The document is a detailed project report for the construction and upgradation of National Highway 127B in Assam, India from Srirampur to Dhubri. It includes location plans, key plans, typical cross sections, horizontal and vertical alignment reports, curve details, legends, plan and profile drawings, miscellaneous drawings related to road components, grade separated interchange improvements, and detailed cross section drawings. The report contains drawings and details for a 36.5 km segment of the highway project.

Uploaded by

nawal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views69 pages

2 D3 Compressed

The document is a detailed project report for the construction and upgradation of National Highway 127B in Assam, India from Srirampur to Dhubri. It includes location plans, key plans, typical cross sections, horizontal and vertical alignment reports, curve details, legends, plan and profile drawings, miscellaneous drawings related to road components, grade separated interchange improvements, and detailed cross section drawings. The report contains drawings and details for a 36.5 km segment of the highway project.

Uploaded by

nawal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 69

Consultancy Services for Feasibility Study and preparation of Detailed

Project Report for Construction & up-gradation of the newly declared NH-127 B
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00
km to the immediate approach of proposed bridge over river Brahmaputra
near Dhubri at chainage 54.523 km to NH standard (4-Lane DPR)

NH-127B

FINAL DETAILED PROJECT REPORT


DRAWING VOLUME – IX
( HIGHWAY & STRUCTURAL DRAWINGS )
PACKAGE – IV (CH: 36.500 KM TO 43.300 KM)
Prepared By

CE Testing Co. Pvt. Ltd.


124-A, N.S.C. Bose Road
Kolkata – 700 092, West Bengal

CET/2015/3636/NHIDCL/127B/FDPR Rev. : R1 March 2020


CONTENTS
SL. NO. OF
NO TITLE OF DRAWINGS DRAWING NO. SHEETS
01 Location Plan CET/2015/3636/NHIDCL/127B/FDPR/LP 01
02 Key Plan CET/2015/3636/NHIDCL/127B/FDPR/KP 01
03 Typical Cross Section CET/2015/3636/NHIDCL/127B/FDPR/TCS 02
04 Horizontal Alignment Report CET/2015/3636/NHIDCL/127B/FDPR/HAR 01
05 Vertical Alignment Report CET/2015/3636/NHIDCL/127B/FDPR/VAR 01
06 Curve Details Report CET/2015/3636/NHIDCL/127B/FDPR/CUR 01
07 Legend CET/2015/3636/NHIDCL/127B/FDPR/LEGEND 01
08 Plan & Profile CET/2015/3636/NHIDCL/127B/FDPR/PP 08
09 Miscellaneous Drawings
Curve Component CET/2015/3636/NHIDCL/127B/FDPR/MIS-01 01
Minor Inter section CET/2015/3636/NHIDCL/127B/FDPR/MIS-02 01
Details of Crash Barrier CET/2015/3636/NHIDCL/127B/FDPR/MIS-03 02
Typical Details of Road Marking CET/2015/3636/NHIDCL/127B/FDPR/MIS-04 02
Typical Details of Road Sign CET/2015/3636/NHIDCL/127B/FDPR/MIS-05 03
Typical Details of Road Furniture CET/2015/3636/NHIDCL/127B/FDPR/MIS-06 01
Details of Drain CET/2015/3636/NHIDCL/127B/FDPR/MIS-07 01
Details of Bus Bay with Passenger Shelter CET/2015/3636/NHIDCL/127B/FDPR/MIS-08 01
Details of Retaining Wall CET/2015/3636/NHIDCL/127B/FDPR/MIS-09 01

10 Improvement of Grade Separater Interchanges CET/2015/3636/NHIDCL/127B/FDPR/GS 08


11 Structural drawings
12 Detailed Cross Section CET/2015/3636/NHIDCL/127B/FDPR/DCS 20
LOCATION PLAN
KEY PLAN
TYPICAL CROSS SECTION
Proposed Right of Way 30000

℄ of Proposed Carriageway
℄ of Existing Carriageway
2750 24500 2750
Space for Space for
Utility Utility
Services 4000 7000 2500 7000 4000 Services
Shoulder Carriageway 500 Median 500 Carriageway Shoulder

RIGHT OF WAY

RIGHT OF WAY
Kerb Kerb
1500 500 2000 Shyness 1500 Shyness 2000 500 1500
Typical Cross Section Mkd. TCS -1A
Drain Paved Paved Drain

Railing

Railing
Chainage (M)
Length (M)
From To
2.5% 2.5%
2.5% 2.5% 36500 36900 400
Total Length= 400

250 Existing Pavement Dismantled 250


up to GSB layer
Existing subgrade used as 40 mm BC
subgrade after loosening & Existing Carriageway 85 mm DBM
Recompacting to achived
8% Design CBR Existing Pavement used as GSB 250 mm WMM(In Two Layer)
after scarifiing bituminous layer 200 mm GSB
500 mm Subgrade
(CBR not less than 8%)

TCS - 1A : RE-CONSTRUCTION OF 4-LANE CARRIAGEWAY FOR FLEXIBLE PAVEMENT


WITH BOTH SIDE DRAIN ( DISMANTLING UPTO EXISTING GSB LAYER )

Proposed Right of Way 45000

℄ of Proposed Carriageway
℄ of Existing Carriageway

26000

Typical Cross Section Mkd. TCS -2B


3500 7000 7000 3500 Chainage (M)
5000 Length (M)
CORRIDOR FOR Shoulder Carriageway 500 Median 500 Carriageway Shoulder CORRIDOR FOR From To
TREE Kerb Kerb TREE
150 mm GRANULAR MATERIAL 2000 1500 1500 2000 150 mm GRANULAR MATERIAL 36900 39150 2250
PLANTATION / Shyness 4000 Shyness PLANTATION /
2000 AFFORESTATION Earthen Paved Paved Earthen AFFORESTATION 2000 41250 42550 1300
RIGHT OF WAY

RIGHT OF WAY
Space for Space for Total Length= 3550
2.5% 2.5% 2.5% 2.5%
Utility 3.0% 3.0% Utility
Services Turfing Turfing Services
2 2
1 1

Unlined 4.0% Existing Pavement Dismantled 4.0% Unlined


Drain up to subgrade layer 40 mm BC Drain
Existing Carriageway 85 mm DBM
250 mm WMM(In Two Layer)
200 mm GSB
500 mm Subgrade
(CBR not less than 8%)

TCS - 2B : RE-CONSTRUCTION OF 4-LANE CARRIAGEWAY FOR FLEXIBLE PAVEMENT WITH NEW SUBGRADE

NATIONAL HIGHWAYS AND INFRASTRUCTURE


DEVELOPMENT CORPORATION LIMITED.
TYPICAL CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/TCS
1:100 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
Sh. 1 of 2
NEW DELHI - 110001

Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the
CE TESTING COMPANY PVT. LTD. Drawn By.
Design By. Checked By. Approved By.
R2 NOV,19 CHANGE OF HIGH FLOOD LEVEL
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of proposed 124-A, N.S.C. Bose Road
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. bridge over river Brahmaputra near Dhubri.
November km to the immediate approach of proposed bridge over river Brahmaputra near
2019 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane) B.Das
Proposed Right of Way 45000/60000

℄ of Proposed Carriageway
℄ of Existing Carriageway

26000

3500 7000 5000 7000 3500


CORRIDOR FOR Shoulder Carriageway 500 Median 500 Carriageway Shoulder CORRIDOR FOR
TREE Kerb Kerb TREE Typical Cross Section Mkd. TCS -3
PLANTATION / 150 mm GRANULAR MATERIAL 2000 1500 Shyness Shyness 1500 2000 150 mm GRANULAR MATERIAL PLANTATION /
4000
2000 AFFORESTATION Earthen Paved Paved Earthen AFFORESTATION 2000 Chainage (M)
Length (M)
From To
RIGHT OF WAY

RIGHT OF WAY
Space for 2.5% 2.5% Space for
Utility 3.0% 2.5% 2.5% 3.0% Utility 39150 39370 220
Services Turfing Turfing Services 42550 43300 750
2 2
Total Length= 970
1 1

Unlined 4.0% 4.0% Unlined


Drain 40 mm BC Drain
85 mm DBM
250 mm WMM(In Two Layer)
200 mm GSB
TCS - 3 : NEW CONSTRUCTION OF 4-LANE CARRIAGEWAY FOR FLEXIBLE PAVEMENT 500 mm Subgrade
(CBR not less than 8%)

Proposed Right of Way 45000/60000

℄ of Proposed Carriageway
25000
Typical Cross Section Mkd. TCS -5A
Chainage (M)
5000 Length (M)
1500 1500 7000 Median 7000 1500 1500 From To
B Paved Carriageway 500 500 Paved 40700 41250 550
Shoulder Kerb Kerb Shoulder
Shyness Shyness Total Length= 550
4000

2.5% 2.5% 2.5% 2.5%

2000 2000
Space for Space for
Utility Utility
Services 40 mm BC Services
1000 1500 5500 1500 85 mm DBM 1500 5500 1500 1000
RIGHT OF WAY

RIGHT OF WAY
Drain Earthen SERVICE ROAD Earthen 250 mm WMM(In Two Layer) Earthen SERVICE ROAD Earthen Drain
Shoulder Shoulder 200 mm GSB Shoulder Shoulder
EARTH FILLING 500 mm Subgrade
A
2.0% 3.0% 3.0% 2.0%
3.0% 3.0%

Selected Earth Selected Earth Selected Earth Selected Earth


150 mm well graded 150 mm well graded 150 mm well graded 150 mm well graded
Granular layer Granular layer Granular layer Granular layer
250 mm PQC 250 mm PQC
150 mm DLC 150 mm DLC
150 mm GSB 150 mm GSB
500 mm Subgrade 500 mm Subgrade

TCS - 5A : 4-LANE CARRIAGEWAY FOR FLEXIBLE PAVEMENT WITH BOTH SIDE RE WALL & SERVICE ROAD

Proposed Right of Way 60000

℄ of Proposed Carriageway
25000

500 5000
125
250 B 1500 1500 7000 Median 7000 1500 1500
150 Paved Carriageway 500 500 Paved
Shoulder Shoulder Typical Cross Section Mkd. TCS -5B
Kerb Kerb
375 625

Shyness 4000 Shyness Chainage (M)


800

Length (M)
From To
1855

250

2.5% 2.5% 2.5% 2.5%


1230 39370 40700 1330
750

730

Total Length= 1330


125

2000 100 thk. LEAN CONC. 2000


100THK.PCC
Space for SAND FILLIING M15 Space for
100

Utility Utility
Services Details of 'B' 40 mm BC Services
Details of 'A'
85 mm DBM
RIGHT OF WAY

RIGHT OF WAY
250 mm WMM(In Two Layer)
200 mm GSB
EARTH FILLING 500 mm Subgrade

TCS - 5B : 4-LANE CARRIAGEWAY FOR FLEXIBLE PAVEMENT WITH BOTH SIDE RE WALL

NATIONAL HIGHWAYS AND INFRASTRUCTURE


DEVELOPMENT CORPORATION LIMITED.
TYPICAL CROSS SECTION DWG. NO. CET/2015/3636/NHIDCL/127 B/FDPR/TCS
1:100 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
Sh. 2 of 2
NEW DELHI - 110001

Consultancy Services for Feasibility Study and preparation of Detailed ROAD NAME: NH-127 B starting from Srirampur in the
CE TESTING COMPANY PVT. LTD. Drawn By.
Design By. Checked By. Approved By.
R2 NOV,19 CHANGE OF HIGH FLOOD LEVEL
Project Report for Construction & up-gradation of the newly declared NH-127 B state of Assam to the immediate approach of proposed 124-A, N.S.C. Bose Road
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD. bridge over river Brahmaputra near Dhubri.
November km to the immediate approach of proposed bridge over river Brahmaputra near
2019 PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 U.Malik R. Mishra A.Nayak
REVISIONS Dhubri at chainage 55.700 km to NH standard (4 Lane) B.Das
HORIZONTAL ALIGNMENT REPORT
VERTICAL ALIGNMENT REPORT
CURVE DETAILS REPORT
LEGEND
PLAN & PROFILE
SRIRAMPUR NEAR DHUBRI

GHAT TEMPLE
RUPSI
LEGEND : -
EXISTING ROAD :

PROPOSED CENTRE LINE :


PROPOSED CARRIAGEWAY :

NING
PROPOSED PAVED SHOULDER :

MOTORJHAR BUR
PROPOSED EARTHEN SHOULDER :

PROPOSED MEDIAN :
PROPOSED REWALL :
PROPOSED DRAIN :
57
No.
Curve 400 PROPOSED ROW : ROW ROW

R (m) 43.842

.106M
DESIGN CH : 1+000
Lc (m) 120.00 t Curve No. 58
h 1+000
Ls (m) 23^28'07" Rig
:

36+550SING HEIGHT=4.875M
HT=5
EXISTING CH
R (m) 2000

LADIES TAYLOR
Delta 5.0% Lc (m) 77.046

PACKAGE -IV
PACKAGE -III
HEIG
e 1 00 StructureNo.- 37/3
37/1 Speed
Design
No.- ert
RESIDENTIA Type:-Box Culvert

