North Core Elevations Comment R1
North Core Elevations Comment R1
FFL 145800
APPROVED FOR CONSTRUCTION
T
1
3
J 0 T
3
1
J 0
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED
J 0
T
1
3 J 0
T
1
3
7 7
7 7
U8 0 2
U8 0 2
U8 0 2
U8 0 2
7 7
7 7
T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0
J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6
01A 1A 1A 1A 1A 1A 1A 1A 01A
T
6
0
J 1 T
6
0
J 1
T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1
T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1
J 1
T
0
6 J 1
T
0
6
TRUNKING/CONDUIT DISAPPROVED
RESUBMISSION REQUIRED
RB
4ft BSC 4ft BSC 4ft BSC 4ft BSC 4ft BSC 4ft BSC Checked by:
1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB 1420 x 852 x UB
2400 2400 2400 2400 2400 2400 Date:
T
1
3
J 0
J 0
L K
3
1
T
1
- 7
N0
N0
- 7
L K
2 7
1
U8 0 8
U8 0 8
2 7
N0
L K 1
- 7
T
1
3
J 0 T
1
3
J 0
7 7
U8 0 2
U8 0 2
7 7
2 7
U8 0 8 8 7
U8 0 2
T
1
6
J 0
T
1
6
0
J
01A 01A
J 0
T
1
3
U8 0 2
7 7
01A
U8 0 1
T
6
0
J 1
8 7
1
T
J0
6
8 7
U8 0 1
T
6
0
J 1
T
1
6
0
J
J 0
6
1
T J 1
T
0
6
2700
U8 0 2
7 7
T
3
1
J 0
J 1
1A
T
0
6
T
6
0
J 1
J 1
T
0
6
2400
UB1 UB2 1200 X 750 X 900 1200 X 750 X 900 1200 X 750 X 900 1200 X 750 X 900 1200 X 750 X 900
870 x 700
MLB15 UB1 UB1 UB1 UB1 UB1
FR
OVERHEAD SERVICE CHASE 1570 1570 1570 1570 1570
x 1780
1500 X 750 X 900
1391 1529
A
Centrifuge
800 W x 800 CELL CULTURE RMD C B
THERMOSTAT
D x 800 H
E_PUSH_BUTTON
BSL2+ NEW CELL CULTURE
ROOM
J 0
T
1
3
1A
J 1
T
0
6
T
6
0
J 1
J 1
T
0
6
J 0
T
1
3
CCR - ELEVATION A
1A
J 1
T
0
6
T
6
0
J 1
J 1
T
0
6
J 0
T
1
3
A 1 : 40
6TH STOREY (NORTH) CELL CULTURE ROOM PLAN 2B
1 1 : 50
A 2 1
Level 7
FFL 145800
Level 7
FFL 145800
2G Lighting Switch 1x13A SSO (E)
1G Lighting Switch 2x13A SSO MAIN CONTRACTOR REVIEW AND CHECK
2x13A SSO
1G Lighting Switch NAME & SIGNATURE NAME & SIGNATURE
1855
2x13A SSO SPM/PM ENGINEER/SM
2 x13A SIGNAGE_GAS 2x13A SSO 2x13A SSO (E)
355 LEAK DO NOT ARCHITECTURAL M&E COORDINATOR
ENTER COORDINATOR
GAS POINTS
DATE
55
700 800 700 1294
425 700 800 700 2x13A SSO (E)
2x13A SSO
165
750
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
660(W)x640(D)x1100(H)
REV NO. AMENDMENT DATE
Gas Gas
INCUBATORS
INCUBATORS
INCUBATORS
INCUBATORS
INCUBATORS
INCUBATORS
INCUBATORS
INCUBATORS
O2 Gas Detector 1x13A SSO (E) Regul CLIENT:
CO2
CO2
CO2
CO2
CO2
CO2
CO2
CO2
1100
VOC BESIDE THE FREEZE Regul
ator
(CEILING)
ator 100 NATIONAL UNIVERSITY OF SINGAPORE
2700
(CEILING)
2300
158
3000
(CEILING)
1300
1300
870x700x1780 1500 887 332
1200
1100
1800
1070
1000
2x13A SSO (E)
1600
ARCHITECT:
1500
C 1 : 40
EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
Tel: (65) 6225 1808 Fax: (65) 6225 6808
B 1 : 40
MAIN CONTRACTOR:
SUB-CONTRACTOR:
CABLE SUPPORT
SYSTEM BY OTHERS
WITH EXISTING CLADDING AT 1000MM HEIGHT PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945
2x13A SSO
3000
(CEILING)
DATA 397 400 400 400 400 400 400 400 400 400 400 400 400 400 397
800
CENTRIFUGE
800x800x800 DRAWING TITLE :
1600
1500
ELECTRICAL INSTALLATION
NEW CELL CULTURE CO2 Gas Detector NEW CELL CULTURE 6TH STOREY PLAN (NORTH CORE)
ROOM CELL CULTURE ROOM
300
ROOM
6th Storey 6th Storey
FFL 141250 FFL 141250 PLAN AND ELEVATIONS
Drawn by : PAI / MYO Checked by : SHREE
CCR - ELEVATION E
CCR - ELEVATION D E 1 : 40
Scale : AS SHOWN Date : 02 NOV 2023
D 1 : 40 CAD File : SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-CCR
Drawing no. : Rev :
SD-T4S12L2L3S9L6-S9N-ELEC-ROOM DETAIL-CCR 0
4 REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
Contract Documents
U8 0 7
2 7
T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0
J 0
6
1
T J 0
6
1
T J 1
T
0
6 J 1
T
0
6 J 1
T
0
6
T
1
6
J 0 T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1
T
1
6
J 0 T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1
RESUBMISSION REQUIRED
