TP for Piping installation
Owmmres Oatecat Omeciie | marin
a—s
—
MABDKOUR
Inspection and Test Plan
(Piping Installation)
®
Tnspecton Coder I MadkarOS % Consakant 3 OWNER 4: CLIENTREP HORA]
11 Wok Pont W:Wiines ——— NEMonitor |
Item | Activity 7 ] Characteristic | Reference | Verifying | Device/toois | Freq. Inspection
| toheVerfed | Document | GrncrirYaterance | yea Eira
| | pot)
Ti Dosanataton — |
TI | Check Document [Technical Verify the useoflatest | Approved | NA] Priore THE TR
drawings(PID/GA/ISO) Specification | rev Document start |
for laew revit 2 drawings __| sebmie he
TS | Mosel tes [Document [Technical [Review MITC or Approved TNA Hees
certfotes fr raw Specification | conformity asperthe | Deemer | man
‘material are revised in & ASME II | project specification | Submittal | work
valince pre Parts |aedappbannente
|__| project specifications oe - | :
13] Revlon Por Document | Technical} ASME MIPARTC approved | NCA Faro
|" | Consumaties Speciation Document mn
Corientes 2 ASME Submitial ot
__|Parre
[Ta Reviewing Tr Document Technical | Callraton Confers | Approved} NCA Frio
machines ealiration Speciation Document sare
varios Calibration Submit work
Cereus |
[15 | Rpprval of WPS Document Technical’ RT epor And DT —taproved
| POR Specification | report Document
a ASME Subs |
E - _|seen |
MDG-QC-DPo1-FMO4
Rev.00—_
SS
MWARDKOUF
Inspection and Test Plan
(Piping Installation)
1 Madkour@@) 3 Consuliant __3_ OWNER 4; CLIENT REP (HORAS)
—WiWitness RiReview fonitor qf
| Eharateistic [Reference [Ascepianee | Vevifping] Devicefook Freq Taspection |
tobe Verified | Document | Criteria/Tolerance Document Code |
172] 374]
13] Approval of | Document [Technical | Verify competent Approved | NA | Priorto [HR [WIR
technicians | Specification | technicians for Document | start
qualification & ASME | prefabrication process | Submittal work |
certificates, SEC IX AND Qual. |
fe : _ Certificates 7
1.6 | Approval of Method | Document Technical | Verify proper | Approved NA | Prior to
statement Specification | sequance of works are | Document | start
im accordance with | Submittal work |
approved method |
= L |
2.0 Fabrication and Testing
2.1 ] Visual inspection for “| -workability | Technical] VT Procedure [Test R)
CS pipes and fittings ( Specification Report
_| Raw Material) -
2.2 | Check cutting list for [workability | Technical | Approval Drawing Test R
the pipe length Specification
DG-QC-DPO1-FMO4 Rev.00—
>a
WABKOUF
Inspection and Test Plan
control sheet signed
(Qc-DP01-FMoa
(Piping Installation)
Inspestion Code: I: Madkour(@.O) 2: Consult 3: OWNER 4: CLIENT REPGHORAS)
H: Hold Point “W:Witness RReview = jonitor |
item | Activity | Characteristic | Reference | Acceptance Verifying | Deviceltools | Freq. Inspection —
L 172 [3]4
|23° [Check all parameters |workability | Technical | WPS & V¥ Procedure {Tea Stander H/R WR
| | for the fite-up (surface Specification Report | machines
preparation, chamfer,
HL, ) |
| |
|
|
24 | Apply a Welding workability Technical WPS & VT Procedure | Test ‘Stander H/R |W E
| procedure ___| Specification Report__| machines
2.5” | Pipe spools are ‘workability Technical WPS & VT Procedure | Test Stander H/R |W R]
fabricated and spool Specification Report | machines
Control sheet signed =
2.6 | Pipe supports workability | Technical | WPS & VT Procedure | Test Stander H/R |W ©
fabrication have been Specification Report machines |
|__| inspected and released |
2.7 | Pipe supporshave | workability | Technical | WPS & V¥ Procedure 1 Tex Stander HR [WR
been installed and Specification Report | machines
|__| accepted
2.8 | Pipe spools have been Technical | WPS & VT Procedurs
field welded and spool Specification Rhpor
Rev.00l
WABRKOUR
Inspection and Test Plan
(Piping Installation)
=e 1: Madkour(Q.©) — 2: Consulant __3: OWNER 4; CLIENT REP (HORAS)
WiWitness RiReview M:Monitor |
| Heem | Activity : Characteristic | Reference | Acceptance Verifying | Deviceliook | Freq. | Inspection
| fobe Verified | Document | Criteria/Tolersnee Document
| 7
2.9 | Apply NDT procedure | workability Technical UT Procedure ‘| Test Stander
| for Burt weld Specification Report | machines
(ultrasonic test) & ASME
| . [seve ft |
2.10/ Apply NDT procedure | workability | Technical | PT Procedure Test Stander
|| for Fillet weld (guid Specification Report | machines
|| penetrant test ) & ASME
_|secv
[R17 [Appi painting workabiliy | Technical | Painting Procedure Tea Siander
procedure Specification Report | machines
[2.12 | Pipe installation is workability ‘Technical ‘Check punich list Test Stander
complete and released Specification Report machines
forhydrotesting ——_| ae ale -
Hydrostatic testing | workability | Technical | Hydrostatic test Test | Stander
Specification | procedure Report machines
L —_— _t —
Inspection Code: 2.
H: HOLD POINT Official notification and next step will not proceed tll the satisTato
W: WITNESS Official notification and next step will proceed automlically
R: REVIEW Review of submitted Documents/Reportcertificate
M: MONITOR NO Official notification Required and next step will proceed automatically
MDG-Qc-DPO1-FMO4 4/4 Rev.00