STORE
START OF
cture
L AREA Delta 2^12'26" Right

SING
lv
Stru Box Cu .0)m Span:- 1/(2.0x2.0)m
4 NO HOUSE

ORE

230M
RESIDENTIAL AREA
e

END OF
:- x2 2.5%

0 .426
p e

PI
T y 2 .0 n 8 NO HOUSE Design Ch:36+750

CROS
:- 1/(

36+300
+150 nstructio Design Speed

36+250
100

36+350
Span n Ch:36

MEDICAL ST

HT=5.
36+400
Imp.Prop. - New Construction

MEDICAL
w Co

36+450
002
RESIDENTIAL AREA
Desig rop. - Ne
RESIDENTIAL AREA

CROS
RESIDENTIAL ARE

36+362+2
RESID

36+600
SHOP
ROW ROW 2 NO HOUSE A
.P ROW ROW

HEIG
ENT ROW 6 NO HOUSE
p ROW ROW

PI
ROW

36+650
ROW

36+631.212
Im 2 NO H IAL AREA ROW ROW ROW

37+350 SHOP
2 NO HOUSE ROW ROW ROW
ROW ROW ROW

36+700
37+050
ROW

SHOP
ROW

50
OUSE
ROW ROW

37+100
ROW ROW ROW ROW
3 NO H
ROW ROW

36+750
RESIDENTIA

37+150
ROW OUSE

SING
ROW ROW RESIDENTIAL AREA RESIDENTIA

37+000

37+200
ROW ROW ROW
L AREA

37+250
ROW L AR

36+800
ROW
4 NO HOUS
2 NO HOUSE EA

36+1

37+300
PWD 7 NO SHOP ROW
ROW ROW 2 NO HOUSE E
ROW

36+850
ROW

CROS
ROW
ROW

37+400
11 NO SHOP 2 NO SHOP ROW ROW

36+900
PILLAR

37+450
ROW ROW
ROW
100

ROW

37+500

36+950
ROW ROW
W ROW ROW
RO

37+000
ND

37+550
ROW

50

ND
ROW ROW
W ROW

37+600
RO ROW
9
PILLAR
36+

ROW

DITCH LA
36+
ROW

DITCH LA
ROW
PILLAR

W DITCH LAND

37+650
RO BUS STOP ROW ROW ROW
ROW
050

37+700
W RO
RO

37+750
ROW ROW ROW ROW ROW

DITCH LAND
5 ROW ROW ROW ROW ROW
0

RESINO ROW

37+800
W ROW ROW
HO E ROW
RO DENTIAUS ROW
90

MOBILE STORE
ROW ROW ROW ROW ROW
DITCH LAND
ROW
36+

ROW ROW ROW


L AREA
36+

OW ROW ROW ROW ROW 3 NO HOUSE


R ROW ROW ROW ROW ROW

36+342.916
ROW
RO
W ROW ROW
0

AT CHAINAGE
ROW RESIDENTIAL AREA

36+222.91
4 NO HOUS MOTORJHAR STATE MOD ROW ROW
ROW
EL HOSPITAL ROW
00

RO
W RESIDENT E ROW ROW
850

ROW
ROW ROW
PILLAR

36+1

36+592.684
W
IAL AREA ROW
RO ROW

LAGE

KM 36+500
ROW
ROW
36+

ROW
36+

36+669.730
W ROW ROW
RO ROW
OW

ST
ROW

CS
ROW

79.07
R ROW
W ROW ROW

6
RO StructureNo.- 37/2 ROW

TOR JHAR VIL


ROW

SC
ROW
00

ROW

PC
W ROW
RO Type:-Box Culvert ROW
3
8

PT
36+

RESIDENTIAL AREA
Span:- 1/(2.0x3.0)m
Design Ch:36+382
W
RO Imp.Prop. - Reconstruction
W
36+

RO RESIDENTIAL AREA

MO
W NTIAL AREA
RO Existing Structure
0 59.0

W
RO Type:-Pipe Culvert
TS

W
RO
73

Dia:- 1 X 0.9m
W
RO
W
RO
W
RO

MOTH MANDIR

ILI
CHAR
44.00M

Type Symmetric Parabola


Dir Sag
42.00M L 230.00m
G1 -2.442%
G2 -0.029% FINISHED ROAD LINE
MO0.69m

Box Culvert 1/(2.0x3.0)m


40.00M

Box Culvert 1/(2.0x2.0)m


EXISTING ROAD / GROUND LINE
Box Culvert 1/(2.0x2.0)m

R 1.05 Type Symmetric Parabola


K 95.30 Dir Crest

Design Ch:- =36+382

Design Ch:- =36+750


Design Ch:- =36+150

SD 508.75m L 60.00m
G1 -0.029%
Design Ch:- =36+070

PVT 36+146

PVC 36+631
Elev 33.027

PVT 36+691
38.00M

Elev 32.887

Elev 32.863
G2 -0.049%
MO-0.00m
End of RE wall

R -0.03
K 2922.17
36.00M SD 23407.33m

34.00M L 485.187m L 389.964m


A
B A
Slp -0.029% A B
A
B

Slp -0.049%
A

32.00M
Elev 33.060
PVI 36+031

Elev 32.878
PVI 36+661
30.00M

28.00M

26.00M

Datum = 24.00M
31.921 34.181

31.980 33.825

32.004 33.534

32.020 33.309

32.025 33.149

32.005 33.055

31.903 33.026

31.695 33.019

31.535 33.011

31.916 33.004

31.872 32.997

31.845 32.990

31.833 32.982

31.850 32.975

31.877 32.968

31.912 32.961

31.944 32.954

31.938 32.946

31.929 32.939

31.989 32.932

32.011 32.925

31.971 32.917

31.912 32.910

31.862 32.903

31.824 32.896

31.830 32.888

31.852 32.881

31.884 32.871

31.919 32.859

31.946 32.846

31.967 32.834

31.951 32.821

31.944 32.809

31.974 32.797

31.962 32.784

31.904 32.772

31.855 32.760

31.861 32.747

31.811 32.735

31.751 32.723

31.729 32.710

31.734 32.698

31.721 32.685
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.
L 43.84
L 120.00 R 400.00
L 120.00
L 77.05
A 219.09 A 219.09
HORIZONTAL ALIGNMENT R 2000.00

L230.000 L485.187 L60.000 L389.964


VERTICAL ALIGNMENT L1 115.000 Slp-0.029% L1 30.000 Slp-0.049%
L2 115.000 L2 30.000
35+999.073

36+119.073

36+175 36+179.073

36+222.916

36+282.916

36+400 36+402.916
e 2.500%

e 2.500%

e 5.000%

e 5.000%

e 2.500%

e 2.500%

36+57536+575.184

36+60036+601.434

36+660.980

36+687.230

37+02537+029.392
e 2.500%

e 2.500%

e 2.500%

e 2.500%

e 2.500%
SUPERELEVATION (e %)
36+000

36+025

36+050

36+075

36+100

36+125

36+150

36+200

36+225

36+250

36+275

36+300

36+325

36+350

36+375

36+425

36+450

36+475

36+500

36+525

36+550

36+625

36+650

36+675

36+700

36+725

36+750

36+775

36+800

36+825

36+850

36+875

36+900

36+925

36+950

36+975

37+000

37+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-01
3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
VER- 1:200 Km 36+500 to Km 37+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
SRIRAMPUR NEAR DHUBRI
LEGEND : -
EXISTING ROAD :

PROPOSED CENTRE LINE :


PROPOSED CARRIAGEWAY :
PROPOSED PAVED SHOULDER :
PROPOSED EARTHEN SHOULDER :
39/1
:
No.- ert
PROPOSED MEDIAN
TIAL
cture lv OUS AREA
PROPOSED REWALL : Stru Box Cu 2.0)m E
p e :- .0 x
Ty /(2 +000 on
PROPOSED DRAIN : n:- 1 tructi
Spa n Ch:38 w Cons

HT=5.396M
PROPOSED ROW ROW ROW ig e
:
Des rop. - N

000
DESIGN CH : 1+000 Imp.P RO
W
W
RO

38+
EXISTING CH : 1+000

50
RESID W
RO

CROSSING HEIG
Existing Structure
ENTIA
L ARE ROW

4M

D
37+9
RESIDENTIAL AREA Type:-Pipe Culvert
AY ROW
A

PON
D BUSB

0
R

G HEIGHT=8.69

800
POND
2 NO HOUSE U Dia:- 1 X 0.9m ROW
RIP

37+90
U
SE ROW

PROPO

38+
GO

37+850
StructureNo.- 38/2 ROW

HT=5.454M

HT=5.206M
ROW

POND
Type:-Box Culvert

HT=5.890M

37+800
ROW

750
ROW
Span:- 1/(2.0x3.0)m
0

37+750
ROW

38+
37+00

ROW
Design Ch:37+626

37+700
0

ROW

LINE CROSSIN
ROW A W

38+700
ROW

CROSSING HEIG
ARE ction RO
Imp.Prop. - Reconstru
37+05

ROW

37+650
CROSSING HEIG
ROW TIAL ROW ROW
ROW

CROSSING HEIG
IDEN ROW
With Earth Cushion

38+650
ROW

37+600

08 POND
ROW E
0 RES ROW
OFC
ROW
37+800

ROW OUS ROW


37+10
LAND ROW
ROW
PILLAR

37+550
H RESIDENTIAL AREA
ROW

38+600
DITCH SHOP ROW 4 NO ROW
ROW

37+150
ROW ROW ROW

37+500
37+850

ROW

38+550
HT LINE
ROW RESIDENTIAL AREA

D
ROW ROW ROW

E YAR
ROW

37+200
ROW

37+450

HT
ROW

38+500

70.4
ROW ROW ROW

37+250

37+400
RESIDENTIAL AREA ROW
ROW ROW
BUS STOP

38+450
ROW

37+300

37+350
37+900

ROW ROW
ROW ROW

37+9
ROW 8 NO HOUSE

GRAV
ROW

38+400
ROW ROW ROW
ROW ROW ROW
PILLAR

GRAVE YARD
ROW ROW ROW

38+350

PI
ROW

DITCH LAND
ROW ROW
37+950 ROW ROW ROW ROW ROW
60

TOWER
ROW ROW ROW ROW

38+300
ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW
ROW o. 800 .115

BSNL
38+000
ve N
ROW ROW

38+250
ROW
ROW ROW
Cur ) 244 0

38+050
ROW

38+200
38+100
ROW ROW

38+150
m 60.0 eft

37+846.4
DITCH LAND
ROW
DITCH LAND
ROW ROW ROW 3 NO
H (
R m)

DITCH LAND
RESIDEN OUSE
ROW
Lc ( m) "L
ROW
PILLAR DITCH LAND
ROW
6'50

37+786.45
ROW ROW ROW TIAL AR
ROW ROW
Ls ( a 21^4 2.5% 100
EA
ROW ROW ROW
Delt
37+05 TS

ROW

SC
ROW ROW
PILLAR

)
A ROW

57
RESIDENTIAL ARE ROW ROW p h
ROW
ROW ROW ROW ROW e (km

TS
37+10 SC

ROW
ROW ROW D/S
8.238

ROW

7
AREA ROW
SIDENTIAL ROW ROW

DITCH LAND
RE ROW ROW
ROW ROW ROW ROW
ROW ROW
PWD
ROW ROW
ROW ROW
3.238

ROW ROW ROW ROW ROW ROW ROW


Structure

37+472.319
No.- 38/1

37+266.891
HT 4
Type:-Box RES NO HOU

37+427.319
LIN
Culvert E IDEN SE

POND
Span:- 1/( 3 NO HOUSE
2.0
TIAL
Design Ch x2.0)m 6 NO HOUSE RESIDENTIA ARE
:37+150
L AR A

ST
EA
Imp.Prop.

PI
SBAY
RESIDENTIA

CS
- New Co L AREA
nstru

SED BU
ction Curve No. 59

PROPO
R (m) 1150
CHAPRA BALAJANI

Lc (m) 324.081

I
AN
Ls (m) 45.00

J
LA
Delta 18^23'19" Left

BA
e 2.5%

A
R
D/S (kmph)

AP
100

H
C
HT
LIN
E

42.00M

40.00M
Box Culvert 1/(2.0x2.0)m

Type Symmetric Parabola Type Symmetric Parabola


Type Symmetric Parabola

Box Culvert 1/(2.0x3.0)m


Dir Crest

Box Culvert 1/(2.0x2.0)m


Design Ch:- =37+150

Dir Sag FINISHED ROAD LINE Dir Crest


L 60.00m L 140.00m

Design Ch:- =37+626

Design Ch:- =38+000


38.00M G1 -0.049% L 60.00m
G1 0.063%
PVC 37+081

PVT 37+141
Elev 32.670

PVC 37+828
G1 -0.163%

PVT 37+968
Elev 32.606

G2 -0.163%

Elev 32.485
Elev 32.472
EXISTING ROAD / GROUND LINE

PVC 37+362
G2 -0.044%

PVT 37+422
Elev 32.245

Elev 32.215
MO-0.01m G2 0.063%
MO-0.02m
R -0.19 MO0.02m
R -0.08
36.00M K 527.75 R 0.38
K 1302.22
SD 4251.97m K 265.04
SD 4534.77m

34.00M
L 221.495m L 406.189m
A

B
A
A

Slp -0.163% B

Slp 0.063% B

32.00M
A

A
Elev 32.655
PVI 37+111

Elev 32.516
PVI 37+898
Elev 32.196
PVI 37+392
30.00M

28.00M

26.00M

24.00M

Datum = 22.00M
31.729 32.710

31.734 32.698

31.721 32.685

31.660 32.673

31.615 32.657

31.569 32.630

31.562 32.591

31.641 32.550

31.672 32.510

31.660 32.469

31.633 32.428

31.556 32.387

31.445 32.346

31.308 32.306

31.216 32.265

31.171 32.227

31.116 32.210

31.106 32.217

31.087 32.233

31.067 32.248

31.086 32.264

31.121 32.280

31.017 32.296

30.896 32.312

30.862 32.327

30.874 32.343

30.893 32.359

30.941 32.375

30.940 32.391

30.904 32.406

30.893 32.422

30.908 32.438

30.946 32.454

31.061 32.470

31.183 32.484

31.303 32.493

31.349 32.497

31.293 32.497

31.242 32.492

31.201 32.482

31.202 32.471

31.252 32.460

31.251 32.449
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.