UB1 UB2 RB 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. APPROVED WITH COMMENTS
MLB15 Level 7 Level 7 NO RESUBMISSION REQUIRED
A 1500 X 750 X 900 FFL 145800 FFL 145800
2000 2000 2199 DISAPPROVED
RESUBMISSION REQUIRED
Checked by:
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VA CA4 CA4 VA VAC VAC VAC
N2 N2 N2
AR AR AR Date:
1420 x 852 x
FR
WP WP WP
4ft BSC
FR
200
VA CA4 CA4 VA
1500 X 750 X 900
MLB 15
1070
A 2x13A SSO
860 x 740 x
VA D
CA4 CA4B VA
FR
DB-L6-LAB-5-N-P4
1500 X 750 X 900
TLB 15
2440
2440
UB2
MOUNTED ON
UB1
1050
MULLION
1500 X 750 X 900
NEW 3
MLB15
THERMOSTAT
E_PUSH_BUTTON
52 sqm
UB1
EVACUATE
1500 X 750 X 900
VOC
O2 V0CVOCP-2
M LAB 3 - ELEVATION A M LAB 3 - ELEVATION B
EVA
GDP1-2 A 1 : 40
B 1 : 40
S USER USER
4KG
SIGNAGE_GAS
CAB CAB DB 1
LEAK DO NOT
ENTER
DB-L6-LAB-5-N-P4
DB-L6-LAB-5-N-P5
DATE
CLIENT:
1125 1900 1900
Level 7 Level 7 NATIONAL UNIVERSITY OF SINGAPORE
FFL 145800 FFL 145800
1200 1200 1200 University Campus Infrastructure
Campus Asset Management (CAM)
8 Kent Ridge Drive,
LEFT TO RIGHT 2x13A SSO (E) LEFT TO RIGHT LEFT TO RIGHT
#02-02, Singapore 119246
VAC VAC VAC
N2 N2 N2
AR AR AR
CA4 CA4 CA4 ARCHITECT:
WP WP WP
200
EVACUATE
165
4G Lighting Switch SIGNAGE 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.
1x13A SSO (E) 2G Lighting Switch M&E CONSULTANT:
2x13A SSO 345 1660 1884 2820 700
O2 Gas Detector
2x13A SSO (E) 50 500 900 EWC Engineers Pte Ltd
VOC
970 Toa Payoh North #06-18 Singapore 318992
1833 2x13A SSO (E) Tel: (65) 6225 1808 Fax: (65) 6225 6808
(CEILING)
2440
BSC
2x13A SSO (E)
1420 x 852 x 2400
158
1800
MAIN CONTRACTOR:
1600
PUSH_BUTTON
1500
FR FR
E_PUSH_BUTTON 860x740x1800 860x740x1800 LIAN SOON CONSTRUCTION PTE LTD
1200
1100
1070
1058
1050
THERMOSTAT MOUNTED ON MULLION 21A SENOKO LOOP
20
NEW MODULAR LAB NEW MODULAR LAB LIAN SOON INDUSTRIAL BUILDING
31 SINGAPORE 758174
6th Storey 3 6th Storey 3 Tel: 6255 7211 Fax: 6253 2632
FFL 141250 FFL 141250
SUB-CONTRACTOR:
C 1 : 40
D 1 : 40
firdge Tel No: (65) 67471346 Fax No: 67477945
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
DRAWING TITLE :
ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
MODULAR LAB 3 PLAN AND ELEVATIONS
J 0
3
1
T
2 7
U8 0 7
T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0
J 0
6
1
T J 1
T
0
6 J 1
T
0
6 J 1
T
0
6 J 1
T
0
6
1C 1B 1B 1B
1A
T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1
T
1
6
J 0 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1 T
6
0
J 1
2400
1420 x 852 x
4ft BSC
APPROVED WITH COMMENTS
1186 1900 2000
A Level 7 Level 7
NO RESUBMISSION REQUIRED
DISAPPROVED
FFL 145800 FFL 145800 RESUBMISSION REQUIRED
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VAC VAC VAC
UB
N2 N2 N2 Checked by:
VA CA4 CA4 VA AR AR AR
VA CA4 CA4 VA
1500 X 750 X 900
MLB 15
200
R D B ( 4500 MM )
UB2
1300
UB1
A
1500 X 750 X 900
VA CA4 CA4 VA
C
1500 X 750 X 900
TLB 15
(CEILING)
(CEILING)
FUME HOOD FUME HOOD FUME HOOD
2800
2800
REFER TO TYPICAL ELEVATION 1x13A SSO (E)
2440
2400
UB2
1800
1800
1800
1420 x 852 x 2400
UB1
NEW
MLB15
PUSH_BUTTON
1500 X 750 X 900
MLB15
S
GDP1-1 M LAB 4 - ELEVATION B
4KG
M LAB 4 - ELEVATION A How to access? B 1 : 40
NEW AIR
A 1 : 40
Power for BSC
EXIT
EVA
EXIT
LOCK
S
10 sqm
6TH STOREY (NORTH) MUDULAR LAB 4 PLAN MAIN CONTRACTOR REVIEW AND CHECK
1 1 : 50
NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR
DATE
CLIENT:
200
Email : enquiry@ewc.com.sg
SIGNAGE 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. www.ewc.com.sg
1x13A SSO (E)
2x13A SSO 2G Lighting Switch 535 1636 1521
O2 Gas Detector
2x13A SSO VOC 4G Lighting Switch 2x13A SSO (E)
50 500 MAIN CONTRACTOR:
2418 2x13A SSO LIAN SOON CONSTRUCTION PTE LTD
2x13A SSO
(CEILING)
(CEILING)
100 21A SENOKO LOOP
2800
2800
20 1x13A SSO (E) LIAN SOON INDUSTRIAL BUILDING
2440
