONSTRUCTION REQUIREMENT TRANSVERSAL LAYER CFS IS APPLIED AT RIGHT ANGLES TO EACH
7. SQUEEZING OUT OF ENTRAPPED AIR
FOR COMPLETE IMPREGNATION, ENTRAPPED AIR IS SQUEEZED
OTHER IN SAME MANNER AS THE LONGITUDINAL DIRECTION.
1. SURFACE PREPARATION OUT OF THE STRIPS USING ROLLER, BEFORE THE ADHESIVE SETS. DO
ALL CONCRETE SURFACES SHALL BE CLEAN, SOUND AND FREE NOT APPLY THE ROLLER AGAINST THE DIRECTION OF THE PLACED CFS
9. QUALITY CONTROL AND INSPECTION
FROM SURFACE MOISTURE. CRACK SEALING OR WATER PROOFING TO AVOID DAMAGING THE MATERIAL.
THE CONTRACTOR SHALL CONDUCT A QUALITY CONTROL
SHALL BE PROVIDED PRIOR TO CONCRETE SURFACE RESTORATION. IF PROGRAM THAT INCLUDES, BUT NOT LIMITED TO, THE FOLLOWING:
WATER LEAKS THROUGH CRACKS ON CONCRETE SURFACE TO BE 8. SURFACE PREPARATION
-INSPECTION OF ALL MATERIALS TO ENSURE CONFORMITY WITH
COVERED WITH CFS, SURFACE PREPARATION AND APPLICATION OF FOR SAFETY PURPOSES, FIRE PROOF PROTECTION MAY BE
CONTRACT REQUIREMENTS, AND THAT ALL MATERIALS ARE NEW AND
THE CFS SHALL BE IN ACCORDANCE WITH THE APPROVED APPLIED TO THE FINISHED SURFACE.8
UNDAMAGED.
MANUFACTURER'S SPECIFICATIONS. BOTH THE CONTRACTOR AND -INSPECTION OF ALL SURFACE PREPARATION SHALL BE CARRIED
MANUFACTURER'S TECHNICAL REPRESENTATIVE MUST VERIFY OUT PRIOR TO CFS APPLICATION. SPECIFICATIONS
SUITABILITY OF ANY CHANGES TO THE APPLICATION METHODS -INSPECTION OF ALL WORK IN PROGRESS TO ENSURE THE WORK
PROPOSED BY THE ENGINEER. CRACKS LARGER THAN 0.30mm SHALL IS BEING DONE IS IN ACCORDANCE WITH THE DPWH STANDARDS AND
THE CFS SHALL CONFORM TO THE REQUIREMENTS OF THE 250 150 250 150 250
BE INJECTED WITH EPOXY USING A SYSTEM/METHOD APPROVED BY SPECIFICATION AND MANUFACTURER'S SPECIFICATIONS. SPECIFICATIONS AS SHOWN:
THE ENGINEER. -INSPECTION OF ALL COMPLETED WORKS INCLUDING
VERIFICATION OF ALL REPAIRS FOR DEBONDING, AND CORRECTION OF PROPERTY TEST METHOD UNIT SPECIFICATION

250
2. MATERIAL HANDLING ANY DEFICIT WORK. CARBON FIBER WEIGHT JIS K 7071 g/m² 200
THE CARBON FIBER COMPONENTS SHALL BE DELIVERED IN AN -AFTER ALLOWING AT LEAST 24 HOURS FOR INITIAL RESIN TENSILE STRENGTH JIS K 7073 / ASTM D3039 N/mm² ≥ 3400

150
ORIGINAL, UNOPENED (EXCEPT CARBON FABRIC OR STRIPS) SATURATE TO CURE, THE CONTRACTOR SHALL PERFORM A VISUAL OVERLAP TENSILE STRENGTH JIS K 7073 / ASTM D3039 N/mm² ≥ 3400
CONTAINERS CLEARLY MARKED WITH THE MANUFACTURER'S NAME, AND ACOUSTIC TAP TEST INSPECTION OF THE LAYERED SURFACE. ALL TENSILE BOND TO CONCRETE
JIS K 5400 / ASTM D7234 N/mm² ≥ 1.50 CF
PRODUCT IDENTIFICATION, AND BATCH NUMBERS. STORAGE AND (DRY/WET)
VOIDS, BUBBLES, AND DELAMINATIONS SHALL BE REPAIRED IN

250
HANDLING OF THE VARIOUS RELATED PRODUCTS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. THE *CF - CONCRETE FAILURE
CONFORMANCE WITH MANUFACTURER'S RECOMMENDATIONS AND CONTRACTOR SHALL CONDUCT ADHESION TESTING OF THE FULLY THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL
INSTRUCTIONS. CURED CFS AND ASSEMBLY USING DIRECT PULL-OFF TESTS, AT CERTIFICATE OF THE SUPPLIER.

