PTW Risk Assessment
It is important to monitor risk controls and review risk assessments regularly. Review is required when there is a change in the process, relevant legal
changes, and where a cause for concern has arisen. Reviews could be scheduled on an annual basis. If the risk assessment has substantially changed a new
risk assessment is warranted.
Review date       23/11/2023                                             Reviewed by        NAVEEN                                    Authorized by      IFTIKHAR AHMED
 Notes: Include legal and advisory documentation that supports this risk assessment be listed. Such documentation includes Acts, Regulations, Standards, where applicable. If
 the risk assessment for an identified hazard is ranked ’Low’ but the regulatory requirements have not been complied to while establishing and/or implementing controls, the
 ranking for the assesses risk shall be considered ‘Very High’
 Risk Assessment Steps:
 Step 1: Identify Hazards Title (e.g. Physical Hazard, Fire Hazard, and Electrical Hazards).
 Step 2: List Hazards Details identified (e.g. Tripping Hazard, Flammable Materials stored,
 Working in Electrical Cabinets).
 Step 3: List Causes of Hazard (e.g.     Untidy workplace, Hot work, un-isolated electrical
 supply).
 Step 4: List Consequences of Hazard (e.g. Personnel Injury, Fire, electric shock).
 Step 5: Determine Likelihood and Consequences to People, Assets, Environment, and Reputation
 from attached Risk Assessment Matrix (Page 2) (this should be the most probable outcome
 without controls and should be listed as 2A, 3D etc.).
 Step 6. Calculate the Risk Index using the Qualitative or Semi-Quantitative Risk Assessment
 Matrix as deemed appropriate. This is a product of Likelihood and Consequence and should be                      Descriptor to assist in Qualitative Assessment of Likelihood/ Frequency of
 stated Low, Medium, High or Very High).                                                             Likelihood   Occurrence.
 Step 7. List Existing Controls. (e.g. Tidy Site Policy, Hot Work Permit, Isolation of
 Electrical Supply).
                                                                                                          A       Has occurred within port industry worldwide.
 Step 8. List Safety Critical Activities and Additional Controls that may be deemed necessary
 to reduce risk level to ALARP.
 Step 9: Recalculate Likelihood and Consequences to People, Assets, Environment, and                      B       Has occurred regionally within port industry or judged likely to have
 Reputation from attached Risk Assessment Matrix.                                                                 occurred.
 Step 10. Recalculate the Risk Index.                                                                     C       Has occurred in port industry within UAE or judged likely to have
 Step 11. If residual risk deemed to be High or Very High then risk must be reduced further                       occurred.
 before proceeding, if risk is medium then note that risk reduction must be planned, monitored            D       Has occurred in port industry within UAE on an annual basis or judged
 and documented, if risk is low then risk is acceptable without required further action.                          likely to have occurred.
                                                                                                          E       May occur in UAE port industry multiple times annually.
                           * Risk Assessment Matrix – Qualitative                                                                           LIKELIHOOD
 Consequences     P= People            A= Assets         E= Environment     R= Reputation                     A              B                  C                  D                 E
 5-               Multiple             Extensive                            International                                                                                           VERY
                                                         Massive effect
 Catastrophic     fatalities           damage                               impact                                                                                                  HIGH
                  Single fatality
 4 - Severe       or permanent         Major damage      Major effect       National impact                                                   HIGH
                  disability
                  Major injury or      Localized         Localized
 3 – Critical                                                               Considerable impact                            MEDIUM
                  health effects       effect            effect
                  Minor injury or
 2 – Marginal                          Minor effect      Minor effect       Minor impact
                  health effects
                  Slight injury or
 1 - Negligible                        Slight effect     Slight effect      Slight impact                 LOW
                  health effects
For additional information refer to HSE-COR-PRC-SYS-11 HSE Risks & Opportunities Management
     CA-HSSE-HSE-FRM-011-02 (G)
     Rev. 02/03-Jan-2022