1. The document outlines requirements and specifications for mechanical works including ventilation and air conditioning systems. It specifies that all work must comply with national building codes and regulations of Quezon City. 2. The scope of work includes all items described in the plans. Equipment such as fan coil units, exhaust fans, and air cooled condensing units must be installed and all piping, ductwork, wiring and other components coordinated with other trades. 3. The contractor is responsible for testing and commissioning the entire ventilation and air conditioning system after installation and must submit shop drawings, catalogs, specifications and samples including vibration isolators to the owner for approval.

Uploaded by

archtgozar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Me1 Moto

1. The document outlines requirements and specifications for mechanical works including ventilation and air conditioning systems. It specifies that all work must comply with national building codes and regulations of Quezon City. 2. The scope of work includes all items described in the plans. Equipment such as fan coil units, exhaust fans, and air cooled condensing units must be installed and all piping, ductwork, wiring and other components coordinated with other trades. 3. The contractor is responsible for testing and commissioning the entire ventilation and air conditioning system after installation and must submit shop drawings, catalogs, specifications and samples including vibration isolators to the owner for approval.

Uploaded by

archtgozar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

-

1. ALL MECHANICAL WORKS SHALL BE DONE IN - EQUIPMENT DESIGNATION


ACCORDANCE WITH THE LATEST REQUIREMENTS - WALL MOUNTED FAN COIL UNIT
OF THE NATIONAL BUILDING CODE AND
REGULATIONS OF QUEZON CITY. - EXHAUST FAN
2. THE SCOPE OF WORK SHALL INCLUDE ALL WORKS RP - REFRIGERANT PIPES
DESCRIBED IN PLANS. PVC PIPE / G.I. PIPE
3. THE WORKS SHALL BE EXECUTED IN CLOSE
- ELBOW UP GALVANIZED PIPE SLEEVE
COORDINATION WITH ALL OTHER TRADES. - ELBOWDOWN ESCUTCHEON PLATE TWO PIPE SIZE LARGER

4. ALL AIRCONDITIONED SPACES SHALL BE EH - EXHAUSTER COAT EXTERIOR SURFACE


MAINTAINED AT 24 °C DB AND 50% RH. EF - EXHAUST FAN OAKUM PACKING W/ TAR COMPOUND
5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, ACCU - AIR-COOLED CONDENSING UNIT
MANUFACTURERS CATALOGUE, SPECIFICATION, MSFCU - MULTI-SPLIT FAN COIL UNIT
SAMPLES, INCLUDING VIBRATION ISOLATORS TO CFm - CUBIC FEET PER MINUTE
PREVENT VIBRATIONS AND NOISE TRANSMISSION.
6. ALL FLOOR SLAB MOUNTED VIBRATING
FT/min - FEET PER MINUTE
EQUIPMENT SHALL BE PROVIDED WITH VIBRATION
HP - HORSEPOWER FLOOR SLAB
V - VOLTZ ACCU ACCU
ISOLATORS TO PREVENT VIBRATIONS AND NOISE 1 1
TRANSMISSION.  - PHASE PLASTIC WATERPROOF 6mm Ø x 75mm LONG STEEL
7. EXHAUST FAN SHALL BE PROVIDED WITH KCal/HR - KILOCALORIE PER HOUR HEAT RESISTANT ROD WELDED
CAULKING COMPOUND TO PIPE SLEEVE
SUITABLE HZ - HERTZ 25mm THK AT BOTH ENDS DN
FLEXIBLE CONNECTIONS TO DISCHARGE DUCT.  - SQUARE METER
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR KW - KILOWATT THRU FLOOR
ALL TESTING AND COMMISSIONING OF THE WHOLE RPM - REVOLUTION PER MINUTE EF
VENTILATION AND AIRCONDITIONING SYSTEM AD W - WATTS ACCU 1
INSTALLATION.
    - CUBIC METER PER MINUTE 1
9. ALL POWER WIRING SHALL BE ELECTRICAL AND
TERMINATION TO EQUIPMENT SHALL BE
mm - MILLIMETER
MECHANICAL.
mmHg - MILLIMETER MERCURY
DN
ACCU
10. PROVIDE CONTROL WIRING FOR in. SP - INCH STATIC PRESSURE 1
AIRCONDITIONING   - CONDENSATE DRAIN LINE
EQUIPMENT. - CEILING CASSETTE FAN COIL UNIT
11. PROVIDE THERMOSTAT FOR ALL INDOOR UNITS /
FAN COIL UNITS. - DUCT CAPS
12. VERIFY LOCATION OF CONTROLLERS AND 6mm Ø x 75mm LONG STEEL ROD ACCU
SWITCHES ON ELECTRICAL PLANS. - AIR COOLED CONDENSING UNIT WELDED TO PIPE SLEEVE 2
13. ALL PIPE EQUIPMENT CONDENSATE DRAIN SHALL CDP - CONDENSING DRAIN PIPE PVC PIPE / B.I. PIPE
BE CONNECTED TO THE VERTICAL DRAIN PIPE AS GALVANIZED PIPE SLEEVE
TWO PIPE SIZE LARGER
SHOWN ON PLANS.
14. PROVIDE GUIDES, HANGERS, AND SUPPLEMENTAL - DUCT (FIRST FIGURE, SIDE SHOWN
400 X 200 - SPLITTER DAMPER
SECOND FIGURE, SIDE NOT SHOWN)
STEEL SUPPORT FOR ALL PIPING, DUCTING AND COAT EXTERIOR SURFACE
EQUIPMENTS W/ TAR COMPOUND
- DIRECTION OF FLOW
- FLEXIBLE CONNECTOR
15. PROVIDE PIPE SLEEVES FOR ALL PIPING PASSING FC

