SOUTH CENTRAL RAILWAY
                        r;rt/Jife;;J<llfRlJ/ Headquarters' Office
                         llif¥n~I'T'W"/ Mechanical Branch
                          &'QRlJJ.i/ Rail Nilayam                     e-mail:
                                                                      pcmedr~scr@~mail.com
                          fflci;cr<Jilla Secunderabad
         lf./ No.     M.95/ SCR Sanction/RPR/130 kmph                 ~/Date:            18.11.2022
DRM's/SC, HYB, BZA, GNT, GTL & NED
        ~/Sub: GM's sanction for regular operation of LHB EOG coaches LWLRRM (LWLRRM2),
               LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and LWFAC
               (LWFAC2) up to a maximum speed of 130 kmph or at the limits of sectional
               speeds whichever is lower over BG sections of South Central Railway.
        ~/Ref:(1)RDSO's Final Speed Certificate No.SV.AS.ML dtd. 29.10.2009 (160 kmph)
                  Amend.1 dtd. 29.04.2020 and SV.AS.ML dtd. 21.08.2009 (105 kmph) with
                  Amend.1 dtd. 20.10.2011.
             (2) Railway Board's sanction Jr. No. 2010/CEDO/SR/ 09 dated 14.01.2011 and GM/
                  N. Rly's. Sanction No. 519-W986/Pt-1/ Track dated 15.01.2021.
             (3) SCR's joint Safety Certificate No. M/C-049 .
                                                         •••••
           Please find enclosed herewith a copy of GM/SCR's sanction letter No. M.95/SCR
 Sanction/RPR/130 kmph dated 18.11.2022 for running of subject coaches up to a max. speed of
 130 kmph or at the limits of sectional speeds whichever is lower over BG sections of South Central
 Railway.                                                                                           '
      The following concomitant documents are enclosed for necessary action please.
                    1. SCR's )SC No.M/C-049.
                    2. Track, Bridge, S&T and OHE Certificates along with para wise compliance
                     to RDSO's Speed Certificate and Railway Board sanction.
                    3. Track Worthiness & Safety Certificate.
                    4. RDSO's Final speed certificate.
                    5. Railway Board's sanction letter.
 Encl.: As above.
 Copy for kind information please:
        (1) CCRS/DRM's Office Campus/Northern Railway/Lucknow
       (2) CRS/South Central Circle/SC
       (3) DG/RDSO/Lucknow
       (4) EDME/Caoching/Railway Board
 Copy for kind information & n.a. please:
       (1) PCOM, PCE, PCSTE, PCEE, PCME, CAO & PCMM ofSC Railway
       (2) PCSO/SCR
       (3) CBE/SCR
       (4) Sr.DME's/SC, HYB, BZA, GTL, GNT & NED ofSC Railway.
 •
             .                                                                       Gftrur lfUl ~
       •                                                                             ~ ~. Jllcj)c;'i(liiiC: - 500 025
                                                                                     General Manager
m      ~+11~     "GR 3JTt3m'lpf~                       :1'1111 ·I'll
                                                 'lffillmlm Govt. of Indio
                                                                                     South Central Railway
ARUN KUMAR JAIN IRMS                          tel >l'liTl'ltl Mlnlotry of Rollwoyo
                                                                                     Rail Nllayam, Secunderabad - 500 025
    No.M.95/SCR sanction/RPR/130 KMPH                                                          Dt: I g .11.2022
        Sanction for operation of LHB EOG Coaches with pneumatic suspension ip SCR
    .s..u..b.i Sanction for regular operation of LHB EOG coaches LWLRRM (LWLRRM2), LWCBAC
         (LWCBAC2), LWACCN(LWACCN2), LWACCW(LWACCW2) and LWFAC(LWFAC2) up
         to a maximum speed of 130 kmph or at the limits of sectional speeds whichever is
         lower over BG sections of South Central Railway.
    Rd": SCR's Joint Safety Certificate No. M/C-049.
                                                         *****
    Sanction is hereby accorded for regular operation of LHB AC Generator Car (LWLRRM/
    LWLRRM2), AC Hot Buffet Car (LWCBAC/LWCBAC2), AC-3 Tier (LWACCN/LWACCN2), AC-
    2 Tier (LWACCW/LWACCW2) and AC First class (LWFAC/LWFAC2) fitted with pneumatic
    suspension (120 kN capacity) at the secondary stage on FIAT Bogies having maximum axle
    load of 16.25 t, up to a maximum speed of 130 kmph or at the limits of sectional speeds
    whichever is lower on track maintained as per standards specified under Para 522 of
    IRPWM June-2020 over BG sections of South Central Railway as certified by RDSO Speed
    certificates and Railway Board & GM/N.Rly. sanctions mentioned below.
