This document describes the results of a field density test conducted on selected borrow material for the construction of a new building. It provides details on the testing methodology and calculations for determining the unit weight of air-dry sand, moisture content, and field density across three test holes. The test was conducted to evaluate the compaction of the borrow material used as fill.

Uploaded by

Ianthe Belauro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
123 views9 pages

FDT CTA

This document describes the results of a field density test conducted on selected borrow material for the construction of a new building. It provides details on the testing methodology and calculations for determining the unit weight of air-dry sand, moisture content, and field density across three test holes. The test was conducted to evaluate the compaction of the borrow material used as fill.

Uploaded by

Ianthe Belauro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 354.12 361.28 362.69
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 111.12 118.28 119.69
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 7,898.00 7,710.00 7,703.00
20. Mass of Jar + Sand ( after pouring), g 3,039.00 3,151.00 3,034.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,168.00 1,868.00 1,978.00
22. Volume of hole, cm3 (21)/(7) 1,323.76 1,140.58 1,207.75
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO/C.J.M. GALLARDO


Materials-In-Charge Engineer II
DPWH-NCR
ST. GERRARD CONSTRUCTION GENERAL CONTRACTOR
AND DEVELOPMENT CORPORATION
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 355.43 358.86 362.59
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 112.43 115.86 119.59
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 8,014.00 7,979.00 7,703.00
20. Mass of Jar + Sand ( after pouring), g 3,005.00 3,095.00 3,044.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,318.00 2,193.00 1,968.00
22. Volume of hole, cm3 (21)/(7) 1,415.35 1,339.02 1,201.64
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 362.83 354.12 356.39
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 119.83 111.12 113.39
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 7,961.00 7,880.00 7,854.00
20. Mass of Jar + Sand ( after pouring), g 3,151.00 3,089.00 3,131.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,119.00 2,100.00 2,032.00
22. Volume of hole, cm3 (21)/(7) 1,293.84 1,282.24 1,240.72
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 356.04 357.42 361.50
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 113.04 114.42 118.50
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 8,094.00 7,796.00 7,722.00
20. Mass of Jar + Sand ( after pouring), g 3,033.00 3,023.00 3,045.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,370.00 2,082.00 1,986.00
22. Volume of hole, cm3 (21)/(7) 1,447.10 1,271.25 1,212.63
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 358.72 361.21 354.53
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 115.72 118.21 111.53
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 8,099.00 7,862.00 7,811.00
20. Mass of Jar + Sand ( after pouring), g 3,056.00 3,000.00 3,003.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,352.00 2,171.00 2,117.00
22. Volume of hole, cm3 (21)/(7) 1,436.11 1,325.59 1,292.62
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 360.98 353.87 355.01
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 117.98 110.87 112.01
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 7,807.00 7,711.00 7,708.00
20. Mass of Jar + Sand ( after pouring), g 3,181.00 3,156.00 3,175.00
21. Sand to Fill Hole, g (19)-(20)-(10) 1,935.00 1,864.00 1,842.00
22. Volume of hole, cm3 (21)/(7) 1,181.49 1,138.14 1,124.71
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 357.98 355.68 359.52
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 114.98 112.68 116.52
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 7,960.00 7,752.00 7,722.00
20. Mass of Jar + Sand ( after pouring), g 3,059.00 3,179.00 3,037.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,210.00 1,882.00 1,994.00
22. Volume of hole, cm3 (21)/(7) 1,349.40 1,149.13 1,217.51
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 362.27 361.51 362.57
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 119.27 118.51 119.57
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 7,880.00 7,865.00 7,837.00
20. Mass of Jar + Sand ( after pouring), g 3,036.00 3,134.00 3,145.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,153.00 2,040.00 2,001.00
22. Volume of hole, cm3 (21)/(7) 1,314.60 1,245.60 1,221.79
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)
]

FIELD DENSITY TEST


Project : Proposed Construction of the Court of Tax Appeals (CTA) Building III-6 Storey Building with 1 Level
Basement and Roof Deck, Quezon City
Kind of Material : Selected Borrow
Test Hole Set : #VALUE!
Representing : #VALUE! 200 mm #VALUE! #VALUE!
(Layer No.) (Depth) (Location) (Date)
Tested by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Computed by : JOHN MARFORI SGCGCDC #VALUE!
(Name and Designation) (Office) (Date)
Lab No. : #VALUE!

UNIT WEIGHT OF AIR -DRY SAND Hole 1 Hole 2 Hole 3


1. Container, g 5,942.00 5,942.00 5,942.00
2. Container full of water, g 4,512.00 4,512.00 4,512.00
3. Water, g (1) -(2) 1,430.00 1,430.00 1,430.00
4. Container, cm3 (3)/1 1,430.00 1,430.00 1,430.00
5. Container filled with dry sand,g 8,284.00 8,284.00 8,284.00
6. Air-dry sand, g (5) -(1) 2,342.00 2,342.00 2,342.00
7. Unit weight of Air -dry Sand, g/cm3 (6)/(4) 1.64 1.64 1.64

MASS OF SAND TO FIL FUNNEL


8. Mass of Jar + Sand , g (before) 8,412.00 8,412.00 8,412.00
9. Mass of Jar + Sand , g (after) 5,721.00 5,721.00 5,721.00
10. Sand in the funnel,g (8)- (9) 2,691.00 2,691.00 2,691.00

MOISTURE CONTENT
11. Container, g 243 243 243
12. Container + Wet Soil, g #VALUE! #VALUE! #VALUE!
13. Container + Dry Soil, g 355.67 357.53 357.27
14. Moisture, g (12) - (13) #VALUE! #VALUE! #VALUE!
15. Dry Soil, g (13) - (11) 112.67 114.53 114.27
16. Actual Moisture Content, % {(14)/(15)} * 100 #VALUE! #VALUE! #VALUE!
17. Average Moisture Content, % #VALUE! #VALUE! #VALUE!

FIELD DENSITY
18. Total Material Taken From Hole, g #VALUE! #VALUE! #VALUE!
19. Mass of Jar + Sand ( before pouring), g 7,982.00 7,874.00 7,737.00
20. Mass of Jar + Sand ( after pouring), g 3,181.00 3,042.00 3,046.00
21. Sand to Fill Hole, g (19)-(20)-(10) 2,110.00 2,141.00 2,000.00
22. Volume of hole, cm3 (21)/(7) 1,288.34 1,307.27 1,221.18
23. Wet Unit Weight , g/cm3 (18/22) #VALUE! #VALUE! #VALUE!
24. Dry Unit Weight , g/cm3 (23)/{1+(17)/100} #VALUE! #VALUE! #VALUE!
25. Laboratory Compaction Test Data :
Lab No. #VALUE!
a. Maximum Dry Density, g/cm3 #VALUE! #VALUE! #VALUE!
b. Optimum Moisture Content, % #VALUE! #VALUE! #VALUE!
26. Degree of Compaction %, #VALUE! #VALUE! #VALUE!

REMARKS/RECOMMENDATIONS :
Satisfactory
CERTIFIED CORRECT: NOTED:

JOHN MARFORI M.M.C.S.ALVARADO/J.L.B.PUEYO


Materials-In-Charge Engineer II
R.U. Aquino Construction & Development Corp./ DPWH-NCR
Le Bron Construction (JV)