L 45.00 L 324.08 L 45.00 L 60.00


HORIZONTAL ALIGNMENT L 244.12
A 227.49 R 1150.00 A 227.49 A 219.09 R 800.00

L60.000 L221.495 L60.000 L140.000


L406.189
VERTICAL ALIGNMENT L1 30.000 Slp-0.163% L1 30.000 L1 70.000
L2 30.000 L2 30.000 Slp0.063% L2 70.000
37+02537+029.392

37+087.084

37+10037+103.238

37+42537+427.319

37+443.473

37+50037+501.165

37+756.457

37+816.457

37+846.457
e 2.500%

e 2.500%

e 3.900%

e 3.900%

e 2.500%

e 2.500%

e 2.500%

e 2.500%

e 5.000%
SUPERELEVATION (e %)
37+000

37+050

37+075

37+125

37+150

37+175

37+200

37+225

37+250

37+275

37+300

37+325

37+350

37+375

37+400

37+450

37+475

37+525

37+550

37+575

37+600

37+625

37+650

37+675

37+700

37+725

37+750

37+775

37+800

37+825

37+850

37+875

37+900

37+925

37+950

37+975

38+000

38+025

38+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-02
3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
VER- 1:200 Km 37+000 to Km 38+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
SRIRAMPUR NEAR DHUBRI
LEGEND : -
EXISTING ROAD :

PROPOSED CENTRE LINE :


PROPOSED CARRIAGEWAY :

SOHEBGANJ
PROPOSED PAVED SHOULDER :
PROPOSED EARTHEN SHOULDER :
PROPOSED MEDIAN :
PROPOSED REWALL :
PROPOSED DRAIN :
PROPOSED ROW : ROW ROW Curve No. 61
1200 StructureNo.- 39/4
R (m)
DESIGN CH : 1+000 Lc (m) 61.086 Type:-Box Culvert
: 1+000 Ls (m) 40.00 Span:- 1/(2.0x2.0)m
EXISTING CH
StructureNo.- 39/3

NCE
Delta 4^49'35" Right Design Ch:38+850
Type:-Box Culvert

NCE
e 2.5% Imp.Prop. - New Construction
StructureNo.- 39/2 Span:- 1/(2.0x2.0)m

2 NOS. RESIDE
Type:-Box Culvert
D/S (kmph) 100
Design Ch:38+550

5 NOS. RESIDE

38+750

38+800
Construction

38+700
Span:- 1/(2.0x2.0)m

38+850
Structure Imp.Prop. - New

38+900
38+650

38+950
No

38+752.918
PI
Type:-Box .- 39/1

39+000
Design Ch:38+350

38+600
38+550
NCE
Culvert Construction
Imp.Prop. - New

38+500
Span:- 1/(

38+450
2.0
Design Ch x2.0)m ROW ROW ROW ROW ROW

38+400
ROW ROW ROW ROW ROW

5 NOS. RESIDE
ROW ROW ROW ROW ROW ROW
:3 ROW

38+350
ROW
Imp.Prop. 8+000 ROW ROW ROW ROW ROW ROW
ROW ROW ROW

38+300
ROW ROW ROW

D
ROW

39+600
- New Co

39+550
ROW

38+250

39+650
39+500
ROW POND POND

2NOS.RESEDENCE
nstruction ROW

YAR
ROW

39+700
ROW

38+200
11KV LINE

39+450
EA ROW

39+750
NTIAL AR ROW

39+800
ROW
38+000

38+150
ROW

39+400
RESIDE ROW ROW POND POND 11KV LINE
38+100 ROW
38+050

ROW

39+350
USE ROW ROW
3 NO HO ROW

AVE
ROW POND PILLAR

39+300
ROW ROW
ROW ROW ROW POND PILLAR

39+250
ROW ROW

39+200
ROW ROW POND POND

GR
ROW ROW ROW

39+150
ROW ROW

MAN
ROW

39+100
ROW
D
ROW POND CE
PW
ROW ROW ROW ROW
RESIDEN
ROW ROW

39+050
ROW ROW ROW ROW
POND

2 NOS.

2 NOS. RESIDENCE
39+000
POND
38+800

NCE
POND

38+950

RAH

NCE
OFC

BUS BAY
38+900
38+850

PILLAR

MD. SAIDURATE
NCE
ROW ROW ROW ROW T PLAN
ROW T
ROW ROW ROW
TMEN

NCE
PILLAR
ROW ROW ROW

NCE
1 NOS. RESIDE
WATER TREA
POND ROW ROW ROW ROW ROW ROW

4 NOS. RESIDE
ROW

TOILET
POND ROW ROW ROW

NCE
LOW LAND ROW

NCE
MOSJID
ROW ROW ROW ROW ROW

ADVOC
ROW ROW

2 NOS. RESIDE
POND ROW ROW ROW
ROW

5 NOS. RESIDE
ROW

7 NOS. RESIDE
ROW

38+783.428
ROW

38+823.428
38+722.343
ROW
POND

3 NOS. RESIDE
ROW

3 NOS. RESIDE
ROW

38+682.343
POND ROW ROW ROW
POND ROW ROW ROW
POND

ROW ROW ROW


POND ROW ROW ROW
ROW ROW ROW
ROW ROW ROW

CS
ROW

SC
ROW

ST
ROW ROW ROW ROW

TS
ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW
POND

POND

38+150.573
38+090.573

ST
CS

S (kmph)
100

A L
LTA
BE
Type Symmetric Parabola
Box Culvert 1/(2.0x2.0)m

Box Culvert 1/(2.0x2.0)m


Dir Crest

Box Culvert 1/(2.0x2.0)m


Design Ch:- =38+000

L 60.00m FINISHED ROAD LINE

Box Culvert 1/(2.0x2.0)m


38.00M

Design Ch:- =38+350


G1 -0.044%

Design Ch:- =38+550

PVC 38+680

Design Ch:- =38+850


EXISTING ROAD / GROUND LINE

PVT 38+740
Elev 32.169

Elev 32.101
G2 -0.183%
MO-0.01m
36.00M R -0.23
K 432.26
SD 3488.04m

34.00M
L 711.956m
Slp -0.044% L 431.807m
32.00M Slp -0.183%
A

Elev 32.156
PVI 38+710
30.00M

28.00M

26.00M

24.00M

22.00M

20.00M

Datum = 18.00M
31.202 32.471

31.252 32.460

31.251 32.449

31.184 32.438

31.183 32.427

31.206 32.416

31.247 32.404

31.306 32.393

31.359 32.382

31.324 32.371

31.283 32.360

31.174 32.349

31.061 32.338

30.976 32.327

30.917 32.316

30.967 32.305

31.076 32.294

31.002 32.283

30.911 32.272

30.790 32.260

30.758 32.249

30.813 32.238

30.868 32.227

30.881 32.216

30.883 32.205

30.877 32.194

30.861 32.183

30.843 32.172

30.830 32.156

30.783 32.127

30.720 32.084

30.743 32.038

30.790 31.992

30.735 31.946

30.683 31.900

30.663 31.855

30.654 31.809

30.623 31.763

30.589 31.717

30.588 31.672

30.593 31.626

30.601 31.580

30.584 31.534
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.

L 40.00 L 61.09 L 40.00


L 60.00 R 1200.00
HORIZONTAL ALIGNMENT A 219.09 A 219.09
A 219.09

L60.000 L431.806
L711.956
VERTICAL ALIGNMENT Slp-0.044% L1 30.000 Slp-0.183%
L2 30.000
38+090.573

38+120.573

38+17538+180.573

38+65038+655.316

38+709.370

38+722.343

38+783.428

38+796.401

38+85038+850.455

39+00039+002.110
e 5.000%

e 2.500%

e 2.500%

e 2.500%

e 2.500%

38+725 e 3.700%

e 3.700%

e 2.500%

e 2.500%

e 2.500%
SUPERELEVATION (e %)
38+000

38+025

38+050

38+075

38+100

38+125

38+150

38+200

38+225

38+250

38+275

38+300

38+325

38+350

38+375

38+400

38+425

38+450

38+475

38+500

38+525

38+550

38+575

38+600

38+625

38+675

38+700

38+750

38+775

38+800

38+825

38+875

38+900

38+925

38+950

38+975

39+025

39+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-03
VER- 1:200 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
Km 38+000 to Km 39+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
SRIRAMPUR NEAR DHUBRI

ND
PO
CUL
IVA T
TED
LAN
D
LEGEND : -
EXISTING ROAD :

2)
PROPOSED CENTRE LINE :
PROPOSED CARRIAGEWAY :
(
-A
PROPOSED PAVED SHOULDER :

40+100
40+050
PROPOSED EARTHEN SHOULDER
PROPOSED MEDIAN
:
:
A D
RO

00
PROPOSED REWALL : ROW ROW ROW ROW ROW
ROW

40+0
ROW ROW
PROPOSED DRAIN : ROW
ROW
PROPOSED ROW : ROW ROW ROW

950
ROW
DESIGN CH : 1+000 W
RO
W

39+

40+000
EXISTING CH : 1+000 CUL RO

40+050
TIV W LAN
RO
ATE
/1 D D
40

40+100
LAN W

950
o.- ert
D RO

0
eN ulv )m
tur ox C x4.0 OW

90
n
c ctio
R
u 0
Str pe:-B /(3.0 +80 stru

40+15
39+
+
W
1 :39 on RO
Ty an:-

39
p C h
R ec ion
S sign p. - ush RO
W
De .Pro rth C

39 900
p
Im h Ea
W
RO
Wit

50

50
e
dg

+
W
/3 Bri RO

39
+8

40+0
- 40 lab n
. tio W
No l S uc RO
re gra 0 nstr

000
ctu te m 0 W
t ru :-In x15 9+7 Co RO

39 850
S pe - 1 :3 ew
Ty an: n Ch - N W

40+
1

00
RO

M IPE RT
=0
Sp sig rop.

+
0.9 F P VE

950
De p.P

+8
W

39
RO

Ø= O. O CUL
RE Im W

N IPE
RO

39+
SI CUL
/4

P
DE
40
W
TIV
RO
ATE

900
o.- ert

39 800
NT D
eN Culv .0)m
LAN

50
tur
IA
W n D
RO uc -Box .0x4 95 uctio
L
r

+
AR t

+7

39+
S e: 3 7 str
1/(

ND
9+

39
W p
Ty an:- Ch:3 econ n
EA
RO

ND

PO

40+0
850
o
Sp sign p. - R ushi

LA
W
RO De .Pro rth C

60.82
p
Im th Ea

TC

39+
W
RO i

SC
00
DI
W

100
800
W

2
RO

+7

39+
50W

ND

39
RO

40+
39+
+7

985
PO
RD
39

ND
CUL
/2 W

750

.822
40 RO
)

TS
TIV

YA
o.- ert

PO
ATE

0
(1
D
reN Culv .0)m

50
E
LAN W

05
u n RO

AV
t
ctio
D
ox x3 5

39+
uc
Str pe:-B /(2.0 9+50 stru

+6
GR
A

0+
1 W
Ty an:- Ch:3 econ n RO
-

700
39

4
o
Sp sign p. - R ushi

AD
W
/1 RO
40 De p.Pro rth C

EA

39+
o.- vert Im th Ea W

AR
reN Cul .0)m

0
RO
Wi

0
u n

650
t

60
uc -Box .0x3 00 uctio

RO

AL

00
t r W
S pe: (2 9+5 nstr RO

I
/

NT

9+
1

+
Ty an:- h :3 eco n

40
DE
W

39+
C o RO
Sp sign p. - R ushi

RD

J
EA

600 3
AN
SI
50
De .Pro rth C

YA
W

RE
AR
RO

G
p
Im th Ea

B
E

55039+5
W 39+

L
RO

HE
AV
IA
i
700
W 700

NT
W

GR
RO

SA 39+
ND
39+

E
W

00
RO

PO

0
SI
0

95
W
+37

RE
RO

50039+5
ROW

+
W
RO ROW
CUL
39

0
39+

39
D
TIV
W ROW
ALL PON

40+00
ATE
CH.

RO

50
D ROW
Existing Str
CULTIVATED LAN
ROW
LAN
ucture W
RO

0
D
ROW
D

45039+4
Type:-Slab ROW

39+95
W
Culvert RO ROW
Span:- 1 X

39+
W ROW
W

2.25m RO

9+900
39+85+900
ROW
00
StructureNo.- W
RE

RO ROW
40
Type:-Box Cu /1 RO
W ROW

0
00 9+4 0
OF

lvert ROW
75

NJ
W

39
Span:- 1/(2.0 RO ROW

3B 9+
x2.0)m
RT

GA
W
RO + ROW

3
Design Ch:39

50
39
ROW
9+4 3
+172
350

STA

39+80
ROW
ND Imp.Prop. -
ATED
LA RO
Reconstructio ROW
0

HE

39+800
CULTIV With Earth n W ROW

0
RO
39+00

Cushion ROW

SA
5309+

39+75
W
RO ROW
ROW ROW
0

ROW

0
ROW ROW
3
0
39+05

ROW ROW ROW

39+70
0

39+3

11KV ROW ROW


ROW ROW /2
0

LINE
9+03

eNo.- 40
ROW ROW

0
NJ
CULTIVATED LAN
39+800

ROW
Structur
39+10

ROW W
50

D
39+330

RO ROW rt

39+65
ox Culve

GA
ROW
0

39+220

ROW
+250

ROW ROW Type:-B


39+200

ROW ROW x4.0)m


+15

0
.0

EB
ROW ROW ROW 1/ (3
Span:-
EA
0

ROW 00
A
39+2

39+60
W
39+85

ROW ROW AR +8
RE Ch:39

AH
ROW ROW n
structio
ROW
Design
ROW
39RO

ROW ROW ROW ROW ROW IAL LA ROW . - Recon


ROW

9+550
NT USE

S
ROW ROW Imp.Prop Cushion
39

E IA SE
39+900
ENCE

ROW
SIDENCE

SID O HO NT OU

D
rth
ROW With Ea
RE E

AR
D H

0
5N SI O
11KV ROW
39+

EY
RE 3 N

39+50
39+950

ROW LINE ROW


. RESID

ROW
ROW
436

AV
0
ROW
ROW ROW
4 NOS. RE

39+45
ROW

GR
.150

ROW
00

ST
0

ROW
00

39+400

ROW ROW
+0
2 NOS

RI
ROW
40+

ROW
ROW 11KV ROW
39+350

MA
LINE ROW
0550

ROW
0

ROW
39+04

ROW
A
ROW
40++0

ROW RE

NIA
39+300

/1
ROW
eNo.- 40
ROW
39+3

AY
3940++02959.809

AR

ROW LA
Structur
PILL
ROW
40

ROW rt
ROW
ox Culve
40+100

IA SE

BE
AL
LAND
ROW Type:-B
T
9.610

ATED U
)m

HY
.0
N O
ROW x3
41.1

CULTIV ROW ROW DE H 1/(2.0


ROW Span:-

VID
ROW SI O
TS

+500

8M
ROW ROW
39+144.61

ROW ROW ROW 39


CS
40+150

RE 2 N n C h: ion
Desig onstruct
50

.75
IYO
39+247.367

. - R ec
Imp.Prop Cushion

=4
AT

HT
rth
40+200

Ea

IJ
ND W ith

IG
CE

AR
SC

PO

HE
0

AM

50 0M
CU
EN

H= 10 RT
50

G
PI

LT

1.2 .11
NI

DT H= VE
IVA

IN

M
SID

A
40+2

AREKET
BA

TE

WI NGT CUL
OS
DL
62 MAR
Curve No.
RE

P AN

CR
EA SHO
00

500

LE LAB
E D
ND
R (m) 8 NO
.