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
158
1800
FR FR
1600
1200
SUB-CONTRACTOR:
1100
1100
1070
PROJECT TITLE :
450 from FFL PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
DRAWING TITLE :
ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
MODULAR LAB 4 PLAN AND ELEVATIONS
EXIT
EVA
REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
Contract Documents
SIGNAGE_GAS
2 3 4
SIGNAGE_GAS APPROVED FOR CONSTRUCTION
Evacuation sign
EVA
LEAK DO NOT 10200 10200 LEAK DO NOT
S
ENTER ENTER instead? APPROVED WITH COMMENTS
RESUBMISSION REQUIRED
APPROVED WITH COMMENTS
GDP2-2 GDP2-1 GDP1-2 GDP1-1
USER USER S S S USER USER S Shouldn't this be NO RESUBMISSION REQUIRED
DB 1 CABINET CABINET
USER
CAB
4KG USER
CAB
USER
CAB DB 1 4KG
CAB CAB DB 1 4KG
facing outside of the DISAPPROVED
RESUBMISSION REQUIRED
UB1
EXIT
GDP (VarioGard DB-L6-LAB-5-N-P2 DB-L6-LAB-5-N-P3 DB-L6-LAB-5-N-P5
LEAK DO NOT
S
Central Unit)
EXIT
GDP (VarioGard ENTER Date:
E_PUSH_BUTTON
GDP (VarioGard Central Unit)
UB1 UB2 MLB12 THERMOSTAT There is a full height Central Unit)
EXIT THERMOSTAT
E_PUSH_BUTTON
MLB15 1200 X 750 X 900 cabinet here. 1H GDP (VarioGard
UB1 PUSH_BUTTON Central Unit)
1500 X 750 X 900
FFL 141.250 PUSH_BUTTON
1C
LS 15 CH=3000 LS 15
GDP3-3 O2 Gas Detector UB1 UB2 GDP3-2 O2 Gas Detector UB1 UB2 O2 Gas Detector GDP3-1
DB-L6-LAB-5-N-P1 VOC 1500 X 750 X 900 VOC 1500 X 750 X 900 VOC
MLB15 MLB15
DB 2
O2 O2 O2
B EVACUATE
1500 X 750 X 900 1500 X 750 X 900
UB2
UB2
UB2
UB2
DB-L6-LAB-5-N-P6
VOCP-11 VOCP-12 1500 X 750 X 900 1500 X 750 X 900
UB1
UB1
UB1
UB1
UB1
UB1
UB1
UB1
UB1
OVERHEAD SERVICE CHASE
MLB15
MLB15
MLB15
1C
UB2
1D
UB2
UB2
UB2
UB2
1F 1J
UB1
UB1
UB2
UB2
UB2
UB2
UB2
O2
UB1
UB1
UB1
UB1
UB1
1500 X 750 X 900
UB1
UB1
UB1
UB1
MLB15
MLB15
MLB15
MLB15
UB2
UB2
UB2
UB2
UB2
Release button & UB1 UB2 UB1 UB2 UB1 UB2
Break glass for MLB15 MLB15 MLB15 MLB15a
Card access? This 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900
One more elevation here
door got card
access
1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900 1500 X 750 X 900
UB2 UB1
MLB15
UB2 UB1
MLB15
UB2 UB1
MLB15
UB2 UB1
MLB15
UB2 UB1
MLB15 MLB12
1200 X 750 X 900
MLB15
6 MLB15
B 4 5
UB2 UB1 UB2 UB1
DATE
DATA_OUTLET
55
break glass? CLIENT:
2x13A SSO
165
CORRIDOR NATIONAL UNIVERSITY OF SINGAPORE
2x13A SSO
1x13A SSO (E) University Campus Infrastructure
1x13A SSO DATA_OUTLET Campus Asset Management (CAM)
EVACUATE 8 Kent Ridge Drive,
2x13A SSO 2x13A SSO SIGNAGE
THERMOSTAT #02-02, Singapore 119246
2x13A SSO 2x13A SSO
2x13A SSO 1x13A SSO
E_PUSH_BUTTON CORRIDOR
PUSH_BUTTON
CORRIDOR 100 ARCHITECT:
1100
20
CPG West Gate Tower
Singapore 608531
6th Storey
1000
Tel : 63574231 Fax : 6357 4398
1100
FFL 141250
1050
NEW OPEN LAB - ELEVATION A NEW OPEN LAB - ELEVATION B NEW OPEN LAB - ELEVATION C
1A 1 : 40
1B 1 : 40
1C 1 : 40 MAIN CONTRACTOR:
Level 7 SUB-CONTRACTOR:
FFL 145800
REFER TO TYPICAL ELEVATION REFER TO TYPICAL ELEVATION REFER TO TYPICAL ELEVATION REFER TO TYPICAL ELEVATION
1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E) OSC 3750 OSC 3000 DRAWING TITLE :
OSC 3000 OSC 3750
EDB-L6-LAB-1-N-P2
1274 1050
EDB-L6-LAB-1-N-L1
1100
1100
1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E) PART - 1
2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO
DATA_OUTLET DATA_OUTLET 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO 2x13A SSO Drawn by : PAI / MYO Checked by : SHREE
CORRIDOR
6th Storey 1x13A SSO (E) 1x13A SSO (E) 1x13A SSO (E)
FFL 141250
Scale : AS SHOWN Date : 02 NOV 2023
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP1 0
B B
B REVIEW OF SHOP DRAWING
Level 7 Level 7 Level 7 Review is only for the limited purposes as set forth in the
FFL 145800 FFL 145800 FFL 145800 Contract Documents
1x13A SSO_ E
1x13A SSO_ E
200
1x13A SSO_ E
1x13A SSO_ E
Date:
2x13A SSO.
