Estimasi Biaya Pengeluaran 1(Satu) Unit Kendaraan Per Tahun
No                Description           Frekuensi / Tahun    Biaya@        Jumlah                       Keterangan
A Biaya Service Berkala Per tahun :
     1 Ganti Oli Mesin                          6            720,000       4,320,000.00
     2 Ganti Oli Persneling                     2            540,000       1,080,000.00
     3 Ganti Oli Gardan                         2            540,000       1,080,000.00
     4 Filter Solar Atas                        6            125,000         750,000.00
     5 Filter Solar Bawah                       4             50,000         200,000.00
     6 Filter Oli                               3            185,000         555,000.00
     7 Filter Udara                             1            350,000         350,000.00
     8 Ban(Luar, Dalam, Flap)                   2           50,000,000   100,000,000.00             Untuk Truk 10 Roda
                              Total                                        108,335,000
B Biaya Lain - Lain :
     1 Asuransi Kendaraan                       1           19,919,700       19,919,700
     2 Biaya Perpanjangan STNK                  1           12,903,000       12,903,000
     3 Biaya KIR                                2            1,500,000        3,000,000
                              Total                                         35,822,700
 C Biaya Driver
     1 Gaji Karyawan(4 Driver)                 48           5,000,000       240,000,000                 4Group 3Shift
     2 BPJS Kesehatan(4 Driver)                48            200,000          9,600,000               4%Xgaji karyawan
     3 BPJS Pensiun(4 Driver)                  48            100,000          4,800,000               2%Xgaji karyawan
     4 BPJS Ketenagakerjaan(4 Driver)          48            185,000          8,880,000               3.7%gaji karyawan
     5 Biaya Hadir Driver                     1056            3,000           3,168,000                  Premi Hadir
     6 Biaya Lain-Lain                          4           1,000,000         4,000,000   Fasilitas seperti seragam, tour, APD, dll
                              Total                                        270,448,000
                                                       12
                               Grand Total (A+B+C)                        414,605,700
Budget Pembelian Truck Tronton Tahun 2023 Sebesar $80,000(Delapan Puluh Ribu Dollar)
Truck Mixing Center
 Mits.Fuso/(Ex Tangki)              Tronton   1997   26   7545   Coklat Biru   Diesel
 Mits. FN517M                       Tronton   2003   20   7545   Orange        Diesel
 Mits. FN527 M2L Tronton            Tronton   2005   18   7545   Orange        Diesel
 Mits. FN 527 MS.MT T ronton        Tronton   2010   13   7545   Orange        Diesel
 M its.FN 527 M L.M T Load Bak      Tronton   2013   10   7545   Orange        Diesel
 Mits. Fuso FM 517 HL Long 4x2      Tronton   2018   5    7545   Orange        Diesel
 Mitsubishi Fuso FM517HLL K 4X2 M   Tronton   2021   2    7545   Orange        Diesel
truck           40 liter/day
FL                                            1997
                                              2003
                                              2005
                                              2010
                                              2013
                                              2018
                                              2021
7545   Coklat Biru   Diesel   B 9058 T
7545   Orange        Diesel   B 9851 D
7545   Orange        Diesel   B 9386 QN
7545   Orange        Diesel   B 9493 PDA
7545   Orange        Diesel   B 9137 PDC
7545   Orange        Diesel   B 9362 PDE
7545   Orange        Diesel   B 9977 PDE
          1 Unit Truck               Biaya          UoM
Maintenance                         108,335,000       IDR/ year
Others                               35,822,700       IDR/ year
Driver                              270,448,000       IDR/ year
Fuel                                234,486,000       IDR/ year
Depreciation expense                120,000,000       IDR/ year
Total                               769,091,700       IDR/ year
                                      2,441,561        IDR/ day
                                        813,854       IDR/ shift
Solar price                              18,610             IDR
fuel tank capacity                           200           Liter
refill frequency                              0.2    times/ day
                                               63   times/ year
purchase price of 1 unit          1,200,000,000        IDR/ unit
Economic life                         10                    year
depreciation expense                120,000,000           / year
fuel consumption ratio                2.7             Km/ Liter
fuel consumption per day               40             Liter/ day
mileage                               108                Km/day
Material handling cost/ meter             22,607        IDR/ Km
Qty oil drum                            2                    pcs
transfer frequency                   1.3333           times/day
Distance MCA-MCI                        1                    Km
Distance x frequency            1.3333333333333              km
OMH oil transfer                          30,143        IDR/ day
                                      10,851,382        IDR/year
benefit                               22,350,085      IDR/ year
investment cost                      1500000000             IDR
payback period                             67.11           year
            1 Unit FL      Biaya               UoM
Maintenance                108,335,000            / year     jam kerja driver
Others                       35,822,700           / year     istirahat
Driver                     270,448,000            / year     efektif jam kerja
Fuel                        234,486,000           / year
Depreciation expense         70,000,000        IDR/ year
Total                      719,091,700            / year
                              2,282,831            / day
                                760,944           / shift
Solar price                         18,610            IDR
fuel tank capacity                       40          Liter
refill frequency                          1    times/ day
                                        315   times/ year
purchase price of 1 unit    350,000,000         IDR/ unit
Economic life                5                       year
depreciation expense         70,000,000            / year
Qty oil drum                  2                      pcs     Qty oil drum
transfer frequency         1.3333              times/day     transfer frequency
CT transfer Drum             120                  second     CT transfer Drum
                            0.083                   hour
CT x frequency              0.111                   hour     CT x frequency
ratio                        2%                              ratio
cost transfer                    36,235         IDR/ day     cost transfer
                             11,414,154         IDR/year
   8              jam/shift
   1              jam/shift
   7              jam/shift
 0.88
 315              day/ year
    2                               pcs
1.3333                        times/day
   40                            second
 0.028                             hour
 0.037                             hour
0.012%
            268                IDR/ day
         84,549                IDR/year