150
LOCATIONS DETERMINED BY THE ENGINEER. FAILURE AT THE BOND
3. PRIME COAT THE EPOXY ADHESIVE SHALL CONFORM TO THE REQUIREMENTS OF
LINE AT TENSILE STRESS BELOW 14 KGF/CM2 (200 PSI) SHALL BE
THE SPECIFICATIONS AS SHOWN:
CONTACT SURFACE SHALL BE DRY BEFORE COATING WITH CAUSE FOR REJECTING THE REPAIR WORKS. A MINIMUM OF TWO

250
EPOXY
PRIMER. THE PRIMER SHOULD BE FORMULATED AND COMPATIBLE TO PULL-OFF TESTS PER SYSTEM (SPAN) SHALL BE PERFORMED. THE PROPERTY TEST METHOD UNIT PRIMER PRIMER
PUTTY
THE CARBON FIBER MATERIAL AND SHOULD NOT BE APPLIED WHEN TEST SHALL BE COMPLETED PRIOR TO THE APPLICATION OF THE VISCOSITY JIS K 6833 / ASTM D2393 mPa-s ≤ 1000 PASTE-LIKE 15,000±5000
RAINING, STORMING, OR AIR IS MISTY OR WHEN CONDITION REMAINS PROTECTIVE TOP COAT ON THE CFS. JIS K 7208 / ASTM
MODULUS OF ELASTICITY
D695M N/mm² ≥ 1500 ≥ 1500 ≥ 1500
UNSATISFACTORY IN THE OPINION OF THE ENGINEER.
SLANT SHEAR BOND TO CONCRETE ASTM C882 N/mm² ≥ 15 ≥ 15 ≥ 15
1 CARBON FIBER SHEET BONDING DETAILS
APPLICATION RATE SHALL BE SUCH AS TO ENSURE COMPLETE
WORK SEQUENCE BOND STRENGTH TO CONCRETE (DRY/WET) JIS K 5400 / ASTM D7234 N/mm² ≥ 1.54 ≥ 1.54 ≥ 1.54 S-10 SCALE NOT TO SCALE
SATURATION OF THE CONTACT SURFACE. PRIMER SHOULD BE CURED
BETWEEN 2-3 HOURS BEFORE PROCEEDING TO THE NEXT STEP. THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL
1. PREPARATION OF CONCRETE CERTIFICATE OF THE SUPPLIER.
4. PUTTY APPLICATION DISC GRINDER OR ABRASIVE SANDBLASTING IS USED TO CLEAN
THIS WORK INVOLVES APPLICATION OF EPOXY PUTTY ONTO THE AND SMOOTHEN THE CONCRETE SURFACE.
PRIMER COATED CONCRETE SURFACE, USING TROWEL OR SPATULA,
TO SMOOTHEN THE SURFACE. THE PUTTY IS APPLIED WHEN THE 2. APPLICATION OF PRIMER
PRIMER IS ALREADY TACK-FREE. THE SURFACE IS COATED WITH A PRIMER RESIN TO INCREASE
THE STRENGTH OF CONCRETE SURFACE AND IMPROVE ITS BONDING
5. APPLICATION OF EPOXY RESIN FOR UNDERCOAT WITH CFS.
PRIOR TO UNDERCOATING EPOXY RESIN ADHESIVE, AMBIENT
TEMPERATURE AT THE WORK SITE SHALL BE CHECKED TO CONFIRM 3. ADJUSTMENT OF UNEVENNESS
THE CURING CONDITIONS FOR APPLYING THE RESIN. THE ANY CONCAVE, PORES, GAPS ON THE CONCRETE SURFACE
CONTRACTOR SHALL CHECK AND CONFIRM THAT THE PRIMER AND MUST BE SMOOTHED USING EPOXY PUTTY.
PUTTY HAVE BECOME TACK-FREE AND THAT NO CLAY AND DUST EXIST
ON THE CONCRETE SURFACE PRIOR TO ENGINEER'S INSPECTION. IF

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CARBON FIBER SHEET BONDING
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I TO DECKSLAB DETAILS LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 10
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
GENERAL NOTES AND SPECIFICATION FOR ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
CARBON FIBER SHEET BONDING DATE: DATE: DATE:
PASUQUIN, ILOCOS NORTE
PROTECTIVE COATING
DESCRIPTION OF REPAIR METHOD SPECIFICATIONS
ACRYL URETHANE PROTECTIVE COATING SHALL CONFORM THE
IF THE BRIDGE IS LOCATED MORE THAN 1KM FROM COASTAL REQUIREMENTS OF THE SPECIFICATION AS SHOWN:
AREA, CONCRETE MEMBER WILL BE DETERIORATED DUE TO PROPERTY TEST METHOD UNIT SPECIFICATION
CARBONATION .
BOND STRENGTH ASTM D3359 / ASTM D7234 N/mm² ≥ 1.50
PROTECTIVE COATING IS MADE FROM ACRYL URETHANE BASED
TAP WATER RESISTANCE ASTM D6943 - No Change
COATING WHICH IS EFFECTIVE AGAINST CARBON DIOXIDE, WEATHER/
ACID RESISTANCE (5% H₂SO4) ASTM D6943 - No Change
UV RAYS, CHEMICAL, AND OIL DAMAGE.
AFTER REPAIRING DAMAGE, PROTECTIVE COATING SHALL BE ACID RESISTANCE (5% NaOH) ASTM D6943 - No Change

APPLIED ON THE CONCRETE MEMBER.


THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL
CERTIFICATE OF THE SUPPLIER.
CONSTRUCTION REQUIREMENT

1. SURFACE PREPARATION
AFTER APPROPRIATE REPAIR METHOD IS SELECTED, SURFACE
PREPARATION SHALL BE CONDUCTED BY ELECTRIC DISC GRINDER
AND/OR BRUSH.

2. MATERIAL HANDLING
AFTER MIXING BASE RESIN AND HARDENER, PROTECTIVE
COATING SHALL BE APPLIED TO THE SURFACE WITHIN HARDENING TIME
OF ABOUT 3 HOURS.

3. APPLICATION OF PROTECTIVE COATING


APPLY 1 TO 3 COATS COATING

4. QUALITY CONTROL AND INSPECTION


THE CONTRACTOR SHALL CONDUCT A QUALITY CONTROL
PROGRAM THAT INCLUDES, BUT NOT LIMITED TO, THE FOLLOWING:
-INSPECTION OF ALL MATERIALS TO ENSURE CONFORMITY WITH
CONTRACT REQUIREMENTS, AND THAT ALL MATERIALS ARE NEW AND
UNDAMAGED.
-INSPECTION OF ALL SURFACE PREPARATION SHALL BE CARRIED
OUT PRIOR TO PROTECTIVE COATING APPLICATION.
-INSPECTION OF ALL WORK IN PROGRESS TO ENSURE THE WORK
IS BEING DONE IS IN ACCORDANCE WITH THE DPWH STANDARDS AND
SPECIFICATION AND MANUFACTURER'S SPECIFICATIONS.
-INSPECTION OF ALL COMPLETED WORKS INCLUDING
VERIFICATION OF ALL REPAIRS FOR COATED SURFACE.

WORK SEQUENCE

1. SURFACE PREPARATION
ENTICE SURFACE OF COATING AREA SHOULD BE CLEANED BY 1ST COAT: PRIMER COAT (EPOXY PRIMER FOR CONCRETE) 1ST COAT: PRIMER COAT (EPOXY PRIMER FOR CONCRETE)
USING CUP WIRE BRUSH AND/OR DISC SANDER. 2ND COAT: PRIMER COAT (EPOXY PRIMER FOR CONCRETE) 2ND COAT: PRIMER COAT (EPOXY PRIMER FOR CONCRETE)
3RD COAT: INTERMEDIATE COAT (ACRYLURETHANE) 3RD COAT: INTERMEDIATE COAT (ACRYLURETHANE)
4TH COAT: TOP COAT (ACRYLURETHANE) 4TH COAT: TOP COAT (ACRYLURETHANE)
2. MIXING ACRYL URETHANE PROTECTIVE COATING MATERIALS
ACRYL URETHANE BASED COATING IS CHARACTERIZED BY ITS
RESITANCE TO WEATHER/UV, CHEMICALS, AND OIL NECESSARY FOR
1 DETAIL SHOWING PROTECTIVE COATING DIAGRAM
THE PROTECTION OF STEEL AND CONCRETE STRUCTURES. THE BASE
RESIN AND HARDENER ARE MIXED AT A RATIO BY WEIGHT OF 4:1, S-11 SCALE 1:10 MTS

RESPECTIVELY.

3. APPLICATION OF PROTECTIVE COATING


ACRYL URETHANE PROTECTIVE COATING IS APPLIED BY ROLLER
AND/OR BRUSH ON SURFACE TO BE COATED. INTERVAL TIME BETWEEN
APPLICATION OF FIRST LAYER AND SECOND LAYER IS MINIMUM 3
HOURS FOR NEXT COATING. COATING IS NORMALLY APPLIED FOR 1 TO
3 COATS.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROTECTIVE COATING DETAILS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I
GENERAL NOTES AND SPECIFICATION FOR
LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 11
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
PROTECTIVE COATING WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
CONSTRUCTION REQUIREMENT ASPHALT.

7. POURING OF FLEXIBLE ASPHALT


1. CHIPPING SURFACE CONCRETE 750
FLEXIBLE ASPHALT (ASPHALT-RUBBER CHIPS) SHALL BE POURED AS
THE SURFACE OF CONCRETE AT THE LOCATION OF THE EXISTING
SECOND LAYER.
DAMAGED JOINT SHALL BE CHIPPED OFF FOR PURPOSES OF INSTALLING NEW
THE SURFACE OF FLEXIBLE ASPHALT SHALL NOT BE COMPACT OR 63 125 125 125 125 125
STEEL FRAME. AFTER CHIPPING, THE CONTRACTOR SHALL VERIFY THE SIZES AND
TAMPING UNTIL DECREASE THE TEMPERATURE.
SPACING OF EXISTING REINFORCEMENTS. 12mm Ø REINFORCING BARS (WELDED)