2x13A SSO.
2x13A SSO.
2x13A SSO.
2x13A SSO.
2x13A SSO.
2x13A SSO.
2x13A SSO.
GDP (VarioGard
Central Unit)
2x13A SSO GAS POINTS
DB-L6-LAB-5-N-P3
375 375 375 375 375 375 375 E_PUSH_BUTTON
service chase service chase THERMOSTAT
CORRIDOR CORRIDOR
158
20
1600
20
1058
1000
CORRIDOR
6th Storey 6th Storey 6th Storey
FFL 141250 FFL 141250 FFL 141250
NEW OPEN LAB - ELEVATION E NEW OPEN LAB - ELEVATION G NEW OPEN LAB - ELEVATION H
1E 1 : 40
1G 1 : 40
1H 1 : 40
2 10200
3 10200
4
Level 7
FFL 145800
DATE
EDB-L6-LAB-1-N-P1
EDB-L6-LAB-1-N-P3
DB-L6-LAB-5-N-P2
DB-L6-LAB-5-N-P3
DB-L6-LAB-5-N-P4
DB-L6-LAB-5-N-P5
REV NO. AMENDMENT DATE
1600
CLIENT:
ARCHITECT:
1F 1 : 40 M&E CONSULTANT:
4
B MAIN CONTRACTOR:
SUB-CONTRACTOR:
LEFT TO RIGHT
1/2" N2
DATA_OUTLET 130 130 3/4" VAC 130 130 LEFT TO RIGHT
∅ 15MM CA4 1/2" N2
DATA_OUTLET 3/4" VAC
∅ 15MM CA4
PRESICO ENGINEERING PTE LTD
Gas points to be 34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
integrated with Tel No: (65) 67471346 Fax No: 67477945
200
1x13A SSO_ E
1x13A SSO_ E
300
300
2x13A SSO.
2x13A SSO.
2x13A SSO.
2x13A SSO.
service chase
GAS POINTS PROJECT TITLE :
2120 CORRIDOR
50 226 PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
VOC O2 Gas Detector 537 920 580 EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
Standardize 200mm NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
2x13A SSO
2x13A SSO
1x13A SSO
2x13A SSO
2x13A SSO
1x13A SSO
GDP (VarioGard above the wall lab
DATA_OUTLET 04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
Central Unit)
375 375 375 375 375 375 375 375 611 918 582 bench. SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
1600
1600
DRAWING TITLE :
1500
CORRIDOR
2x13A SSO
2x13A SSO
1x13A SSO
2x13A SSO
2x13A SSO
1x13A SSO
1100
1100
ELECTRICAL INSTALLATION
DATA_OUTLET
CORRIDOR
6TH STOREY PLAN (NORTH CORE)
6th Storey 6th Storey 6th Storey
FFL 141250 FFL 141250 FFL 141250 OPEN LAB PLAN AND ELEVATIONS
PART - 2
NEW OPEN LAB - ELEVATION I Drawn by : PAI / MYO Checked by : SHREE
1I 1 : 40 Scale : AS SHOWN Date : 02 NOV 2023
NEW OPEN LAB - ELEVATION J NEW OPEN LAB - ELEVATION K
1J 1 : 40
1K 1 : 40
CAD File :SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP2
Rev :
Drawing no. :
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-OLP2 0
REVIEW OF SHOP DRAWING
6 Review is only for the limited purposes as set forth in the
Contract Documents
D Checked by:
Date:
Can the switches be
C this side instead?