     S.No.        Nameofthe      LayoutDrg.         RDSO Speed Certificate               Railway BoardjN.R GM
                    Coach            No.                     Nos.                          Sanction Letter No.
       1         LWLRRM/         11012            SV.AS.ML dtd. 29.10.2009              2010/CEDO/SR/ 09 dated
                 LWLRRM2                          (160 kmph) Amend.1 dtd.               14.01.2011.
       2         LWFAC/          LA-90018         29.04.2020.                                  and
                 LWFAC2                                  and                            GM/N. Rly's. Sanction No.
       3         LWACCN/         LE-90009         SV.AS.ML dtd. 21.08.2009              519-W986/Pt-1/ Track
                 LWACCN2                          (105 kmph). Amend.1 dtd.              dated 15.01.2021.
       4         LWACCW/         LW-90023         20.10.2011.
                 LWACCW2
       5         LWCBAC/         LH-90001
                 LWCBAC2
     The above sanction is subject to the following stipulations:
       a. Observance of all permanent and temporary speed restrictions in force and those
          that may be imposed from time to time due to track, bridges, cuiVes, signalling and
          interlocking etc.
       b. ObseiVance of all conditions and speed restrictions stipulated in SC Railway's JSC
          No. M/C-049 along with its concomitant Track, Bridge, Track Worthiness and Safety,
          S&T and OHE Certificates.
                                                                                                         Contd ...2
                              Telephone : 040-27822874, Fax : 040-27833203
   c. Observance of ·all conditions stipulated in RDSO's Speed Certificates, Railway
      Board's sanction and GM/N.Rly's. sanctions mentioned above.
   d. In case of air spring gets deflated, the speed shall be limited to 60 kmph. This has to
      be manually implemented by loco pilot.
                                                                  (Arun Kumar Jamf &ll\l').(Jl'Y
                                                                  General Manager
                                                                 South Central Railway
Copy for kind information please:
      (1) CCRS/SDRM's Office Campus/Northern RailwayfLucknow
      (2) CRS/South Central Circle/SC
      (3) DG/RDSO/Lucknow
      (4) EDME/Coaching/Railway Board
Copy for kind information & n.a. please:
      (1) PCOM, PCE, PCSTE, PCEE, PCME, CAO & PCMM ofSC Railway
      (2) PCSO /SCR
      (3) CBE/SCR
                                                                                                        ')..~
                                                                                           Page 1 ofB
                                   South Central Railway
              _              )oint Safety Certificate No. M /C-049
 JSC for regular operation of LHB AC Generator Car (LWLRRM/LWLRRM2), AC Hot Buffet Car
 (LWCBAC/LWCBAC2), AC-3 Tier (LWACCN/LWACCN2), AC-2 Tier (LWACCW/LWACCW2)
 and AC First class (LWF.AC/LWFAC2) coaches up to a max. speed of 130 kmph or at the limits
 of sectional speeds whichever is lower on track maintained as per IRPWM standards over BG
 sections of South Central Railway.
 Certified that, it is safe to run LHB EOG coaches LWLRRM(LWLRRM2), LWCBAC
 (LWCBAC2), LWACCN(LWACCN2), LWACCW(LWACCW2) and LWFAC(LWFAC2) fitted
 with pneumatic suspension (12.0 kN capacity) at the secondary stage on FIAT Bogies having
 max. axle load of 16.25 t, up to a max. speed of 130 kmph or at the limits of sectional speeds
 whichever is lower on track maintained to standards given under Para 522 of IRPWM (June
 2020) over BG sections of South Central Railway as certified by RDSO Speed certificates and
  Railway Board & GM/N.Rly. sanctions mentioned below. Sectional speeds mentioned against
  each section is enclosed as Annexure-A, SRs & PSRs are enclosed as Annexure-B.
      S.No.         Name of the   LayoutDrg.    RDSO Speed Certificate     Railway BoardfN.RGM
                      Coach           No.                 Nos.               Sanction Letter No.
