570 Recertification Renewal Quiz
Question 1 of 25 ‘Time Remaining: 240 Minutes
Question 1: To evaluste bieters and larninatione a tinescfar-cervise assessment should be performed
in accordance wt
©, APLS?3 Section 5
© p, APLS79 Section 8
© G, APLS72 Section 6
@ p, apr sra section 7
SS Oe570 Recertification Renewal Quiz
Question 2 of 25 ‘Time Remaining: 238 Minutes
(Question 2: The ouner-ucer shall pacty industry qualfied UT Shear Wave Examiners when
© a, Trying to detect and si fans for Ftnecs-tor-Servoe evalusten
© B. validating that hisher-term carreson vets are to he used in remaining ie caeulations
© c. The accuracy of lenatudinel wave thickness measurements is in question,
c
D. Conducting guided wave ultrasenio measurements far external eerrosion on buried pining570 Recertification Renewal Quiz
Question 3 of 25 ‘Time Remaining: 235 Minutes
(Question 2: The 401 578 Matenal Verfcston Program i for
©. PL of resales and Ranges on praccure vessels
© a, Oetermining ifthe allor pining system has been correctly species
© c.New end existing alloy pina systems, ¢———
© p, All naw and axisting 821.9 giping aystome,570 Recertification Renewal Quiz
Question 4 of 25 “Time Remaining: 233 Minutes
Question 4: When Phil is conducted on walding electrodes or wire samples from a lot or package cf
alley weld rods
© a. Certified Mil Test reports can be substituted for the PME Exerrination
© p, One electrode or wite sample should be tested,
CG, Hie not acceptable te test weld buttone as an alternstve:
Cp, Sthofthe electrode or wire samples should be tasted
II A Oe570 Recertification Renewal Quiz
Question 5 of 25 “Time Remaining: 232 Minutes
Question 5: In assessing psi systems for possible Revuactive Materiel Identification prourams
(PM), which of the following is not considered as a consegueice feckor?
© A, Lkolihood of material mix-up.
© B,_ Petanticl size of the release
© c.Toxioty to hurnans and the environment,
© p, Flammatilty ofthe produc.
I AI OoQuestion 6 of 25 Time Remait
ing: 230 Minutes
Question 6: During welding operation: the inspector should contrm that
c
nao
A
‘The inepection dessior ic accurate and complete
‘The weS and WFQ are qualified for the Work
‘The welding peremeters ere supported by the WES and WFO
“The NDE examrinor and NDE procedures sro acceptable for the work
I AI A570 Recertification Renewal Quiz
‘question 7 of 25 “Time Remaining: 223 Winutes
Question 7: When the oner/user chooses to conduct a RBT assessment k must be 4 systematic
evaluation in accordance with
Coq APrsat
@ pg, aPisza
© oc, aPrss0 <———_
© op, aPts70
I AI OoQuestion 8 of 25 ‘Time Remaining: 223 Minutes
Question & Statistical analysis employing point measurements is not applica to pining systems vith
© a. Insutiient dats covenng exch campanent.
© a, alloy components uni run-length
© c.Slanificant localized corrosion mechanisms
© p. Short-term eotrocion rates over § mile per year
I AI A570 Recertification Renewal Quiz
Question 9 of 25 “Time Remaining: 225 Minutes
Question 9: When postive material identification (PMN) testing Is recuired, portable x-ray fluorescence
spectrometer:
© p, cannot bo used te detect elemants lighter then sulfur (6)
© B,_ te the most affective technique to detact carbon (C).
© c. s aneffectve technique ta detect al common alloying elements,
© p, canbe used to detect elements lighter than sulfur (S}
I AI OoQuestion 10 of 25 ‘Time Remaining: 224 Minutes
Question 10: Evternal visual inspection intervals can be established by Using
Com Apap sza
© a, APIRFSSL
© c. APF SOO
© op. ApRP S78
I AI A570 Recertification Renewal Quiz
Question 11 of 25, ‘Time Remaining: 223 minutes
Question 115 Enspestin intervals or ootentall oovesive inition mic pints ean elo be established
o
Coa Apap sz7a
@ p, APrRP S30
Coc. APR SSL
© op. APIRP S74
I AI OoQuestion 12 of 25 ‘Time Remaining: 221 Minutes
Question 12: Ftnass-tor-Service ascessment ic 4 methodology for flaw aesecemant in order to
o
a4
astermine
‘The likelhcod that e piping component will be acceptable for hich temperature service
‘The consequence of a sudden brite fracture at low temperatures
TF 2 piping system has the integrity for cantinued service
“The risk chat a piping