B
M_Thermostat
2x13A SSO
M_Thermostat
2G Lighting Switch
2395 1G Lighting Switch
537
A
50
20
1200
1100
NEW PANTRY 20
NEW PANTRY 50
6th Storey 6th Storey
FFL 141250 FFL 141250
6TH STOREY (NORTH) PANTRY NEW PANTRY - ELEVATION A NEW PANTRY - ELEVATION B
1 1 : 50
A 1 : 40
B 1 : 40
Level 7 Level 7
FFL 145800 FFL 145800 REV NO. AMENDMENT DATE
CLIENT:
ARCHITECT:
1100
1100
1100
MAIN CONTRACTOR:
6th Storey NEW PANTRY NEW PANTRY
6th Storey LIAN SOON CONSTRUCTION PTE LTD
FFL 141250 FFL 141250
21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
C D 1 : 40
1 : 40 PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
DRAWING TITLE :
ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
PANTRY PLAN AND ELEVATIONS PART
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-PANTRY 0
REVIEW OF SHOP DRAWING
6 Review is only for the limited purposes as set forth in the
Contract Documents
D Checked by:
Date:
C
B
M_Thermostat
2x13A SSO
M_Thermostat
2G Lighting Switch
2395 1G Lighting Switch
537
A
50
20
1200
1100
NEW PANTRY 20
NEW PANTRY 50
6th Storey 6th Storey
FFL 141250 FFL 141250
6TH STOREY (NORTH) PANTRY NEW PANTRY - ELEVATION A NEW PANTRY - ELEVATION B
1 1 : 50
A 1 : 40
B 1 : 40
Level 7 Level 7
FFL 145800 FFL 145800 REV NO. AMENDMENT DATE
CLIENT:
1100
1100
1100
MAIN CONTRACTOR:
6th Storey NEW PANTRY NEW PANTRY
6th Storey LIAN SOON CONSTRUCTION PTE LTD
FFL 141250 FFL 141250
21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
C D 1 : 40
1 : 40 PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
DRAWING TITLE :
ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
PANTRY PLAN AND ELEVATIONS PART
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-PANTRY 0
REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
1 1 Contract Documents
J 0
6
1
T
T
1
6
J 0
J 0
6
1
T
J 0
3
1
T
Autoclave Autoclave
440 x 660 x440
1040
x 660 x 1040 FFL 145800 Level 7 RESUBMISSION REQUIRED
MLB12 Icemaker 660 x 690 x 1040 FFL 145800
800 x 400 x
Purification
1200 X 750 X 900 APPROVED WITH COMMENTS
VOC UB1 NO RESUBMISSION REQUIRED
Water
560
PUSH_BUTTON
VOCP-8 DISAPPROVED
V0C RESUBMISSION REQUIRED
CORE E_PUSH_BUTTON
THERMOSTAT Checked by:
FACILITIES
J 0
3
1
T
J 0
1A
6
1
T
T
1
6
J 0
J 0
6
1
T
J 0
3
1
T
1500
Date:
MLB12
1200 X 750 X 900 1263 840 437
UB1
WLB
J 1
1A
T
0
6
T
6
0
J 1
J 1
T
0
6
J 0
T
1
3
C
UB1 32A SPN ISOL.
2x13A SSO 2x13A SSO 1x13A SSO
MLB12 2x13A SSO 32A SPN ISOL.
2x13A SSO
1200 X 750 X 900 1x13A SSO
1x13A SSO 1x13A SSO NEW CORE
00
2700
UB1 VOC
10
FACILITIES
RB 1x13A SSO
500 500
158
J 0
T
1
3
NS
U0
NS
- 0
-U 0
1
1
2
NS
U0- 1
1A
J 1
T
0
6
T
6
0
J 1
J 1
J 1
NS
T
0
6
T
0
6
U0- 0
2
J 0
T
1
3
1x13A SSO
NS
U0- 2
MLB12
U0
NS 2
- 3
U0
NS 2
- 3
U0
NS 2
- 3
800
U0
NS 2
- 3
U0
NS 2
- 3
1500
1500
1500
U0
NS 2
- 3
U0
NS 2
- 3
1100
1050
U0
NS 2
- 3
U0
NS 2
- 3
U0
NS 2
- 3
DATA_OUTLET
1100
U0
NS 2
- 3
1050
1040
1040
U0
NS 2
- 3
U0
NS
U0
NS
U0
NS
2
- 3
2
- 3
2
- 3
AUTO CLAVE
High speed
560
440x660x1040
U0
NS 2
- 3
MLB12 MLB12
U0
NS 2
- 3
U0
NS
U0
NS
2
- 3
2
- 3
U0
NS
2
- 3
2
- 3
U0
NS
U0
NS
2
- 3
2
- 3
FFL 141250
This is table top
U0
NS 2
- 3
U0
NS 2
- 3
FFL 141250
U0
NS - 2
T
3
1
J 0
NS
U0- 0
1
J 1
T
0
6
T
6
0
J 1
J 1
J 1
NS
T
0
6
T
0
6
U0- 0
2
FC FC 2x13A SSO
2x13A SSO
1090 x 670 1090 x 670 1090 x 670
1x13A SSO
6TH STOREY (NORTH) NEW CORE FACILITIES NEW CORE FACILITIES - ELEVATION A NEW CORE FACILITIES - ELEVATION B
1 1 : 50
A 1 : 40
B 1 : 40
Height??
CLIENT:
DATA_OUTLET DATA_OUTLET
NATIONAL UNIVERSITY OF SINGAPORE
400 NEW CORE
University Campus Infrastructure
FACILITIES 10 Campus Asset Management (CAM)
DATA_OUTLET NEW CORE 2x13A SSO 8 Kent Ridge Drive,
STROBE LIGHT #02-02, Singapore 119246
DATA_OUTLET FACILITIES DATA_OUTLET
3G Lighting Switch
(CEILING)
1G Lighting Switch
