The document contains a test with 34 multiple choice questions covering various topics in civil engineering drawings and specifications. The questions address different types of drawings used in construction projects, structural elements like columns and walls, measurement units, and order of approval for drawings, specifications and amounts. Commercial and health facility design standards are also touched on.

Uploaded by

wonkplomery
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views9 pages

Stracture

The document contains a test with 34 multiple choice questions covering various topics in civil engineering drawings and specifications. The questions address different types of drawings used in construction projects, structural elements like columns and walls, measurement units, and order of approval for drawings, specifications and amounts. Commercial and health facility design standards are also touched on.

Uploaded by

wonkplomery
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

‫‪--------‬‬ ‫‪--------‬‬

‫‪Dr.Tala Ali Ahmed‬‬

‫اعداد‬
‫طالب‬
‫الفرقه‬
‫االولي‬
‫كهربة‬
‫‪15#‬‬
1-Civil drawings are divided according to the stage of
implementation and presentation into:

A-tender drawing.

B-shop drawing.

C-as built drawing.

D-all of them.

2-The number of skewers per linear meter must not be less


than ........ skewers, and the thickness of the skewer must not be
less than ...........

A-10-12

B-5-12

C-12-5

D-6-12

3-The specifications document contains the general requirements,


which are.....،.....،.....

A- opening envelopes,

B-the duration of the process,

C- the delay fine.

D-all of them .

4-The drawings that are presented according to what has been


implemented are.

A-tender drawing .

B-as built drawing.

C-shop drawing.

D-a,b.

5-The drawings provided by the company after award are:


A-tender drawing .

B-as built drawing.

C-shop drawing.

D-a,b.

6-The civil drawings submitted during the tender stage are:

A-tender drawing .

B-as built drawing.

C-shop drawing.

D-a,b.

7-It determines the location of the facility and determines the length
and direction of each of the lines defined for the site’s land, which
are the drawings

A-Construction drawings,

B- architectural drawings,

C -general site plan,

D- interior coordination drawings.

8-The engineer who cares about the aesthetic appearance of the


facility is the engineer .........and provides drawings......

A-Architect, structural drawings,

B- civil engineer, structural drawings,

C- civil engineer, architectural drawings,

D- architect, architectural drawings.

9- When the slabs are steel with a lower and upper steel, the lower
steel is........ a and the upper steel is a....

A-Main,secondary—Main

B-Main,secondary--secondary
C-secondary -Main

10- Construction drawings include all of the following except:

A-Details of foundations and axles.

B-Column models, sectors and steel.

C-Main destinations and quality of building cladding materials.

D- steel slabs and beams.

11- The first drawing we need to begin in any project is


………………..drawings.

a) Structural

b) architectural

c) electrical

d) mechanical

12- The space between the wooden box and the iron spits is
…………….

a) 5 cm in each side

b) 2.5 cm in each side

c) 10 cm in each side

d) there is no space between them.

13- the spport which have three parameters is …………suppot.

a) Roller

b) hinged

c) fixed

d) intermediate hinge

14- which of these is a public building ………….

a) Offices

b) palaces
c) hospitals

d) a&c

15- the last drawing we prepare is ………………..Drawing.

a) Tender

b) shop

c) coordinating

d) as built

16- when the civil , electrical and mechanical prepare drawing we


call this

drawing………..

a) Tender

b) shop

c) coordinating

d) as built

17-we class the walls and floor covering as…………… load.

a) Dead

b) live

c ) dynamic

18- the drawing which have the details of columns and slabs is
…….drawing.

a) Architectural

b) structure

c) electrical

d) mechanical

19- the drawing which have shape and model of stairs…………..

a) Architectural
b) structure

c) electrical

d) mechanical

20- If you have these models of columns ( a1,a2,a3,a4) range them


according to

the loads on them.

a) a1>a2>a3>a4

b) a1<a2<a3<a4

c) a1=a2=a3=a4

21- if the concrete is 3000 m2 then the reinforced concrete should


be………….m2.

a) 3000

b) 2500

c)3500

d) 9000

22-We take the horizontal loads when the building is more than
……….floor.

a) Four

b) five

c) six

d) seven

23- the least number of spits in the square meter is ………

a) 5

b) 6

c) 7

d)9
24-the least wide for any column according to Egyptian code is
……….cm

a) 20

b) 25

c) 30

d) 35

25-the least distance between the toilet seat and any element
is………

a ) 30 cm

b) 40 cm

c)50 cm

d) 60 cm

26- the thickness of outer walls usually is………..cm

a) 30

b) 12

c) 20

d)25

27 – if the cross section of the column in the first floor is 120cm2


the cross

section of last floor’s column may be………cm2

a) 150

b) 100

c) 120

d) b&c

28-External walls are often a ..........centimeter thick in order to.......

A-25 ▪It has no constructive purpose


B-12 ▪It has no constructive purpose

C-25▪Heat and sound insulation

D12▪Heat and sound insulation

1. 29-The thickness of the internal walls is .......cm.in order to.....

A-25▪Heat and sound insulation

B-12▪Partition only

C-12▪It has no constructive purpose

D-25▪Partition only

30- Gable construction is used in.....Columns and beams are.....

A-Small distance▪One part

B- Long distances▪detached

C-Small distances▪detached

D-Long distances▪One part

31-The initial measurement for wooden doors and electrical works


such as bulbs is by .....

A-cubic metre

B-Linear meters

C-numerically

D-a,c.

32-Excavation, backfilling and concrete are measured in units....

A-Linear meters

B-cubic metre

C-numerically

D-a,c

33-When the engineer submits the preliminary assessment, this


assessment contains:
A-Business statement▪Quantity▪unit price

B-Business statement▪Quantity▪Total

C-Business statement▪Quantity

D-Business statement▪unit price▪Total

34 -According to the order of priorities ......... is approved first


a- drawing

b- Specifications

c- amounts

 Examples of commercial buildings are schools and


hospitals(x)

 The thickness of the columns increases as

 they get closer to the foundation(‫)صح‬

 Health equipment must be placed as far as possible from the


door(‫)صح‬

 Electrical works drawings include knowing the details of


cooling devices(x)