US AR
40+3
OS

19 6.540 PO

S
Lc (m) HO IAL EA
2N

95.00 AR
Ls (m) NO
T 50
ALA

IAL E
" Left
N E
'29 ND
^24 US
40+3

De lta 33
4 DE PO E NT S
UE

2.5% SI HO STO
P SID U
BELT

O A
e RE BUS RE NO H ARE
SQ

100 SE EA ND D
D/S (kmph)
NO

00
ON L
OU PO P 8 NTIA
MO

O H IAL AR

50
40+4
3 E
8N SID
A RE DENCE

+8
ENT ARE

40
ID SE TIAL
RES E
S.R IDEN
I

50
SB
AR

ND 4NO RES

40+4
PO 1
AM
NI
BE

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-04
VER- 1:200 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
Km 39+000 to Km 40+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
Type Symmetric Parabola Type Symmetric Parabola
Dir Crest Dir Crest

Integral Slab ( 1x 15m)


Design Ch:- =39+700
L 150.00m L 150.00m
G1 2.500% G1 0.000%

Box Culvert 1/(2.0x2.0)m

PVC 39+713
PVT 39+688
44.00M

Elev 38.965

Elev 38.965
G2 0.000% G2 -2.304%

Design Ch:- =39+550


MO-0.47m MO-0.43m Type

With Earth Cushion


R -1.67 R -1.54

PVT 39+863
K 65.11

PVC 39+538
K 60.00

Elev 37.237
Elev 37.090
42.00M SD 267.01m SD 283.36m

PVC 39+909
Elev 36.169
Type Symmetric Parabola ROAD-A(1)
Dir Sag
40.00M L 250.00m L 25.000m ROAD-A(2)
FINISHED ROAD LINE G1 -0.183% ROAD-B

PVT 39+422
Slp 0.000%

Elev 34.207
G2 2.500%
EXISTING ROAD / GROUND LINE MO0.84m
38.00M R 1.07
1/(2.0x2.0)m

L 46.3
K 93.18 Slp -2 98m
=39+172

SD 423.76m .304%

Elev 38.965

Elev 38.965
PVI 39+613

PVI 39+788
ROAD-B
.383m
PVC 39+172

L 115 00%
Ch:-31.311

END OF RE WALL
36.00M Slp 2
.5
Box Culvert
Design Elev

CH. 39+370
34.00M REWALL PORTION REWALL PORTION

32.00M

30.00M
Elev 31.082
PVI 39+297

28.00M

26.00M

24.00M

22.00M

20.00M

Datum = 18.00M
30.593 31.626

30.601 31.580

30.584 31.534

30.563 31.488

30.531 31.443

30.503 31.397

30.036 31.351

29.331 31.306

29.428 31.301

29.848 31.364

29.413 31.493

28.455 31.690

28.410 31.953

28.701 32.284

28.678 32.682

28.786 33.147

29.087 33.679

29.494 34.278

30.334 34.903

29.507 35.528

28.537 36.153

28.998 36.778

29.657 37.390

30.175 37.910

29.661 38.327

28.942 38.639

28.714 38.848

29.270 38.952

29.351 38.965

29.406 38.953

29.313 38.857

29.326 38.665

29.245 38.377

29.210 37.993

29.210 37.513

29.197 36.949

28.972 36.373

28.842 35.815

28.730 35.336

28.777 34.941

28.799 34.630

28.721 34.404

28.658 34.262
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.

L 75.00
L 95.00 L 95.00 A 150.00
HORIZONTAL ALIGNMENT L 196.54
A 217.94 A 217.94
R 500.00

L46
Slp
L250.000 L150.000
L25.000
L150.000 -2.3 .386
VERTICAL ALIGNMENT L1 125.000 L115.347 L1 75.000 L1 75.000 04%
% Slp0.000%
L2 125.000 Slp2.500 L2 75.000 L2 75.000
39+00039+002.110

39+097.110

39+144.610

39+341.150

39+388.650

39+483.650

39+948.322

40+023.322

40+060.822
e 2.500%

e 2.500%

e 5.000%

e 5.000%

e 2.500%

e 2.500%

e 2.500%

e 2.500%
SUPERELEVATION (e %)
39+025

39+050

39+075

39+100

39+125

39+150

39+175

39+200

39+225

39+250

39+275

39+300

39+325

39+350

39+375

39+400

39+425

39+450

39+475

39+500

39+525

39+550

39+575

39+600

39+625

39+650

39+675

39+700

39+725

39+750

39+775

39+800

39+825

39+850

39+875

39+900

39+925

39+950

39+975

40+000

40+025

40+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-05
3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
VER- 1:200 Km 39+000 to Km 40+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
CU
LTI
VA
TE
DL
AN
D

SRIRAMPUR Curv LAND


NEAR DHUBRI
R (m e No.
D
IVATE
CULT
Lc (m) 63

2 ) Ls (m ) 300

40+100

40+150
A(
Delta ) 236.6 4

0
59^3 75.0079
12
-

00
e

40+05
1+

T
W
1'35

RI

KE
RO
D/S " Rig
D

250 D

UB
40+2
ROW ROW St
(kmp 5.0% ht
ROW ROW

AR
N
ROW ROW
ROW ROW
Ty ructu

OA

PO

I
00

DH
ROW

BR
ROW h)