1200 849 ARCHITECT:
(CEILING)
1x13A SSO
2700
(CEILING)
1x13A SSO 100
2700
1 Gateway Drive #23-01
CPG West Gate Tower
1100
1100
HIGH SPEED CENTRIFUGAL VOC Singapore 608531
900
1500
1500
1500
1500
PUSH_BUTTON
2x13A SSO MLB12 MLB12
2x13A SSO 6th Storey
1200
1200x750x900
1070
1200x750x900 E_PUSH_BUTTON M&E CONSULTANT:
1x13A SSO 2x13A SSO FFL 141250 20 HIGH SPEED CENTRIFUGAL
2x13A SSO (E) ICE MAKER
THERMOSTAT 1000x700x1300
6th Storey 1x13A SSO
2x13A SSO
660x690x1040
NEW CORE EWC Engineers Pte Ltd
FFL 141250 2x13A SSO
1x13A SSO 6th Storey FACILITIES 970 Toa Payoh North #06-18 Singapore 318992
2x13A SSO (E) FFL 141250
Tel: (65) 6225 1808 Fax: (65) 6225 6808
Email : enquiry@ewc.com.sg
www.ewc.com.sg
NEW CORE FACILITIES - ELEVATION C NEW CORE FACILITIES - ELEVATION D NEW CORE FACILITIES - ELEVATION E MAIN CONTRACTOR:
C 1 : 40
D 1 : 40
E 1 : 40 LIAN SOON CONSTRUCTION PTE LTD
21A SENOKO LOOP
LIAN SOON INDUSTRIAL BUILDING
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
SUB-CONTRACTOR:
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
DRAWING TITLE :
ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
CORE FACILITIES PLAN AND ELEVATIONS
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-CF 0
Level 7 REVIEW OF SHOP DRAWING
1030x882 1030x882
ULTFR ULTFR
x1993
1030x882 1030x882
ULTFR ULTFR
FFL 145800 Level 7 Review is only for the limited purposes as set forth in the
HWB
FFL 145800 Contract Documents
x1993
What is this? APPROVED FOR CONSTRUCTION
x1993
RESUBMISSION REQUIRED
FREEZER
x1993
What is this? APPROVED WITH COMMENTS
GDP4-1
ROOM EVACUATE
1x13A SSO (E) NO RESUBMISSION REQUIRED
O2 1D DATA_OUTLET
O2 Gas Detector 1A 1C SIGNAGE DISAPPROVED
LEVELING 1x13A SSO (E) 1x13A SSO (E) RESUBMISSION REQUIRED
V0C VOCP-7 1B
55
VOC REQUIRED DATA_OUTLET
Checked by:
LEVELING Distance from door 2283 1x13A SSO (E)
165
frame to wall can 1x13A SSO (E) Date:
EVACUATE reduce to 100? Then NEW FREEZER 1200 95 850 DATA_OUTLET
EVA
S
1800
1600
1800
1450
1200
PUSH_BUTTON NEW FREEZER
PUSH_BUTTON
6TH STOREY (NORTH) FREEZER ROOM ROOM
1000
53 E_PUSH_BUTTON
1 1 : 50 6th Storey
FR
601x620x201
FR
601x620x201
FR
601x620x201
FR
601x620x201
THERMOSTAT
201
FFL 141250 6th Storey
FFL 141250
Put 2m first?
NEW FREEZER RM - ELEVATION A NEW FREEZER RM - ELEVATION B
Level 7 1A 1 : 40
1B 1 : 40
Level 7 FFL 145800
FFL 145800
250 882
2145
850
1x13A SSO (E)
DADO TRUNKING
DADO TRUNKING
3000
DATA_OUTLET
1x13A SSO (E) MAIN CONTRACTOR REVIEW AND CHECK
ULTFR ULTFR
1800
NEW FREEZER
NAME & SIGNATURE NAME & SIGNATURE
1030X882X1993 1030X882X1993 ROOM
1800
SPM/PM ENGINEER/SM
1C 1 : 40
1D 1 : 40 O2 Gas Detector NATIONAL UNIVERSITY OF SINGAPORE
VOC University Campus Infrastructure
Campus Asset Management (CAM)
WLB-LS REGULATOR
Where is BG?? O2 V0CVOCP-1
8 Kent Ridge Drive,
#02-02, Singapore 119246
REGULATOR
EXIT
WS GDP1-1
S RB BG
ARCHITECT:
Icemaker 660 x 690 x 1040 THERMOSTAT EVACUATE
SIGNAGE
HWB
WS
CPG Consultants Pte Ltd
NEW AIR
EXIT
EVA
1 Gateway Drive #23-01
EXIT
VOCP-8 3A
AIR2BLOCK LOCK CPG West Gate Tower
S
V0C Singapore 608531
2A 10 sqm Don't enter sign?
Tel : 63574231 Fax : 6357 4398
THERMOSTAT LCC
EXIT M&E CONSULTANT:
RB BG CA
EVA
CA
HWB EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
EVACUATE Tel: (65) 6225 1808 Fax: (65) 6225 6808
SIGNAGE
Don't enter sign Email : enquiry@ewc.com.sg
outside? www.ewc.com.sg
SUB-CONTRACTOR:
PROVISION FOR
BREAK GLASS &
RELEASE BUTTON PRESICO ENGINEERING PTE LTD
34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945
2x13A SSO
PROJECT TITLE :
55
1200
1200
1200
310 THERMOSTAT
FREEZER ROOM, AIR LOCK 1 & 2
1070
1000
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-FZRAL 0
REVIEW OF SHOP DRAWING
B Review is only for the limited purposes as set forth in the
