The State currently has a dependable capacity for electricity of approximately 1,180 MW5
as of 2021
TADAU (SURIA)
LSS 2.0MW LEGEND NOTE
CCGT: COMBINED CYCLE GAS TURBINE
IPP FIT SESB 132kV Line 275kV Line Future OCGT: OPEN CYCLE GAS TURBINE
TADAU (LUMINA)
MFO: MEDIUM FUEL OIL
LSS 48.0MW IPP: INDEPENDENT POWER PRODUCERS
One River
RE: RENEWABLE ENERGY
Minihydro 10.98 MW
Kudat
IPP SBPC
G
CCGT Gas 100.0 MW 46.5kmMatunggong RE Pangapuyan
G Minihydro 4.5MW
IPP RPI Mengaris SESB SJ Sandakan
CCGT Gas 190.0 MW 55km G Sayap (GT Batu Sapi & GT Gantisan)
WEST Kota Belud Minihydro 1.0MW Diesel 53.4 MW
IPP RPII
RE Kadamaian
CCGT Gas 190.0 MW 76km
RE Cash Horse
Minihydro 2.0 MW
G Ranau Biomass 10.0MW
G
IPP KPSB Elopura
Sapi Nangoh Tshun Nyen
G G
CCGT Gas 285.0 W RE Mistral Engineering
Lok Kawi Kota Kinabalu Sandakan
G
45km G G
Bukit Nenas Biogas 3.5 MW
IPP SPR 31.5km
G Kolopis 255km 35.5km
CCGT Gas 100.0 MW Seguntor
G Papar Segaliud
G RE TSH Biogas
Kimanis 51km Biogas 2.7MW
Average Power Transfer = 216MW
G
68.5km 113k EAST RE QL Biogas
Beaufort Keningau m
Biogas 2.0MW
Labuan 70km
35.5km
40km Dam Road
G 5.3km
Warisan
SESB Tenom Pangi HEP
Mengalong L.Datu SESB SJ Tawau 22.0 MW
SESB SJ Patau2 Tenom Hydro 66.9 MW
90km SESB SJ Kubota 55.0 MW
CCGT/OCGT Gas
70.9 MW SESB SJ Tawau Canopy 8.6 MW
Nabawan G Kunak
Diesel
Lawas Kalumpang
50km
33km
Bombalai & Merotai G G Semporna
G
Minihydro 0.5MW Apas Tawau
Note: 5Inclusive of Federal Territory of Labuan, Dependable Capacity excludes LSS Tadau 50MW due to intermittency
Libaran (30MW), TSH Biomass (10MW), Serudong (33MW) are not included as they were only recommissioned in 2022
Source: Sabah Electricity Sdn Bhd (SESB)