THRU BUILDING STRUCTURE.


16. ALL PIPE DIMENSIONS ARE MILLIMETER UNLESS - TRANSITION
- VOLUME DAMPER
OTHERWISE NOTED.

PLASTIC WATERPROOF HEAT


GENERAL NOTES AND LEGENDS 1 RESISTANT CAULKING COMPOUND
25mm THK AT BOTH ENDS
SCALE NTS M-101

AIR COOLED CONDENSING UNITS OAKUM PACKING

COOLING ACCU
POWER CURRENT AIR FLOW FAN MOTOR ELECTRICAL MAIN REFRIGERANT THRU WALL 2
DESIGNATION LOC. QTY TYPE CAPACITY INPUT INPUT RATE OUTPUT SUPPLY PIPING
BTUH KW AMP VOLTS PHASE HERTZ LOWSIDE/HIGHSIDE

WALL 3 1
ACCU BOARD ROOM 12,661KJ/H 1096W 4.76 A 566/508/361 m³/h N/A 230.0 1Ø 60.0 4''Ø 2'' Ø
1
2 MOUNTED
DN

3 1
ACCU 4 FLOOR 38,201.KJ/H 3200 W 1850/1700/1550/1400 N/A 230.0 1Ø 60.0 4''Ø 2'' Ø
2
WORKSTATION 14 A
STANDING m³/h

ACCU N/A N/A


ACCU
CEO ROOM 1 610-1860 W 2.7-9.1A N/A N/A 230.0 1Ø 60.0
3 WINDOW TYPE 8447-20462 KJ/H 1
ACCU
2 ACCU
3

EXHAUST FAN
ACCU ACCU
AIR POWER STATIC ELECTRICAL
1 2 ACCU
DESIGNATION LOC. QTY TYPE VOLUME OUTPUT PRESSURE SUPPLY ACCU
2 2
CU.M/M WATTS Pa VOLTS PHASE HERTZ

EF WALL
PANTRY 1 1.5 23.0 .8.0
1 MOUNTED 220.0 1Ø 60.0

EQUIPMENT SCHEDULE 2 EQUIPMENT LAYOUT 3


SCALE NTS M-101
SCALE 1:50M M-101

PLUMBING ENGR./ MASTER PLUMBER CONTRACTOR: REVISIONS: OWNER/REPRESENTATIVE: PROJECT TITLE: DRAWING CONTENTS: DRAWING NO.

MECHANICAL DETAILS

JEREMY E. PAMPOLINA
PROPOSED OFFICE FITOUT M-101
DR. SIXTO ANTONIO AVENUE, PASIG CITY

You might also like