1-Civil drawings are divided according to the stage of
implementation and presentation into:
A-tender drawing.
B-shop drawing.
C-as built drawing.
D-all of them.
2-The number of skewers per linear meter must not be less
than ........ skewers, and the thickness of the skewer must not be
less than ...........
A-10-12
B-5-12
C-12-5
D-6-12
3-The specifications document contains the general requirements,
which are.....،.....،.....
A- opening envelopes,
B-the duration of the process,
C- the delay fine.
D-all of them .
4-The drawings that are presented according to what has been
implemented are.
A-tender drawing .
B-as built drawing.
C-shop drawing.
D-a,b.
5-The drawings provided by the company after award are:
A-tender drawing .
B-as built drawing.
C-shop drawing.
D-a,b.
6-The civil drawings submitted during the tender stage are:
A-tender drawing .
B-as built drawing.
C-shop drawing.
D-a,b.
7-It determines the location of the facility and determines the length
and direction of each of the lines defined for the site’s land, which
are the drawings
A-Construction drawings,
B- architectural drawings,
C -general site plan,
D- interior coordination drawings.
8-The engineer who cares about the aesthetic appearance of the
facility is the engineer .........and provides drawings......
A-Architect, structural drawings,
B- civil engineer, structural drawings,
C- civil engineer, architectural drawings,
D- architect, architectural drawings.
9- When the slabs are steel with a lower and upper steel, the lower
steel is........ a and the upper steel is a....
A-Main,secondary—Main
B-Main,secondary--secondary
C-secondary -Main
10- Construction drawings include all of the following except:
A-Details of foundations and axles.
B-Column models, sectors and steel.
C-Main destinations and quality of building cladding materials.
D- steel slabs and beams.
11- The first drawing we need to begin in any project is
………………..drawings.
a) Structural
b) architectural
c) electrical
d) mechanical
12- The space between the wooden box and the iron spits is
…………….
a) 5 cm in each side
b) 2.5 cm in each side
c) 10 cm in each side
d) there is no space between them.
13- the spport which have three parameters is …………suppot.
a) Roller
b) hinged
c) fixed
d) intermediate hinge
14- which of these is a public building ………….
a) Offices
b) palaces
c) hospitals
d) a&c
15- the last drawing we prepare is ………………..Drawing.
a) Tender
b) shop
c) coordinating
d) as built
16- when the civil , electrical and mechanical prepare drawing we
call this
drawing………..
a) Tender
b) shop
c) coordinating
d) as built
17-we class the walls and floor covering as…………… load.
a) Dead
b) live
c ) dynamic
18- the drawing which have the details of columns and slabs is
…….drawing.
a) Architectural
b) structure
c) electrical
d) mechanical
19- the drawing which have shape and model of stairs…………..
a) Architectural
b) structure
c) electrical
d) mechanical
20- If you have these models of columns ( a1,a2,a3,a4) range them
according to
the loads on them.
a) a1>a2>a3>a4
b) a1<a2<a3<a4
c) a1=a2=a3=a4
21- if the concrete is 3000 m2 then the reinforced concrete should
be………….m2.
a) 3000
b) 2500
c)3500
d) 9000
22-We take the horizontal loads when the building is more than
……….floor.
a) Four
b) five
c) six
d) seven
23- the least number of spits in the square meter is ………
a) 5
b) 6
c) 7
d)9
24-the least wide for any column according to Egyptian code is
……….cm
a) 20
b) 25
c) 30
d) 35
25-the least distance between the toilet seat and any element
is………
a ) 30 cm
b) 40 cm
c)50 cm
d) 60 cm
26- the thickness of outer walls usually is………..cm
a) 30
b) 12
c) 20
d)25
27 – if the cross section of the column in the first floor is 120cm2
the cross
section of last floor’s column may be………cm2
a) 150
b) 100
c) 120
d) b&c
28-External walls are often a ..........centimeter thick in order to.......
A-25 ▪It has no constructive purpose
B-12 ▪It has no constructive purpose
C-25▪Heat and sound insulation
D12▪Heat and sound insulation
1. 29-The thickness of the internal walls is .......cm.in order to.....
A-25▪Heat and sound insulation
B-12▪Partition only
C-12▪It has no constructive purpose
D-25▪Partition only
30- Gable construction is used in.....Columns and beams are.....
A-Small distance▪One part
B- Long distances▪detached
C-Small distances▪detached
D-Long distances▪One part
31-The initial measurement for wooden doors and electrical works
such as bulbs is by .....
A-cubic metre
B-Linear meters
C-numerically
D-a,c.
32-Excavation, backfilling and concrete are measured in units....
A-Linear meters
B-cubic metre
C-numerically
D-a,c
33-When the engineer submits the preliminary assessment, this
assessment contains:
A-Business statement▪Quantity▪unit price
B-Business statement▪Quantity▪Total
C-Business statement▪Quantity
D-Business statement▪unit price▪Total
34 -According to the order of priorities ......... is approved first
a- drawing
b- Specifications
c- amounts
Examples of commercial buildings are schools and
hospitals(x)
The thickness of the columns increases as
they get closer to the foundation()صح
Health equipment must be placed as far as possible from the
door()صح
Electrical works drawings include knowing the details of
cooling devices(x)