MANAGEMENT OF CHANGE No:
PROCEDURE LEVEL 2
Date:
TITLE
Equipmen
Change Relates to Process Safeguarding New installation Organization Procedure
t
DESCRIPTION Of PROPOSED CHANGE
JUSTIFICATION: WHY IS THE CHANGE REQUIRED/BUSINESS BENEFIT:
HOW WILL THE CHANGE BE MADE/IMPLEMENTED/CONTROLLED :
Change Requested by:
Signature Date
Comments by Technical Authority
Comments by Technical Authority
Process and Method
Hardware Design
Material Selection
Legal Requirements
Relevant Drawings
Process Feasibility
Technically Approved
by : Signature Date
EHS Requirements - Attach any Supporting Documents
Risk Assesment
Yes/No
Job Hazard Analysis
Yes/No
Health/Ergonomics Risk Assesment
Yes/No
Environment Aspect Impact
Assesment Yes/No
Legal & Security Risk Assessment
Yes/No
Occupational Hygiene Surveys
Yes/No
Energy Consumption and Impact
Assessment Yes/No
Social Impact Assesment
Yes/No
Emergency and Contingency
Assesment Yes/No
Specific PPE Requirements
Yes/No
Other EHS Concerns-
EHS Approval by: Signature Date
Change Authorized by: Signature Date
Change Approved by HOD: Signature Date
Approval accepted by: Signature Date
Change Completed by: Signature Date
Change Audited/Verified by (EHS) Signature Date
Change Accepted by: Signature Date
Post-implementation EHS
approval : (If applicable) Signature Date
Documentation Update: Signature Date
Change Signed Off by : Signature Date
Post-implementation Observations
Made by : Signature Date
Post-implementation
Corrective / Mitigation measures
Made by : Signature Date
Procedure