M
ROW

W
ROW Sp pe:- reN

N
0

U
ROW

RO
ROW 80 10
ROW De an:- Box o.-

JA

DH
0
ROW

ND
ROW 1+
Im sign 1/(2 Cul 41/1

LA
PI
40+

40+195.304
R ROW

-31
ROW

BA
CU
W p.Pr Ch .0x vert

PO
40+
ND
ROW

RO
LTI

K
RO

NH
VA ith op :4 3.0 LA

AC
W W
Ea . - 0+3 )m

50
TE
RO DL RO ED

TR
D
W W rth Re 10 AT AN

W
AN
RO Cu con TIV

0
L

+9
RO

RO

AY
40+050
D
St

40+000
W L D
OW sh str

0
TE
Ty ructu
CU

LW
ion uc

40+100
R RO IVA

+3
39
W tio
Sp pe:- reN
CU

AI
W
OW
T

40+150
LTI n UL LIM

R
R

RO
RO
De n: Box o.-
a
VA

40
W
C

40+200
TE
Im sign - 1/( Cu 41/1
W
DL
RO IT

950
/1 RO

40+250
0

40+150
W p.Pr Ch 2.0x lvert
AN

40+262
40 t O

W
W 05

00
D
o.- lver m
W

RO
ith op :4 3. FW

40+200
40+100
RO RO 1+
reN Cu 4.0) on Ea . - 0+2 0)m

+9

39+
W

0
t u x x 0 cti OW rth Re 50 /8 OR

5
ruc Bo .0 80 tru

W
R RO Cu con 52

9
St pe:- 1/(3 39+ ons

+3

RO
W sh str K

3
: c

250
-
Ty an: Ch Re hion

050
W ion uc
RO RO

40
tio E
Sp sign op. - Cus

4,853
W n ENC

W
SID
De p.Pr arth

+8 0

RO
W RO . RE

40+
RO

40+
0
Im ith E
W 7NO

+9
50
RO

W
W

0
W RO
ge

RO
000
W

39

0
0

00
id 00
Br

+4
/3 RO

RO
W
40 b on

9
RO
W 1+

+3

W
.- Sla cti

40+

40

RO
No al
RO
ru
re egr m 0 nst W W

40
RO
t u t 5 7 0 o
AD

W
c RO
ru :-In x1 9+ C
+8 0

950

O
R
W
St pe :- 1 h:3 New
39 +85
W
RO

50
00

Ty an n C . -
-C
RO

0
W
RO

50
W
Sp esig rop

39+

95
+4
W
39

RO
01
M IPE= T

D p.P RO

+3
0.9 P ER

40+250
CU

0+

K
RO

40+200
W

40
LTI

AC
Im OW /7
Ø= . OF ULV

900
V
/4 AT
52

40
RO

0
R

TR
40 t W
ED D
W RO
o.- lver m
N
NO E C

40+30
40+
LAN

150

AY
LA
RE

W
RO reN Cu 4.0) on RO
D

39+
OW
PIP

cti

LW
+7 0

ED
SI

tu W

00
060
x x 5 R
ruc Bo .0 79 tru
0

0
DE

AT

AI
50

W
St pe:- 1/(3 39+ ons
+8

00
350
RO

90
RO

40+

W
W

R
+5
NT

IV

.822
: W RO

SC
c

RO
-

40
y n

50
T an: Ch Re hio
T
IA

39

UL

+4
ND

0+
OW Sp sign op. - Cus

+2
0
RO

40
W
L

R RO
W
C

40+

W
9

10
AR

97 CS
De p.Pr arth
PO

40

RO
3

39+
EA

.50
W RO
D

39+
W
RO Im ith E RO

+
W
N

-B

W
1
LA

40
W

1
98

00

RO
RO

-3
D

0
W W
800

0
RO W RO

H
ROA

5.8

55
CH

85

N
0
+4
0

TS

W
RO

5
W

22
70
DIT

RO
RO

+
)
W
RO

0+
+4
39+

40
05

40

W
2

RO
IL
+

RA
RO

1
W
750

+440

W
W RO

40
W

m
39
ND

62 .- 40+E WLL
A(

+
RO

RO
4K
+3
39+
750

40
RO

40
W
PO

53
72
W W RO

50 0+ T CH OF R

W
RO
-

CH DIN 0
.50 T

0
40+250

RO
ND

ROW ROW RO W
ROW

0
0
39+

ROW ROW W RO

80
00
1
S
/6

-A G
ROW

AD

+6
ROW
PO

40+20
50

RO
RO
52

W
ROW

300
ROW W

0+
+5
W RO

RO
1
40
EN
ROW ROW
+6

700

0 ROW

50
RA

W ROW
00 ROW

40
RO RO ROW ROW ROW

W
O
G

39

ROW W

40+

RO
+

40+1
40 ROW RO
39+

W
RO
R

W
W IL

RO
4
RA
ROW

00

W
50
/1
o.- 41
RO

RO
W ROW
RO tureN W
650

ROW rt
Struc ox Culve
0

40+1

+3
ROW
0
60

RO

+5
:-B

W
e )m 75
W y p .0 .0
x 3 W

RO
50
RO T
:- 1/(2
W

40
RO 3
Span Ch:40+19 truction
39+
G 9+

40
W RO
W
ns
RO
W
0+

40+0
0
n

W
RO Desig p. - Reco .92
J

ROW
3

RO
0
AN

19
39+ ro ion RO

00
95 p .P h
0

RO
W
ROW Im hC u s W

00
700
a rt

W
+AH60

700 E

RO
IL

ROW
B

With
RA

W
+

00
RO
E

40+0

RO
39+
39 ROW

+4
W 80
ROW

+6
.2

50
39S

RO 37

40

W
ROW W

RO
0

40
ROW /5

39+9
ROW RO .92
0 70 52

W
W
00
ROW 17 0+ .28
0

RO
50 0

W 37 80

0
RO RO
39+8 9+90

.2
39+9

45

50
W
ROW
37

W
63

RO
0

K
W .28

+
RO

+6

AC

W
RO
IL
37 RA

40
ROW

+4
ED LAND

TR
ROW
3

W
40
ROW CULTIVAT

O
AY

R
40

Km L
ROW

39 AL
0
50
0

.28

LW
ROW
0

+7 W
5

37

W
ROW 65

AI

RO
+7

40 E
ROW
0
39+8

CU .28

.- F R
R
ROW 0+

0
39+85000

LT 37
39

ROW

CH G O
IV

0W
AT

+R7O
ROW ED

-A TIN
ROW

ROW
39+7

41+100
LA E W
NC

CH AR
RO

40W
D
ROW
ND

T
E

O
D
AN
00

/2

ER
SE

ST
W
ROW o.- 40

R
150

RO
0 IL
E RA
.28 L
tureN
S.R W
ROW rt RO

OW
Struc ox Culve
O 37 ED

41+

W
5N
39+7

ROW

O
ROW :-B )m AT

RO
Type 1/(3.0x4.0

E TL
50
W
ROW RO
50

IV

BILTE
50
:- 0
ROW a n 9 0 truction
8 LT

WE
+

200
Sp

W
+0
0 /4
n Ch:3

+7

MOAIR
ROW

O
ns 60

W
CU
W
52

41
Desig p. - Reco

R
39+6

ROW RO

RO
41+

O
ROW 0+

E TL
ro n

40
Imp.P arth Cushio

BILCE
W
00

D
ROW
W

AN
E RO

R
W
ROW it h

MOAIR
2R5O0
W
ROW
39+6

HL
W
W

41+
ROW RO

O
ARD
50

00

C
RO
ROW

DIT
0
W

RO
W
ROW

0
RO

+8
+0

300
39+5

EY

RO
1
RO

41

-3
W

W
W

A
41+

40
H
RO
RAV

RO

RE
N

W
0

RO
55

LA
ED LAND -
RI G

50
W
CULTIVAT RO
D
0+ LAN RO

W
RO

TIA
3
W W

RO
41+
D

50
ATE
A

RO

EN
TIV RO

50
IAM

W CUL

+8
W

RO
IL
41

+9

W
CU RA

RO

SID
400
RO
/2 RO

40
LT
BEN

W RO

40
IVA
W

RE
41+
Y

W
TE

W
RO
LA

/3

RO
D RO

RO
CU W
52
YA

LT LA W
m N

450
IVA D RO
M

RO

W
TE W
0

00
0
58

RO

41+
tion

RO
nstruc
D
50 RO
.7

00
LA
RO

+9
W
=4

ND +9 0+ W

W
ion

W
HT

40

500
RO

RO
RO

40
W
W RO
IG

RO
IL
RA

41+
W
.25 .110M
HE

TH H=10 ERT

RO

W
W RO
G

0M

RO
W
WIDNGT ULV
SIN

550
RO

50
W RO
OS

LE AB C

=1

41+
W

K
50

RO

RO

AC

+9
CR

+8

W RO
SL

REA

TR
40

0 W

40
LA RO

600
45

AY
NTIA SE D
LAN W RO

RO
IDE

41+
LW
0+
40+350

E
TED W

ND
RES O HO
U REA NC RO
TIAL
A DE TIVA W

AI
RO

D
SE Ex

LA
8N IDEN CUL

R
E
W
A RES Ty isti

RO
S.R RO

650
D
40+400

00
PON L ARE E

D
ENC O
W
3N p n
St Spa e:-S g S
D ENTIA RO

D-

E
ESE
0

41+
RESID
80

AT
OS.R RO

+0
n: la tru

W
14N W Ty ruc
+
M

RO
- c

TIV
Sp pe: ture 1 X b Cu ture
40
0

RO
8
SB

40+45

41
.86

RO W

700
A
D an -Bo No

L
W 1. lve
=4

CU
Im esig :- 1 x C .- 4 5m rt
ND D RO

41+
PON

RO
RO
HT
40+500

PO W
W p.P n C /(2.0 ulv 2/1

RO
D
PON 00 W
EIG

4 RO ith ro h: x er

40
RO

W
0+ Ea p. 41+ 3.0 t
D

750
W
GH

PON CU
0

RO
OFC
W

+9
40+550

rth - R 08 )m
5

50
LT
+7

51
LAND
Cu eco 3

41+
RO
SIN

IVA RO

C (m m) )
40

DITCH D

+0
W

.45 S
PON TE W

ur )
sh ns

R (
40+600

OS

RO
D

ve
ion tru

ND
3

Lc s (mta
RO

T
LA

41
RO
CR

ND W cti

N
L el
W on
40+700

LA

o.
W

D
40+650

RO

RO
RO

e /S
SE W

TE
HOU W

64 0 66
4 NO RO

50 42. .00 ght


27
IVA
W
SE D 0 W
HOU R

RO
LAN

1 5 Ri
EA

^1 2 )
3 NO TIAL AR ITCH 35 O
W 00

LT
00

(k
RO +8

0' .5
USE

9 "
D
0+ 41

m
EN

3
HO W

1
CU
W

8 % 10
ID
5 NO 1 PI

ph
RE S

RO

R
1+
RO

O
1 8
2/

W
W
97
4

41
5 9.

W
1

+0
RO

RO
RO
W +1

46 S

W
41

0
.4 C
W
RO

53

RO
RO
SE W

W
A
OU ARE

ND
D
O H AL PON 00 W

D
RO
R
6 N ENTI

PO
3
RO

N
50

W
0+ 50

LA
SID +8
+1
RE 41

D
W

RO
O
41
RO

TE
W

A
RO

TIV
W

RO
W
RO

UL
W

C
RO
W

RO
W
RO

0
-3

W
25

EA
H

RO
N

AR
W

0+

RO
W
AC
RO

W
0
TR

LD
/0 90
+2
+

RO
52 41

FIE
W

AY

W
41

RO
RO

LW

W
K
AI

RO

IC
W

BR
W
RO

RO
0

W
41

RO
20 18 +

RO
0+ 8.6

W
1
CS 9

RO
W
ND
+9
50
50

LA
41
+2

RO
41

W
D
TE
0

RO
15

TIV

W
0+

L
CU
/9

RO
51 LEGEND : -

W
EXISTING ROAD : 0
25

RO
4 1+
PROPOSED CENTRE LINE
H.

W
:
C
0 PROPOSED CARRIAGEWAY : A LL

RO
10 EW
FR

W
PROPOSED PAVED SHOULDER :
0+ DO
41
EN
+2
:

RO
PROPOSED EARTHEN SHOULDER 83
.61

W
:
9
PROPOSED MEDIAN ST

RO
PROPOSED REWALL :

W
PROPOSED DRAIN :
0

RO
ROW ROW
05 PROPOSED ROW :

W
0+ DESIGN CH : 1+000

RO
/ 8 EXISTING CH : 1+000

W
51

RO
W
0

RO
00

W
0+
K
AC
TR
1

AY
-3
H

LW
N

AI
R
J
AN

LI
G

M
K

IT
LA
O

O
G

F
W
O
RK

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-06
VER- 1:200 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
NEW DELHI - 110001 Km 40+000 to Km 41+000
Consultancy Services for Feasibility Study and preparation of Detailed CE TESTING COMPANY PVT. LTD.
ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1
Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
Type Symmetric Parabola Type Symmetric Parabola
Dir Crest Dir Crest
L 150.00m L 150.00m
G1 2.423% G1 0.000%

PVC 40+732
PVT 40+542
Elev 41.420

Elev 41.420
G2 0.000% G2 -2.495%
46.00M MO-0.45m MO-0.47m FINISHED ROAD LINE
R -1.62 R -1.66
K 60.11 EXISTING ROAD / GROUND LINE

PVC 40+392
K 61.91

END OF RE WALL

PVT 40+882
END OF RE WALL
Elev 39.603

Elev 39.549
SD 273.10m SD 267.36m
44.00M

CH. 40+534

CH. 40+739
Type Symmetric Parabola
Dir Sag Box Culvert 1/(2.0x3.0)m
L 350.00m L 190.000m
42.00M ROAD-A(1) G1 -2.304%
Design Ch:- =40+250
Slp 0.000%
PVT 40+259
ROAD-A(2) G2 2.423% Elev 36.377 A B

ROAD-B MO2.07m
R 1.35
40.00M K 74.05

Elev 41.420

Elev 41.420
PVI 40+467

PVI 40+807
A

SD 289.82m
.153m
L 133 23%
.4
ROAD-B Slp 2
38.00M L 247
.6
Slp -2 85m
.495%

36.00M

REWALL PORTION REWALL PORTION


34.00M

32.00M
Elev 32.137
PVI 40+084

30.00M

28.00M

26.00M

24.00M

22.00M

Datum = 20.00M
28.799 34.630

28.721 34.404

28.658 34.262

28.418 34.205

28.524 34.232

28.271 34.344

28.649 34.540

29.254 34.820

29.592 35.185

29.720 35.634

29.527 36.167

29.421 36.768

29.429 37.374

29.650 37.979

30.024 38.585

29.829 39.191

29.423 39.791

29.123 40.314

29.204 40.736

29.146 41.057

29.210 41.278

28.124 41.397

28.823 41.420

29.238 41.420

29.011 41.420

28.757 41.420

31.292 41.420

29.010 41.420

28.351 41.420

28.598 41.420

28.531 41.393

28.537 41.266

28.924 41.035

28.937 40.701

29.409 40.262

28.598 39.719

28.362 39.099

28.924 38.476

28.491 37.852

28.807 37.228

28.734 36.604

28.596 35.980

28.506 35.357
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.
L 236.68
L 75.00 R 300.00 L 75.00
L 95.00
A 150.00 A 150.00
HORIZONTAL ALIGNMENT A 217.94

L350.000 L150.000 L150.000 L247.608


L190.000
VERTICAL ALIGNMENT L1 175.000 L133.114 L1 75.000 L1 75.000 Slp-2.495%
Slp0.000%
L2 175.000 Slp2.423% L2 75.000 L2 75.000
40+023.322

40+060.822

40+297.501

40+335.001

40+410.001

40+90040+903.953

40+998.953

41+046.453
e 2.500%

e 5.000%

e 5.000%

e 2.500%

e 2.500%

e 2.500%

e 2.500%

e 5.000%
SUPERELEVATION (e %)
40+000

40+025

40+050

40+075

40+100

40+125

40+150

40+175

40+200

40+225

40+250

40+275

40+300

40+325

40+350

40+375

40+400

40+425

40+450

40+475

40+500

40+525

40+550

40+575

40+600

40+625

40+650

40+675

40+700

40+725

40+750

40+775

40+800

40+825

40+850

40+875

40+925

40+950

40+975

41+000

41+025

41+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-07
VER- 1:200 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
Km 40+000 to Km 41+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
SRIRAMPUR LEGEND : -
EXISTING ROAD :
NEAR DHUBRI
PROPOSED CENTRE LINE :
PROPOSED CARRIAGEWAY :
PROPOSED PAVED SHOULDER :
PROPOSED EARTHEN SHOULDER :

PROPOSED MEDIAN :
PROPOSED REWALL :
PROPOSED DRAIN :
PROPOSED ROW : ROW ROW

DESIGN CH : 1+000
64 EXISTING CH : 1+000
o. Curve No. 65
rve N 500 66 R (m) 2000 StructureNo.- 42/3
re Cu ) 142.10 StructureNo.- 42/2
ctu t R (m ) Lc (m) 25.944 Type:-Box Culvert
Stru lver 95.0 ight Type:-Box Culvert Span:- 1/(2.0x3.0)m
ting lab Cu m Lc (m ) '38"
R
xis Span:- 1/(2.0x2.0)m
E e:-S 1.5 Ls (m 27^10 2.5% Delta 0^44'36" Right Design Ch:41+800
Typ n:- 1 X 2/1 e lta 100 Design Ch:41+400 e 2.5% Imp.Prop. - New Cons
truction
D
CULTIVATED LAND
a 4 truction
Sp N o.-
e r t e p h ) Imp.Prop. - New Cons D/S (kmph) 100

41+250
(km

41+300
re Culv

41+350

41+400
41+200

41+450

41+500

41+550
ctu

41+600
)m

41+650
CULTIVATED LAND
Stru e:-Box .0x3.0 3 D/S
CULTIVATED LAND

41+700

41+750
8

41+800
PI
n

41+150

41+850
o

19.97

41+900
2 ti
Typ n:- 1/( :41+08 nstruc

41+950
PI
41+641.037
ROW ROW

42+000
ROW

42+050
ROW ROW
Spa ign Ch Reco n ROW

ND

RICE MILL
- io ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

41+1
Des .Prop. Cush
ROW ROW ROW ROW

00
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

PO
ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW
p th ROW ROW

41+800
r ROW

41+850
ROW

41+900
ROW

41+950
Im a ROW ROW

42+000
ROW ROW

42+050
ROW

42+100
hE ROW

42+150
41+1
ROW

42+200
ROW

42+250
BRICK FIELD ARE ROW
BUS BAY

42+300
ROW ROW ROW

42+350
Wit ROW
ROW ROW ROW RO

42+400
A

42+450

42+500

42+550
ROW

42+600

42+650
0

42+700

42+750
ROW
05

W
RO

H
CULTIVATED LAND
41+
50

TC
W
RO
+7

DI
41

W
RO
000

D
ND

LD
OO

N
OW BUS BAY

LA
FIE
R

PO
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW

CH
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
W ROW ROW ROW

CH
41+

RO ROW ROW ROW ROW ROW ROW ROW ROW

K
ROW

.S
ROW ROW ROW ROW ROW ROW ROW

IC
ROW ROW ROW ROW ROW ROW

T
CULTIVATED LAND ROW
W ROW ROW ROW

L.P
ROW

END OF RE WALL CH. 41+250


RO ROW ROW ROW

DI
41+283.619
ROW

BR
CULTIVATED LAND RO
ROW

41+188.619

41+628.065

41+654.009
D
ROW
950

N
W N
RO
00

ROW

YA
PO
+7

ROW

42+070.294
W

RA
41

RO ROW
40+

ST

NA
CS
W
ROW

PC

PT
RO

RA
W
RO
CULTIVATED LAND
W
RO

ND
W
RO

JE
41+

W
RO
CULTIVATED LAND

GA
046

W
50

RO Curve No
+6

.45

W
SC
41

RO R (m)
3

RO
W Lc (m)
W
RO Delta 0^

LI
W e
RO

TU
D/S (km
40+

UA
OW
00

T
+6

951

BA
W
41

RO
.45
TS

W
RO
3

W
RO
Box Culvert 1/(2.0x3.0)m

Design Ch:- =41+083

Type Symmetric Parabola


With Earth Cushion

40.00M Dir Sag


FINISHED ROAD LINE L 250.00m
G1 -2.495%
PVC 41+130
Elev 33.370

EXISTING ROAD / GROUND LINE G2 0.163%


38.00M MO0.83m Type Symmetric Parabola
L 247

Box Culvert 1/(2.0x2.0)m


.6

Box Culvert 1/(2.0x3.0)m


Slp -2 85m R 1.06 Dir Crest
.495% K 94.03 L 60.00m

Design Ch:- =41+400

Design Ch:- =41+800


SD 431.75m G1 0.163%

PVC 41+613
36.00M

PVT 41+673
Elev 30.866
Elev 30.837
G2 -0.067%

PVT 41+380
Elev 30.455
MO-0.02m
END OF RE WALL

R -0.38
K 260.48
34.00M SD 2113.81m
CH. 41+250

32.00M
L 233.227m
B
A
Slp 0.163% A B

A A

30.00M

Elev 30.886
PVI 41+643
Elev 30.251
PVI 41+255

28.00M

26.00M

24.00M

22.00M

Datum = 20.00M
28.734 36.604

28.596 35.980

28.506 35.357

28.420 34.733

28.598 34.109

29.102 33.485

28.620 32.883

29.010 32.347

29.520 31.877

29.563 31.474

29.600 31.137

29.632 30.866

29.576 30.662

29.517 30.525

29.532 30.454

29.564 30.449

29.610 30.489

29.644 30.530

29.634 30.570

29.640 30.611

29.696 30.652

29.750 30.693

29.769 30.734

29.788 30.775

29.877 30.816

29.857 30.854

29.825 30.871

29.824 30.864

29.824 30.847

29.727 30.831

29.628 30.814

29.564 30.797

29.505 30.781

29.446 30.764

29.398 30.747

29.356 30.730

29.329 30.714

29.312 30.697

29.309 30.680

29.308 30.663

29.306 30.647

29.299 30.630

29.286 30.613
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.

L 142.17 L 95.00
L 95.00 L 25.94
R 500.00 A 217.94
HORIZONTAL ALIGNMENT A 217.94 R 2000.00

L247.608 L250.000 L60.000


VERTICAL ALIGNMENT Slp-2.495% L1 125.000 L233.226 L1 30.000
L2 125.000 Slp0.163% L2 30.000
40+998.953

41+046.453

41+188.619

41+236.119

41+32541+331.119

41+610.565

41+636.815

41+645.259

41+671.509

42+05042+053.961
e 2.500%

41+050 e 5.000%

e 5.000%

e 2.500%

e 2.500%

e 2.500%

e 2.500%

e 2.500%

e 2.500%

e 2.500%
SUPERELEVATION (e %)
41+000

41+025

41+075

41+100

41+125

41+150

41+175

41+200

41+225

41+250

41+275

41+300

41+350

41+375

41+400

41+425

41+450

41+475

41+500

41+525

41+550

41+575

41+600

41+625

41+650

41+675

41+700

41+725

41+750

41+775

41+800

41+825

41+850

41+875

41+900

41+925

41+950

41+975

42+000

42+025
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-08
3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
VER- 1:200 Km 41+000 to Km 42+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
SRIRAMPUR NEAR DHUBRI
LEGEND : -
EXISTING ROAD :

PROPOSED CENTRE LINE :


PROPOSED CARRIAGEWAY :
PROPOSED PAVED SHOULDER :
PROPOSED EARTHEN SHOULDER :
PROPOSED MEDIAN :
PROPOSED REWALL :

T
PROPOSED DRAIN :

AHA
PROPOSED ROW : ROW ROW

KAL
DESIGN CH : 1+000

REA
ET
: 1+000

RK
EXISTING CH

TA
MA

K E
Existing Structure

BI

EA

R
Curve No. 67

HA
Type:-Pipe Culvert

MA
ET AR
R (m) 600

BD
Dia:- 2 X 0.8m

SHOP=25NOS
Existing Structure Lc (m) 44.554

HA
Type:-Pipe Culvert StructureNo.- 43/2 Ls (m) 80.00

SRK
D
Dia:- 1 X 0.9m Type:-Box Culvert Delta 11^53'38" Right

MA
Existing Structure

=25NO
Span:- 1/(2.0x3.0)m e 2.5%
StructureNo.- 43/1

ND
Design Ch:42+482 Type:-RCC Box Bridge
Type:-Box Culvert
D/S (kmph) 100

PO
Imp.Prop. - Reconstruction Span:- 4.0X3.0X2.0

SHOP
42+550
Span:- 1/(2.0x3.0)m

42+600
(TotalLength13.70m)

42+500

PI
42+607.408
42+450

42+650
Design Ch:42+191

SEMI PUCCA=5NOS
42+400
42+350
Imp.Prop. - Reconstruction

ND
42+300

42+700
ND
42+250

LA
With Earth Cushion ROW ROW ROW
MARKET AR

42+200
ROW ROW ROW ROW ROW

LA

HUT=3NOS
ROW ROW
EA

42+150

CH

42+750
ROW ROW ROW ROW
42+100

ROW ROW ROW

AREA
ROW

43+300
42+050

ROW

T
43+250
ROW ROW ROW

TC
42+000

ROW

DI
ROW

43+200
ROW

42+800
ROW

43+350
ROW ROW ROW

43+150
ROW

DI
ROW ROW ROW

43+100
ROW

ET AREA
ROW ROW ROW

43+400
ROW

43+050

42+850

SMARKET
ROW ROW ROW ROW POND

43+000
ROW ROW ROW ROW
ROW

42+950
ROW ROW ROW

43+450
ROW

42+900
ROW ROW

42+900
ROW ROW ROW TEMPLE
42+850

ROW

ND
42+800

ROW
42+750

43+500
ROW

MARK
42+950
LA
42+700

ROW

ND

ND

=12NO
ROW

ND

OS
H
ND
ROW

PO

43+550
PO

43+000
TC
ROW

DITCH LA
ROW ROW ROW

PO
ROW ROW ROW ROW

SHOP=25N
ROW ROW

DI
ROW ROW ROW ROW ROW

43+600
ROW ROW ROW

050
ROW ROW

43+SHOP
ROW ROW ROW ROW

ND
ND

ROW ROW ROW ROW ROW

ND
ROW

42+584.866
ROW ROW

43+650
ROW ROW

PO
LA

ROW

42+629.419
ROW

42+504.866
42+076.916

ROW ROW ROW ROW

PO
ROW ROW

ND
ROW ROW ROW
H

ROW ROW ROW ROW ROW

43+700
RESID
TC

ROW ROW ROW

PO
ROW ROW ROW ROW
ENTIA ROW

42+709
ROW ROW
DI

ROW
L ARE
ROW ROW ROW A ROW ROW
ROW

43+750
SC
ROW ROW

CS
ROW

TS
ND

MARKET AREA
PI

ROW

DITCH LAND
42+083.537

ROW

43+800
42+070.294

PO
ROW

.419
ROW

ST
ROW
StructureNo.- 43/3 ROW
ROW
Type:-Box Culvert ROW
ROW
PT
PC

Span:- 1/(2.0x3.0)m ROW


ROW
Design Ch:42+605 ROW
ROW
I L

ROW
TU

66 Imp.Prop. - New Cons ROW


Curve No. truction ROW
UA

R (m) 2000 Structur ROW


ROW
AT

13.243 Type:-B eNo.- 43/4

43+043 TS
B

Lc (m) ox Cul

ND
Span: vert
- 1/

43+093.12
Design (2.0x2.0)m
Delta 0^22'46" Left

DITCH LA
C Structur
Imp.Pro h:42+810

.126
2.5% eN
e p. - New Type:-M o.- 44/1
100 inor Br
I
UL

D/S (kmph)
SB
Constru Span:- idge

I
ctio

UL
3X
AT

SC
Bridge 6.0X4.0M Rcc
SB

6
AT
TU

Design Box

TU
BA

C
Imp.Pr h:43+010

BA
op. - N
ew Con
structio
n

40.00M

38.00M Type Symmetric Parabola Type

Box Culvert 1/(2.0x3.0)m


Dir Crest RCC Box Bridge 3/(6.0x4.0)m
FINISHED ROAD LINE

Box Culvert 1/(2.0x2.0)m


Box Culvert 1/(2.0x3.0)m

Type Symmetric Parabola Design Ch:- =43+010

Design Ch:- =42+605


Box Culvert 1/(2.0x3.0)m
Dir Sag L 60.00m

Design Ch:- =42+810


EXISTING ROAD / GROUND LINE
Design Ch:- =42+191

G1 0.208%

Design Ch:- =42+482


L 60.00m

PVC 43+035
PVT 42+990
PVC 42+930
With Earth Cushion

36.00M

Elev 30.979

Elev 30.979
Elev 30.917
G1 -0.067% G2 0.000%

PVT 42+635
PVC 42+575
MO-0.02m

Elev 30.304
Elev 30.262
G2 0.208%
MO0.02m R -0.35
R 0.46 K 288.74
34.00M SD 2339.90m
K 218.43

32.00M L 45.000m
L 902.525m L 294.682m Slp 0.000%
Slp -0.067% Slp 0.208% A
B A A

30.00M
A

Elev 30.979
PVI 42+960
Elev 30.242
PVI 42+605
28.00M

26.00M

24.00M

22.00M

Datum = 20.00M

29.106 30.262

28.998 30.259

28.452 30.285

28.649 30.335

28.170 30.387

28.434 30.439

28.925 30.490

28.684 30.542

28.610 30.594

28.176 30.646

28.528 30.698

28.598 30.750

28.628 30.802

28.488 30.854

28.313 30.906

28.069 30.951

27.862 30.975

27.411 30.979

27.212 30.979

28.522 30.978
29.306 30.647

29.299 30.630

29.286 30.613

29.252 30.597

29.177 30.580

29.138 30.563

29.140 30.546

29.143 30.530

29.148 30.513

29.168 30.496

29.204 30.480

29.238 30.463

29.270 30.446

29.244 30.429

29.169 30.413

29.159 30.396

29.163 30.379

29.172 30.362

29.194 30.346

29.214 30.329

29.235 30.312

29.234 30.296

29.176 30.279
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.

L 44.55 L 80.00
L 80.00
L 13.24 R 600.00 A 219.09
HORIZONTAL ALIGNMENT A 219.09 A 223
R 2000.00

L60.000 L60.000
L902.525 L294.681 L45.000
VERTICAL ALIGNMENT L1 30.000 L1 30.000
Slp-0.067% Slp0.208% Slp0.000%
L2 30.000 L2 30.000
42+05042+053.961

42+07542+075.370
42+078.461

42+099.870

42+464.866

42+544.866
e 2.500%

e 2.500%
e 2.500%

42+100 e 2.500%

e 2.500%

e 2.500%

42+584.866

42+62542+629.419

42+669.419

42+749.419

43+014.717
e 5.000%

e 5.000%

e 2.500%

42+750 e 2.500%

e 2.500%
SUPERELEVATION (e %)
42+000

42+025

42+125

42+150

42+175

42+200

42+225

42+250

42+275

42+300

42+325

42+350

42+375

42+400

42+425

42+450

42+475

42+500

42+525

42+550

42+575

42+600

42+650

42+675

42+700

42+725

42+775

42+800

42+825

42+850

42+875

42+900

42+925

42+950

42+975

43+000

43+025

43+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-09
VER- 1:200 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
Km 42+000 to Km 43+000
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
SRIRAMPUR NEAR DHUBRI

AT
KALAH
KET
LEGEND : -

MAR

A
T ARE
EXISTING ROAD :

ABI
PROPOSED CENTRE LINE :

ARKE
B DH

AREA
PROPOSED CARRIAGEWAY :

DHA

SHOP=25NO M
PROPOSED PAVED SHOULDER :

S
S KET
PROPOSED EARTHEN SHOULDER :
Existing

MAR
St
Type:-R ructure PROPOSED MEDIAN :

SHOP=25NO
CC Box
Span:- Br
4.0X3.0X idge

D
PROPOSED REWALL :

LAN
(TotalLe 2.0

D
ngth13

AND
:

PON
.70m) PROPOSED DRAIN

LOW
PO N
PROPOSED ROW : ROW ROW

L
LOW
A=5NOS
ure
DESIGN CH : 1+000 g Struct
MARKET AREA Existin vert
lab Cul
EXISTING CH : 1+000 Type:-S X 1.5m

HUT=3NOS
:- 1

050 NOSMARKET AREA


Span

SEMI PUCC
E
TEMPL

D
cture /5
Existing Stru eNo.- 44
EA

LAN
Structur

I
vert rt

AR
Type:-Slab Cul ox Culve
MARKET AR

50
Type:-B (2.0x2.0)m_E
950

RB
Span:- 1 X 1.5

LOW
:- 1/
Span 74

44+0
43 +9

A
ROW
Design
C h: ruction
DITCH LAND

AM
44/4 on st
42+

StructureNo.- ec

0
ROW op. - R
Imp.Pr
000

KH

0
vert
SHOP=25NOS

Type:-Box Cul

D
ROW ROW
650

44+0
.0)m_EC

LA N

43+950
.- 44/3 Span:- 1/(3.0x3
OP=12

ROW
Existing Structure StructureNo ROW
43+

788

D
43+

ROW lvert Ch: 43+ ROW

43+900
Type:-Box Cu 0)m ign

750
Des

PON

LOW
Type:-Slab Culvert onstruction ROW
Imp.Prop. - Rec
ROW x2.
POND

43+850
Span:- 1/(2.0

44+
ROW
00

D
Span:- 1 X 2.8m
43+SH

ROW +650 ROW

P ON
Design Ch:43

43+800
43+7

tion ROW
New Construc
ROW ROW

00
ROW
Imp.Prop. -

43+750
00
ROW StructureNo.- 44/2 ROW

44+7
DITCH
ROW PO

PACKAGE -IV
ROW
LAND DITCH

43+700

44+650
ND
ROW
EA50

Type:-Box Culvert

PACKAGE -V
ROW ROW
43+1
ROW
43+7

43+650

44+600
ROW Span:- 1/(3.0x3.0)m ROW

POND
0

START OF
ROW RES
ROW ROW
DITCH LAND

ROW
MARKET AR

ROW

43+600

44+550
43+15
IDEN
ROW Design Ch:43+268 MO ROW DITCH

END OF
ROW B 5 NO TIAL AR ROW ROW ND LA ROW
00

43+550

44+500
43+200
ROW ROW Imp.Prop. - Reconstruction ILE
ROW
ROW ROW
TO HOU EA
43+8

ROW ROW ROW

43+500
ROW

44+450

6.092
ROW
WE SE

43+250
EA ROW R ROW ROW DITCH
ROW ROW

43+450
NTIAL AR ROW

44+400
ROW ROW
50

43+400
RESIDE ROW ROW

43+350
ROW ROW ROW
DITCH
ROW
43+8

43+98
44+350
ROW ROW ROW LAND
ROW ROW ROW ROW
ROW

44+300
ROW ROW

43+9
43+900
ROW ROW ROW ROW ROW
ROW

PI
ROW ROW

44+250
ROW ROW

43+973
ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW

98.31
44+200
43+950
DITCH LAND

ROW
43+

ROW ROW
Stru

44+150
PON
ROW

44+100
ROW

44+000
c

44+050

CS
ROW
Typ tureNo
D
ROW
043.1 TS

DITCH LA

43+883.340
ROW ROW

ce
ND

.340
e .- ND

4
PON
ROW
Spa :-Minor 44/1

SC
ROW D ROW

en
n ROW

PO
B ROW
Brid :- 3X6.0 ridge
43+0

ROW ROW

sid
26

ROW
OFC
PON
ge X4.0 ROW D ROW 69
Des ROW
No.

