0% found this document useful (0 votes)
73 views3 pages

Lined Canal Schedule

The document provides a schedule for the Talanai Homes Site Development project located in Sapang Bayabas, Mabalacat City, Pampanga from January 25 to March 4. It outlines the planned activities, resources needed including materials, manpower, equipment, and work stations on a daily basis. Activities include structure excavation, foundation preparation and gravel bedding, rebar laying and formworks, and concreting. Manpower will include both administrative staff and subcontractors. Equipment includes backhoes, dump trucks, compactors, and other machinery.

Uploaded by

argeldizon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views3 pages

Lined Canal Schedule

The document provides a schedule for the Talanai Homes Site Development project located in Sapang Bayabas, Mabalacat City, Pampanga from January 25 to March 4. It outlines the planned activities, resources needed including materials, manpower, equipment, and work stations on a daily basis. Activities include structure excavation, foundation preparation and gravel bedding, rebar laying and formworks, and concreting. Manpower will include both administrative staff and subcontractors. Equipment includes backhoes, dump trucks, compactors, and other machinery.

Uploaded by

argeldizon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT: Talanai Homes Site Development

PROJECT CODE : PRO-2018-001


LOCATION: Sapang Bayabas Mabalacat City Pampa

January
ITEM ACTIVITY 25 26 27 28 29 30 31 1 2 3
MATERIALS N/A - - - - - - - -
RESOURC

NEEDED

MANPOWER A-06-02 ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN
ES

Structure Excavation
EQUIPMENT A-06-01 BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT
( Lined Canal)
STATION Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal

Lined Canal
MATERIALS D-12-03
MANPOWER D-12-02 ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN
Foundation Preparation / BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate
EQUIPMENT D-12-01
Gtavel Bedding Compactor Compactor Compactor Compactor Compactor Compactor Compactor

Sta. 0+020 to Sta. 0+030 to Sta. 0+040 to Sta. 0+050 to Sta. 0+060 to Sta. 0+070 to Sta. 0+080 to
STATION
0+030 0+040 0+050 0+060 0+070 0+080 0+090
MATERIALS D-12-03
MANPOWER D-12-04 SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11)
Rebar Laying and
EQUIPMENT D-12-01 BH BH BH BH BH BH
Formworks
Sta. 0+020 to Sta. 0+030 to Sta. 0+040 to Sta. 0+050 to Sta. 0+060 to Sta. 0+070 to
STATION
0+030 0+040 0+050 0+060 0+070 0+080
MATERIALS D-12-03
MANPOWER D-12-04 SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9)
EQUIPMENT D-12-01 Concreting Class "B"
Sta. 0+020 to Sta. 0+030 to Sta. 0+040 to Sta. 0+050 to Sta. 0+060 to
STATION
0+030 0+040 0+050 0+060 0+070
February
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
- - - - - - - - - - - - -
ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN
BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT

Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal

ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN
BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate
Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor

Sta. 0+090 to Sta. 0+100 to Sta. 0+110 to Sta. 0+120 to Sta. 0+130 to Sta. 0+140 to Sta. 0+150 to Sta. 0+160 to Sta. 0+170 to Sta. 0+190 to Sta. 0+200 to Sta. 0+210 to Sta. 0+220 to
0+100 0+110 0+120 0+130 0+140 0+150 0+160 0+170 0+180 0+200 0+210 0+220 0+230

SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11)
BH BH BH BH BH BH BH BH BH BH BH BH BH
Sta. 0+080 to Sta. 0+090 to Sta. 0+100 to Sta. 0+110 to Sta. 0+120 to Sta. 0+130 to Sta. 0+140 to Sta. 0+150 to Sta. 0+160 to Sta. 0+170 to Sta. 0+190 to Sta. 0+200 to Sta. 0+210 to
0+090 0+100 0+110 0+120 0+130 0+140 0+150 0+160 0+170 0+180 0+200 0+210 0+220

SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9)

Sta. 0+070 to Sta. 0+080 to Sta. 0+090 to Sta. 0+100 to Sta. 0+110 to Sta. 0+120 to Sta. 0+130 to Sta. 0+140 to Sta. 0+150 to Sta. 0+160 to Sta. 0+170 to Sta. 0+190 to Sta. 0+200 to
0+080 0+090 0+100 0+110 0+120 0+130 0+140 0+150 0+160 0+170 0+180 0+200 0+210
March
19 20 21 22 23 24 25 26 27 28 1 2 3 4
- - - - - - - - - -
ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN
BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT BH, DT

Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal Line Canal

ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN ADMIN
BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate BH, Plate
Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor Compactor

Sta. 0+230 to Sta. 0+240 to Sta. 0+250 to Sta. 0+260 to Sta. 0+270 to Sta. 0+280 to Sta. 0+290 to Sta. 0+300 to Sta. 0+310 to Sta. 0+320 to
0+240 0+250 0+260 0+270 0+280 0+290 0+300 0+310 0+320 0+330.7

SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11) SUBCON (11)
BH BH BH BH BH BH BH BH BH BH BH
Sta. 0+220 to Sta. 0+230 to Sta. 0+240 to Sta. 0+250 to Sta. 0+260 to Sta. 0+270 to Sta. 0+280 to Sta. 0+290 to Sta. 0+300 to Sta. 0+310 to Sta. 0+320 to
0+230 0+240 0+250 0+260 0+270 0+280 0+290 0+300 0+310 0+320 0+330.7

SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9) SUBCON (9)

Sta. 0+210 to Sta. 0+220 to Sta. 0+230 to Sta. 0+240 to Sta. 0+250 to Sta. 0+260 to Sta. 0+270 to Sta. 0+280 to Sta. 0+290 to Sta. 0+300 to Sta. 0+310 to Sta. 0+320 to
0+220 0+230 0+240 0+250 0+260 0+270 0+280 0+290 0+300 0+310 0+320 0+330.7

You might also like