2. INSTALL STEEL FRAME SPECIFICATION


THE CONTRACTOR SHALL SUBMIT SHOP DRAWING TO BE APPROVED BY PREFABRICATED STEEL FRAME: ASTM A36 OR EQUIVALENT
THE ENGINEER, PRIOR TO THE INSTALLATION OF THE STEEL FRAME. FLEXIBLE ASPHALT SHALL BE BASED ON THE SPECIFICATIONS AS FOLLOWS:

22 45
3. POURING FLEXIBLE ASPHALT

200
PRIOR TO POURING, THE CONTRACTOR SHALL SUBMIT MATERIAL TEST PROPERTY TEST METHOD UNIT SPECIFICATION

45 22
RESULTS FOR THE FLEXIBLE ASPHALT, FOR APPROVAL OF THE ENGINEER.
DENSITY ASTM D1188 g/cm³ 2.26±0.05
4. EXPANSION SHEET
EXPANSION SHEET SHALL BE LAID ON FIRST LAYER OF FLEXIBLE ASPHALT SPLITTING STRENGTH ASTM D4123-82 N/mm² 1.57±0.29

USING GAS BURNER.


DEFORMATION (FLOW VALUE) JIS 52207 / ASTM D1559 1/100cm 140±20

5. POURING OF FLEXIBLE ASPHALT


THE 2ND LAYER OF FLEXIBLE ASPHALT SHALL BE SUBJECTED TO STRICT THE MATERIAL SHALL BE APPROVED BY THE ENGINEER THROUGH MILL
QUALITY CONTROL ESPECIALLY FOR THE TEMPERATURE CONTROL CERTIFICATE OF THE SUPPLIER.
REQUIREMENTS.
1 ASPHALTIC PLUG JOINT PLAN
DESCRIPTION OF REPAIR METHOD S-12 SCALE 1:5 Mts.

THE QUALITY AND MAINTENANCE OF THE EXPANSION JOINTS ARE VITAL TO


THE BEHAVIOR OF THE BRIDGES AND ITS DURABILITY. ACCORDINGLY, IT SHOULD
BE ENSURED THAT EXPANSION JOINTS ARE WATERPROOFED AS WELL AS
RESISTANT TO LEAKAGE. IN THE CASE OF SEALANT ASPHALT, THE SEALANT IS SEE ASPHALTIC PLUG JOINT DETAILS
EASILY DAMAGED DUE TO TRAFFIC LOAD AND AGING.
THE USUAL GAP BETWEEN CONCRETE EDGES IS AROUND 20mm
CONSIDERING TEMPERATURE IN THE PHILIPPINES AS 27°C±10°C. THE
MOVEMENT OF A 20m BRIDGE SPAN DUE TO CHANGE IN
TEMPERATURE IS 12x10-6/°C x 20m x (±10°C) = ±2.4mm AND THE
MOVEMENT OF THE SAME SPAN DUE TO TRAFFIC LOAD IS
APPROXIMATELY LESS THAN 5mm. TOTAL MOVEMENT OF A 20m
SPAN RCDG BRIDGE IS BELOW ±10mm. WITH THESE
CONSIDERATIONS, THE MOST SUITABLE REPAIR MEASURE FOR
DAMAGED ASPHALT SEALANT IS THE INSTALLATION OF ASPHALTIC
PLUG JOINT.
200

WORK SEQUENCE 10 45 22 22 45 10
12mm Ø BAR (WELDED) EXPANSION SHEET FLEXIBLE ASPHALT
1. DISMANTLE EXISTING DAMAGED ASPHALT JOINT SEALANT
ASPHALT OVERLAY
THE DAMAGED SEALANT DUE TO HEAVY TRAFFIC, AGING,
ETC., SHALL BE DISMANTLED.

25
2. CHIPPING SURFACE CONCRETE

50
CHIP-OFF EDGES OF CONCRETE TO INSTALL STEE LFRAME
AND TO INSERT THE FORM TO NARROW GAP. (PROPER GAP FOR
SEAMLESS JOINT IS LESS THAN 25mm)

3. INSTALL STEEL FRAME


STEEL FRAME SHALL BE FABRICATED WITH BOX FRAME AND
PRIMER
REBAR. THIS FRAME SHALL BE FIXED BY WELDING BETWEEN CONCRETE 45 28 28 45
ANCHOR AND REBAR.

