The document outlines the method statement for site set-out and mark-up at the PSK Camp-KOREK Tower project, including installing antennas, steelwork, ethernet cables, and fall protection measures using ropes and pulleys at heights of up to 35 meters by certified riggers. Emergency procedures and first aid facilities are also specified.

Uploaded by

Abdullah Dhia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views3 pages

PL in DNO

The document outlines the method statement for site set-out and mark-up at the PSK Camp-KOREK Tower project, including installing antennas, steelwork, ethernet cables, and fall protection measures using ropes and pulleys at heights of up to 35 meters by certified riggers. Emergency procedures and first aid facilities are also specified.

Uploaded by

Abdullah Dhia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

DNO

Ref No.: P-WMS-034


Method Statement

Description of the
Task/Activity:
Site Set-Out and Mark-up

Project Name: PSK SCADA/DAS Project Ref:

Start Date/Time: 30 -10-22


Site Address/ Location: PSK Camp – KOREK Tower
Finish Date/Time: 05-11-22
Name Role/Trade
Mazin Wajdi Rigger
Kaveh Alireza Rigging Supervisor
Murtadha faraj Rigger
Abdullah Dhyaa Fibre Supervisor
Personnel involved: Dilkhaz Haji HSE Advisor

Works Supervisor: Abdullah Dhyaa Role: Porject Lead Tel: 0780 4050004

Key Plant and Tools Full PPE, Full Body Harness, Double Lanyard.
Required:

Key Materials Required: N/A


(ie: access platforms/winches/ladders etc)
Other Essential
Equipment: Rescue Kit

Specific Identified 1) Failing.


Residual Hazards: 2) Tripping.
(or refer to the task specific
risk assessment(s))
(ie: Confined Spaces/Abrasive Wheels/Working at Height/Plant Operators etc)
Specific Staff
Training 1) Individual is Advanced Climber and Irata Level 1,2,3 Trained.
Requirements:

Page 1 of 3

Downloaded from http://www.tidyforms.com


1. Ensure all tools/test equipment/materials/personnel are ready and
available at site.
2. Open PTW.
3. Toolbox Talk along with the team, area authority
4. Create a safe zone around the tower for Rigging Installation with
barriers rope.
5. Check the claiming harness and lanyards to ensure no damage.
6. Step 1: this is for installation of 3 x rocket prism- section Air at height
of 35 meters. Azimuth of 120°,240°, 360° respectively also installation
Sequence of of 3 x cat 6e Ethernet cable using exit cable management cable.
Operations: installation of steelwork. sendup Antennas (3 rigger IRAKA 1,2,3
(Specifying methods of working,
tools, materials and equipment certified).
utilised) 7. Step 2; this installation will be completed by use of roped pulley
system. All certified.
8. Step 3: install the steelwork at designed locations. with Roped pulley
system.
9. Step 4: install Air x 3 at designed location with rope pulley system.
10. Step 5: install 3 x Ethernet Cat 6e cable from Antenna location to RBS
2202 Via cable clamps.
11. Step 6: Coil up 7-10m at RBS to be connected at lakes dake by DNO
12. Site clean up
13. Demobilize and close PTW.
(If none, state none.)
Temporary Supports
and Props needed to 1) Rope and pulley can be used for lifting Antenna to proposed location for install.
facilitate the works:
(ie: Ladders/MEWPS/Scaffold/Trestles/Step Ladder etc)
Method of Access
and Egress to the 1) Climb the Korek tower
work area:

Fall Protection (ie: Guard Rails/Toe Boards/Brick Guards/Safety Harnesses/Exclusion Zones etc)

Measures:
(Where work at height cannot be
1) Full body harness and Double Lanyards
eliminated - consider both
Personnel & Materials)
(ie: Lubricants/Solvents/Flammable Materials/Refrigerants/Welding Gases etc)

Hazardous Substances:
(Attach COSHH Assessments and
MSDS) Dangerous for
Harmful/ the Highly
Very Toxic Irritant Corrosive environment Oxidising flammable Explosive
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Applicable:
(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements of the structure
where work is taking place.)
SWL's:

Page 2 of 3
Other:
1. Hi-Viz
2. Coveralls
Required Personnel 3. Full Body
4.Harness. 5.Double
Protective Equip.:
Safety Safety Hearing Respiratory Eye Lanyards.
Boots Hard Hats Gloves Protection Protection Protection
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No

Call the CCR and Project Construction manager in Case of Emergency


Emergency Procedures:
PSK Emergency Number +964 751 7452091

Name of On-Site First Aider: List of First Aiders on ERT

First Aid First Aid Box Location: Vehicle


Facilities:
Location of Nearest Hospital: Zakho

Other Information &


Comments:

Page 3 of 3