        1          LWLRRM/ .      11012        SV.AS.ML dtd. 29.10.2009   2010/CEDO/SR/ 09 dated
                   LWLRRM2                     (160 kmph) Amend.1 dtd.    14.01.2011.
        2          LWFAC/         LA-90018     29.04.2020.                       and
                   LWFAC2                             and                 GM/N. Rly's. Sanction No.
        3          LWACCN/        LE-90009     SV.AS.ML dtd. 21.08.2009   519-W986/Pt-lf Track
                   LWACCN2                     (105 kmph). Amend.1 dtd.   dated 15.01.2021.
        Ll,.       LWACCW/        LW-90023     20.10.2011.
                   LWACCW2
        5          LWCBAC/        LH-90001
  I                LWCBAC2
   The followina: conditions shall apply:
   Railway Board's Sanction:                                   .
1) Observance of all stipulations laid down in the sanction letters issued by the Railway Board
   vide letter Nos. mentioned above shall be strictly adhered to.
   Track;
2) Track Certificate is issued by Headquarters Engineering department vide letter
   No.W.506/CRS/TR/AC/Vol.IV dated 17.1i.2022. Further, vide letter No. W.506/CRS/TR/AC/
   Vol.IV dated 17.11.2022 para-wise compliance furnished to· paras of Track portion of RDSO's
   speed certificate & Railway Board's sanction and this shall be strictly adhered to.
3) Speed Restrictions: All Speed restriCtions printed in current Working Time Table in force, SRs
   & PSRs as mentioned in Annexure-B and subsequent restrictions imposed from time to time
   due to track, bridges, curves, signaling and interlocking etc. shall be ob   ed.
                    ~l-C~a.--
                                                                                        \7 \'\\~
 Principal Chief Mechanical Engineer                            Principal Chi   1gnal & Telecom Engineer
                     ~'
                            ~'-                  ~~~                              ~-~-~
               .
                            I
                            I11'1-t.-
 Principal Chief Electrical ng\neer      Principal Chief Operations Manager      Principa\ Chief Engineer
                                                                                             Page 2 ofS   ~~
                                        South Central Railway
                                   Joint Safety Certificate No. M/C-049
    Brid~:e:
4) Bridge Certificate is issued by Headquarters Engineering department vide letter No. W.469/
   Bridge certificatesjCoaches/130Kmph dated 17.11.2022. Further vide letter No. W.469/
   Bridge certificatesjCoachesj130Kmph dated 17.11.2022 para-wise compliance furnished to
   paras of Bridge portion of RDSO's speed certificate & Railway Board's sanction and this shall
   be strictly adhered to.
   Si~:nallin~:
5) S&T Certificate is issued by Headquarters S&T department vide letter No. SG.191/IX/SPfVol.4
   dated 17.11.2022 shall be strictly adhered to.
6) In SC Railway, GDR-BZA-KZJ-BPQ, KZJ-GT, LPI-WD, GTL-KLU-CCA, NLPD-STUR, GKM-GJI,
   DHNE-MKR, RU-GY-GTL-WD, GWM-THY sections are provided with STD IIIR interlocking
   (second distant signaling system) and GT-SC-LPI & BZA-GWM sections are provided with 4
   aspect automatic signaling, caters for EBD more than 1 km and maximum permissible speed is
   130 Kmph. All other. sections in SCR are provided with STD IIR interlocking, hence maximum
   permitted speed is 110 kmph.
7) EBD values for a rake have been calculated at down gradient 1/80 with 95% Brake Power by
   using 'STOP' software of Motive Power Directorate of RDSO and details are given below:
   For a rake of 1 Loco+24 LHB coaches at 130 kmph,EBD is 1191 mts.
   For a rake of 1 Loco+24 qm coaches at 110 kmph,EBD is 879 mts.
   The above EBD calculation is derived based on certain theoretical assumptions. Hence, the
   EBD values may be taken as guidelines only.
   Traction Installation;
8) OHE certificate is issued by Headquarters Electrical Engineering department vide letter
   No.220/JSC/CW/Vol-111 dated 16.11.2,022. Further vide letter No. E.220/JSC/CW/Vol.I~I dated
   16.11.2022 para-wise compliance furnished to paras of Traction installation portion of
   RDSO's speed certificate & Railway Board's sanction shall be strictly adhered to.
9) Restrictions as per OHE certificate incorporated in Annexure-Bare to be observed.
    Romn~: stock:
10)Irack Worthiness & Safety Certificate: Track Worthiness & Safety Certificate is issued by
   Headquarters Mechanical department vide letter No. M.95/GM sanction/7 LHB Vari~nts dated
   16.11.2022 duly ensuring proper maintenance and safety of the Rolling stock.
11) Brakes of the rolling stock shall be in good working order during the oper tion.
                  ~             ,_'1--
               ~·''. "VV
 Principal Chief Mechanical Engineer
           ~·                                                                  /?~l
            ~                                  · ~~?0~                        ~
 Principal Chief Electrical Engineer     Principal Chief Operations Manager   Principal Chief Engineer
                                                                                                Page 3 ofJ    l'>f>
                                       South Central Railway
                                  Joint Safety Certificate No. M/C-049
12)1n case air spring gets deflated, the speed shall be limited to 60 kmph. Failure Indication cum
   Brake Application (FIBA) device shall be provided in pneumatic circuit of Air Spring and Air
   Brake.
13)Instructions in regard to functioning of WSP at the starting station and en-route working is
   advised by RDSO vide letter No. MC/LHB/Brake dated 25.04.2016 shall be followed.
14)Earthing in the coach body and all the panels shall always be properly maintained.
15) In case of enroute breakage of primary coil spring, action as per instructions contained in
    RDSO letter No. SV.FIAT Spring dated 18.08.2022 shall be taken.
   General;
16)All other conditions laid down in RDSO Speed certificates & Railway Board sanctions shall be
   strictly adhered to.
   Encl: Annexure- A (4 sheets) & Annexure- B (t.sheet)
                                ")..-'1---
                 ~-yc>
                ~ - ''r                                                                    \?\1\l~
 Principal Chief Mechanical Engineer                                Principal Ch   igna & Telecom Engineer
         cbi
        · ~
             ·                                                                         ~LL
  Principal   :.:e~~~Engineer                Principal Chief Operations Manager    Principal Chief Engineer
                                                                                                 Page 4 ofS   ~I.\
                                                                              Annexure -A sheet 1 of 4
                                        South Central RaHway
                           Enclosure to Joint Safety Certificate No. M/C-049
 Annexure showing the Division-wise sections and speeds proposed for running of LHB EOG Coaches
 LWLRRM(LWLRRM2), LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and
 LWFAC(LWFAC2) over BG sections of South Central Railway.
                                   SECUNDERABAD DIVISION
   Sl. No.   Section                                    From Km              ToKm          Max. Speed
                                                                                             Kmph
     1       Balharshah (Excl)- Kazipet (UP,DN& UD lines)
             (old UP & DN lines over which COCR was                                                       •
                                                                135.00       366.86              130
             conducted, presently covering UP,DN& UD lines
             only)
     2       Kazipet -Kondapalli (UP&DN)
                                                                366.86       569.01              130
             (Incl. Bye pass line at Kazipet Jn.) .
     3       Secunderabad - Kazipet (UP & ON)                   194.36       324.89              130
             Manikgarh- Wirur(3rd Line)                         141.91       159.84              110
             Mandamarri- Manchiryal (3rd Line)                  250.25       260.54              110
             Manchiryal - Peddampet (3rd Line}                  260.54       269.69              100
             Peddampet -Raghavapuram (3rd Line)                 269.69      283.997              110
     4
             Raghavapuram- Kolanur -Potkapalli(3rd Line)       283.997       314.22              90
             Bisugirsharif- Uppal (3rd Line)                    324.64       342.97              100
             Cheruvumadhavaram (Excl.) -Kondapalli(3rd
                                                               562.585      569.010               75
             Line)
     5       Secunderabad - Lallaguda (3rd Line)               194.36        196.57               50
             Wadi (Excl.)-Hyderabad- Secunderabad
     6                                                           3.00        194.36             110*
             (UP&DN)(Incl. Chord line at Hussainsagar Jn.)