4. REBAR ANCHOR
BESIDES INTERSECTION OF REBAR, THE CONCRETE ANCHOR SHALL BE
INSERTED FOR EVERY INTERSECTION OF REBAR. BACKING
12mm Ø REBAR OR ANCHOR BOLT @ 250mm SPACING
5. POURING FLEXIBLE ASPHALT
FLEXIBLE ASPHALT SHALL BE POURED TO THE CHIPPED OFF EDGES. THE
HEIGHT OF POURING IS HALF OF TOTAL THICKNESS.
2 ASPHALTIC PLUG JOINT DETAIL
6. INSTALLATION OF EXPANSION SHEET
S-12 SCALE 1:2 Mts.
EXPANSION SHEET SHALL BE SPREAD ON THE FIRST LAYER OF FLEXIBLE

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1 ASPHALTIC PLUG JOINT(APJ) DETAILS
REGIONAL OFFICE I LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 12
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD GENERAL NOTES AND SPECIFICATIONS FOR ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
ASPHALTIC PLUG JOINT (APJ) WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
D D D D

TO MANILA TO VIGAN

D D D

2D

NOTE:
1. "D" (meters) = DISTANCE IN METERS EQAUL TO
THE APPROACH SPEED OF TRAFFIC
IN KILOMETERS PER HOUR (ASSUMED APP. SPEED
OF 40KPH).
2. "L" (meters) = LENGTH OF BRIDGE
3. DISTANCES CAN BE MODIFIED AS TO ACTUAL
SITE CONDITION.
4. SEE D.O. 013 S.2018 FOR MORE INFORMATION.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I
TRAFFIC MANAGEMEN PLAN
LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 13
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
TRAFFIC SIGNS AND HAZARD MARKERS
SIGN NO. SIZE (mm) LETTERS BACKGROUND SIGN NO. SIZE (mm) LETTERS BACKGROUND

ADVANCE WARNING SIGNS DETOUR SIGNS

LINE 1 - BLACK 200 DM YELLOW LINE 1 - BLACK 160 EN YELLOW


ROADWORK AHEAD T1-1 1800 x 600 DETOUR AHEAD T1-6 1200 x 600
LINE 2 - BLACK 160 DM REFLECTORIZED LINE 2 - BLACK 160 EN REFLECTORIZED

BRIDGEWORK LINE 1 - BLACK 200 DM YELLOW DETOUR YELLOW


T1-2 1800 x 600 T5-1 1200 x 300 BLACK 120 EN
AHEAD LINE 2 - BLACK 160 DM REFLECTORIZED (LEFT OR RIGHT) REFLECTORIZED

LINE 1 - BLACK 100 EM


ROAD MACHINERY YELLOW YELLOW
T1-3 1200 x 600 LINE 2 - BLACK 120 DM DETOUR MARKER T5-6A 450 x 450 BLACK 300 HIGH
AHEAD REFLECTORIZED REFLECTORIZED
LINE 3 - BLACK 100 EM

LINE 1 - BLACK 100 EN


YELLOW LOCAL YELLOW
GRADER AHEAD T1-4 900 x 600 BLACK 140 DN G9-40-2 900 x 600 LINE 2 - BLACK 100 EN
REFLECTORIZED TRAFFIC ONLY REFLECTORIZED
LINE 3 - BLACK 100 EN

RED / ORANGE
-FLUORESCENT FOR DAY
WORKMEN AHEAD LINE 1 - BLACK 160 DM YELLOW
T1-5 900 x 600 BLACK USE (SHORT TERM) END DETOUR T2-23 1200 x 600
(SYMBOLIC) LINE 2 - BLACK 160 DM REFLECTORIZED
-REFLECTORIZED FOR
NIGHT USE (LONG TERM)

SIGNS FOR ROAD CONDITION & HAZARDS


ROADWORK NEXT ... LINE 1 - BLACK 200 DM YELLOW
T1-24 1800 x 600
KM LINE 2 - BLACK 160 DM REFLECTORIZED
900 x 600 LINE 1 - BLACK 160 FM YELLOW
WET TAR T3-1
(TYPE B-2) LINE 2 - BLACK 160 FM REFLECTORIZED

ROADWORK LINE 1 - BLACK 160 EN YELLOW


T1-25 1800 x 600
ON SIDE ROAD LINE 2 - BLACK 160 DN REFLECTORIZED
900 x 600 YELLOW
SLIPPERY T3-3 SYMBOL BLACK
(TYPE B-2) REFLECTORIZED

LINE 1 - BLACK 150 DM YELLOW


NEXT 2 KM T1-28 600 x 600
LINE 2 - BLACK 150 DN & 100 LC REFLECTORIZED
900 x 600 LINE 1 - BLACK 160 DN YELLOW
SOFT EDGES T3-6
(TYPE B-2) LINE 1 - BLACK 160 DN REFLECTORIZED

LINE 1 - BLACK 200 DM YELLOW


END ROADWORK T1-16 1800 x 600
LINE 2 - BLACK 160 DM REFLECTORIZED
900 x 600 LINE 1 - BLACK 120 EN YELLOW
ROUGH SURFACE T3-7
(TYPE B-2) LINE 2 - BLACK 120 DN REFLECTORIZED
REGULATORY SIGNS

LINE 1 - WHITE 120 DM


LINE 2 - WHITE 120 DM RED 900 x 600 YELLOW
PREPARE TO STOP T1-18 900 x 600 LOOSE STONES T3-9 SYMBOL BLACK
LINE 3 - WHITE 120 EM REFLECTORIZED (TYPE B-2) REFLECTORIZED
REFLECTORIZED

