0% found this document useful (0 votes)
17 views3 pages

C15C18 深油底的保养周期

Uploaded by

linkangjun0621
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views3 pages

C15C18 深油底的保养周期

Uploaded by

linkangjun0621
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

C15 Industrial Engine JRE00001-UP(SEBP3815 - 70) - Documentation Page 1 of 3

Previous Screen

Welcome: j540txy

Product: INDUSTRIAL ENGINE


Model: C15 INDUSTRIAL ENGINE JRE
Configuration: C15 Industrial Engine JRE00001-UP

Operation and Maintenance Manual


C15 Industrial Engines
Media Number -SEBU7902-06 Publication Date -01/04/2014 Date Updated -01/04/2014

i05757058

Maintenance Interval Schedule - Engines Which Have Deep


Sumps
SMCS - 1000; 4450; 7500

Ensure that all safety information, warnings, and instructions are read and understood before any
operation or any maintenance procedures are performed. The user is responsible for the
performance of all maintenance including the following procedures: all adjustments, the use of
proper lubricants, fluids, filters and the installation of new components due to normal wear and
aging . The performance of this product may be diminished if proper maintenance intervals and
procedures are not followed. Components may experience accelerated wear if proper maintenance
intervals and procedures are not followed.

Note: Use whichever of the following that occurs first in order to determine the maintenance
intervals: service hours and calendar time . Before each consecutive interval is performed, all
maintenance from the previous intervals must be performed.

Refer to this Operation and Maintenance Manual, "Refill Capacities" to determine the type of oil
pan with which your engine is equipped.

Products that operate in severe operating conditions may require more frequent maintenance.
Refer to this Operation and Maintenance Manual, "Severe Service Applications" to determine if
the engine is operating in a severe service application.

When Required
Battery - Replace
Battery or Battery Cable - Disconnect
Coolant - Change
Coolant Extender (ELC) - Add
Engine Air Cleaner Element (Dual Element) - Inspect/Clean/Replace
Engine Oil and Filter - Change
Engine Storage Procedure - Check
Fuel System - Prime

https://sisweb.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/siswe... 2016/1/26
PDF 文件使用 "pdfFactory Pro" 试用版本创建 ÿwww.fineprint.com.cn
C15 Industrial Engine JRE00001-UP(SEBP3815 - 70) - Documentation Page 2 of 3

Daily
Coolant Level - Check
Engine Air Cleaner Service Indicator - Inspect
Engine Air Precleaner - Check/Clean
Engine Oil Level - Check
Fuel System Primary Filter/Water Separator - Drain
Fuel Tank Water and Sediment - Drain
Walk-Around Inspection

Every 250 Service Hours


Battery Electrolyte Level - Check
Coolant Sample (Level 1) - Obtain
Cooling System Supplemental Coolant Additive (SCA) - Test/Add
Fuel System Primary Filter (Water Separator) Element - Replace
Fuel System Secondary Filter - Replace
Grounding Stud - Inspect/Clean/Tighten
Hoses and Clamps - Inspect/Replace
Radiator - Clean
Starting Motor - Inspect

Initial 500 Service Hours (or at first oil change)


Engine Valve Lash - Check
Engine Valve Rotators - Inspect

Initial 500 Hours (for New Systems, Refilled Systems, and Converted Systems)
Coolant Sample (Level 2) - Obtain

Every 500 Service Hours


Belts - Inspect/Adjust/Replace
Engine Oil Sample - Obtain
Engine Oil and Filter - Change
Turbocharger - Inspect
Water Pump - Inspect

Every 1000 Service Hours


Engine Crankcase Breather - Clean

Every Year
Coolant Sample (Level 2) - Obtain

Every 3000 Service Hours or 3 Years


Aftercooler Core - Clean/Test
Coolant Temperature Regulator - Replace
Crankshaft Vibration Damper - Inspect

https://sisweb.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/siswe... 2016/1/26
PDF 文件使用 "pdfFactory Pro" 试用版本创建 ÿwww.fineprint.com.cn
C15 Industrial Engine JRE00001-UP(SEBP3815 - 70) - Documentation Page 3 of 3

Driven Equipment - Check


Electronic Unit Injector - Check/Replace
Engine - Clean
Engine Mounts - Inspect
Engine Protective Devices - Check
Engine Speed/Timing Sensor - Clean/Inspect
Engine Valve Lash - Check
Engine Valve Rotators - Inspect
Fan Drive Bearing - Lubricate

Every 585,000 L (154,540 US gal) of Fuel


Overhaul Considerations

Overhaul
Fan Drive Bearing - Replace

Copyright 1993 - 2016 Caterpillar Inc. Tue Jan 26 01:11:00 UTC+0800 2016
All Rights Reserved. j540txy
Private Network For SIS Licensees.

https://sisweb.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/siswe... 2016/1/26
PDF 文件使用 "pdfFactory Pro" 试用版本创建 ÿwww.fineprint.com.cn

You might also like