0% found this document useful (0 votes)
331 views9 pages

Rab Cat

The document provides a list of hourly wage rates and material prices for various construction jobs. Labor roles and their hourly rates are listed, ranging from 200,000 IDR for a foreman to 130,000 IDR for a worker. Material prices are also provided for items like paint, wood treatments, roofing materials and more, with unit prices per kilogram, liter or other unit. Sample work items are outlined with labor and material quantities needed to estimate the unit price.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
331 views9 pages

Rab Cat

The document provides a list of hourly wage rates and material prices for various construction jobs. Labor roles and their hourly rates are listed, ranging from 200,000 IDR for a foreman to 130,000 IDR for a worker. Material prices are also provided for items like paint, wood treatments, roofing materials and more, with unit prices per kilogram, liter or other unit. Sample work items are outlined with labor and material quantities needed to estimate the unit price.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

DAFTAR HARGA SATUAN UPAH & BAHAN

PEKERJAAN 1 (SATU) PAKET PENGECATAN KANTOR KAS BANK


PEMBANGUNAN KALTENG
LIKOTA PALANGKARAYA, RSUD DORIS SYLVANUS, PEMPROP KALTENG, SAMSAT PROP K

UPAH TENAGA KERJA


HARGA SATUAN
NO. TENAGA KERJA SATUAN
(Rp.)
A UPAH
1 Mandor org/hr 200,000.00
2 Kepala tukang org/hr 180,000.00
3 Tukang Kayu org/hr 155,000.00
4 Tukang Besi Beton org/hr 155,000.00
5 Tukang Besi / IWF org/hr 155,000.00
6 Tukang Batu org/hr 155,000.00
7 Tukang Cat org/hr 155,000.00
8 Tukang Pipa org/hr 155,000.00
9 Tukang Listrik org/hr 155,000.00
10 Pekerja org/hr 130,000.00

HARGA BAHAN BANGUNAN


HARGA SATUAN
NO. MATERIAL SATUAN
(Rp.)
A
1 Amplas lbr 15,000.00
2 Minyak Cat kg 30,000.00
3 Cat kilat kg
4 Plamur Tembok Set. MATEX kg 32,000.00
5 Cat dasar kg 46,000.00
6 Cat tembok Dulux type weather shield kg 155,000.00
7 Cat tembok type weather coat (acrylic) kg 117,000.00
8 Cat tembok Interior, warna Stand. liter 124,000.00
9 Cat tembok Exterior, warna Std. liter 175,000.00
10 Cat weather shield kg 65,600.00
11 Cat Plafond kg 54,750.00
12 Cat seng (zinc chromate) kg 31,000.00
13 Cat besi/kayu Set. Dulux kg 83,000.00
14 Dempul kg 28,000.00
15 Plitur kg 67,000.00
16 Thiner impala ltr 37,000.00
17 Thiner ND ltr 48,000.00
18 Melamic ltr 93,000.00
19 Vemis ltr 75,000.00
20 Meni kg 31,000.00
21 Oker kg 10,000.00
22 Lem kayu kg 87,000.00
23 Lem kuning kg 47,000.00
24 Sealent tube 45,000.00
25 Paint Remover kg 89,000.00
26 Rol Cat bh 45,000.00
27 Sabun/cream pembersih kotoran kg 15,000.00
28 Cat Duko kg 67,000.00
29 Ter/residu ltr 4,000.00
30 Kuas bh 14,000.00
31 Road line paint (cat marka) kg 53,000.00
32 Glass bit kg 17,500.00
33 Weatherbong emulsion (cat kerb) kg 120,000.00
34 Termoplast kg 17,500.00
35 Water proofing m2 85,000.00
36 Wallpaper m2 48,000.00
37 Sealent GE / Dow Coming Non Asan tube 45,000.00
38 Kape bh 28,000.00
39 Coumpond zak 102,500.00
40 White Sreen Microvision bh 968,000.00
41 Pasir Beton m3 325,000.00
42 Semen Kg 1,700.00
43 Gypsum Board 9 mm Lbr 87,000.00
44 Sekrup Gypsum Kg 47,000.00
45 Lis Plafond Gypsum M' 23,000.00
43 Batu Pecah 2-3 m3 475,000.00
ANALISA HARGA SATUAN PEKERJAAN

A.4.7.1 1m2 Pengikisan/pengerokan permukaan cat lama

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.1500 130,000.00 19,500.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 20,100.00
B BAHAN
Amplas 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 50,100.00


E Overhead & Profit (Contoh 15 %) 0% x D -
F Harga Satuan Pekerjaan (D+E) 50,100.00

A.4.7.1. 1 m2 Pengecatan bidang kayu lama (1 lapis cat dasar, 1 lapis cat penutup)

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0700 130,000.00 9,100.00
Tukang cat L.02 OH 0.0090 155,000.00 1,395.00
Kepala tukang L.03 OH 0.0060 180,000.00 1,080.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 12,175.00
B BAHAN
Cat menie Kg 0.2000 32,000.00 6,400.00
Plamuur Kg 0.0300 32,000.00 960.00
Cat dasar Kg 0.1700 46,000.00 7,820.00
Cat penutup Kg 0.1700 83,000.00 14,110.00
Kuas Bh 0.0100 14,000.00 140.00
Pengencer Ltr 0.0300 30,000.00 900.00
Ampelas Lbr 0.2000 15,000.00 3,000.00
JUMLAH HARGA BAHAN 33,330.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 45,505.00


E Overhead & Profit (Contoh 15 %) 0% x D -
F Harga Satuan Pekerjaan (D+E) 45,505.00

A.4.7.1 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0200 130,000.00 2,600.00
Tukang cat L.02 OH 0.0630 155,000.00 9,765.00
Kepala tukang L.03 OH 0.0063 180,000.00 1,134.00
Mandor L.04 OH 0.0030 200,000.00 600.00
JUMLAH TENAGA KERJA 14,099.00
B BAHAN
Plamuur Kg 0.1000 32,000.00 3,200.00
Cat dasar Kg 0.1000 46,000.00 4,600.00
Cat penutup Kg 0.2600 124,000.00 32,240.00
JUMLAH HARGA BAHAN 36,840.00
C PERALATAN
Kuas 0.2000 14,000.00 2,800.00
Roll Cat 0.3000 45,000.00 13,500.00
JUMLAH HARGA ALAT 16,300.00

D Jumlah (A+B+C) 67,239.00


E Overhead & Profit (Contoh 15 %) 0% x D -
F Harga Satuan Pekerjaan (D+E) 67,239.00
N.2 1 m2 POLITUR BIDANG KAYU DENGAN CAT KAYU
A BAHAN
1 Cat kayu Kg 0.3720 83,000.00 30,876.00
2 Kuas bh 0.1000 14,000.00 1,400.00
3 Amplas lbr 2.0000 15,000.00 30,000.00
62,276.00
B TENAGA
1 Pekerja Oh 0.0700 130,000.00 9,100.00
2 Tukang cat Oh 0.0600 155,000.00 9,300.00
3 Kepala tukang Oh 0.0160 180,000.00 2,880.00
4 Mandor Oh 0.0025 200,000.00 500.00
21,780.00
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 84,056.00


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 84,100.00
N.3 1 m2 PENGECATAN TEMBOK INTERIOR
A BAHAN
1 Plamir kg 0.1000 32,000.00 3,200.00
2 Cat dasar kg 0.1000 46,000.00 4,600.00
3 Cat penutup liter 0.2600 124,000.00 32,240.00
40,040.00
B TENAGA
1 Pekerja Oh 0.0200 130,000.00 2,600.00
2 Tukang cat Oh 0.0630 155,000.00 9,765.00
3 Kepala tukang Oh 0.0063 180,000.00 1,134.00
4 Mandor Oh 0.0030 200,000.00 600.00
14,099.00
C PERALATAN
1 Kuas Cat 0.2000 14,000.00 2,800.00
2 Roll Cat 0.3000 45,000.00 13,500.00
16,300.00

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 70,439.00


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 70,500.00
N.4 1 m2 PENGECATAN TEMBOK EXTERIOR
A BAHAN
1 Plamir kg 0.1000 32,000.00 3,200.00
2 Cat dasar kg 0.1000 32,000.00 3,200.00
3 Cat penutup liter 0.2600 175,000.00 45,500.00
51,900.00
B TENAGA
1 Pekerja Oh 0.0200 130,000.00 2,600.00
2 Tukang cat Oh 0.0630 155,000.00 9,765.00
3 Kepala tukang Oh 0.0063 180,000.00 1,134.00
4 Mandor Oh 0.0030 200,000.00 600.00
14,099.00
C PERALATAN
1 Kuas Cat 0.2000 14,000.00 2,800.00
2 Roll Cat 0.3000 45,000.00 13,500.00
16,300.00

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 82,299.00


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 82,300.00
N.6 1 m2 PENGECATAN PLAFOND
A BAHAN
1 Cat penutup liter 0.1200 54,750.00 6,570.00
2 Cat Penutup 2 kali liter 0.2400 54,750.00 13,140.00
3 Amplas lbr 0.5000 15,000.00 7,500.00
4 Rol Cat bh 0.0100 45,000.00 450.00
27,660.00
B TENAGA
1 Pekerja Oh 0.0600 130,000.00 7,800.00
2 Tukang cat Oh 0.0400 155,000.00 6,200.00
3 Kepala tukang Oh 0.0040 180,000.00 720.00
4 Mandor Oh 0.0030 200,000.00 600.00
15,320.00
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 42,980.00


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 43,000.00

E.1 1 m3 MEMBUAT LANTAI KERJA BETON 1 PC : 3 PSR : 5 KR


A BAHAN
1 Semen portland kg 218.0000 1,700.00 370,600.00
2 Pasir beton kg 0.5200 325,000.00 169,000.00
3 Batu split kg 0.8700 475,000.00 413,250.00
952,850.00
B TENAGA
1 Pekerja Oh 1.6500 130,000.00 214,500.00
2 Tukang batu Oh 0.2500 155,000.00 38,750.00
3 Kepala tukang Oh 0.0250 180,000.00 4,500.00
4 Mandor Oh 0.0800 200,000.00 16,000.00
273,750.00
C PERALATAN

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 1,226,600.00


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 1,226,600.00

D.4 1 m2 PLESTERAN LANTAI 1 pc : 3 ps, tebal = 20 mm


A BAHAN
1 Semen portland kg 10.3680 1,700.00 17,625.60
2 Pasir pasang m3 0.0310 325,000.00 10,075.00
27,700.60
B TENAGA
1 Pekerja Oh 0.2600 130,000.00 33,800.00
2 Tukang batu Oh 0.2000 155,000.00 31,000.00
3 Kepala tukang Oh 0.0200 180,000.00 3,600.00
4 Mandor Oh 0.0130 200,000.00 2,600.00
C PERALATAN 71,000.00

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 98,700.60


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 98,800.00

G.3 1 m2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm


A BAHAN
1 Gypsum board (120 x 240 x 9 ) mm lbr 0.3640 87,000.00 31,668.00
2 Sekrup gypsum kg 0.1100 47,000.00 5,170.00
36,838.00
B TENAGA
1 Pekerja Oh 0.1000 130,000.00 13,000.00
2 Tukang kayu Oh 0.0500 155,000.00 7,750.00
3 Kepala tukang Oh 0.0050 180,000.00 900.00
4 Mandor Oh 0.0050 200,000.00 1,000.00
C PERALATAN 22,650.00

D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 59,488.00


E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 59,500.00
G.2 1 m LIST LANGIT - LANGIT GYPSUM 10 cm
A BAHAN
1 List gypsum profil m 1.1000 23,000.00 25,300.00
2 Paku kg 0.0100 47,000.00 470.00
3 Tepung gypzum kg 0.1500 102,500.00 15,375.00
41,145.00
B TENAGA
1 Pekerja Oh 0.0500 130,000.00 6,500.00
2 Tukang kayu Oh 0.0500 155,000.00 7,750.00
3 Kepala tukang Oh 0.0050 180,000.00 900.00
4 Mandor Oh 0.0030 200,000.00 600.00
15,750.00
C PERALATAN
D Jumlah Bahan, Tenaga, dan Peralatan (A+B+C) 56,895.00
E Overhead & Profit 10 % X D -
F Harga Satuan Pekerjaan (D+E) 56,900.00
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN 1 (SATU) PAKET PENGECATAN KANTOR KAS BANK PEMBANGUNAN KALTENG
(KANTOR WALIKOTA PALANGKARAYA, RSUD DORIS SYLVANUS, PEMPROP KALTENG, SAMSAT PROP KALTENG)

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6

I Kantor Kas Pemerintah Kota Palangka Raya


1 Pekerjaan Pengupasan Cat Lama M² 245.59 50,100.00 12,304,059.00
2 Pekerjaan Pengecatan Dinding Interior M² 146.87 70,500.00 10,354,335.00
3 Pekerjaan Pengecatan Dinding Exterior M² 98.72 82,300.00 8,124,656.00
4 Pekerjaan Pengecatan Bidang Kayu Lama M² 65.10 45,505.00 2,962,375.50
5 Pekerjaan Pemasangan Plafond Baru M² 2.33 59,500.00 138,635.00
6 Pekerjaan Perbaikan Plafond M² 69.64 10,000.00 696,400.00
7 Pekerjaan Pemasangan List Plafond M´ 3.00 56,900.00 170,700.00
8 Pekerjaan Pengecatan Plafond M² 71.97 43,000.00 3,094,710.00
9 Pekerjaan Cor Lantai Kerja M³ 4.24 1,226,600.00 5,200,784.00
Total Biaya 43,046,654.50

II Kantor Kas Pemprop Kalimantan Tengah


1 Pekerjaan Pengupasan Cat Lama M² 239.20 50,100.00 11,983,920.00
2 Pekerjaan Pengecatan Dinding Interior M² 140.60 70,500.00 9,912,300.00
3 Pekerjaan Pengecatan Dinding Exterior M² 98.60 82,300.00 8,114,780.00
4 Pekerjaan Perbaikan Plafond M² 102.70 10,000.00 1,027,000.00
5 Pekerjaan Pengecatan Plafond M² 102.70 43,000.00 4,416,100.00
Total Biaya 35,454,100.00

III Kantor Kas RSUD Doris Sylvanus


1 Pekerjaan Pengecatan Dinding Interior M² 216.00 70,500.00 15,228,000.00
2 Pekerjaan Pengupasan Cat Lama M² 94.80 50,100.00 4,749,480.00
3 Pekerjaan Pengecatan Plafond M² 94.80 43,000.00 4,076,400.00
Total Biaya 24,053,880.00

IV Kantor Kas Samsat Propinsi Kalimantan Tengah


1 Pekerjaan Pengupasan Cat Lama M² 253.49 50,100.00 12,699,849.00
2 Pekerjaan Pengecatan Dinding Baru M² 254.00 70,500.00 17,907,000.00
3 Pekerjaan Pengecatan Plitur Bidang Kayu Dengan Cat Kayu M² 55.44 84,100.00 4,662,504.00
4 Pekerjaan Perbaikan Plafond M² 83.49 10,000.00 834,900.00
5 Pekerjaan Pengecatan Plafond M² 83.49 43,000.00 3,590,070.00
6 Pekerjaan Pemasangan Lis Plafond M' 3.30 56900 187,770.00
Total Biaya 39,882,093.00

Jumlah Total (I + II + III + IV) 142,436,727.50


PPn 15,668,040.03
Grand Total 158,104,767.53
Pembulatan 158,105,000.00

Terbilang : Seratus Lima Puluh Delapan Juta Seratus Lima Ribu Rupiah