WHITE REFLECTORIZED
SPEED 600 x 800 BLACK 240 DN 900 x 600 LINE 1 - BLACK 140 DN YELLOW
R4-1 RED - CIRCLE GRAVEL ROAD T3-13
RESTRICTION (SIZE B) CIRCLE - 600 DIA. RED (TYPE B-2) LINE 2 - BLACK 140 DN REFLECTORIZED
REFLECTORIZED

600 x 400 LINE 1 - BLACK 100 EM WHITE 900 x 600 LINE 1 - BLACK 140 DM YELLOW
ROAD WORK R4-3 LOOSE SURFACE T3-14
(SIZE B) LINE 2 - BLACK 100 EM REFLECTORIZED (TYPE B-2) LINE 2 - BLACK 140 CM REFLECTORIZED

LINE 1 - BLACK 140 EM


LINE 1 - BLACK 160 EM WHITE REFLECTORIZED NO LINES
END SPEED 600 X 1000 1500 x 900 LINE 2 - BLACK 140 EM YELLOW
R4-12 LINE 2 - BLACK 240 DN RED CIRCLE - DO NOT OVERTAKE T3-12
RESTRICTION (SIZE B) (TYPE B-1) LINE 3 - BLACK 140 EM REFLECTORIZED
CIRCLE - 600 DIA. RED REFLECTORIZED UNLESS SAFE
LINE 4 - BLACK 120 DM

600 X 800 1200 x 900 LINE 1 - BLACK 160 DM


END SPEED SYMBOL - 600 DIA. WHITE TRAFFIC HAZARD YELLOW
R4-2 T1-10 LINE 2 - BLACK 160 DM
RESTRICTION (SIZE B) BLACK REFLECTORIZED AHEAD (TYPE A-2) REFLECTORIZED
LINE 3 - BLACK 160 DM

900 x 600 SYMBOL YELLOW


TRUCKS ENTERING T2-25
(TYPE B-2) BLACK REFLECTORIZED

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I TRAFFIC SIGNS AND HAZARD MARKERS LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 14
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
TRAFFIC SIGNS AND HAZARD MARKERS
SIGN NO. SIZE (mm) LETTERS BACKGROUND 0.08

SIGNS FOR LANES AND ROAD CLOSURES


0.200 NOTES :
F&B
1800 x 300 YELLOW
ROAD CLOSED T2-4 BLACK 140 EN 0.050 1. ALL PERSONNEL WORKING ON OR ADJACENT TO ROADWORK SITE SHALL WEAR APPROPRIATE HIGH
(TYPE C-1) REFLECTORIZED
B VISIBILITY CLOTHING.
C
A 2. THE VEST SHALL BE WORN OVER NORMAL CLOTHING AND PROPERLY FASTENED SO THAT THE ENTIRE
AVAILABLE AREA OF HIGH VISIBILITY MATERIAL CAN BE SEEN IN ANY DIRECTION. TO MAXIMIZE
1200 x 900 YELLOW 0.050 EFFECTIVENESS THE VEST SHOULD BE KEPT CLEAN AND IN GOOD CONDITION.
LANE STATUS T2-6-1 BLACK 600 HIGH
(TYPE A-2) REFLECTORIZED
0.050 3. THE TRAFFIC SAFETY VEST SHALL BE MADE FROM FLUORESCENT RED OR ORANGE MATERIAL. THE VEST
D
R50 SHALL ALSO HAVE TWO (2) STRIPS OF YELLOW RETRO-REFLECTIVE MATERIAL AT THE FRONT AND THREE
(3) STRIPS AT THE BACK. REFLECTIVE MATERIAL SHALL BE 50mm WIDE. DPWH LOGO SHALL BE 80mm
FRONT BACK
DIAMETER. THE SAFETY VEST SHOULD HAVE A SECURE FASTENING, PREFERABLY A ZIP.
1800 x 900 YELLOW
LANE STATUS T2-6-2 BLACK 600 HIGH
(TYPE A-1) REFLECTORIZED A (mm) B (mm) C (mm) D (mm) 4. THE JACKET MAY BE WORN OVER WET WEATHER CLOTHING. ALTERNATIVELY, WET WEATHER HIGH
MEDIUM 280 600 750 580 VISIBILITY CLOTHING SHALL BE MADE FROM WATERPROOF MATERIAL MATCHING THOSE PROPERTIES
ABOVE FOR COLOR AND RETRO REFLECTIVITY.
LARGE 295 625 775 610
SIGNS FOR PEDESTRIAN CONTROL
EXTRA LARGE 310 650 800 640

PEDESTRIAN 900 x 600 LINE 1 - BLACK 100 CN


YELLOW TRAFFIC SAFETY VEST
T8-1 (TYPE B-2) LINE 2 - BLACK 100 CN
WATCH YOUR STEP REFLECTORIZED
LINE 3 - BLACK 100 CN DETAIL
STANDARD SIGN PANEL OF APPROPRIATE
VARIES DEPENDING ON SHEETING FASTENED WITH BOLTS AND NUTS
T8-2 1200 x 300 BLACK 100 CM YELLOW
PEDESTRIANS
L OR R (TYPE C-2) ARROW 140 REFLECTORIZED
THE SIZE OF THE SIGN PANEL FOR EASE OF REPLACEMENT

