North Core Elevations Comment R1

This document is a review of shop drawings for a construction project. The review is only to check if the shop drawings meet the requirements outlined in the contract documents. The reviewer has approved the shop drawings for construction.

Uploaded by

jeremy.vfe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views12 pages

North Core Elevations Comment R1

This document is a review of shop drawings for a construction project. The review is only to check if the shop drawings meet the requirements outlined in the contract documents. The reviewer has approved the shop drawings for construction.

Uploaded by

jeremy.vfe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

1 2 REVIEW OF SHOP DRAWING

1 2 Review is only for the limited purposes as set forth in the


11145 Level 7
Contract Documents

FFL 145800
APPROVED FOR CONSTRUCTION

APPROVED WITH COMMENTS


RESUBMISSION REQUIRED

T
1
3
J 0 T
3
1
J 0
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED
J 0
T
1
3 J 0
T
1
3

7 7

7 7

U8 0 2

U8 0 2
U8 0 2

U8 0 2

7 7

7 7
T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0

J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6

01A 1A 1A 1A 1A 1A 1A 1A 01A

T
6
0
J 1 T
6
0
J 1

T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

J 1
T
0
6 J 1
T
0
6

TRUNKING/CONDUIT DISAPPROVED
RESUBMISSION REQUIRED
RB
4ft BSC 4ft BSC 4ft BSC 4ft BSC 4ft BSC 4ft BSC Checked by:
1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB
2400 2400 2400 2400 2400 2400 Date:

T
1
3
J 0
J 0
L K

3
1
T

1
- 7
N0

N0
- 7

L K
2 7
1

U8 0 8

U8 0 8
2 7

N0
L K 1
- 7

T
1
3
J 0 T
1
3
J 0
7 7

U8 0 2
U8 0 2

7 7

2 7
U8 0 8 8 7
U8 0 2

T
1
6
J 0
T
1
6
0
J
01A 01A
J 0
T
1
3

U8 0 2
7 7
01A

U8 0 1

T
6
0
J 1
8 7

1
T
J0
6
8 7
U8 0 1
T
6
0
J 1

T
1
6
0
J

J 0
6
1
T J 1
T
0
6

CABLE SUPPORT SYSTEM BY OTHERS 1x13A SSO (E)


E
GDP4-4 GDP4-2 WITH EXISTING CLADDING AT 1000MM HEIGHT 2x13A SSO
A O2 C02 VOC
O2 Gas Detector LLC LLC LLC LLC LLC
VOC
O2 Gas Detector
C02 O2 2x13A SSO
V0C GDP4-5
CO2 Gas Detector GDP4-3
CO2 Gas Detector V0C
VOCP-6 VOCP-5 BSC BSC BSC BSC BSC BSC

2700
U8 0 2
7 7
T
3
1
J 0

J 1
1A

T
0
6
T
6
0
J 1

J 1
T
0
6

1420x852X2400 1420x852X2400 1420x852X2400 1420x852X2400 1420x852X2400 1420x852X2400


J 0
T
1
3

MLB12 MLB12 MLB12 MLB12 MLB12

2400
UB1 UB2 1200 X 750 X 900 1200 X 750 X 900 1200 X 750 X 900 1200 X 750 X 900 1200 X 750 X 900

Micoscope 320 x 530 x 500

870 x 700
MLB15 UB1 UB1 UB1 UB1 UB1

FR
OVERHEAD SERVICE CHASE 1570 1570 1570 1570 1570

x 1780
1500 X 750 X 900
1391 1529
A
Centrifuge
800 W x 800 CELL CULTURE RMD C B
THERMOSTAT
D x 800 H
E_PUSH_BUTTON
BSL2+ NEW CELL CULTURE
ROOM
J 0
T
1
3

1A

J 1
T
0
6
T
6
0
J 1

J 1
T
0
6
J 0
T
1
3

PUSH_BUTTON 6th Storey


RB HMLB 15 HMLB 15 SIGNAGE_GAS HMLB 15 HMLB 15 FFL 141250
1500 X 750 X 1100 1500 X 750 X 1100 LEAK DO NOT 1500 X 750 X 1100 1500 X 750 X 1100
ENTER
HMLB
15a
WLB-LS REGULATOR
660 x 640 660 x 640 660 x 640 660 x 640 REGULATOR
EXIT 660 x 640 660 x 640 660 x 640 660 x 640
x 1100 x 1100 x 1100 x 1100 x 1100 x 1100 x 1100 x 1100
WS
S
J 0
T
1
3

CCR - ELEVATION A
1A

J 1
T
0
6
T
6
0
J 1

J 1
T
0
6
J 0
T
1
3

A 1 : 40
6TH STOREY (NORTH) CELL CULTURE ROOM PLAN 2B

1 1 : 50

A 2 1
Level 7
FFL 145800

Level 7
FFL 145800
2G Lighting Switch 1x13A SSO (E)
1G Lighting Switch 2x13A SSO MAIN CONTRACTOR REVIEW AND CHECK
2x13A SSO
1G Lighting Switch NAME & SIGNATURE NAME & SIGNATURE
1855
2x13A SSO SPM/PM ENGINEER/SM
2 x13A SIGNAGE_GAS 2x13A SSO 2x13A SSO (E)
355 LEAK DO NOT ARCHITECTURAL M&E COORDINATOR
ENTER COORDINATOR
GAS POINTS
DATE

55
700 800 700 1294
425 700 800 700 2x13A SSO (E)
2x13A SSO

165
750

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)

660(W)x640(D)x1100(H)
REV NO. AMENDMENT DATE

Gas Gas

INCUBATORS

INCUBATORS

INCUBATORS

INCUBATORS

INCUBATORS

INCUBATORS

INCUBATORS

INCUBATORS
O2 Gas Detector 1x13A SSO (E) Regul CLIENT:

CO2

CO2

CO2

CO2

CO2

CO2

CO2

CO2
1100
VOC BESIDE THE FREEZE Regul
ator

(CEILING)
ator 100 NATIONAL UNIVERSITY OF SINGAPORE

2700
(CEILING)

4 nos 4 nos University Campus Infrastructure

2300

158
3000

(CEILING)

Campus Asset Management (CAM)


2700

8 Kent Ridge Drive,


2x13A SSO #02-02, Singapore 119246
FR 2x13A SSO

1300

1300
870x700x1780 1500 887 332

1200
1100
1800

1070

1000
2x13A SSO (E)
1600

ARCHITECT:
1500

2x13A SSO CO2 Gas Detector


2x13A SSO (E)
1258

NEW CELL CULTURE


ROOM
CPG Consultants Pte Ltd
6th Storey
NEW CELL CULTURE FFL 141250 1 Gateway Drive #23-01
CPG West Gate Tower
300

6th Storey ROOM Singapore 608531


FFL 141250
PUSH_BUTTON Tel : 63574231 Fax : 6357 4398
E_PUSH_BUTTON
THERMOSTAT
WAVE SENSOR

CCR - ELEVATION C M&E CONSULTANT:

C 1 : 40
EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
Tel: (65) 6225 1808 Fax: (65) 6225 6808

CCR - ELEVATION B Email : enquiry@ewc.com.sg


www.ewc.com.sg

B 1 : 40
MAIN CONTRACTOR:

LIAN SOON CONSTRUCTION PTE LTD


A 21A SENOKO LOOP
Level 7 Level 7 LIAN SOON INDUSTRIAL BUILDING
FFL 145800 FFL 145800 SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632

SUB-CONTRACTOR:

CABLE SUPPORT
SYSTEM BY OTHERS
WITH EXISTING CLADDING AT 1000MM HEIGHT PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

2x13A SSO. PROJECT TITLE :


2162 2x13A SSO. PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
2x13A SSO 1x13A SSO fb EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
800 DATA_OUTLET NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
O2 Gas Detector 04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
2x13A SSO
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
(CEILING)

2x13A SSO
3000
(CEILING)

1x13A SSO (E) VOC


2700

DATA 397 400 400 400 400 400 400 400 400 400 400 400 400 400 397
800

CENTRIFUGE
800x800x800 DRAWING TITLE :
1600
1500

ELECTRICAL INSTALLATION
NEW CELL CULTURE CO2 Gas Detector NEW CELL CULTURE 6TH STOREY PLAN (NORTH CORE)
ROOM CELL CULTURE ROOM
300

ROOM
6th Storey 6th Storey
FFL 141250 FFL 141250 PLAN AND ELEVATIONS
Drawn by : PAI / MYO Checked by : SHREE
CCR - ELEVATION E
CCR - ELEVATION D E 1 : 40
Scale : AS SHOWN Date : 02 NOV 2023
D 1 : 40 CAD File : SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-CCR
Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-CCR 0
4 REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
Contract Documents

APPROVED FOR CONSTRUCTION


A
J 0
T
1
3

U8 0 7
2 7
T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0

J 0
6
1
T J 0
6
1
T J 1
T
0
6 J 1
T
0
6 J 1
T
0
6

APPROVED WITH COMMENTS


1A 1A 1A 1A 1A

T
1
6
J 0 T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

T
1
6
J 0 T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

RESUBMISSION REQUIRED
UB1 UB2 RB 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. APPROVED WITH COMMENTS
MLB15 Level 7 Level 7 NO RESUBMISSION REQUIRED
A 1500 X 750 X 900 FFL 145800 FFL 145800
2000 2000 2199 DISAPPROVED
RESUBMISSION REQUIRED

Checked by:
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VA CA4 CA4 VA VAC VAC VAC

1500 X 750 X 900


MLB 15

1500 X 750 X 900


MLB 15
UB

N2 N2 N2
AR AR AR Date:
1420 x 852 x

CA4 CA4 CA4

FR
WP WP WP
4ft BSC

1200 1200 1200


2400

FR

200
VA CA4 CA4 VA
1500 X 750 X 900
MLB 15

1500 X 750 X 900


MLB 15
R D B ( 4500 MM ) 32A SPN ISOL.
860 x 740 x
FR
1800

1070
A 2x13A SSO
860 x 740 x

VA D
CA4 CA4B VA
FR

C 2x13A SSO 320 FUME HOOD FUME HOOD FUME HOOD

DB-L6-LAB-5-N-P4
1500 X 750 X 900
TLB 15

1500 X 750 X 900


TLB 15
1800

550 1x13A SSO (E) REFER TO TYPICAL ELEVATION

2440

2440
UB2

MOUNTED ON
UB1

NEW MODULAR LAB

1050
MULLION
1500 X 750 X 900

NEW 3
MLB15

NEW MODULAR LAB


MODULAR 3
1500 X 750 X 900
6th Storey 6th Storey
LS 15 LAB3 FFL 141250 FFL 141250
UB2

THERMOSTAT
E_PUSH_BUTTON
52 sqm
UB1

EVACUATE
1500 X 750 X 900

PUSH_BUTTON O2 Gas Detector


SIGNAGE
MLB15

VOC

O2 V0CVOCP-2
M LAB 3 - ELEVATION A M LAB 3 - ELEVATION B
EVA
GDP1-2 A 1 : 40
B 1 : 40
S USER USER
4KG

SIGNAGE_GAS
CAB CAB DB 1
LEAK DO NOT
ENTER
DB-L6-LAB-5-N-P4
DB-L6-LAB-5-N-P5

6TH STOREY (NORTH) MUDULAR LAB 3 PLAN


1 1 : 50
MAIN CONTRACTOR REVIEW AND CHECK
NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR

DATE

4 A REV NO. AMENDMENT DATE

CLIENT:
1125 1900 1900
Level 7 Level 7 NATIONAL UNIVERSITY OF SINGAPORE
FFL 145800 FFL 145800
1200 1200 1200 University Campus Infrastructure
Campus Asset Management (CAM)
8 Kent Ridge Drive,
LEFT TO RIGHT 2x13A SSO (E) LEFT TO RIGHT LEFT TO RIGHT
#02-02, Singapore 119246
VAC VAC VAC
N2 N2 N2
AR AR AR
CA4 CA4 CA4 ARCHITECT:
WP WP WP

CPG Consultants Pte Ltd


1 Gateway Drive #23-01
CPG West Gate Tower
Singapore 608531
Tel : 63574231 Fax : 6357 4398
155

200

EVACUATE
165

4G Lighting Switch SIGNAGE 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.
1x13A SSO (E) 2G Lighting Switch M&E CONSULTANT:
2x13A SSO 345 1660 1884 2820 700
O2 Gas Detector
2x13A SSO (E) 50 500 900 EWC Engineers Pte Ltd
VOC
970 Toa Payoh North #06-18 Singapore 318992
1833 2x13A SSO (E) Tel: (65) 6225 1808 Fax: (65) 6225 6808
(CEILING)

100 2x13A SSO (E) Email : enquiry@ewc.com.sg


www.ewc.com.sg
2800

1x13A SSO 1x13A SSO

2440
BSC
2x13A SSO (E)
1420 x 852 x 2400
158

1800
MAIN CONTRACTOR:
1600

PUSH_BUTTON
1500

FR FR
E_PUSH_BUTTON 860x740x1800 860x740x1800 LIAN SOON CONSTRUCTION PTE LTD
1200

1x13A SSO (E)


1100

1100
1070

1058

1050
THERMOSTAT MOUNTED ON MULLION 21A SENOKO LOOP
20
NEW MODULAR LAB NEW MODULAR LAB LIAN SOON INDUSTRIAL BUILDING
31 SINGAPORE 758174
6th Storey 3 6th Storey 3 Tel: 6255 7211 Fax: 6253 2632
FFL 141250 FFL 141250

SUB-CONTRACTOR:

Make the power


points accessible for
the user. This applies PRESICO ENGINEERING PTE LTD
M LAB 3 - ELEVATION C M LAB 3 - ELEVATION D to all Modular Lab
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579

C 1 : 40
D 1 : 40
firdge Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)

DRAWING TITLE :

ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
MODULAR LAB 3 PLAN AND ELEVATIONS

Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

CAD File : SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-M LAB 3

Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-M LAB 3 0


REVIEW OF SHOP DRAWING
4 Review is only for the limited purposes as set forth in the
Contract Documents

J 0
3
1
T

4 A APPROVED FOR CONSTRUCTION

2 7
U8 0 7
T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0

J 0
6
1
T J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6

1C 1B 1B 1B
1A

T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

APPROVED WITH COMMENTS


RESUBMISSION REQUIRED
RB

2400
1420 x 852 x
4ft BSC
APPROVED WITH COMMENTS
1186 1900 2000
A Level 7 Level 7
NO RESUBMISSION REQUIRED
DISAPPROVED
FFL 145800 FFL 145800 RESUBMISSION REQUIRED
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VAC VAC VAC

UB
N2 N2 N2 Checked by:
VA CA4 CA4 VA AR AR AR

1500 X 750 X 900


MLB 15

1500 X 750 X 900


MLB 15
CA4 CA4 CA4
WP WP WP
Date:
860 x 740 x

1120 1120 1120


FR
1800
860 x 740 x
FR

VA CA4 CA4 VA
1500 X 750 X 900
MLB 15

1500 X 750 X 900


MLB 15
1800

200
R D B ( 4500 MM )
UB2

1300
UB1

A
1500 X 750 X 900

D B 2x13A SSO (E) 1x13A SSO (E)


MLB15

VA CA4 CA4 VA
C
1500 X 750 X 900
TLB 15

1500 X 750 X 900


TLB 15

(CEILING)

(CEILING)
FUME HOOD FUME HOOD FUME HOOD

2800

2800
REFER TO TYPICAL ELEVATION 1x13A SSO (E)

2440

2400
UB2

FACADE MULLION BSC

1800

1800

1800
1420 x 852 x 2400
UB1

1500 X 750 X 900

NEW
MLB15

NEW MODULAR LAB


1500 X 750 X 900
MODULAR 4 NEW MODULAR LAB
LS 15 3 4
LAB 6th Storey 6th Storey 4
UB2

FFL 141250 FFL 141250


THERMOSTAT 1900 301
E_PUSH_BUTTON 52 sqm
UB1

PUSH_BUTTON
1500 X 750 X 900
MLB15

EVA O2 V0C VOCP-1

S
GDP1-1 M LAB 4 - ELEVATION B
4KG
M LAB 4 - ELEVATION A How to access? B 1 : 40
NEW AIR
A 1 : 40
Power for BSC
EXIT
EVA
EXIT

LOCK
S

10 sqm

6TH STOREY (NORTH) MUDULAR LAB 4 PLAN MAIN CONTRACTOR REVIEW AND CHECK
1 1 : 50
NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR

DATE

REV NO. AMENDMENT DATE

CLIENT:

NATIONAL UNIVERSITY OF SINGAPORE


University Campus Infrastructure
4 Campus Asset Management (CAM)
8 Kent Ridge Drive,
A #02-02, Singapore 119246

Level 7 Level 7 ARCHITECT:


FFL 145800 FFL 145800
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VAC
N2
VAC
N2
VAC
N2
CPG Consultants Pte Ltd
AR AR AR 1 Gateway Drive #23-01
1125 1900
CA4
WP 1900
CA4
WP
CA4
WP CPG West Gate Tower
Singapore 608531
Tel : 63574231 Fax : 6357 4398

1200 1200 1200


M&E CONSULTANT:
EVACUATE
SIGNAGE
EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
155

200

Tel: (65) 6225 1808 Fax: (65) 6225 6808


EVACUATE
165

Email : enquiry@ewc.com.sg
SIGNAGE 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. www.ewc.com.sg
1x13A SSO (E)
2x13A SSO 2G Lighting Switch 535 1636 1521
O2 Gas Detector
2x13A SSO VOC 4G Lighting Switch 2x13A SSO (E)
50 500 MAIN CONTRACTOR:
2418 2x13A SSO LIAN SOON CONSTRUCTION PTE LTD
2x13A SSO
(CEILING)

(CEILING)
100 21A SENOKO LOOP
2800

2800
20 1x13A SSO (E) LIAN SOON INDUSTRIAL BUILDING

2440
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
158

1800
FR FR
1600

860 x 740 x 1800 860 x 740 x 1800


1500

1200

SUB-CONTRACTOR:
1100

1100
1070

PUSH_BUTTON 31 NEW MODULAR LAB


E_PUSH_BUTTON
NEW MODULAR LAB THERMOSTAT 20 4
6th Storey 4 6th Storey PRESICO ENGINEERING PTE LTD
FFL 141250 FFL 141250
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :

450 from FFL PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN

M LAB 4 - ELEVATION D NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,


04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
M LAB 4 - ELEVATION C D SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
C 1 : 40
1 : 40

DRAWING TITLE :

ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
MODULAR LAB 4 PLAN AND ELEVATIONS

Drawn by : PAI./MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

CAD File SD-T4S12L2L3S9L6-S9-ELEC-ROOM


: DETAIL-M LAB 4
Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-M LAB 4 0


2B

EXIT
EVA
REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
Contract Documents

SIGNAGE_GAS
2 3 4
SIGNAGE_GAS APPROVED FOR CONSTRUCTION
Evacuation sign

EVA
LEAK DO NOT 10200 10200 LEAK DO NOT

S
ENTER ENTER instead? APPROVED WITH COMMENTS
RESUBMISSION REQUIRED
APPROVED WITH COMMENTS
GDP2-2 GDP2-1 GDP1-2 GDP1-1
USER USER S S S USER USER S Shouldn't this be NO RESUBMISSION REQUIRED
DB 1 CABINET CABINET
USER
CAB
4KG USER
CAB
USER
CAB DB 1 4KG
CAB CAB DB 1 4KG
facing outside of the DISAPPROVED
RESUBMISSION REQUIRED
UB1

SIGNAGE_GAS SIGNAGE_GAS SIGNAGE_GAS lab?


1200 X 750 X 900

1A LEAK DO NOT LEAK DO NOT LEAK DO NOT


EDB-L6-LAB-1-N-P3 EDB-L6-LAB-1-N-P1 DB-L6-LAB-5-N-P4 Checked by:
MLB12

1B ENTER ENTER ENTER SIGNAGE_GAS

EXIT
GDP (VarioGard DB-L6-LAB-5-N-P2 DB-L6-LAB-5-N-P3 DB-L6-LAB-5-N-P5
LEAK DO NOT

S
Central Unit)

EXIT
GDP (VarioGard ENTER Date:
E_PUSH_BUTTON
GDP (VarioGard Central Unit)
UB1 UB2 MLB12 THERMOSTAT There is a full height Central Unit)
EXIT THERMOSTAT
E_PUSH_BUTTON
MLB15 1200 X 750 X 900 cabinet here. 1H GDP (VarioGard
UB1 PUSH_BUTTON Central Unit)
1500 X 750 X 900
FFL 141.250 PUSH_BUTTON
1C
LS 15 CH=3000 LS 15
GDP3-3 O2 Gas Detector UB1 UB2 GDP3-2 O2 Gas Detector UB1 UB2 O2 Gas Detector GDP3-1
DB-L6-LAB-5-N-P1 VOC 1500 X 750 X 900 VOC 1500 X 750 X 900 VOC
MLB15 MLB15
DB 2

O2 O2 O2
B EVACUATE
1500 X 750 X 900 1500 X 750 X 900

1500 X 750 X 900


MLB15
SIGNAGE
4KG V0C VOCP-10 V0C V0C UB1 UB2 UB1 UB2

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15
EXIT
MLB15 MLB15

UB2

UB2

UB2

UB2
DB-L6-LAB-5-N-P6
VOCP-11 VOCP-12 1500 X 750 X 900 1500 X 750 X 900

UB1
UB1

UB1

UB1

UB1

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15
1500 X 750 X 900

1500 X 750 X 900

1500 X 750 X 900

1500 X 750 X 900


LC LC LC LC LC LC LC LC

UB1

UB1

UB1

UB1
OVERHEAD SERVICE CHASE

OVERHEAD SERVICE CHASE

OVERHEAD SERVICE CHASE

OVERHEAD SERVICE CHASE


MLB15

MLB15

MLB15

MLB15
1C

UB2
1D

UB2

UB2

UB2

UB2
1F 1J

UB1

UB1

1500 X 750 X 900


MLB15
1E 1G 1I 1K
1D

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15
UB2

UB2

UB2

UB2

UB2

UB2
O2

UB1
UB1

UB1

UB1

UB1
1500 X 750 X 900

1500 X 750 X 900

1500 X 750 X 900

1500 X 750 X 900

1500 X 750 X 900


MLB15

1500 X 750 X 900


MLB15
GDP3-4 LC LC LC LC LC LC LC LC

UB1

UB1

UB1

UB1
MLB15

MLB15

MLB15

MLB15

UB2
UB2

UB2

UB2

UB2
Release button & UB1 UB2 UB1 UB2 UB1 UB2
Break glass for MLB15 MLB15 MLB15 MLB15a
Card access? This 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900
One more elevation here
door got card
access
1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900

UB2 UB1
MLB15
UB2 UB1
MLB15
UB2 UB1
MLB15
UB2 UB1
MLB15
UB2 UB1
MLB15 MLB12
1200 X 750 X 900
MLB15
6 MLB15
B 4 5
UB2 UB1 UB2 UB1

13.52MM THK BACK PAINTED GLASS


UB1
6 6 5 5 4 4 3/B 3/B

B 6TH STOREY (NORTH) OPEN LAB


Level 7
1 1 : 50
FFL 145800
2 MAIN CONTRACTOR REVIEW AND CHECK
Level 7
Level 7 FFL 145800 NAME & SIGNATURE NAME & SIGNATURE
FFL 145800
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR

DATE
DATA_OUTLET

REV NO. AMENDMENT DATE


Release button and

55
break glass? CLIENT:
2x13A SSO

165
CORRIDOR NATIONAL UNIVERSITY OF SINGAPORE
2x13A SSO
1x13A SSO (E) University Campus Infrastructure
1x13A SSO DATA_OUTLET Campus Asset Management (CAM)
EVACUATE 8 Kent Ridge Drive,
2x13A SSO 2x13A SSO SIGNAGE
THERMOSTAT #02-02, Singapore 119246
2x13A SSO 2x13A SSO
2x13A SSO 1x13A SSO
E_PUSH_BUTTON CORRIDOR
PUSH_BUTTON
CORRIDOR 100 ARCHITECT:
1100

DB-L6-LAB-5-N-P6 CPG Consultants Pte Ltd


20 1 Gateway Drive #23-01

20
CPG West Gate Tower
Singapore 608531
6th Storey

1000
Tel : 63574231 Fax : 6357 4398
1100

FFL 141250
1050

1170 6th Storey M&E CONSULTANT:


6th Storey FFL 141250
FFL 141250
1315 120 441 624 145 423 EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
1445 145 120 Tel: (65) 6225 1808 Fax: (65) 6225 6808
Email : enquiry@ewc.com.sg
www.ewc.com.sg

NEW OPEN LAB - ELEVATION A NEW OPEN LAB - ELEVATION B NEW OPEN LAB - ELEVATION C
1A 1 : 40
1B 1 : 40
1C 1 : 40 MAIN CONTRACTOR:

LIAN SOON CONSTRUCTION PTE LTD


4 3 21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
10200 SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632

Level 7 SUB-CONTRACTOR:
FFL 145800

PRESICO ENGINEERING PTE LTD


34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
100x100MM TATOO TRUNKING Tel No: (65) 67471346 Fax No: 67477945
MOUNT ON RC WALL
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)

REFER TO TYPICAL ELEVATION REFER TO TYPICAL ELEVATION REFER TO TYPICAL ELEVATION REFER TO TYPICAL ELEVATION
1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E) OSC 3750 OSC 3000 DRAWING TITLE :
OSC 3000 OSC 3750
EDB-L6-LAB-1-N-P2

1274 1050
EDB-L6-LAB-1-N-L1

2x13A SSO 2x13A SSO 2x13A SSO 1599


ELECTRICAL INSTALLATION
DB-L6-LAB-5-N-L1

1050 1106 1500 1500 1688


2x13A SSO 2x13A SSO 2x13A SSO
UPVC DADO TRUNKING UPVC DADO TRUNKING UPVC DADO TRUNKING 6TH STOREY PLAN (NORTH CORE)
1775 604 896 604 896 1343 1233 OPEN LAB PLAN AND ELEVATIONS
1100

1100

1100

1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E) PART - 1
2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO
DATA_OUTLET DATA_OUTLET 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO Drawn by : PAI / MYO Checked by : SHREE
CORRIDOR
6th Storey 1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E)
FFL 141250
Scale : AS SHOWN Date : 02 NOV 2023

Height? 1800? CAD File :SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP1


NEW OPEN LAB - ELEVATION D Height?
1D 1 : 40
Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP1 0
B B
B REVIEW OF SHOP DRAWING
Level 7 Level 7 Level 7 Review is only for the limited purposes as set forth in the
FFL 145800 FFL 145800 FFL 145800 Contract Documents

APPROVED FOR CONSTRUCTION

APPROVED WITH COMMENTS


RESUBMISSION REQUIRED
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED
Evacuation sign DISAPPROVED
DATA_OUTLET RESUBMISSION REQUIRED
DATA_OUTLET instead?
Checked by:

1x13A SSO_ E

1x13A SSO_ E
200

1x13A SSO_ E

1x13A SSO_ E
Date:

2x13A SSO.

2x13A SSO.

2x13A SSO.

2x13A SSO.
2x13A SSO.

2x13A SSO.

2x13A SSO.

2x13A SSO.
GDP (VarioGard
Central Unit)
2x13A SSO GAS POINTS

Gas points to be Gas points to be CORRIDOR


integrated with 465 470 470 470 470 470 470 462 integrated with 100
PUSH_BUTTON

DB-L6-LAB-5-N-P3
375 375 375 375 375 375 375 E_PUSH_BUTTON
service chase service chase THERMOSTAT

CORRIDOR CORRIDOR
158

20

1600
20
1058

1000
CORRIDOR
6th Storey 6th Storey 6th Storey
FFL 141250 FFL 141250 FFL 141250

NEW OPEN LAB - ELEVATION E NEW OPEN LAB - ELEVATION G NEW OPEN LAB - ELEVATION H
1E 1 : 40
1G 1 : 40
1H 1 : 40
2 10200
3 10200
4

Level 7
FFL 145800

SIGNAGE_GAS GDP (VarioGard SIGNAGE_GAS SIGNAGE_GAS GDP (VarioGard SIGNAGE_GAS


LEAK DO NOT Central Unit) LEAK DO NOT LEAK DO NOT Central Unit) LEAK DO NOT
ENTER ENTER ENTER ENTER
55

MAIN CONTRACTOR REVIEW AND CHECK


165

NAME & SIGNATURE NAME & SIGNATURE


SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR

DATE

EDB-L6-LAB-1-N-P1
EDB-L6-LAB-1-N-P3

DB-L6-LAB-5-N-P2

DB-L6-LAB-5-N-P3

DB-L6-LAB-5-N-P4

DB-L6-LAB-5-N-P5
REV NO. AMENDMENT DATE
1600

CLIENT:

NATIONAL UNIVERSITY OF SINGAPORE


CORRIDOR University Campus Infrastructure
Campus Asset Management (CAM)
6th Storey 8 Kent Ridge Drive,
FFL 141250
#02-02, Singapore 119246

ARCHITECT:

CPG Consultants Pte Ltd


1 Gateway Drive #23-01
Where are all the CPG West Gate Tower
Singapore 608531
DDCs?
NEW OPEN LAB - ELEVATION F Tel : 63574231 Fax : 6357 4398

1F 1 : 40 M&E CONSULTANT:

EWC Engineers Pte Ltd


970 Toa Payoh North #06-18 Singapore 318992
Tel: (65) 6225 1808 Fax: (65) 6225 6808
Email : enquiry@ewc.com.sg
www.ewc.com.sg

4
B MAIN CONTRACTOR:

Level 7 B Level 7 Not so high level. Level 7


LIAN SOON CONSTRUCTION PTE LTD
FFL 145800 FFL 145800 FFL 145800 21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
CL Tel: 6255 7211 Fax: 6253 2632
CL

SUB-CONTRACTOR:
LEFT TO RIGHT
1/2" N2
DATA_OUTLET 130 130 3/4" VAC 130 130 LEFT TO RIGHT
∅ 15MM CA4 1/2" N2
DATA_OUTLET 3/4" VAC
∅ 15MM CA4
PRESICO ENGINEERING PTE LTD
Gas points to be 34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
integrated with Tel No: (65) 67471346 Fax No: 67477945
200

1x13A SSO_ E

1x13A SSO_ E

300

300
2x13A SSO.

2x13A SSO.

2x13A SSO.

2x13A SSO.

service chase
GAS POINTS PROJECT TITLE :
2120 CORRIDOR
50 226 PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
VOC O2 Gas Detector 537 920 580 EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
Standardize 200mm NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,

2x13A SSO
2x13A SSO
1x13A SSO

2x13A SSO
2x13A SSO
1x13A SSO
GDP (VarioGard above the wall lab
DATA_OUTLET 04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
Central Unit)
375 375 375 375 375 375 375 375 611 918 582 bench. SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
1600

1600

DRAWING TITLE :
1500

CORRIDOR
2x13A SSO
2x13A SSO
1x13A SSO

2x13A SSO
2x13A SSO
1x13A SSO

1100

1100
ELECTRICAL INSTALLATION
DATA_OUTLET
CORRIDOR
6TH STOREY PLAN (NORTH CORE)
6th Storey 6th Storey 6th Storey
FFL 141250 FFL 141250 FFL 141250 OPEN LAB PLAN AND ELEVATIONS
PART - 2
NEW OPEN LAB - ELEVATION I Drawn by : PAI / MYO Checked by : SHREE
1I 1 : 40 Scale : AS SHOWN Date : 02 NOV 2023
NEW OPEN LAB - ELEVATION J NEW OPEN LAB - ELEVATION K
1J 1 : 40
1K 1 : 40
CAD File :SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP2
Rev :
Drawing no. :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP2 0
REVIEW OF SHOP DRAWING
6 Review is only for the limited purposes as set forth in the
Contract Documents

APPROVED FOR CONSTRUCTION


1863
6 6 APPROVED WITH COMMENTS
RESUBMISSION REQUIRED
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED

Level 7 Level 7 DISAPPROVED


FFL 145800 FFL 145800 RESUBMISSION REQUIRED

D Checked by:

Date:
Can the switches be
C this side instead?
B

M_Thermostat

2x13A SSO
M_Thermostat
2G Lighting Switch
2395 1G Lighting Switch
537
A

B 2x13A SSO 2x13A SSO

50
20

1200

1100
NEW PANTRY 20

NEW PANTRY 50
6th Storey 6th Storey
FFL 141250 FFL 141250

6TH STOREY (NORTH) PANTRY NEW PANTRY - ELEVATION A NEW PANTRY - ELEVATION B
1 1 : 50
A 1 : 40
B 1 : 40

MAIN CONTRACTOR REVIEW AND CHECK


NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR
B
DATE

Level 7 Level 7
FFL 145800 FFL 145800 REV NO. AMENDMENT DATE

CLIENT:

NATIONAL UNIVERSITY OF SINGAPORE


University Campus Infrastructure
Campus Asset Management (CAM)
8 Kent Ridge Drive,
#02-02, Singapore 119246

ARCHITECT:

CPG Consultants Pte Ltd


1 Gateway Drive #23-01
CPG West Gate Tower
Singapore 608531
Tel : 63574231 Fax : 6357 4398
2x13A SSO 2x13A SSO Fridge
1G Lighting Switch 2x13A SSO
2x13A SSO M&E CONSULTANT:
2x13A SSO 300
2x13A SSO
EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
Tel: (65) 6225 1808 Fax: (65) 6225 6808
Email : enquiry@ewc.com.sg
www.ewc.com.sg
1143
1101

1100

1100

1100

MAIN CONTRACTOR:
6th Storey NEW PANTRY NEW PANTRY
6th Storey LIAN SOON CONSTRUCTION PTE LTD
FFL 141250 FFL 141250
21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632

NEW PANTRY - ELEVATION C NEW PANTRY - ELEVATION D SUB-CONTRACTOR:

C D 1 : 40
1 : 40 PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)

DRAWING TITLE :

ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
PANTRY PLAN AND ELEVATIONS PART

Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

CAD File : SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-PANTRY

Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-PANTRY 0
REVIEW OF SHOP DRAWING
6 Review is only for the limited purposes as set forth in the
Contract Documents

APPROVED FOR CONSTRUCTION


1863
6 6 APPROVED WITH COMMENTS
RESUBMISSION REQUIRED
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED

Level 7 Level 7 DISAPPROVED


FFL 145800 FFL 145800 RESUBMISSION REQUIRED

D Checked by:

Date:

C
B

M_Thermostat

2x13A SSO
M_Thermostat
2G Lighting Switch
2395 1G Lighting Switch
537
A

B 2x13A SSO 2x13A SSO

50
20

1200

1100
NEW PANTRY 20

NEW PANTRY 50
6th Storey 6th Storey
FFL 141250 FFL 141250

6TH STOREY (NORTH) PANTRY NEW PANTRY - ELEVATION A NEW PANTRY - ELEVATION B
1 1 : 50
A 1 : 40
B 1 : 40

MAIN CONTRACTOR REVIEW AND CHECK


NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR
B
DATE

Level 7 Level 7
FFL 145800 FFL 145800 REV NO. AMENDMENT DATE

CLIENT:

NATIONAL UNIVERSITY OF SINGAPORE


University Campus Infrastructure
Campus Asset Management (CAM)
8 Kent Ridge Drive,
#02-02, Singapore 119246

The glass window is ARCHITECT:


one piece, don't have
this mullion in the CPG Consultants Pte Ltd
middle. 1 Gateway Drive #23-01
CPG West Gate Tower
Singapore 608531
Tel : 63574231 Fax : 6357 4398
2x13A SSO 2x13A SSO
1G Lighting Switch 2x13A SSO
2x13A SSO M&E CONSULTANT:
2x13A SSO 300
2x13A SSO
EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
Tel: (65) 6225 1808 Fax: (65) 6225 6808
Email : enquiry@ewc.com.sg
www.ewc.com.sg
1143
1101

1100

1100

1100

MAIN CONTRACTOR:
6th Storey NEW PANTRY NEW PANTRY
6th Storey LIAN SOON CONSTRUCTION PTE LTD
FFL 141250 FFL 141250
21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632

NEW PANTRY - ELEVATION C NEW PANTRY - ELEVATION D SUB-CONTRACTOR:

C D 1 : 40
1 : 40 PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)

DRAWING TITLE :

ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
PANTRY PLAN AND ELEVATIONS PART

Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

CAD File : SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-PANTRY

Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-PANTRY 0
REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
1 1 Contract Documents

APPROVED FOR CONSTRUCTION


J 0
3
1
T
Level 7 APPROVED WITH COMMENTS
1A

J 0
6
1
T
T
1
6
J 0

J 0
6
1
T
J 0
3
1
T

Autoclave Autoclave
440 x 660 x440
1040
x 660 x 1040 FFL 145800 Level 7 RESUBMISSION REQUIRED
MLB12 Icemaker 660 x 690 x 1040 FFL 145800

800 x 400 x
Purification
1200 X 750 X 900 APPROVED WITH COMMENTS
VOC UB1 NO RESUBMISSION REQUIRED
Water

560
PUSH_BUTTON
VOCP-8 DISAPPROVED
V0C RESUBMISSION REQUIRED
CORE E_PUSH_BUTTON
THERMOSTAT Checked by:
FACILITIES
J 0
3
1
T

J 0
1A

6
1
T
T
1
6
J 0

J 0
6
1
T
J 0
3
1
T

1500
Date:

MLB12
1200 X 750 X 900 1263 840 437
UB1
WLB

B MLB12 NEW CORE SELECTOR SWITCH


A D E
1200 X 750 X 900 FACILITIES
J 0
T
1
3

J 1
1A

T
0
6
T
6
0
J 1

J 1
T
0
6
J 0
T
1
3

C
UB1 32A SPN ISOL.
2x13A SSO 2x13A SSO 1x13A SSO
MLB12 2x13A SSO 32A SPN ISOL.
2x13A SSO
1200 X 750 X 900 1x13A SSO
1x13A SSO 1x13A SSO NEW CORE

00
2700
UB1 VOC

10
FACILITIES
RB 1x13A SSO
500 500

158
J 0
T
1
3
NS
U0
NS

- 0
-U 0

1
1
2

NS
U0- 1
1A

J 1
T
0
6
T
6
0
J 1

J 1
J 1
NS

T
0
6
T
0
6
U0- 0
2
J 0
T
1
3

1x13A SSO
NS
U0- 2

MLB12
U0
NS 2
- 3

U0
NS 2
- 3

U0
NS 2
- 3

800
U0
NS 2
- 3

U0
NS 2
- 3

SINK 438 100 438

1500

1500
1500
U0
NS 2
- 3

U0
NS 2
- 3

1100

1050
U0
NS 2
- 3

U0
NS 2
- 3

U0
NS 2
- 3

DATA_OUTLET

1100
U0
NS 2
- 3

1050

1040

1040
U0
NS 2
- 3

U0
NS

U0
NS

U0
NS
2
- 3

2
- 3

2
- 3
AUTO CLAVE
High speed

560
440x660x1040
U0
NS 2
- 3

MLB12 MLB12
U0
NS 2
- 3

U0
NS

U0
NS
2
- 3

2
- 3

WATER ICE MAKER


U0
NS

U0
NS
2
- 3

2
- 3

Centrifuge PURIFICATION MLB12 660x690x1040


1200 X 750 X 900 1200 X 750 X 900
6th Storey
U0
NS 2
- 3

U0
NS

U0
NS
2
- 3

2
- 3

1000 x 700 1200x750x900


U0
NS 2
- 3

UB1 UB1 x 1300 6th Storey


U0
NS 2
- 3

FFL 141250
This is table top
U0
NS 2
- 3

1500 2226 271


U0
NS 2
- 3

U0
NS 2
- 3

FFL 141250
U0
NS - 2
T
3
1
J 0
NS
U0- 0
1

J 1
T
0
6
T
6
0
J 1

J 1
J 1
NS

T
0
6
T
0
6
U0- 0
2

FC FC 2x13A SSO
2x13A SSO
1090 x 670 1090 x 670 1090 x 670
1x13A SSO
6TH STOREY (NORTH) NEW CORE FACILITIES NEW CORE FACILITIES - ELEVATION A NEW CORE FACILITIES - ELEVATION B
1 1 : 50
A 1 : 40
B 1 : 40

Height??

1 Level 7 MAIN CONTRACTOR REVIEW AND CHECK


FFL 145800
NAME & SIGNATURE NAME & SIGNATURE
Level 7 SPM/PM ENGINEER/SM
FFL 145800
Level 7 ARCHITECTURAL M&E COORDINATOR
FFL 145800 COORDINATOR
2x13A SSO (E)
2x13A SSO DATE
1x13A SSO

REV NO. AMENDMENT DATE

CLIENT:
DATA_OUTLET DATA_OUTLET
NATIONAL UNIVERSITY OF SINGAPORE
400 NEW CORE
University Campus Infrastructure
FACILITIES 10 Campus Asset Management (CAM)
DATA_OUTLET NEW CORE 2x13A SSO 8 Kent Ridge Drive,
STROBE LIGHT #02-02, Singapore 119246
DATA_OUTLET FACILITIES DATA_OUTLET
3G Lighting Switch
(CEILING)

32A SPN ISOL. 20 1500


2700

1G Lighting Switch
1200 849 ARCHITECT:
(CEILING)

1x13A SSO
2700

32A SPN ISOL. CPG Consultants Pte Ltd

(CEILING)
1x13A SSO 100

2700
1 Gateway Drive #23-01
CPG West Gate Tower
1100

1100
HIGH SPEED CENTRIFUGAL VOC Singapore 608531
900
1500

1000x700x1300 Tel : 63574231 Fax : 6357 4398


1100

2x13A SSO 1x13A SSO

1500

1500

1500
PUSH_BUTTON
2x13A SSO MLB12 MLB12
2x13A SSO 6th Storey

1200
1200x750x900

1070
1200x750x900 E_PUSH_BUTTON M&E CONSULTANT:
1x13A SSO 2x13A SSO FFL 141250 20 HIGH SPEED CENTRIFUGAL
2x13A SSO (E) ICE MAKER
THERMOSTAT 1000x700x1300
6th Storey 1x13A SSO
2x13A SSO
660x690x1040
NEW CORE EWC Engineers Pte Ltd
FFL 141250 2x13A SSO
1x13A SSO 6th Storey FACILITIES 970 Toa Payoh North #06-18 Singapore 318992
2x13A SSO (E) FFL 141250
Tel: (65) 6225 1808 Fax: (65) 6225 6808
Email : enquiry@ewc.com.sg
www.ewc.com.sg

NEW CORE FACILITIES - ELEVATION C NEW CORE FACILITIES - ELEVATION D NEW CORE FACILITIES - ELEVATION E MAIN CONTRACTOR:

C 1 : 40
D 1 : 40
E 1 : 40 LIAN SOON CONSTRUCTION PTE LTD
21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632

SUB-CONTRACTOR:

PRESICO ENGINEERING PTE LTD


34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)

DRAWING TITLE :

ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
CORE FACILITIES PLAN AND ELEVATIONS

Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

CAD File :SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-CF


Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-CF 0
Level 7 REVIEW OF SHOP DRAWING

1030x882 1030x882
ULTFR ULTFR

x1993
1030x882 1030x882
ULTFR ULTFR
FFL 145800 Level 7 Review is only for the limited purposes as set forth in the

HWB
FFL 145800 Contract Documents

x1993
What is this? APPROVED FOR CONSTRUCTION

APPROVED WITH COMMENTS

x1993
RESUBMISSION REQUIRED
FREEZER

x1993
What is this? APPROVED WITH COMMENTS
GDP4-1
ROOM EVACUATE
1x13A SSO (E) NO RESUBMISSION REQUIRED
O2 1D DATA_OUTLET
O2 Gas Detector 1A 1C SIGNAGE DISAPPROVED
LEVELING 1x13A SSO (E) 1x13A SSO (E) RESUBMISSION REQUIRED
V0C VOCP-7 1B

55
VOC REQUIRED DATA_OUTLET
Checked by:
LEVELING Distance from door 2283 1x13A SSO (E)

165
frame to wall can 1x13A SSO (E) Date:
EVACUATE reduce to 100? Then NEW FREEZER 1200 95 850 DATA_OUTLET
EVA
S

SIGNAGE shift the thermostat to ROOM 1x13A SSO (E)


the ULTFR side
DADO TRUNKING
E_PUSH_BUTTON
O2 Gas Detector DADO TRUNKING
PUSH_BUTTON 1G Lighting Switch VOC 120 650 650 650
1G Lighting Switch 85
20 1160 Can shift same side
THERMOSTAT ULTFR ULTFR 20
Why still here? 1030X882X1993 1030X882X1993
as the switch ???

1800
1600

1800
1450
1200
PUSH_BUTTON NEW FREEZER
PUSH_BUTTON
6TH STOREY (NORTH) FREEZER ROOM ROOM

1000
53 E_PUSH_BUTTON

1 1 : 50 6th Storey
FR
601x620x201
FR
601x620x201
FR
601x620x201
FR
601x620x201
THERMOSTAT

201
FFL 141250 6th Storey
FFL 141250

Put 2m first?
NEW FREEZER RM - ELEVATION A NEW FREEZER RM - ELEVATION B
Level 7 1A 1 : 40
1B 1 : 40
Level 7 FFL 145800
FFL 145800

250 882

1x13A SSO_Metal Clad (E)

1x13A SSO_Metal Clad (E)

2145
850
1x13A SSO (E)
DADO TRUNKING
DADO TRUNKING

3000
DATA_OUTLET
1x13A SSO (E) MAIN CONTRACTOR REVIEW AND CHECK
ULTFR ULTFR
1800
NEW FREEZER
NAME & SIGNATURE NAME & SIGNATURE
1030X882X1993 1030X882X1993 ROOM
1800

SPM/PM ENGINEER/SM

NEW FREEZER ARCHITECTURAL M&E COORDINATOR


COORDINATOR
ROOM
6th Storey DATE
6th Storey FFL 141250
FFL 141250

REV NO. AMENDMENT DATE

NEW FREEZER RM - ELEVATION C NEW FREEZER RM - ELEVATION D CLIENT:

1C 1 : 40
1D 1 : 40 O2 Gas Detector NATIONAL UNIVERSITY OF SINGAPORE
VOC University Campus Infrastructure
Campus Asset Management (CAM)
WLB-LS REGULATOR
Where is BG?? O2 V0CVOCP-1
8 Kent Ridge Drive,
#02-02, Singapore 119246
REGULATOR
EXIT
WS GDP1-1
S RB BG
ARCHITECT:
Icemaker 660 x 690 x 1040 THERMOSTAT EVACUATE
SIGNAGE
HWB

WS
CPG Consultants Pte Ltd
NEW AIR

EXIT
EVA
1 Gateway Drive #23-01

EXIT
VOCP-8 3A
AIR2BLOCK LOCK CPG West Gate Tower

S
V0C Singapore 608531
2A 10 sqm Don't enter sign?
Tel : 63574231 Fax : 6357 4398

THERMOSTAT LCC
EXIT M&E CONSULTANT:
RB BG CA
EVA
CA
HWB EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
EVACUATE Tel: (65) 6225 1808 Fax: (65) 6225 6808
SIGNAGE
Don't enter sign Email : enquiry@ewc.com.sg
outside? www.ewc.com.sg

6TH STOREY (NORTH) AIR LOCK 2


EVA

6TH STOREY (NORTH) AIR LOCK 1 3 1 : 50


MAIN CONTRACTOR:

LIAN SOON CONSTRUCTION PTE LTD


2 1 : 50 21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
Level 7 Level 7 Level 7
FFL 145800 FFL 145800 FFL 145800

SUB-CONTRACTOR:

PROVISION FOR
BREAK GLASS &
RELEASE BUTTON PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

2x13A SSO
PROJECT TITLE :
55

PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF


EVACUATE EVACUATE EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
165

SIGNAGE SIGNAGE NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,


2300
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
20
950 100 SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
NEW AIR LOCK 2
1G Lighting Switch 300
(CEILING)

PROVISION FOR RELEASE BUTTON


1G Lighting Switch DRAWING TITLE :
2700

& BREAK GLASS


300
WAVE SENSOR ELECTRICAL INSTALLATION
THERMOSTAT
6TH STOREY PLAN (NORTH CORE)
1200

1200

1200

1200

310 THERMOSTAT
FREEZER ROOM, AIR LOCK 1 & 2
1070

1000

PLAN AND ELEVATIONS


450

AIR LOCK 1 AIR LOCK 1


6th Storey 6th Storey 6th Storey
FFL 141250 FFL 141250 FFL 141250 Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023


NEW AIR LOCK 1 - ELEVATION A NEW AIR LOCK 1 - ELEVATION B NEW AIR LOCK RM - ELEVATION A
2A 2B 1 : 40 3A
CAD File :SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-FZRAL
1 : 40 1 : 40 Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-FZRAL 0
REVIEW OF SHOP DRAWING
B Review is only for the limited purposes as set forth in the
Contract Documents

APPROVED FOR CONSTRUCTION

Level 7 APPROVED WITH COMMENTS


FFL 145800 RESUBMISSION REQUIRED

Level 7 B APPROVED WITH COMMENTS


NO RESUBMISSION REQUIRED
FFL 145800
DISAPPROVED
RESUBMISSION REQUIRED

Checked by:
FC 1100 x 460 x
1580 Date:

BG
1 RB 200
1x13A SSO (E)
T
3
1
J 0
NS
U0- 0
1

J 1
T
0
6
T
6
0
J 1

J 1
J 1
NS

T
0
6
T
0
6
U0- 0
2

FC FC FC FC CA VOC
1090 x 670 1090 x 670 1090 x 670 1090 x 670 DB-L6-LAB-5-N-P1

DB 2
B x 1650 x 1650 x 1650 x 1650 NEW MATERIAL
2G Lighting Switch HANDLING ROOM
PUSH_BUTTON DB-L6-LAB-5-N-P6 1G Lighting Switch
VOC
J 1
T
0
6
T
6
0
J 1

J 1
T
0
6

E_PUSH_BUTTON
20100
MATERIAL THERMOSTAT

1800
1C NEW MATERIAL
ABC 920 x ABC 920 x

V0C VOCP-9
550 x 900 550 x 900

HANDLING 1B 1A

1500
1D HANDLING ROOM
ROOM
PROVISITON
J 1
T
0
6
T
6
0
J 1

J 1
T
0
6

1200
FOR RB & BG 31

1070
FAIL PUSH_BUTTON 20 6th Storey
E_PUSH_BUTTON FFL 141250
FR for
SECURE THERMOSTAT
EP 601 x 6th Storey
618 x FHC-4250 HR FFL 141250
NU
S -0 0
1

2003
S -0 1
NU
J 1
J 1
T
0
6
T
0
6
T
6
0
J 1

J 1
J 1
NU

T
0
6
T
0
6
S -0 0
2

FR here, where is the 4800 FHC NEW MATERIAL HANDLING RM - ELEVATION A NEW MATERIAL HANDLING RM - ELEVATION B
power for FR? 1A 1 : 40
1B 1 : 40
6TH STOREY (NORTH) MATERIAL HANDLING ROOM
1 1 : 50

Level 7 1
FFL 145800
Coros cabinet 914 x Level 7
FFL 145800
635 x 889
STACK 2 nos
together
MAIN CONTRACTOR REVIEW AND CHECK
825 825 825 825 367
1200 600 600 600 600 NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR

5 1x13A SSO (E)


PROVISION FOR EXHAUST
DATE

15A SSO (E)


PROVISION FOR EXHAUST

VOC REV NO. AMENDMENT DATE

200 CLIENT:

2700
NATIONAL UNIVERSITY OF SINGAPORE

2700
University Campus Infrastructure
Campus Asset Management (CAM)

1800
8 Kent Ridge Drive,
FC FC FC FC
1090 x 670 x 1650 1090 x 670 x 1650 1090 x 670 x 1650 1090 x 670 x 1650
#02-02, Singapore 119246

900
ABC
2A 2C 920 x 550 x 900
2B
NEW MATERIAL ARCHITECT:

6th Storey HANDLING ROOM


FFL 141250 CPG Consultants Pte Ltd
6th Storey
1 Gateway Drive #23-01
PI OFFICE 1 FFL 141250
CPG West Gate Tower
Singapore 608531

NEW MATERIAL HANDLING RM - ELEVATION C Tel : 63574231 Fax : 6357 4398

1C NEW MATERIAL HANDLING RM - ELEVATION D


1 : 40 1D 1 : 40
M&E CONSULTANT:

EWC Engineers Pte Ltd


Coros cabinet 914 x 970 Toa Payoh North #06-18 Singapore 318992
Tel: (65) 6225 1808 Fax: (65) 6225 6808
635 x 889
6TH STOREY (NORTH) OFFICE
Email : enquiry@ewc.com.sg
www.ewc.com.sg
STACK 2 nos
2 1 : 50
A
MAIN CONTRACTOR:

A LIAN SOON CONSTRUCTION PTE LTD


5 21A SENOKO LOOP
Level 7 LIAN SOON INDUSTRIAL BUILDING
FFL 145800
SINGAPORE 758174
Level 7 Level 7 Tel: 6255 7211 Fax: 6253 2632
FFL 145800 FFL 145800

SUB-CONTRACTOR:

PRESICO ENGINEERING PTE LTD


34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
50

DATA_OUTLET 1250 1G Lighting Switch 2x13A SSO DRAWING TITLE :


10 10 THERMOSTAT Service Chase box
20

1800 543
up to put switch & ELECTRICAL INSTALLATION
Thermostat
6TH STOREY PLAN (NORTH CORE)
1200

1095

450
PI OFFICE 1
2x13A SSO
2x13A SSO

MATERIAL HANDLING ROOM & PI OFFICE 1


900

6th Storey
PI OFFICE 1 FFL 141250

6th Storey 6th Storey


PI OFFICE 1 PLAN AND ELEVATIONS
FFL 141250 FFL 141250
450 to center
Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

PI OFFICE 1 - ELEVATION A PI OFFICE 1 - ELEVATION B


2B PI OFFICE 1 - ELEVATION C CAD File :SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-MHOF
2A 1 : 40
1 : 40 2C 1 : 40 Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-MHOF 0
2 REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
Contract Documents
2 APPROVED FOR CONSTRUCTION

T
J 0
3
1

K -0 1
7
8 7

L N
U8 0 2
N0
L K 1
- 7

T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0
2 7
U8 0 8

T
J 1
6
0
A
01A
J 0
6
1
T J 1
T
0
6 J 1
T
0
6

APPROVED WITH COMMENTS


1A 1A 1A

T
1
6
J 0
0
6
1
T
J
1 7
U8 0 8

T
1
6
J 0 T
6
0
J 1 T
6
0
J 1

T
1
6
J 0 T
6
0
J 1 T
6
0
J 1

J 0
6
1
T

RESUBMISSION REQUIRED
UB1 UB2
GDP4-2 RB MLB15 Level 7 Level 7
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED
A 1500 X 750 X 900 FFL 145800 FFL 145800
1900 1900 2615 DISAPPROVED
RESUBMISSION REQUIRED

Checked by:
VA CA4 CA4 VA 1200 1200 1200

1500 X 750 X 900


MLB 15

1500 X 750 X 900


MLB 15

1420 x 852 xUB


LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VAC VAC VAC
Date:
N2 N2 N2

4ft BSC
AR AR AR
CA4 CA4 CA4
WP WP WP

2400
32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.

200
VA CA4 CA4 VA
1500 X 750 X 900
MLB 15

1500 X 750 X 900


MLB 15
R D B ( 4500 MM )

1x13A SSO (E)

860 x 740 x
1x13A SSO (E)

FR
2x13A SSO 700 2x13A SSO 2x13A SSO 900 2x13A SSO

1800
2x13A SSO
2x13A SSO
A
E D B 1497 576

860 x 740 x
VA CA4 CA4 VA

FR
C
1500 X 750 X 900
TLB 15

1500 X 750 X 900


TLB 15

REFER TO TYPICAL ELEVATION

1800
BSC FR FR

2440
1420 x 852 x 2400 860x740x1800 860x740x1800

MOUNTED ON
1x13A SSO (E)

108
108

1800
THE MULLION

UB2
MOUNTED ON
FACADE MULLION
MLB15 MLB15

1050

1050
1050
UB1
1500 X 750 X 900

NEW NEW MODULAR LAB


MLB15
NEW MODULAR LAB
MODULAR 1
6th Storey 6th Storey 1
THERMOSTAT
E_PUSH_BUTTON LS 15 LAB 1 FFL 141250 FFL 141250
1500 X 750 X 900
UB2

PUSH_BUTTON
LEVELING
VOC 52 sqm
UB1

O2 Gas Detector EVACUATE


1500 X 750 X 900

SIGNAGE
MLB15

VOCP-4 V0C O2
EVA
GDP2-2
DB 1 USER USER S USER M LAB 1 - ELEVATION A M LAB 1 - ELEVATION B
CABINET CABINET
SIGNAGE_GAS
CAB
A 1 : 40
B 1 : 40
LEAK DO NOT
ENTER

EDB-L6-LAB-1-N-P3
6TH STOREY (NORTH) MUDULAR LAB 1 PLAN
DB-L6-LAB-5-N-P2 1 1 : 50
A
2 MAIN CONTRACTOR REVIEW AND CHECK
NAME & SIGNATURE NAME & SIGNATURE
Level 7 Level 7
FFL 145800 FFL 145800 SPM/PM ENGINEER/SM
1900 2000
ARCHITECTURAL M&E COORDINATOR
COORDINATOR
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VAC VAC VAC
N2 N2 N2
DATE
AR AR AR
CA4 CA4 CA4
WP WP WP

32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.


REV NO. AMENDMENT DATE
2x13A SSO
CLIENT:
155

200
EVACUATE 1200 1200 1200 NATIONAL UNIVERSITY OF SINGAPORE
165

SIGNAGE 1x13A SSO (E) 32A SPN ISOL. University Campus Infrastructure
O2 Gas Detector 2x13A SSO Campus Asset Management (CAM)
2G Lighting Switch 400 8 Kent Ridge Drive,
2x13A SSO #02-02, Singapore 119246
4G Lighting Switch
68
1941
1635 ARCHITECT:

(CEILING)
VOC
FUME HOOD FUME HOOD FUME HOOD

2800
100

2600
CPG Consultants Pte Ltd
2440

2300
1 Gateway Drive #23-01
CPG
108

West Gate Tower


Singapore 608531
1600
1500

Tel : 63574231 Fax : 6357 4398


1200

1100
1070
1050

20
NEW MODULAR LAB M&E CONSULTANT:
NEW MODULAR LAB 1
6th Storey 1 6th Storey
FFL 141250
PUSH_BUTTON FFL 141250 EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
E_PUSH_BUTTON Tel: (65) 6225 1808 Fax: (65) 6225 6808
THERMOSTAT Email : enquiry@ewc.com.sg
www.ewc.com.sg

M LAB 1 - ELEVATION C M LAB 1 - ELEVATION D


C 1 : 40
General usage? 450
from FFL
D 1 : 40
MAIN CONTRACTOR:

LIAN SOON CONSTRUCTION PTE LTD


21A SENOKO LOOP
A LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
Level 7
FFL 145800
SUB-CONTRACTOR:

PRESICO ENGINEERING PTE LTD


34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
DATA_OUTLET 2x13A SSO 1x13A SSO (E) NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
2x13A SSO (E) 2x13A SSO DATA_OUTLET 04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
2x13A SSO 2x13A SSO SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
1x13A SSO 2x13A SSO (E)
1x13A SSO
(CEILING)

DRAWING TITLE :
2800

287 260 285 260 288 290 400 400 290 288 260 285 260 287 ELECTRICAL INSTALLATION
Reagent Dropper for
MOUNTED ON THE all island benches? 6TH STOREY PLAN (NORTH CORE)
FACADE FRAME (TYPICAL ELEVATION BOTH SIDE OF LAB BENCH FOR MODULAR LABS 1 TO 4)
MODULAR LAB 1 PLAN AND ELEVATIONS
NEW MODULAR LAB
1
6th Storey Drawn by : PAI / MYO Checked by : SHREE
FFL 141250

Scale : AS SHOWN Date : 02 NOV 2023

CAD File : SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-M LAB-1

M LAB 1 - ELEVATION E
E 1 : 40
Drawing no. :

SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-M LAB-1


Rev :

0
REVIEW OF SHOP DRAWING
3 Review is only for the limited purposes as set forth in the
Contract Documents

APPROVED FOR CONSTRUCTION

APPROVED WITH COMMENTS


RESUBMISSION REQUIRED
J 0
T
1
3 J 0
T
1
3

7 7
U8 0 2

U8 0 2
7 7
T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0

1A

T
1
6
J 0
J 0
6
1
T

1A

T
1
6
J 0
J 0
6
1
T

1A

T
6
0
J 1
J 1
T
0
6

1A

T
6
0
J 1
J 1
T
0
6

1A

T
6
0
J 1
J 1
T
0
6

APPROVED WITH COMMENTS


NO RESUBMISSION REQUIRED
T
1
6
J 0 T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1

1500 X 750 X 900


MLB15
DISAPPROVED
UB1 UB2 RB RB RESUBMISSION REQUIRED
MLB15
A 1500 X 750 X 900 Checked by:

UB1
Date:

UB2
VA CA4 CA4 VA

1500 X 750 X 900


MLB 15

1500 X 750 X 900


MLB 15
UB

3
1420 x 852 x

A
4ft BSC
2400

Level 7 Level 7
FFL 145800
VA CA4 CA4 VA FFL 145800 1125 1900 1900
1500 X 750 X 900
MLB 15

1500 X 750 X 900


MLB 15
R D B ( 4500 MM )
860 x 740 x

LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT


FR

VAC VAC VAC


1800

N2 N2 N2
AR AR AR
CA4 CA4 CA4
WP WP WP
A 1200 1200 1200
860 x 740 x

VA CA4
D CA4
B VA
FR

1500 X 750 X 900


TLB 15

1500 X 750 X 900


TLB 15

C
1800

200
UB2

32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.
UB1

1500 X 750 X 900

NEW 2x13A SSO


MLB15

900 2685 700


1500 X 750 X 900
MODULAR 2x13A SSO
LS 15 LAB 2 2x13A SSO 2x13A SSO
2x13A SSO 526 1x13A SSO (E)
UB2

692 1x13A SSO (E) REFER TO TYPICAL ELEVATION

2440
THERMOSTAT
E_PUSH_BUTTON
51 sqm 2x13A SSO BSC
2x13A SSO
UB1

1420 x 852 x 2400


1500 X 750 X 900

PUSH_BUTTON 1x13A SSO (E)

1800
1800
EVACUATE
MLB15

SIGNAGE O2 Gas Detector MOUNTED ON


VOC
V0CVOCP-3
THE MULLION FR FR

1100
1x13A SSO (E)

1050
O2

1050

1050
EVA 860x740x1800 860x740x1800

GDP2-1
S NEW MODULAR LAB
4KG USER
CAB
USER
CAB DB 1 6th Storey 2 6th Storey
FFL 141250
NEW MODULAR LAB
2
FFL 141250

GDP (VarioGard SIGNAGE_GAS


EDB-L6-LAB-1-N-P1
Central Unit) LEAK DO NOT
ENTER DB-L6-LAB-5-N-P3
EXIT
MAIN CONTRACTOR REVIEW AND CHECK
M LAB 2 - ELEVATION A M LAB 2 - ELEVATION D
6TH STOREY (NORTH) MUDULAR LAB 2 PLAN A 1 : 40
D 1 : 40
NAME & SIGNATURE NAME & SIGNATURE

1 1 : 50
SPM/PM
ARCHITECTURAL
ENGINEER/SM

M&E COORDINATOR
COORDINATOR

DATE

REV NO. AMENDMENT DATE

CLIENT:

NATIONAL UNIVERSITY OF SINGAPORE


University Campus Infrastructure
Campus Asset Management (CAM)
A 3 8 Kent Ridge Drive,
#02-02, Singapore 119246

ARCHITECT:
Level 7 Level 7
FFL 145800 FFL 145800
1470 2000 2000 CPG Consultants Pte Ltd
1 Gateway Drive #23-01
LEFT TO RIGHT
VAC
LEFT TO RIGHT
VAC
LEFT TO RIGHT
VAC
CPG West Gate Tower
Singapore 608531
N2 N2 N2 Tel : 63574231 Fax : 6357 4398
AR AR AR
CA4 CA4 CA4
WP WP WP
M&E CONSULTANT:

1070 1121 1121 1121


EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992

155
200

200

Tel: (65) 6225 1808 Fax: (65) 6225 6808


EVACUATE Email : enquiry@ewc.com.sg

165
O2 Gas Detector www.ewc.com.sg
32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. VOC
SIGNAGE

2199 1x13A SSO (E) 2G Lighting Switch


2x13A SSO
50 500 4G Lighting Switch MAIN CONTRACTOR:

2x13A SSO 2x13A SSO LIAN SOON CONSTRUCTION PTE LTD


538 2x13A SSO 1874 820
FUME HOOD FUME HOOD FUME HOOD
100 1x13A SSO (E)
21A SENOKO LOOP
1x13A SSO (E) LIAN SOON INDUSTRIAL BUILDING
2440

SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
1600
1500

SUB-CONTRACTOR:

1200
1100

1100
1070
31
1050

THERMOSTAT
E_PUSH_BUTTON
NEW MODULAR LAB NEW MODULAR LAB PUSH_BUTTON
20
6th Storey 2 6th Storey 2 PRESICO ENGINEERING PTE LTD
FFL 141250 FFL 141250 34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945

PROJECT TITLE :
General usage then PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
M LAB 2 - ELEVATION B M LAB 2 - ELEVATION C 400 from FFL EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN

B C 1 : 40
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
1 : 40 SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)

DRAWING TITLE :

ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
MODULAR LAB 2 PLAN AND ELEVATIONS

Drawn by : PAI / MYO Checked by : SHREE

Scale : AS SHOWN Date : 02 NOV 2023

CAD File : SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-M LAB 2

Drawing no. : Rev :

SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-M LAB 2 0

You might also like