     7       Moula Ali 'C' -Ghatkesar(MMTS UP & DN lines)      202.09        213.84             100
             Peddapalli- Karimnagar (SL)                         0.00        34.925             100
     8       Karimnagar· -Lingampetfagityal (SL)               34.925        82.75               90
             Lingampet-Jagityal- Nizamabad (SL)                 82.75       177.794             100*
     9       Tela pur- Ramachandrapuram                          0.00         5.337              70
             Dornakal- Manuguru (SL)
     10      (Incl. Bye pass line at                            0.00         103.69             100
             Dornakal Jn. & at Bhadrachalam Road)
     11      Khanapur Jn. - Taj Sultanpur (Excl.) (SL)            0           97.7              100
     12      Vikarabad- ParliVaijnath (SL)                      0.00         267.77             100
  *Speed restrictions as per Annexure-B
  Note: In case air spring gets deflated, the speed shall be limited-to 60 kmph. Failure Indication cum
        Break Application (FIBA) device shall be provided in pneumatic circuit of Air Spring and Air
        Brake.
             ~-v> -v l-
                 \ 1• ,,                                                               \'?\ I\ '(Viii"'
Principal Chief Mechanical Engineer                           Principal Chief Signal & Telecom Engineer
                                                                                  ~~tl..
                                                                                  ~~
                                      Principal Chief Operations Manager       Principal Chief Engineer
                                                                                                   Page 5 of9      1,
                                                                                     Annexure - A sheet 2 of 4
                                              South Central Railway
                                Enclosure to Joint Safety Certificate No. M/C-049
 Annexure showing the Division-wise sections and speeds proposed for running of LHB EOG Coaches
 LWLRRM(LWLRRM2), LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and
 LWFAC(LWFAC2) over BG sections of South Central Railway.
                                                    GUNTAKAL DIVISION
  Sl. No.     Section                                          From Km     ToKm           Max. Speed Kmph
      1       Wadi (Excl.) - Gooty (UP&DN)                        669.50    414.51                 130
      2       Gooty- Renigunta (UP&DN)                            414.51    133.56                 130
              Dharmavaram- Chigicherla (SL)                       177.00    189.86                 110
              Chigicherla - Taticherla (UP & ON)                  189.86    219.46                 110
              Taticherla - Garladinne (UP)                        219.46    228.46                  90
     3        Taticherla- Garladinne (DN)                         219.46    228.46                 110
              Garladinne - Kalluru (UP&DN)                        228.46    239.54                 110
              Kalluru - Gooty (UP)                                239.54    269.04                100*
              Kalluru - Gooty (DN)                                239.54    269.04                 110
     4        Nandyal- Dhone (SL)                                 256.98    332.74                 110
              Dhone- Pendekallu (UP&DN)                           297.12    323.01                 100
              Pendekallu- Maddikera (UP)                          323.01    353.96                 100
     5
              Pendekallu - Maddikera (DN)                         323.01    353.96                  90
              Maddikera -Guntakal (SL)                            353.96    365.66                 100
              Bellary (Excl.)- Guntakal (UP&DN)                   212.00    258.20                 110
     6
              (Incl. Bye pass line at Guntakal Jn.)
              Gudur-Renigunta(Excl. RU Yard) (UP&DN)               0.00      80.00                110
     7
              Renigunta(Incl. RU Yard)-Tirupati (UP&DN)           80.00    . 92.96                100
    8         Katpadi (Excl.) - Tirupati (SL)                      0.85     104.39                110
    9         Gooty- Pendekallu (SL)                               0.00     29.275                110
    10        Kalluru -Guntakal (UP&DN)                           239.54    279.80                110
    11        Dharmavaram- Pakala(SL)                              0.00     227.42                100
    12        NandyalQunction cabin)- Yerraguntla (SL)            2.324     123.00                100
    13        Kadapa-Pendlimarri(SL)                               0.00      21.30                40
                                                     NANDED DIVISION
     1        Ankai (Excl)- Parbhani (SL)                        16.00     290.44                 100
     2        Parbhani-Pumaln-Mudkhed (UP & ON)                 290.44     371.87                 100
     3        Mudkhed- Kinwat (SL)                                 0       116.774                100
              Kinwat- Adilabad (SL)                            116.774     161.95                 90
     4        Adilabad- Pimpalkutty (SL)                        161.95     181.975                50
     5        Puma-Akola (SLJ                                  950.40      743.52                 100