USE OTHER 900 x 600 LINE 1 - BLACK 100 DN YELLOW


ROADWORK
T8-3
FOOTPATH (TYPE B-2) LINE 2 - BLACK 100 DN REFLECTORIZED
AHEAD
TEMPORARY HAZARD MARKERS VARIES DEPENDING ON THE ALL MATERIALS ARE
1.500
SIZE OF THE SIGN PANEL 2" X 2" X 2.33 mm
ANGULAR BAR
TEMPORARY 600 x 600 CHEVRONS YELLOW 0.30 m ALL MATERIALS ARE
T5-5
HAZARD MARKERS (TYPE B-3) BLACK 194 WIDE AT 45° REFLECTORIZED 2" X 2" X 2.33 mm
ANGULAR BAR

1500 x 450 0.60 m CLEAR SPACING VARIES DEPENDING ON THE


TEMPORARY CHEVRONS YELLOW
T5-4 SIZE OF THE SIGN PANEL
HAZARD MARKERS (TYPE B-1) BLACK 177 WIDE AT 45° REFLECTORIZED

SIDE ELEV.
SCALE: NTS FRONT
TRAFFIC SIGNAGE INSTALLATION ELEVATION
SCALE:
DETAIL NTS
SCALE:
NTS
NOTES :
SPACING CONDITION SPACING CONDITION
1. ROADWORK AHEAD - THE FIRST ADVANCE WARNING SIGN SEEN BY DRIVERS, SHOULD
BE LOCATED AT A MINIMUM DISTANCE "2D" METERS (DIMENSION "D" IS THE DISTANCE ON TAPERS ON TAPERS
EXPRESSED IN METERS EQUAL TO THE APPROACH SPEED OF TRAFFIC IN KILOMETERS WHEN USED AROUND SMALL WORK SITES WHEN USED AROUND SMALL WORK SITES
PER HOUR) BEFORE THE START OF THE WORKS, OR IF THERE IS A TRANSITION AREA, 5 - 10 M 5 - 10 M
THE START OF THE TAPER. (MAY BE REDUCED TO 3m TO GUIDE PEDESTRIANS OR TO PREVENT TRAFFIC (MAY BE REDUCED TO 3m TO GUIDE PEDESTRIANS OR TO PREVENT TRAFFIC
TAKING A WRONG TURN THROUGH A GAP IN THE LINE OF BOLLARDS) TAKING A WRONG TURN THROUGH A GAP IN THE LINE OF CONES)
2. OTHER SIGNS IN ADVANCE WARNING AREA SHOULD BE SPACED "D" METERS APART.
WHEN USED AS LONGITUDINAL SEPARATION BETWEEN OPPOSING TRAFFIC FLOWS WHEN USED AS LONGITUDINAL SEPARATION BETWEEN OPPOSING TRAFFIC FLOWS
3. LONGITUDINAL BUFFER SPACE SHOULD BE 20 TO 30 METERS LONG BUT CAN BE WHEN USED AS LONGITUDINAL SEPARATION OF TRAFFIC FROM THE WORKSITE WHEN USED AS LONGITUDINAL SEPARATION OF TRAFFIC FROM THE WORKSITE
EXTENDED IF THE WORK AREA IS HIDDEN FROM APPROACHING ROAD USERS, e.g. BY A 10 - 20 M 10 - 20 M
OR A CLOSED LANE OR A CLOSED LANE
CURVE OR CREST. (MAY BE INCREASED TO 50m WHERE THE LENGTH OF BOLLARDS EXCEEDS 1
(MAY BE INCREASED TO 50m WHERE THE LENGTH OF CONES EXCEEDS 1 KM)
KM)
4. LATERAL BUFFER SPACE SHOULD BE A MINIMUM OF 1.2 METERS IN SLOW SPEED AREAS,
OR IN HIGH SPEED AND HIGH VOLUME AREAS, A LARGE ADJACENT CLEARANCE IS NOTES :
DESIRABLE WITH SAFETY BARRIERS ADJACENT TO THE WORK AREA. NOTES :
1. TRAFFIC CONES SHALL BE FLUORESCENT RED OR ORANGE PLASTIC. IT MUST BE
5. LOCATION OF TRAFFIC CONTROLLER SHOULD BE 30 METERS IN ADVANCE OF WORK 1. BOLLARDS SHALL BE FLUORESCENT RED OR ORANGE PLASTIC THAT IS RESILIENT
RESILIENT TO IMPACT AND WILL NOT DAMAGE VEHICLES WHEN HIT AT LOW SPEED.
AREA, WITH GOOD SITE DISTANCE OF ONCOMING TRAFFIC, WITH AN ESCAPE PATH IN TO IMPACT AND WILL NOT DAMAGE VEHICLES WHEN HIT AT LOW SPEED.
2. HEIGHT VARIES FROM 450mm UP TO 750mm FOR USE ON EXPRESSWAYS OR IN
2. HEIGHT: UP TO 1 M.
AN EMERGENCY, WHERE THE OTHER TRAFFIC CONTROLLER IS VISIBLE, AND CAN BE VERY HIGH SPEED SITUATIONS.
3. AT NIGHT TIME OPERATION THE BOLLARDS MUST BE FITTED WITH REFLECTIVE
SEEN BY THE ROAD USER. 3. TRAFFIC CONES SHALL BE DESIGNED TO BE STABLE IN WIND AND THE AIR
TAPE WITH A MINIMUM BANDWIDTH OF 250mm.
TURBULENCE FROM PASSING TRAFFIC.
4. AT NIGHT TIME OPERATION THE CONES MUST BE FITTED WITH REFLECTIVE TAPE
TEMPORARY BOLLARDS WITH A MINIMUM BANDWIDTH OF 150mm.