Contract Documents
Checked by:
FC 1100 x 460 x
1580 Date:
BG
1 RB 200
1x13A SSO (E)
T
3
1
J 0
NS
U0- 0
1
J 1
T
0
6
T
6
0
J 1
J 1
J 1
NS
T
0
6
T
0
6
U0- 0
2
FC FC FC FC CA VOC
1090 x 670 1090 x 670 1090 x 670 1090 x 670 DB-L6-LAB-5-N-P1
DB 2
B x 1650 x 1650 x 1650 x 1650 NEW MATERIAL
2G Lighting Switch HANDLING ROOM
PUSH_BUTTON DB-L6-LAB-5-N-P6 1G Lighting Switch
VOC
J 1
T
0
6
T
6
0
J 1
J 1
T
0
6
E_PUSH_BUTTON
20100
MATERIAL THERMOSTAT
1800
1C NEW MATERIAL
ABC 920 x ABC 920 x
V0C VOCP-9
550 x 900 550 x 900
HANDLING 1B 1A
1500
1D HANDLING ROOM
ROOM
PROVISITON
J 1
T
0
6
T
6
0
J 1
J 1
T
0
6
1200
FOR RB & BG 31
1070
FAIL PUSH_BUTTON 20 6th Storey
E_PUSH_BUTTON FFL 141250
FR for
SECURE THERMOSTAT
EP 601 x 6th Storey
618 x FHC-4250 HR FFL 141250
NU
S -0 0
1
2003
S -0 1
NU
J 1
J 1
T
0
6
T
0
6
T
6
0
J 1
J 1
J 1
NU
T
0
6
T
0
6
S -0 0
2
FR here, where is the 4800 FHC NEW MATERIAL HANDLING RM - ELEVATION A NEW MATERIAL HANDLING RM - ELEVATION B
power for FR? 1A 1 : 40
1B 1 : 40
6TH STOREY (NORTH) MATERIAL HANDLING ROOM
1 1 : 50
Level 7 1
FFL 145800
Coros cabinet 914 x Level 7
FFL 145800
635 x 889
STACK 2 nos
together
MAIN CONTRACTOR REVIEW AND CHECK
825 825 825 825 367
1200 600 600 600 600 NAME & SIGNATURE NAME & SIGNATURE
SPM/PM ENGINEER/SM
ARCHITECTURAL M&E COORDINATOR
COORDINATOR
200 CLIENT:
2700
NATIONAL UNIVERSITY OF SINGAPORE
2700
University Campus Infrastructure
Campus Asset Management (CAM)
1800
8 Kent Ridge Drive,
FC FC FC FC
1090 x 670 x 1650 1090 x 670 x 1650 1090 x 670 x 1650 1090 x 670 x 1650
#02-02, Singapore 119246
900
ABC
2A 2C 920 x 550 x 900
2B
NEW MATERIAL ARCHITECT:
SUB-CONTRACTOR:
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
50
1800 543
up to put switch & ELECTRICAL INSTALLATION
Thermostat
6TH STOREY PLAN (NORTH CORE)
1200
1095
450
PI OFFICE 1
2x13A SSO
2x13A SSO
6th Storey
PI OFFICE 1 FFL 141250
SD-T4S12L2L3S9L6-S9-ELEC-ROOM DETAIL-MHOF 0
2 REVIEW OF SHOP DRAWING
Review is only for the limited purposes as set forth in the
Contract Documents
2 APPROVED FOR CONSTRUCTION
T
J 0
3
1
K -0 1
7
8 7
L N
U8 0 2
N0
L K 1
- 7
T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0
2 7
U8 0 8
T
J 1
6
0
A
01A
J 0
6
1
T J 1
T
0
6 J 1
T
0
6
T
1
6
J 0
0
6
1
T
J
1 7
U8 0 8
T
1
6
J 0 T
6
0
J 1 T
6
0
J 1
T
1
6
J 0 T
6
0
J 1 T
6
0
J 1
J 0
6
1
T
RESUBMISSION REQUIRED
UB1 UB2
GDP4-2 RB MLB15 Level 7 Level 7
APPROVED WITH COMMENTS
NO RESUBMISSION REQUIRED
A 1500 X 750 X 900 FFL 145800 FFL 145800
1900 1900 2615 DISAPPROVED
RESUBMISSION REQUIRED
Checked by:
VA CA4 CA4 VA 1200 1200 1200
4ft BSC
AR AR AR
CA4 CA4 CA4
WP WP WP
2400
32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.
200
VA CA4 CA4 VA
1500 X 750 X 900
MLB 15
860 x 740 x
1x13A SSO (E)
FR
2x13A SSO 700 2x13A SSO 2x13A SSO 900 2x13A SSO
1800
2x13A SSO
2x13A SSO
A
E D B 1497 576
860 x 740 x
VA CA4 CA4 VA
FR
C
1500 X 750 X 900
TLB 15
1800
BSC FR FR
2440
1420 x 852 x 2400 860x740x1800 860x740x1800
MOUNTED ON
1x13A SSO (E)
108
108
1800
THE MULLION
UB2
MOUNTED ON
FACADE MULLION
MLB15 MLB15
1050
1050
1050
UB1
1500 X 750 X 900
PUSH_BUTTON
LEVELING
VOC 52 sqm
UB1
SIGNAGE
MLB15
VOCP-4 V0C O2
EVA
GDP2-2
DB 1 USER USER S USER M LAB 1 - ELEVATION A M LAB 1 - ELEVATION B
CABINET CABINET
SIGNAGE_GAS
CAB
A 1 : 40
B 1 : 40
LEAK DO NOT
ENTER
EDB-L6-LAB-1-N-P3
6TH STOREY (NORTH) MUDULAR LAB 1 PLAN
DB-L6-LAB-5-N-P2 1 1 : 50
A
2 MAIN CONTRACTOR REVIEW AND CHECK
NAME & SIGNATURE NAME & SIGNATURE
Level 7 Level 7
FFL 145800 FFL 145800 SPM/PM ENGINEER/SM
1900 2000
ARCHITECTURAL M&E COORDINATOR
COORDINATOR
LEFT TO RIGHT LEFT TO RIGHT LEFT TO RIGHT
VAC VAC VAC
N2 N2 N2
DATE
AR AR AR
CA4 CA4 CA4
WP WP WP
200
EVACUATE 1200 1200 1200 NATIONAL UNIVERSITY OF SINGAPORE
165
SIGNAGE 1x13A SSO (E) 32A SPN ISOL. University Campus Infrastructure
O2 Gas Detector 2x13A SSO Campus Asset Management (CAM)
2G Lighting Switch 400 8 Kent Ridge Drive,
2x13A SSO #02-02, Singapore 119246
4G Lighting Switch
68
1941
1635 ARCHITECT:
(CEILING)
VOC
FUME HOOD FUME HOOD FUME HOOD
2800
100
2600
CPG Consultants Pte Ltd
2440
2300
1 Gateway Drive #23-01
CPG
108
1100
1070
1050
20
NEW MODULAR LAB M&E CONSULTANT:
NEW MODULAR LAB 1
6th Storey 1 6th Storey
FFL 141250
PUSH_BUTTON FFL 141250 EWC Engineers Pte Ltd
970 Toa Payoh North #06-18 Singapore 318992
E_PUSH_BUTTON Tel: (65) 6225 1808 Fax: (65) 6225 6808
THERMOSTAT Email : enquiry@ewc.com.sg
www.ewc.com.sg
PROJECT TITLE :
PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
DATA_OUTLET 2x13A SSO 1x13A SSO (E) NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
2x13A SSO (E) 2x13A SSO DATA_OUTLET 04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
2x13A SSO 2x13A SSO SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
1x13A SSO 2x13A SSO (E)
1x13A SSO
(CEILING)
DRAWING TITLE :
2800
287 260 285 260 288 290 400 400 290 288 260 285 260 287 ELECTRICAL INSTALLATION
Reagent Dropper for
MOUNTED ON THE all island benches? 6TH STOREY PLAN (NORTH CORE)
FACADE FRAME (TYPICAL ELEVATION BOTH SIDE OF LAB BENCH FOR MODULAR LABS 1 TO 4)
MODULAR LAB 1 PLAN AND ELEVATIONS
NEW MODULAR LAB
1
6th Storey Drawn by : PAI / MYO Checked by : SHREE
FFL 141250
M LAB 1 - ELEVATION E
E 1 : 40
Drawing no. :
0
REVIEW OF SHOP DRAWING
3 Review is only for the limited purposes as set forth in the
Contract Documents
7 7
U8 0 2
U8 0 2
7 7
T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
1
3
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0 T
3
1
J 0
1A
T
1
6
J 0
J 0
6
1
T
1A
T
1
6
J 0
J 0
6
1
T
1A
T
6
0
J 1
J 1
T
0
6
1A
T
6
0
J 1
J 1
T
0
6
1A
T
6
0
J 1
J 1
T
0
6
UB1
Date:
UB2
VA CA4 CA4 VA
3
1420 x 852 x
A
4ft BSC
2400
Level 7 Level 7
FFL 145800
VA CA4 CA4 VA FFL 145800 1125 1900 1900
1500 X 750 X 900
MLB 15
N2 N2 N2
AR AR AR
CA4 CA4 CA4
WP WP WP
A 1200 1200 1200
860 x 740 x
VA CA4
D CA4
B VA
FR
C
1800
200
UB2
32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL.
UB1
2440
THERMOSTAT
E_PUSH_BUTTON
51 sqm 2x13A SSO BSC
2x13A SSO
UB1
1800
1800
EVACUATE
MLB15
1100
1x13A SSO (E)
1050
O2
1050
1050
EVA 860x740x1800 860x740x1800
GDP2-1
S NEW MODULAR LAB
4KG USER
CAB
USER
CAB DB 1 6th Storey 2 6th Storey
FFL 141250
NEW MODULAR LAB
2
FFL 141250
1 1 : 50
SPM/PM
ARCHITECTURAL
ENGINEER/SM
M&E COORDINATOR
COORDINATOR
DATE
CLIENT:
ARCHITECT:
Level 7 Level 7
FFL 145800 FFL 145800
1470 2000 2000 CPG Consultants Pte Ltd
1 Gateway Drive #23-01
LEFT TO RIGHT
VAC
LEFT TO RIGHT
VAC
LEFT TO RIGHT
VAC
CPG West Gate Tower
Singapore 608531
N2 N2 N2 Tel : 63574231 Fax : 6357 4398
AR AR AR
CA4 CA4 CA4
WP WP WP
M&E CONSULTANT:
155
200
200
165
O2 Gas Detector www.ewc.com.sg
32A SPN ISOL. 32A SPN ISOL. 32A SPN ISOL. VOC
SIGNAGE
SINGAPORE 758174
Tel: 6255 7211 Fax: 6253 2632
1600
1500
SUB-CONTRACTOR:
1200
1100
1100
1070
31
1050
THERMOSTAT
E_PUSH_BUTTON
NEW MODULAR LAB NEW MODULAR LAB PUSH_BUTTON
20
6th Storey 2 6th Storey 2 PRESICO ENGINEERING PTE LTD
FFL 141250 FFL 141250 34 Toh Guan Road East, #01-27
Enterprise Hub, Singapore 608579
Tel No: (65) 67471346 Fax No: 67477945
PROJECT TITLE :
General usage then PROPOSED ADDITIONS & ALTERATIONS TO 2ND AND 3RD STOREY OF
M LAB 2 - ELEVATION B M LAB 2 - ELEVATION C 400 from FFL EXISTING BLK S12 AND 6TH STOREY OF EXISTING BLOCK S9 WITHIN
B C 1 : 40
NATIONAL UNIVERSITY OF S INGAPORE MK 03 ON LOT 03891P, 03894K,
04340V, 04342T, 05023L, 05025M, AND 05112L AT 2 SCIENCE DRIVE 3,
1 : 40 SINGAPORE 117551 (QUEENSTOWN PLANNING AREA)
DRAWING TITLE :
ELECTRICAL INSTALLATION
6TH STOREY PLAN (NORTH CORE)
MODULAR LAB 2 PLAN AND ELEVATIONS