.Re
MR ROW ROW
SB

Curve 550 4

TS
ign ROW
93.1 C

Imp C cc B OFC
ROW ROW
.Pro h:43+0 ox ROW
24.97

OS
DITCH
ROW ROW
R (m) )
SB

LAND
p. - 1 ROW POND ROW
New 0 ROW
90.00 ft
26
S

2N
ROW ROW
Lc (m )

INE
Con ROW ROW
ROW ROW
8" Le

INE
stru ROW ROW (m ^58'3 %

EL
ction ROW ROW ROW ROW Ls 1 1

EL
ROW ROW ROW ROW
ROW ROW ROW ROW
Delt a 2.5

PIP
ROW
100
MOB POND

PIP
ILE T

43+499.19
h)

R
e
OWE
p

43+274.020
2 NO HOUSE
m

TE
(k

R
43+449.199
AT CHAINAGE
R
D/S

TE
WA
RESIDENTIAL AREA

WA
KM 43+300

ST
9
CS
PI
Curve No. 68
R (m) 1000
Lc (m) 356.072

SIALI
Ls (m) 50.00
Delta 23^15'58" Left

KHEK
e 2.5%
D/S (kmph)
100

FINISHED ROAD LINE


40.00M
EXISTING ROAD / GROUND LINE

Type Symmetric Parabola Type Symmetric Parabola

Box Culvert 1/(2.0x2.0)m


38.00M
Box Culvert 1/(2.0x3.0)m

Box Culvert 1/(3.0x3.0)m


RCC Box Bridge 3/(6.0x4.0)m Type Symmetric Parabola

Box Culvert 1/(2.0x2.0)m


Dir Crest Dir Sag
Design Ch:- =43+010

Design Ch:- =43+974


Design Ch:- =43+268

Design Ch:- =43+788


L 100.00m

Design Ch:- =43+650


L 60.00m
G1 0.000% G1 -0.040%
PVC 43+035
PVT 42+990

PVT 43+135
Elev 30.979

Elev 30.979

Elev 30.959

PVC 43+580

PVT 43+640
G2 -0.040%

Elev 30.787
Elev 30.783
36.00M G2 0.054%
MO-0.00m MO0.01m
R -0.04 R 0.16
K 2525.06 K 639.68
34.00M SD 12170.28m

32.00M L 45.000m L 444.960m L 503.899m


Slp 0.000% Slp -0.040% Slp 0.054%
A A B

A A

A A A

30.00M
Elev 30.979
PVI 43+085

Elev 30.771
PVI 43+610
28.00M

26.00M

24.00M

22.00M

Datum = 20.00M
27.411 30.979

27.212 30.979

28.522 30.978

28.873 30.976

28.978 30.971

28.413 30.963

28.668 30.953

28.491 30.943

28.881 30.933

29.178 30.923

29.505 30.914

29.836 30.904

29.673 30.894

29.561 30.884

29.463 30.874

29.545 30.864

29.666 30.854

29.725 30.844

29.798 30.834

29.797 30.824

29.816 30.815

29.793 30.805

29.761 30.795

29.751 30.785

29.748 30.778

29.709 30.781

29.647 30.793

29.597 30.806

29.557 30.820

29.517 30.833

29.529 30.847

29.654 30.860

29.764 30.874

29.783 30.888

29.798 30.901

29.818 30.915

29.842 30.928

29.847 30.942

29.825 30.955

29.810 30.969

29.803 30.982

29.771 30.996

29.726 31.009
FINISHED ROAD LEVEL.
ALONG THE PROPOSED CL.

EXISTING GROUND LEVEL


ALONG THE PROPOSED CL.

L 50.00 L 356.07 L 50.00 L 90.00


HORIZONTAL ALIGNMENT L 24.97 L 90.00
A 223.61 R 1000.00 A 223.61 A 222.49
R 550.00 A 222.49

L100.000 L444.960 L60.000


L45.000 L503.899
VERTICAL ALIGNMENT L1 50.000 Slp-0.040% L1 30.000
Slp0.000% Slp0.054%
L2 50.000 L2 30.000

43+838.340

43+92543+928.340

43+973.340

43+998.314

44+043.314
e 2.500%

e 2.500%

e 5.000%

e 5.000%

e 2.500%
43+014.717

43+071.535

43+093.126

43+449.199

43+470.790

43+52543+527.608
e 2.500%

43+075 e 2.500%

e 4.400%

e 4.400%

e 2.500%

e 2.500%

SUPERELEVATION (e %)
43+000

43+025

43+050

43+100

43+125

43+150

43+175

43+200

43+225

43+250

43+275

43+300

43+325

43+350

43+375

43+400

43+425

43+450

43+475

43+500

43+550

43+575

43+600

43+625

43+650

43+675

43+700

43+725

43+750

43+775

43+800

43+825

43+850

43+875

43+900

43+950

43+975

44+000

44+025

44+050
CHAINAGE (KM)

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. PLAN & PROFILE DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/PP-10
3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
VER- 1:200 Km 43+000 to Km 43+300
Consultancy Services for Feasibility Study and preparation of Detailed
NEW DELHI - 110001
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
MISCELLANEOUS DRAWING
ROAD ROAD
B A C

A C
B
PLAN OF COVERED DRAIN
(Scale 1:25) 10mm Ø @150 C/C
1500
8mm Ø @200 C/C
300

200

SECTION D-D

SECTION OF AA

SECTION OF CC

DETAILS REINFORCEMENT OF DRAIN


SECTION E-E

D E

SECTION OF DRAIN
D E
SECTIONAL PLAN OF PRECAST SLAB

SECTION OF BB

NATIONAL HIGHWAYS AND INFRASTRUCTURE


DEVELOPMENT CORPORATION LIMITED. TYPICAL DETAILS OF DRAIN
DWG. NO. CET/3636/ASSAM /127B/FDPR/MISC-7
AS SHOWN 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
NEW DELHI - 110001
Consultancy Services for Feasibility Study and preparation of Detailed
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
100m 30 m 100m

Passenger Shelter
Median

Bus Bay

Carriage way Bus Bay


Paved Shoulder
Earthen Shoulder

100m 30 m 100m

DETAILS OF BUS BAY LOCATION


Design
TYPICAL LAYOUT OF BUS BAY
Sl no Chainage Side Location
(km)
PKG 1
1 37.650 Both Baniamari
2 38.550 Both Baniamari
3 41.600 Both Batuatuli

PASSENGER SHELTER

NATIONAL HIGHWAYS AND INFRASTRUCTURE TYPICAL LAYOUT OF BUS BAY WITH


DEVELOPMENT CORPORATION LIMITED. PASSENGER SHELTER DWG. NO. CET/3636/ASSAM /127B/FDPR/MISC-8
AS SHOWN 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
NEW DELHI - 110001
Consultancy Services for Feasibility Study and preparation of Detailed
CE TESTING COMPANY PVT. LTD. Drawn By.
ROAD NAME: NH-127 B starting from Srirampur in the Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
(Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
MKD. DATE DESCRIPTION CHKD. APPRD.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1 Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
IMPROVEMENT OF
GRADE SEPARATER INTERCHANGES
CU

ET
NEAR DHUBRI
4

RK
BRI
2
1+1
SRIRAMPUR

MA
W

DHU
RO

N
JA
LA
W
LIM

RO

BA

K
00

AC
1+1

-31
IT O

TR
NH
W
FW

RO

AY
OR

IL W
K

RA
RO
D
D
CULTIVATED LAN

PON
CU

W
RO
LT
IVA
TE

/8
D Curve N 050

52
W
LA o. 63
R (m)

RO
ND
LAN
D 1+
Lc (m) 300 D
TE
Ls (m) 236.679 IVA

W
Str D T

RO
75.0 u AN L
Delta 59 Typ cture CU
^31'35" R0
DL

40+150
Sp e:-Bo No.-

D
E

40+200
e AT
ight

PON
a TIV
De n:- 1 x Cu 41/1

W
5.0% L

0
D/S (k

RO
s lv CU
mph) Imp ign C /(2.0x ert

40+10

50

D
80 Wit .Prop h:40+ 3.0)m

PON
ROW

W
ROW ROW

4 0 +2
ROW ROW ROW ROW hE .- 3
art Rec 10

RO
40+195.304
PI
050
ROW Str

2)
ROW ENCE
ROW
ROW ROW
ROW
hC o
ush nstru
u
Typ cture RESID
7NO. 000

300
ROW ROW ion ctio Sp e:-B No.-
1+
(

W
n

40+
o
De an:- 1 x Cu 41/1

RO
ROW ROW

-A
CU
ROW ROW
Im sign C /(2.0x lvert

40+
LT
ROW p

W
IVA RO
Wit .Prop h:40 3.0)m

00
W

RO
ROW
TE

D D RO
W hE .- +2
art Rec 50

+0
W

50
LA
RO hC
A o
RO

0+ W

K
ND
ush nstru

/7
OW W

95RO

AC
R

40

52
+3
ion ctio

40+262
40+250
RO

RO

TR
W

40+200
40+200
RO
W n

40+150
W

40+150
RO

40
40+100
RO

AY
40+050
W

0
W
RO

ILW
40+25
RO

50
W

00
W
W RO

W
RO

RO

RA

RO
000

00
RO

+9
W

+4
4,853
W W
RO

00
RO RO

1
39
AD

W
W

0
40

RO
40+

40+
W RO ND

90
RO W W
LA RO
CU

-C

40+
LT RO

50

0+
D

W
W TE

50
IVA W

RO
RO W

50
TE RO VA RO

+4
TI

1
D W

350
+0
L

-3
W

+9
LA

00

W
RO RO CU W

NH
N

RO
40
1 D W RO
0/

40
+W 9

39
- 4 rt
RO

40+
n W
o. lve 0)m tio W

39

W
RO

R
eN Cu x4. 00 truc
RO

RO
0
r W

85
tu ox 3.0 +8 ns

+5
W
c RO W

ROW
00
ru :-B /(

RO
RAIL
9 co n

00
W RO

0+
St ype :- 1 h:3 Re shio

W
40

RO
RO
T an n C p. - Cu

40+250

+4
40+300
0+
W

W
W
Sp esig ro rth

RO
00 RO RO

/6
50
W

40

W
P
D p. Ea

52
+9 50

50

RO
RO

W
W
Im ith

0
W RO

RO

+5
40+
9

40+2

50

m
W

40+3
RO

0+ WLL
3 +8

50

4K

W
W

0
W

40
297 CS

RO
W
RO

ge

53
+4
39

80
RO

RO

+9

150

CH F RE
W

id

400
.501
40+
n
Br

ROW
0+
RAIL

Pr C 5 l S /3
RO

00
.- 4
W

tio

40

W
RO

39
W
W

O
b
p. n x1 ra 40

RO
uc
op h:3 m la

RO

060

CH DING
40+
RO

20
ROW

r
Im sig :- 1 teg o.-

+6
40+
W

st

00
ROW

1
w 0

-AT
n
De pan :-In eN
RO

.82
SC
Ne 70
Co

W
50

W
CU
ROW

+4

2
W

EN
40

40
S ype tur

RO

RO
. - 9+

00
LT

+5
ROW

50 40+6
+8 00

+3
T truc
-B
IVA ROW

40
TE

+9

10

7
W
9

40
S

W
D

2.5 ST
3 +8

O
D
/4

RO
R
LA
40 t

OA

+
39

01
ND
39 .- ver )m n

40
io

40+250
W
0
No Cul 4.0 5 ruct ROW ROW ROW

RO

39

40+300

W
ROW ROW 75
e
ur x
R ROW

RO
x 9 t ROW

+5
+9
ct o .0 +7 ns ROW 0+

01

200
ROW
rt u e:-B 1/(3 :39 eco ion

W
Ø=0 . OF PIPVERT

50

8
RO

5.8
W

E=
RO

40
S yp :- RO

TS
h R h

W
W

ROW
T an n C p. - Cus
RAIL

+8

350

RO
00

22
NO E CUL 0 W RO
0
RO .92

40+
W
Sp esig ro rth 05 W 19

0
O
+8 50
RE

/5
W

39
R
.9 M
D p.P Ea RO RO

52

W
+ W

SI

150

40+
39 +7
PIP

RO
Im ith W

+6
W
40 RO

W ND
DE RO 0
.28

O
W W

1)
R
39 RO
W
1/1
37
NT

R PO

40
RO
.- 4

00

W
40+

00
W
eNo ulvert
W
IA

RO
RO 0
ctur

O
0

(
RO
L

70

+8
C .0)m
.28
Stru :-Box

50
W W
RO

+4
AR

ROW
37 80

CK
.0 3 3

-A
RAIL

100
e x n 0+

L
W
Typ :- 1/(2 0+19 tructio

W
W RO 0 .2

73 WAL
39
EA

.92 37

A
RO

+6

RO
W
AND

40
n 17

TR
ons

m
0 p a C h :4
OW S ign Rec n

9K
RO

AD
0 R

40+

.- 4 RE
Des rop. - Cushio

40
W

AY
00

W
+0

W
L

ER
W

50
RO 80

RO
.P

R
RO

CH OF
0+
ILW
Imp Earth
CH

40

50
+570 W 37.2
0
.28

OW
050
W

63

0W 0
RO h 37

G
Wit

+4
W

RA
DIT

WOND
9
7

CH ARTIN
+7
RO+

RO
39 3

BIL EL
ET
W

+7RO
+4
RO

ROW
40
ND

-AT
39

40+

MOAIRT
0 W
ROP

W RO LA

ST
.28
RO

40

4W0
0 37

ER
D
65

RO
W E
W RO

000
RO AT

OW
ROW
0+

ROW
RAIL

AND
50
W

W
IV

0
W
D

RO

RO RO T

W
CULTIVATED LAND UL

70
PON

BIL EL
50

ET
RO
0
W

+7
.28 C

40+
RD 0 RO

HL
W
37 RO

MOAIRC
95
W

+6 E

+
YA W ENC
RO

ROW
RO

40
ED
2

C
W
39
+ OW
0/ .RES
E 9

50

RO

DIT
- 4 rt
AV 39 RO
W NOS
R

/4
n
3 5
o. lve 0)m
W

t io GR W

52
CU

00
W RO
O

9
eN Cu x3. 05 truc RO
R

W
LT
r

W
39+
tu ox 2.0 +5 ns

RO
IVA W
W
50

RO

EA
RO

+8
RO
c
W

TE
ru :- B /( 9 co n
O

CU
St pe :- 1 h:3 Re shio
D W

+8NTIAL AR
RO
R

W
+6

41+150
RO

41+100

W
LA LT

40
00

Ty pan n C p. - Cu
0

RO
W
ND W IV

90
W RO 60 RO
S esig ro rth EA
39

RO
39

RO
AT
+6

W RO
0+

41+200
AR W

50
0
ED
D p. Ea P +7 W

0
RO

39+
0

W
AL RO
9

W RO
+7

850 90
LA

RO
Im ith 00 W
/1 TI RO

W
W
00 3

IDE
40 t NJ ND

41+2R50
RO
39

O
W
N
.- ver )m n RO

39+ 9+
DE GA
io W RO W
No ul .0
SI W
ct

RES
RO W

40
ND

1
RO EB D LA

RO
-3
re x C 0x3 500 stru RO

3
RE

41+300
-
+6

IVATE

0
RO

W
50

u W W

NH
H

5
ct o . + n RO W CULT

RO
W

+0
SA
ru :-B /(2 9 co n RO RO

00
39

W RO

41
St pe :- 1 h:3 Re shio

W
RO W
5

41+350
W

RO
41
50 9+

T y pan n C p . - C u
W W RO

+9
RO /2 RO

W
RO

50
W W
S esig ro rth

RO

41+400
80
W RO
+5 3

W
W RO RO

ROW
D p .P E a

40
RAIL
0 W
RO W

RO
Im ith RO
W 55 RO

39+
RO

41+450
W 0+ W W

RO
RD W
00

RO W
50

RO
D

W
RO

00
YA
PON

RO
39+7850
CU
39

41+500
A
RO
0 +5

/3
E W
+7

RE

00
LT RO
RO

W
AV

52
CULTIVATED LAND
0/2 W

+0
LA IV W

RO
GR AT RO .- 4

W
50 39

41
eNo ulvert
39

RO

41+550
IA W

RO
39+
E W
ctur
W
NT RO RO
D
C m
Stru :-Box .0x4.0)
LA RO
DE

W
ND W W
SI W RO e n

41+600
RO
0
RO Typ n:- 1/(3 9+80 structio

W
0

RE RO

RO
W
50

RO :3 W
+70

Spa n Ch Recon n
9+

W
0

RO RO

ROW
ROW
RAIL
ig

W
-
Des rop. Cushio
7

W
4

CU

RO
+3

41+6
ROW
0
50 9+

W .P 50 RO
Imp Earth
LT
RO
D

39

W
39

RO W 0+
I
PON

50
h VA
Wit RO
+4 3
H.

650

W
+9
W
ROW W
TE
RO

RO
40
LC

D D RO
RO
W D LAN W
W
LA IVATE
AL

RO
NJ

W CULT
0

N RO
RO
39+

K
W
D W
0

AC
EW

GA

RO
39

W RO RO
RO
CUL
+4

TR
W

40
TIV W
EB

600

RO
FR

ATE
W NCE

+9
DL
09

AY
DE
RO
H

W
W ESE
RO
TO

40 3

SA

RO

51
.R
ARD

ILW
CU S
W W 3NO
39+

RO

.45 S
RO

00
R

LT

RA
+9
TA

W IV
50

T
W
RO

3
AVE Y

40
W A
9+
50

RO
4
S

RO
50

TE
W 0+
RO
J

D
AN
3
3

W W
LA
9+5

RO RO

W
09+

N
BG

RO
ARI G

W W
RO
HE

RO

-D
353

W
SA

500

W RO

W
RO
+

RO
M

W
RO

0
0

39

BENIA

AD
85
RO
30

39+

0+
W
RO

W
9+00

4
W

RO
CUL
39

RO
TIVA
RO
W
+4

450

0
3

TED
A
RO
W LA N
RO
W 40
3

RE
+

W
RO
0/1
D
LAY
6.1

LA 0+
0

.- 4
ST

RO
39

W
RO
A
+2550

I W A
eNo ulvert
NT USE RO
RE
39+
50

A
ctur
HYA

E L
8M

SID O HO TIA W C
RO )m
ROW Stru :-Box .0x3.0
E N
3399+2

E E

W
ID
4.75

R 3N RES O HOUS ROW e n


400

VID

ROW
Typ :- 1/(2 9+500 tructio

RO
00
R OW
5N W
RO n :3 s
HT=

+8
pa C Recon
h
IYO

40
ROW ign n
1.25 .110M

-
Des rop. Cushio

W
39+

EIG

WID GTH=1VERT
JAT

RO
ROW .P
0M

Imp Earth
A
350

RE
GH

8M
RO W
0

LA CU
ARI

h
Wit
L

TIA E
ROW

4.86

W
LENAB CU

LT
SSIN

EN OUS
IAM

RO
L ARE I
50
TH=

D VA
ROW
I
39

39+

S H
ENTIA

HT=

1
RE 2 NO L AREA TE 3
BAN

/
SIDENTIA
CRO

W 0+
+3

RESID HOUSE

52
RO
A
SL

RESIDENTIAL ARE RE
40+10000

W
50
EIG
41

NCE LA
0
3940+095.89

W
D 8 NO

RO
RO PON AREA RESEDE

+7
40+050

ND
40+050

14NOS.
CS40+150
.15
+29
3

40+200

GH
40+250

11KV LINE

40
W
MARKET
RO
40+300
+

40+350

W
SSIN
W 8 NO SHOP
39

RO POND
40+400

RO
W
RO
40+450

CRO

ROW
POND POND
40+500
SB

POND

W
ROW POND 700
40+550

RO
BUS STOP DITCH LAND
40+600

ROW 40+
67

D
40+650

PON
CE

UE
47.3

W
D 0
PON
EN

OFC

RO
+3
SQ
39+2

ID

D 0
PON
MO
S
RE

W
PI

OUSE

RO
8 NO H
S.

62 E E EA LAND
US TIAL AR
NO

. US EA DITCH
AR

e No
D
500 40 AR PON HO RESIDEN

W
HO
C ur v )
2

196.50
AM

RO
O IAL 3N
O USE
4 NO H
O
( m 4 N E NT
95.0 eft
NI

1
)

-3
L c (m ) SI D
BE

W
OUSE
'29"

NH
3 NO H OUSE

K
RE

RO
5 NO H
Ls (ma 33^24 2.5% 00
EA

AC
TIAL AR 0 5
RESIDEN

/0
elt 1

TR
D +2

52
W
h )
(kmp
POND 0

RO

AY
e
D/S

ILW
SE
HOU REA
EXISTING NH-127B

W
6 NO TIAL A

RA
RO
IDEN
RES

W
RO
0
20
0+

LEGEND : -
EXISTING ROAD :
0

/9
15 PROPOSED CENTRE LINE

51
:
0+ PROPOSED CARRIAGEWAY :
PROPOSED PAVED SHOULDER :
PROPOSED EARTHEN SHOULDER :

PROPOSED MEDIAN :
:

ROAD-(A1) CH(39+700KM-40+420KM)
PROPOSED REWALL
0
10 PROPOSED DRAIN :
0+ PROPOSED ROW : ROW ROW

DESIGN CH : 1+000

ROAD-(A2) CH(39+700KM-40+262KM) EXISTING CH : 1+000

0
05

/8
ROAD-B CH(39+290KM-40+463KM) 0+

51
LI
M
ROAD-C CH(39+300KM-40+621KM) IT
OF
W
K

0
AC

00 OR
TR

0+ K
ROAD-D CH(0+000KM-1+124KM)
AY
1
-3

ILW
NH

RA
NJ
GA
K
LA
GO

NATIONAL HIGHWAYS AND INFRASTRUCTURE


HOR- 1:2000 DEVELOPMENT CORPORATION LIMITED. GRADE SEPARATOR DWG. NO. CET/3636/ASSAM PWD/127B/FDPR/GS-01
VER- 1:200 3RD FLOOR, PTI BUILDING, 4-PARLIAMENT STREET,
NEW DELHI - 110001
Consultancy Services for Feasibility Study and preparation of Detailed CE TESTING COMPANY PVT. LTD.
ROAD NAME: NH-127 B starting from Srirampur in the Drawn By. Design By. Checked By. Approved By.
Project Report for Construction & up-gradation of the newly declared NH-127 B 124-A, N.S.C. Bose Road
state of Assam to the immediate approach of proposed
MKD. DATE DESCRIPTION CHKD. APPRD. (Assam portion) starting from Srirampur on NH-27(old NH-31 C) at Chainage 0.00 bridge over river Brahmaputra near Dhubri. Kolkata - 700092.
Mar,2020 km to the immediate approach of proposed bridge over river Brahmaputra near
REVISIONS : R1
Dhubri at chainage 55.700 km to NH standard PACKAGE NO: PWD - NH (R) / ABY / 2014 - 15 /02 P.Nondy S.Dey B.Das A.Nayak
PACKAGE-IV
(36.500KM TO 43.300KM)
LEVEL DETAILS OF PROPOSED BOX CULVERTS ON NH-127B(SIRAMPUR TO DHUBRI) PKG - IV

Earth Vent Height of Proposed Proposed


Design Size_FDPR_R2 Total Width Carriageway Finished Super Top Slab Bottom Slab Proposed
Sl Structure Remarks For Cushion Median Protection FRL- Slope Box(m) Founding
Chainage Road Stretch of Road of Culvert (Cw) Road Level LBL(m) Elevation Thickness Thickness Invert level
No. No. Proposal Height (m) Type LBL(m) side level
(km) (Tw)m (m) (m) (%) (m) (m) (m)
No. of cell x Span x (m) (m)
(b) (b1) (b2)
Height

4L
1 36.750 37/3 Balancing 1 X 2.0M X 2.0M 24.5 11.000 1.500 Flexible 32.834 30.696 2.138 NC 2.000 2.275 - 0.350 0.380 30.144 29.764
Built Up

LHS -3.9%
2 37.150 38/1 Balancing 1 X 2.0M X 2.0M - 4L 26.0 10.500 4.000 Flexible 32.591 31.562 1.029 L TO R 2.000 2.410 2.819 0.350 0.380 29.767 29.387
RHS 3.9%

4L LHS-15.0 &
3 37.626 38/2 Re-Construction 1 X 2.0M X 2.0M_EC 1.505 41.0 4.000 Flexible 32.344 28.889 3.455 NC 2.000 0.250 0.300 28.589 28.289
Bus Bay RHS-20.0

LHS -5.0%
4 38.000 39/1 Balancing 1 X 2.0M X 2.0M_EC 1.968 4L 26.0 10.500 4.000 Flexible 32.471 28.553 3.918 L TO R 2.000 2.525 2.725 0.250 0.300 28.253 27.953
RHS 5.0%

5 38.350 39/2 Balancing 1 X 2.0M X 2.0M 4L 26.0 10.500 4.000 Flexible 32.316 30.647 1.669 NC 2.000 2.263 - 0.350 0.380 29.638 29.258

4L LHS-18.0 &
6 38.550 39/3 Balancing 1 X 2.0M X 3.0M 41.0 4.000 Flexible 32.227 29.199 3.028 NC 3.000 3.450 0.250 0.300 28.462 28.162
Bus Bay RHS-18.0

7 38.850 39/4 Balancing 1 X 2.0M X 3.0M 4L 26.0 10.500 4.000 Flexible 31.900 28.729 3.171 NC 3.000 3.263 - 0.370 0.420 28.203 27.783

LHS-11.5 & LHS -5.0%


8 39.172 40/1 Re-Construction 1 X 2.0M X 2.0M 4L_Tapper 32.0 4.000 Flexible 31.311 28.966 2.345 L TO R 2.000 2.575 3.350 0.350 0.380 28.321 27.941
RHS-15.5 RHS 5.0%

Re-Construction
4L
9 39.505 40/2 (Realignment 1 X 2.0M X 3.0M_EC 4.721 25.0 10.000 4.000 Flexible 36.278 28.537 7.741 NC - 3.000 0.320 0.350 28.237 27.887
Portion)
RE Wall

4L
10 39.795 40/4 Balancing 1 X 3.0M X 4.0M_EC 4.947 25.0 10.000 4.000 Flexible 38.442 29.345 9.097 NC - 4.000 0.450 0.550 29.045 28.495
RE Wall

4L LHS-13.5 & LHS 5.0%


11 40.250 41/1 Balancing 1 X 2.0M X 3.0M_EC 3.621 39.0 4.000 Flexible 36.168 29.527 6.641 R TO L 3.000 0.320 0.370 29.227 28.857
RE Wall_Tapper RHS-19.5 RHS -5.0%

45_25.0m RE
4L
Wall LHS 5.0%
12 41.083 42/1 Balancing 1 X 2.0M X 3.0M_EC 3.093 RE Wall+ - 4.000 Flexible 34.533 28.420 6.113 R TO L 3.000 0.320 0.370 28.120 27.750
(10.0M SW on RHS -5.0%
Service Rd.
both side)

13 41.400 42/2 Balancing 1 X 2.0M X 2.0M_EC 1.635 4L_Tapper 34.0 14.500 4.000 Flexible 30.489 26.904 3.585 NC 2.000 0.250 0.300 26.604 26.304

LHS-10.5 &
14 41.800 42/3 Balancing 1 X 2.0M X 3.0M 4L_Tapper 32.0 4.000 Flexible 30.781 27.858 2.923 NC 3.000 3.413 3.150 0.370 0.420 26.933 26.513
RHS-16.5

15 42.191 43/1 Re-Construction 1 X 2.0M X 3.0M 4L 26.0 10.500 4.000 Flexible 30.519 27.645 2.874 NC 3.000 3.263 - 0.370 0.420 26.821 26.401

16 42.482 43/2 Re-Construction 1 X 2.0M X 3.0M 4L 26.0 10.500 4.000 Flexible 30.324 27.051 3.273 NC 3.000 3.263 - 0.370 0.420 26.627 26.207

LHS 5.0 %
17 42.605 43/3 New Balancing 1 X 2.0M X 3.0M 4L 26.0 10.5 4.0 Flexible 30.3 27.6 2.7 R TO L 3.000 3.525 3.725 0.370 0.420 26.300 25.880
RHS -5.0%

18 42.810 43/4 New Balancing 1 X 2.0M X 2.0M 4L 26.0 10.5 4.0 Flexible 30.6 28.5 2.1 NC 2.000 2.263 - 0.350 0.380 27.931 27.551

LHS -4.4%
19 43.268 44/2 Re-Construction 1 X 3.0M X 3.0M 4L 26.0 10.500 4.000 Flexible 30.938 27.805 3.133 L TO R 3.000 3.462 3.638 0.420 0.420 26.991 26.571
RHS 4.4%