DETAIL

TYPICAL TRAFFIC CONE


DETAIL

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TRAFFIC SIGNS AND HAZARD MARKERS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I
NOTES ON TEMPORARY SIGNAGES LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 15
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
AND SAFETY VEST WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE:
PROJECT BILLBOARD DETAILS
2400 (8 ft.)
NOTES:
REFER TO D.O. NO. 11 SERIES OF 2022
2.440

80 80 SI
NO
ON

AU
MI
COMMISSION ON AUDIT

DI
CO M

T
(PROVINCE AND CITY)

R EPU

E S
50

I N
B L
I

P
C

P
I
O
L

F
T H I
E P H

Project: Cost:
210

WHITE BACKGROUND
Fund BLACK TEXT
50

Location: Source:
20

THIS IS WHERE YOUR TAXES GO


60 50 60

Implementing Agency:
NAME OF PROJECT: HELVETICA 3"
Development Partner:
50
1200 mm (4 ft.)

2400 (8 ft)
LOCATION: Contractor/Supplier:
50

30

NAME OF CONTRACTOR:
50

Brief Description of Project:


30

DATE STARTED:
50

Project Details:
30

CONTRACT COMPLETION DATE:


50

30

CONTRACT COST: Project Date Project Status


50

Target Date of Percentage of Cost Incurred to Date


30

As of Remarks
Duration Started
IMPLEMENTING OFFICE: Completion Completion (Date) Date Completed
50

HELVETICA 1"
30

SOURCES OF FUND:
50

20 20

Department of Public Works and Highways


30
20 20

Text 2920 or Call(02)165-02 for any concern on this project


For Particulars or complaints about this project, please contact the Regional Office or Cluster which has audit jurisdiction on this
20

www.dpwh.gov.ph
project.
HELVETICA 1" COA Regional Office No./Cluster: _______________________________
Address: ___________________________________________________
10

Contact No.: _____________________ or Text COA Citizen's Desk at 0915-539-1957

DPWH STANDARD PROJECT BILLBOARD


FACE OF
BILLBOARD
NOTE :

45°
*For Source of Fund, state if DPWH Regular Budget, Priority Development 2400 (8 ft.)

0'0"
Assistance Fund, DepEd/ DA/ DAR Budget, Calamity Fund, MVUC Fund, etc.
*Color Shade Combination for the Yellow Background: EDGE OF ROAD
CYAN : 0
MAGENTA : 7
YELLOW : 78
KEY : 0
TRAFFIC DIRECTION
DISPLAY AREA
ROAD DISPLAY AREA
(TARPAULIN ON 2400 X 2440 X 5 MARINE PLYWOOD)

2400

2400
ORIENTATION
50 X 50 HORIZONTAL 50 X 50 HORIZONTAL
DISPLAY AREA
1200
COCO LUMBER COCO LUMBER
1200

50 X 50 HORIZONTAL
(1200 X 2440 X 12 MARINE PLYWOOD)
COCO LUMBER

50 X 75 VERTICAL
50 X 50
1000

COCO LUMBER
1000

WOODEN STAKE

1000
50 X 50

1000
WOODEN STAKE
GROUND LEVEL

GROUND LEVEL
500
500

500

500
1000 2400
1000 2400
TYPICAL FRAME ELEVATION FRONT ELEVATION
( OPTION 1 ) TYPICAL FRAME ELEVATION FRONT ELEVATION

STANDARD PROJECT BILLBOARD STANDARD PROJECT BILLBOARD


(DPWH) (COA)
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED & DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES RETROFITTING/STRENGTHENING OF PERMANENT


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
BRIDGES,CARUAN BR. 1
REGIONAL OFFICE I STANDARD PROJECT BILLBOARD DETAILS LARRY JOEL C. OBRA KENNEX LORENZ S. TAMBOT ALBERTO B. ESQUEJO, JR. MATHIAS L. MALENAB RONNEL M. TAN, CESO III - 16
SAN FERNANDO CITY, LA UNION (B04803LZ) ALONG MANILA NORTH ROAD
ENGINEER II CHIEF, BRIDGES AND OTHER PUBLIC CHIEF, PLANNING AND DESIGN DIVISION ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR - - 16
WORKS DESIGN SECTION DATE:
PASUQUIN, ILOCOS NORTE DATE: DATE: DATE: