0% found this document useful (0 votes)
27 views5 pages

ITP

Inspection test plan for piping

Uploaded by

kokod9757
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
27 views5 pages

ITP

Inspection test plan for piping

Uploaded by

kokod9757
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
TP for Piping installation Owmmres Oatecat Omeciie | marin a —s — MABDKOUR Inspection and Test Plan (Piping Installation) ® Tnspecton Coder I MadkarOS % Consakant 3 OWNER 4: CLIENTREP HORA] 11 Wok Pont W:Wiines ——— NEMonitor | Item | Activity 7 ] Characteristic | Reference | Verifying | Device/toois | Freq. Inspection | toheVerfed | Document | GrncrirYaterance | yea Eira | | pot) Ti Dosanataton — | TI | Check Document [Technical Verify the useoflatest | Approved | NA] Priore THE TR drawings(PID/GA/ISO) Specification | rev Document start | for laew revit 2 drawings __| sebmie he TS | Mosel tes [Document [Technical [Review MITC or Approved TNA Hees certfotes fr raw Specification | conformity asperthe | Deemer | man ‘material are revised in & ASME II | project specification | Submittal | work valince pre Parts |aedappbannente |__| project specifications oe - | : 13] Revlon Por Document | Technical} ASME MIPARTC approved | NCA Faro |" | Consumaties Speciation Document mn Corientes 2 ASME Submitial ot __|Parre [Ta Reviewing Tr Document Technical | Callraton Confers | Approved} NCA Frio machines ealiration Speciation Document sare varios Calibration Submit work Cereus | [15 | Rpprval of WPS Document Technical’ RT epor And DT —taproved | POR Specification | report Document a ASME Subs | E - _|seen | MDG-QC-DPo1-FMO4 Rev.00 —_ SS MWARDKOUF Inspection and Test Plan (Piping Installation) 1 Madkour@@) 3 Consuliant __3_ OWNER 4; CLIENT REP (HORAS) —WiWitness RiReview fonitor qf | Eharateistic [Reference [Ascepianee | Vevifping] Devicefook Freq Taspection | tobe Verified | Document | Criteria/Tolerance Document Code | 172] 374] 13] Approval of | Document [Technical | Verify competent Approved | NA | Priorto [HR [WIR technicians | Specification | technicians for Document | start qualification & ASME | prefabrication process | Submittal work | certificates, SEC IX AND Qual. | fe : _ Certificates 7 1.6 | Approval of Method | Document Technical | Verify proper | Approved NA | Prior to statement Specification | sequance of works are | Document | start im accordance with | Submittal work | approved method | = L | 2.0 Fabrication and Testing 2.1 ] Visual inspection for “| -workability | Technical] VT Procedure [Test R) CS pipes and fittings ( Specification Report _| Raw Material) - 2.2 | Check cutting list for [workability | Technical | Approval Drawing Test R the pipe length Specification DG-QC-DPO1-FMO4 Rev.00 — >a WABKOUF Inspection and Test Plan control sheet signed (Qc-DP01-FMoa (Piping Installation) Inspestion Code: I: Madkour(@.O) 2: Consult 3: OWNER 4: CLIENT REPGHORAS) H: Hold Point “W:Witness RReview = jonitor | item | Activity | Characteristic | Reference | Acceptance Verifying | Deviceltools | Freq. Inspection — L 172 [3]4 |23° [Check all parameters |workability | Technical | WPS & V¥ Procedure {Tea Stander H/R WR | | for the fite-up (surface Specification Report | machines preparation, chamfer, HL, ) | | | | | 24 | Apply a Welding workability Technical WPS & VT Procedure | Test ‘Stander H/R |W E | procedure ___| Specification Report__| machines 2.5” | Pipe spools are ‘workability Technical WPS & VT Procedure | Test Stander H/R |W R] fabricated and spool Specification Report | machines Control sheet signed = 2.6 | Pipe supports workability | Technical | WPS & VT Procedure | Test Stander H/R |W © fabrication have been Specification Report machines | |__| inspected and released | 2.7 | Pipe supporshave | workability | Technical | WPS & V¥ Procedure 1 Tex Stander HR [WR been installed and Specification Report | machines |__| accepted 2.8 | Pipe spools have been Technical | WPS & VT Procedurs field welded and spool Specification Rhpor Rev.00 l WABRKOUR Inspection and Test Plan (Piping Installation) =e 1: Madkour(Q.©) — 2: Consulant __3: OWNER 4; CLIENT REP (HORAS) WiWitness RiReview M:Monitor | | Heem | Activity : Characteristic | Reference | Acceptance Verifying | Deviceliook | Freq. | Inspection | fobe Verified | Document | Criteria/Tolersnee Document | 7 2.9 | Apply NDT procedure | workability Technical UT Procedure ‘| Test Stander | for Burt weld Specification Report | machines (ultrasonic test) & ASME | . [seve ft | 2.10/ Apply NDT procedure | workability | Technical | PT Procedure Test Stander || for Fillet weld (guid Specification Report | machines || penetrant test ) & ASME _|secv [R17 [Appi painting workabiliy | Technical | Painting Procedure Tea Siander procedure Specification Report | machines [2.12 | Pipe installation is workability ‘Technical ‘Check punich list Test Stander complete and released Specification Report machines forhydrotesting ——_| ae ale - Hydrostatic testing | workability | Technical | Hydrostatic test Test | Stander Specification | procedure Report machines L —_— _t — Inspection Code: 2. H: HOLD POINT Official notification and next step will not proceed tll the satisTato W: WITNESS Official notification and next step will proceed automlically R: REVIEW Review of submitted Documents/Reportcertificate M: MONITOR NO Official notification Required and next step will proceed automatically MDG-Qc-DPO1-FMO4 4/4 Rev.00

You might also like