     6        Akola- Akot (SL)                                .742.079     697.71                 60
     7        ParliVaijnath -Parbhani (SL)                      267.77     331.38                 100
  *Speed restrictions as per Annexur:e-B
  Note: In case air spring gets deflated, the speed shall be limited to 60Kmph. This has to be manually
        implemented by the loco pilot. Suitable mechanism shall be in place for indication of deflated
            spring to loco pilot.                                                    ~
                  ~             ,.....1--                                            .J
                 ~· ,,."J-.0                                                                    \1\1\\~
Principal Chief Mechanical Engineer                                  Principal Chief Signal & Telecom Engineer
                                                                                          ~tL
                                            Principal Chief Operations Manager            Princi~Jchtef Engineer
                                                                                               Page 6 of~
                                                                                    Annexure -A sheet 3 of 4    ""lt
                                          South Central Railway
                            Enclosure to Joint Safety Certificate No. M/C-049
Annexure showing the ·Division-wise sections and speeds proposed for running of LHB EOG Coaches
LWLRRM(LWLRRM2), LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and
LWFAC(LWFAC2) over BG sections of South Central Railway. ·
                                               VIJAYAWADA DIVISION
 SI.No   Section                                                From Km       ToKm       Max. Speed Kmph
   1     Kondapalli- Vijayawada (UP&ON)                         569.01        586.50               130
   2     Gudur-Vijayawada (UP&ON) '                             134.30      "428.76                130
         (Incl. Krishna Canal- Vijayawada (3rd Line)
     3   Kondapalli- New West Block Hut (3rd Line)             569.010       579.308               90
         Talamanchi- Ulavapadu (3rd Line)                       190.44       252.88                110
     4
         Nellore- Talamanchi (3rd Line)                         174.36       190.44                90
     5   Vijayawada-Ouvvada (Excl.) (UP&ON)                     428.76       759.70               110
         Samalkot- Kakinada Port (UP& ON)                        0.00         15.60               110
     6
         (Incl. Bye pass line at Samalkot )n.)
     7   Vijayawada- Aravalli (UP, ON & SL)                        0         120.45               100*
         Aravalli - Kaldhari (ON)                               120.45       148.37               100 .
     8   Kaldhari- Nidadavolu (ON)                              148.37       154.75                90
         Aravalli - Nidadavolu (UP)                             120.45       154.75                90
     9   Gudivada-Machilipatnam (UP & ON)                        0.00         36.74               100
         Bhimavaram - Narsapur (UP)                              0.00         29.48               90*
    10
         Bhimavaram - Narsapur (ON)                              0.00         29.48             . 100
    11   Kakinada- Kotipalli (SL)                                0.00        30.056                50
                                  -do-                          30.056       44.709                40
                                                 GUNTUR DIVISION
     1   Pagidipalli- Nadikude (SL)                              4.02        152.69               110
     2   Nallapadu -Nadikude (SL)                                5.00         95.25               110
         Nallapadu-Satulur (UP & ON)                             5.00         34.29               110
         Satulur- Gundlakamma (SL)                              34.29         95.85               110
         Gundlakamma- Gajjelakonda_(UP & ONj                    95.85        130.78               110
     3
         Gajjelakonda - Tarlupadu (UP)                          130.78       156.44               110
         Gajjelakonda - Tarlupadu (ON)                          130.78       156.44                90
         Tarlupadu- Nandyal (SL)                                156.44       256.98               110
     4   Guntur- Krishna Canal (UP&ON)                           0.00         27.12               110
         Tenali-Guntur (UP&ON)               ·
     5                                                           0.00         25.47               110
         (Incl. Bve pass line at Guntur Jn.)
     6   Guntur- Nallapadu (UP)                                  0.00          5.00               100
     7   Guntur.: Nallapadu (ON)                               . 0.00          5.00                60
     8   Tenali-Repalle  (SL)                                    0.00         33.85                90
     9   Nandyal- Nandyal (Junction cabin) (SL)                  0.00         2.324                50
    10   New Piduguralla )n.- Savalyapuram (SL)                  5.15           51                 80
    11   Nadikude-Macherla (SL)                                 95.25        130.26                80
  • Speed restrictions as per Annexure-B
  Note: In case air spring gets deflated, the speed shall be limited to 60Kmph. This has to be manually
        implemented by the loco pilot. Suitable mechanism shall be in place for indication of deflated spring
        to loco pilot.
