MAC J Pest Management submitted their pest control treatment report for the DOLE Main Building, Annex, Executive Building, and BF Condominium for December. Low to heavy infestations of German cockroaches and mosquitoes were observed and treated. No active termite activity was found at 14 monitoring stations. Rodent traps and baits were placed strategically and rat abatement activities were performed on 5 dates in December.

Uploaded by

Karen Cano Antoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views4 pages

Dole Report 1

MAC J Pest Management submitted their pest control treatment report for the DOLE Main Building, Annex, Executive Building, and BF Condominium for December. Low to heavy infestations of German cockroaches and mosquitoes were observed and treated. No active termite activity was found at 14 monitoring stations. Rodent traps and baits were placed strategically and rat abatement activities were performed on 5 dates in December.

Uploaded by

Karen Cano Antoc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Address: 30 Sto Tomas St. Brgy Don Manuel Q.

C
T. 02 7369-3904/ Mobile No. 09055158398/09171457306
Email address: macpest@yahoo.com
Web: www.macjpest.com

December 11, 2023

DEPARTMENT OF LABOR AND EMPLOYEMENT


Muralla cor. General Luna St. San Jose Intramuros
Manila

ATTN: ENGR. RAF KEVIN FANG

Dear Sir,

We are pleased to submit our post general pest control treatment activities report
conducted in your facilities DOLE Main Building, Annex and Executive bldg. and BF
Condominium for month of December 02, 09, 16,23, & 29, 2023.

 PEST CONTROL ACTIVITIES:

DOLE MAIN BUILDING & ANNEX AND EXECUTIVE BUILDING & BF


CONDOMINIUM
 Presence of German cockroaches was observed during treatment in
following areas:
 Low infestation observed at main bldg. ground floor pantry.
 Mosquitos’ observation during treatment was noticed as follows:
 Moderate infestation at ground floor lobby and security office
due to open doors and windows.
 Heavy infestation at Main bldg. perimeter due to open area.
 Heavy infestation at annex & executive bldg ground floor and
perimeter area and pile stock on the side.
 Low infestation observed in BF Condominium.
 OTHERS
 Deployed five (5) personnel during treatment activities
assisted by authorized personnel.
 Chemical used was CYMFLEX, ATTRATHOR,OPTIGARD
ROACH GEL BAIT and KLERAT for rat bait and Bosny rat
glue for customized rat traps.
 All concern areas were intensively treated.
 MAC J Team performed manual spraying, ULV /Misting
treatment, and rodent control.

TERMITE ACTIVITY

Number of Stations December 02, REMARKS


2023

Above ground # 1 No-Active Termites Continued replenished of termite


(7th floor Comfort Room- women bait
cabinet)
Above ground # 2 No-Active Termites Continued replenished of termite
(7th floor Elevator Area) bait

Above ground # 3 No-Active Termites Continued replenished of termite


(7th floor Usec. Dominic Rubia-Tutay) bait

Above ground # 4 No-Active Termites Continued replenished of termite


(7th floor Usec. Benavidez) bait

Above ground # 5 No-Active Termites Continued replenished of termite


(6th floor Planning Division) bait

Above ground # 6 No-Active Termites Continued replenished of termite


(5th Floor DOLE Command Center) bait

Above ground # 7 No-Active Termites Continued replenished of termite


(4th floor Management Division) bait

Above Ground # 8 No-Active Termites Continued replenished of termite


(NCMB Cabinet) bait
Above Ground # 9 No-Active Termites Continued replenished of termite
(Atty. Romeo Lime) bait
Above Ground # 10 No-Active Termites Continued replenished of termite
(Glassdoor #2) bait
Above Ground # 11 No-Active Termites Continued replenished of termite
(Near fire Exit Storage) bait

Above Ground # 12 No-Active Termites Continued replenished of termite


(7th floor Conference room) bait
Above Ground # 13 No-Active Termites Continued replenished of termite
(6th floor MED Department) bait

Above Ground # 14 No-Active Termites Continued replenished of termite


(5th floor Pantry dishwashing area) bait

 All non-active termite’s stations are indication that baiting system


installed are working and effective.
 Please see attached pictures for your reference.
Rodent Control Program:
 Placed of rodent traps and rodent bait strategically were rats reported
positioned in the building. Attached rodent forms including monitoring
report form.
 Disposed klerat at Annex & executive bldg. perimeter area.

Summary of Pest Control Treatment Activities:


DATE TIME DAY REMARKS
December 02, 6:00 pm Saturday Main Bldg. –Rat Abatement & Termite
2023 Inspection
Annex & executive Bldg.- Rat
Abatement & Termite Inspection and
Bed bug treatment
BF Condominium- Rat Abatement &
Termite Inspection
December 09, 6:00 pm Saturday Main Bldg. – Pest Control & Rat
2023 Abatement
Annex & executive Bldg.- Pest Control
& Rat Abatement
BF Condominium- Pest Control &Rat
Abatement
December In progress
16,2023 - -

December 23, In progress


2023 - -
December 29, In progress
2023 - -

Thank you and Stay Safe.

Truly Yours,

KAREN C. ANTOC
Technical sales