               ~'}P'V~
Principal Chief Mechanical Engineer                               Principal Chief
                    I
Principal Chief Electri                 Principal Chief Operations Manager
                                                                                       ~~
                                                                                    Principal Chief Engineer
                                                                                           Page 7 of{ 'l\
                                                                              Annexure -A sheet 4 of 4
                                        South Central Railway
                            Enclosure to Joint Safety Certificate No. M/C-049
Annexure showing the Division-wise sections and speeds proposed for running of LHB ·EOG Coaches
LWLRRM(LWLRRM2), LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and
LWFAC(LWFAC2) over BG sections of South Central Railway.
                                          HYDERABAD DIVISION
  Sl. No.   Section                                     From Km         ToKm      Max. Speed Kmph
      1     Mudkhed- M·edchal (SL)                      371.870        592.93            110
      2     Medchal - Bolarum (UP & ON)                 592.930        606.80            100
      3     Secunderabad-Falaknuma (UP&DN)                 0.00         14.54             80
            Falaknuma (Excl) - Shadnagar (DN)             14.54         59.06            100
            Shadnagar- Gollapalli (DN)                    59.06         87.82            110
     4
            Gollapalli- Mahabubnagar (DN)                 87.82        112.98             90
            Mahabubnagar-Dhone(SL)                       112.98        297.12            110
     5      Malkajgiri- Moula Ali Chord Line (SL)          0.00          4.90             30
            Raichur- Pandurangaswamy RoadlSL)              0.00         29.89            75*
     6
            Pandurangaswamy Road- GadwallSL)_             29.89         57.16            100
            Devarakadra-Jaklair(SL)                      65.825        37.480             75
     7      Jaklair- Makthal(SL)                          37.48        26.003             60
            Makthal- Maganur(SL)                         26.003        12.698             70
    8       Manoharabad - Gajwel - Kodakondla (SL)_        0.00         43.32            60
     9      Akanapet- Medak (SL)                             0         17.338            70
    10      Bolarum -Secunderabad (UP&DN)                606.80        620.65            90
    11      Falaknuma_(Excl)- Mahabubnagar (UP)           14.54        112.98            105
    12      Chord line bet. Sitafalmandi 'A' Cabin on
            Secunderabad- Dhone section and
                                                        0.62673        1.3662              30
            Sitafalmandi 'B' Cabin on Secunderabad -
            Mudkhed section
            Bye-Pass line towards Mudkhed i.e.,
    13      Dayanandnagar Bye-Pass Line connecting        0.000         0.610              15
            MLY-MJF Chord Line to SC-MUE Main Line
    14      Jankampet-Bodhan(SL)                           0.00         20.05              75
  *Speed restrictions as per Annexure-B
  Note: In case air spring gets deflated, the speed shall be limited to 60Kmph. This has to be manually
        implemented by the loco pilot Suitable mechanism shall be in place for indication of deflated
        spring to loco pilot.
                                                              Principal Chi
                 1'6 ll11L-
Principal Chief Electrical ~ngineer   Principal Chief Operations Manager
                                                                                     ~L
                                                                                Principal Chief Engineer
                                                                                                             Page 8 of~
                                                                                               Annexure - 8 sheet 1 of2.. ~y.'O
                                             South Central Railway
                              Enclosure to Joint Safety Certificate No. M/C-049
 Annexure showing the Division-wise sections and PSRs proposed for running of LHB EOG Coaches
 LWLRRM(LWLRRM2), LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and LWFAC(LWFAC2)
 over BG sections of South Central Railway.
                                           SECUNDERABAD DIVISION
  * PSR on Nlzamabad - Llngampet-)agityal section (UP& DN direction)
    1    Near NZB Yard I    176/8 - 177/3              I        80         I Due to sharp curve of 2.5o
  *Speed Restrlctlonson 52 Kg (72 UTS) Rall
   Sl. No.     Section                                  From Km                   ToKm              SRlnKmph
               Wadi (Excl.)-Hyderabad- Secunderabad (UP) 122.64                   122.85               105
                                                         160.08                   161.63               105
     1
            Wadi (Excl.)-Hyderabad- Secunderabad (ON)      8.94                     9.68               105
                                                          15.65                    15.93               105
                                           VIIAYAWADA DIVISION
  *PSRs-BZA-UPL (UP line)
  S.No.    Stations between      KM from - Km To      SR(Kmph)                                 Remarks
    1          BZA-RMV                2/45-2/9            50                      Due to 5.81 degree sharp curve.
    2          BZA-RMV .             4/13-2/55            70                      Due to 4.50 dE!g!"_ee sharp curve.
    3          BZA-RMV               4/51-4/17            90                      Due to 3.00 dE!g!"_ee sharp curve.
    4          BZA-RMV                5/23-5/9            70                      Due to 4.63 dE!g!"_ee sharp curve.
    5          RMV-NDM              9/43-9/27             90                      Due to 2.50 d~ree sharp curve.
    6          UPL-NDM             14/03-13/25            75                      Due to 3.50 dE!g!"_ee sharp curve.
    7          UPL-NDM              16j_9-15/27           75                      Due to 3.75 degree sharp curve.
  *PSRs-BVRT-AVLI (UP line)
    1.                          109/100 107_1900          75                           2.06 degree sharp curve
             Byepass near
    2.                          107/900 107/400           50                           5.90 degree·sharp curve
                 BVRM
    3.                          107/200      107/0 .      75                      P&Crossin_g_s on 2.75 degree curve.
  *PSRs-BVRT-AVLI· Diversion ofExg line
    1.                          106}900 107_1300          75                           2.75 degree sharp curve
    2.       Byepass near       107/400 107/900           50                           5.90 degree sharp curve
    3.    •      BVRM
                                107/900 109/100           75
                                                                                     P&Crossings on 2.047 degree
                                                                                               curve.
  *PSRs-BVRM-NS (UP line)
                                                                                 Series of reverse curves in BVRM
     1.          BVRMYard              0/500       0/800             30
                                                                                 yard
     2.           NSYARD               29/2A
                                           29/42       15                        Terminal station UP direction only
                                         HYDERABAD DIVISION
  * PSR on RC-PASR (SL) section (UP & DN direction)
     1       I RC-PASR           I          4.80-5.70   I       70             j Due to 4° curve
                                                   GUNTAKAL DIVISION
  *PSR on Kalluru - Gooty (UP line)
   S.No.    Block Section        Location                              Reason                        SR (Kmph)
     1        TKPY-GY          265/25-266/l                       3.5 degree curve                       60
     2        TKPY-GY            266/7-45                  6 degree approach curve to GY                 30
                                                                      junction.
                                     '1--
                 ~-z...D.,_
               ~. \1 -
Prlnclpal Chief Mechanical Engineer                                       Principal Ch
                                                      ~*..,~~                                   ~ ~lt.
                                                                                                ~vl
Principal Chief Electrical Engineer            Principal Chief Operations Manager            Principal    ~hlef Engineer
                                                                                                  Page 9 of9   ,:.,...
                                                                                    Annexure - B sheet1of2..   '() '
                                         South Central Railway
                            Enclosure to Joint Safety Certificate No. M/C-049
Annexure showing the Division-wise sections and PSRs proposed for running of LHB EOG Coaches
LWLRRM(LWLRRM2), LWCBAC(LWCBAC2), LWACCN(LWACCN2), LWACCW (LWACCW2) and LWFAC(LWFAC2)
over BG sections of South Central Railway.
Restrictions as per OHE certificate Issued by HQrs. Electrical Department;
 S.No.   Station                                From Loc.                ToLoc.        Remarks
                                        SECUNDERABAD DIVISION
   1     Bhalki-Kalgupur                          130/1                  130/2         90 kmph due to
   2     Kalgupur-Kamal nagar                    151/16                  151/17        TramwayOHE
                                          GUNTAKAL DIVISION
   1     Chittoor Stn. Rd-2 M/L                   32/5                  32/31          90 kmph due to
   2     Chittoor Stn. Rd-3                       32/3                 CT0/2019        TramwayOHE
   3     Chittoor Stn. Rd-4                       32/7                  33/12
                                         VIJAYAWADA DIVISION
   1     NDDyard                                    554/4               554/10         SR of 120 kmph
   2     KYM-DWP                                    593/28              593/32         due to curve in
   3     MPU-SLO                                     626/6              626/26         section
   4     SLO-PAP                                    637/32              638/10         (Temporary,
   5     SLO-PAP                                    632/10              632/30         shall be removed
   6     BVM-AKP                                    741/32               742/2         after attention of
                                                                                       OHE mast with
                                                       ,                               less
                                                                                       implantation      in
                                                                                       the ·
                                                                                       curve)
                                                                                        \1\ '"\J'fVEngineer
                                                                Principal Chief Signal & Telecom
                                       Principal Chief Operations Manager
                                                                                  ~btL
                                                                                  Principal Chief Engineer