NAIR PRANAV PRAKASH
Email: pranav.ranghat@gmail.com
Phone: +91 – 9400317798
SUMMARY
Aspiring towards assignment in pursuit of a challenging career where there are opportunities for intellectual growth,
rigorous thinking, and dynamic environment to build upon knowledge and expertise while fostering organizational and
personal growth.
SKILL SET
• Knowledge in ETAP 20.5 (load flow, short circuit, voltage drop and motor starting, relay coordination), SKM,
CEDGS for grounding study.
• Other Software –DiaLUX,
• Design calculations for electrical equipment like switchgears, transformers, cables, battery and charger, earthing
and lightning protection.
WORK EXPERIENCE
• Working as “Project Technical Engineer” in Hitachi Energy, India Operation Centre, Chennai from May 2022 to till
date.
▪ Detailed design engineering for HVDC Converter Station. Design includes sizing of electrical equipment’s Air
Clearance Requirement, Conductor Sizing Requirements, Ground Grid Analysis using CDEGS and lightning
protection.
▪ Preparation of Requirement specification for various equipment’s in the plant.
▪ Familiar with national and international codes (IEC & IEEE), CSA, ETAP, DiaLUX software.
• Working as “Senior Electrical Engineer” in Burns & Mcdonnells India, Mumbai from August 2019 to May 2022.
▪ Detailed design engineering for coal and gas-based power plant. Design includes sizing of electrical
equipment’s like switchgears, transformers, cables, battery and charger, earthing and lightning protection.
▪ Preparation of single line diagram, equipment layout, cable routing layout, lightning protection layout, cable
scheduling, interconnection scheduling, control cable scheduling etc.
▪ Bid evaluations, vendor drawings / document review.
▪ Familiar with national and international codes (IEC & IEEE), CSA, ETAP, DiaLUX software.
• Working as “Electrical Design Engineer” in Fichtner Consulting Engineers India Private Limited, Chennai from
August 2017 to August 2019.
▪ Detailed design engineering for coal-based power plant. Design includes sizing of electrical equipment’s like
switchgears, transformers, cables, battery, and charger, earthing and lightning protection.
▪ Preparation of single line diagram, equipment layout, cable routing layout, lightning protection layout, cable
scheduling, interconnection scheduling, control cable scheduling etc.
▪ Bid evaluations, vendor drawings / document review.
▪ Familiar with national and international codes (IEC & IEEE), ETAP, DiaLUX software.
▪ Routine test for the 245kV SF6 circuit breakers for the Saurya Urja - Post contract engineering & quality
service, at GE Factory, Padappai
▪ Routine test for the 132kV SF6 circuit breakers for the CPCL Manali - Post contract engineering & quality
service, at GE Factory, Padappai
▪ Routine test for the 7.2kV Vacuum circuit breakers for the CPCL Manali - Post contract engineering & quality
service, at Kolkkata
• Worked as “Substation Operator” in Kerala State Electricity Board, Palghat from September 2015 to October
2016.
▪ Keeping strict watch over the performance of HT and EHT equipment’s in the substation such as
Transformers, CTs, and Breakers etc.
▪ Rectification of abnormalities, if possible, immediately with the permission or in the presence of concerned
officers.
▪ Issuing and cancellations of permit to work, Isolation certificates, non-back feed certificates on the HT and
EHT equipment’s and feeders as per rules.
▪ Monitoring voltage and specific gravity of pilot cells, charging current of the battery, earth leakage etc.
▪ Test charging the HT and EHT feeders according to the nature of faults and instructing the maintenance
wing under respective sections when the fault can’t be resolved.
▪ Inspect the yard and condition of equipment’s.
▪ Carrying out and coordinating maintenance works under substation by proper safety and minimum
interruption with back feeding arrangements.
• Worked as “Site Engineer” in Installtech Engineering Pvt. Ltd, Palghat from November 2013 to November 2014.
▪ Understand all the work related to Lighting, Power, Fire Alarm System, Emergency Lighting Systems, HVAC
Powering, etc.
▪ Single Line Diagram (SLD) system is adopted, and individual drawing details are provided for Lighting layout,
Power layout, SLD, Emergency Lighting layout.
▪ Lux level calculation and knowledge about different types of lamps like GLS, FLT, CFL, LED, MVL, etc using
DIALux, CGlux.
▪ Prepare the Load Schedule for Lighting, Power and all other kinds of load connected as per the local
authority regulation.
▪ Panel board designing, testing and installation with MCCB, SDFU, Isolators, etc. based upon standard fuse
grading and Cable selection, conductor type, strands, cores, and insulation are performed based on
standards, voltage drop due to length and quality approved.
▪ Installation, testing and commissioning of low current systems including Fire Alarm, Central Battery
Emergency Lighting, Structured cabling System, Digital Signage System, CCTV System.
▪ Installation, testing and commissioning of Building Management System (BMS) including containment design
and installation, Cable dressing and termination, interfacing with HVAC, plumbing, Electrical and firefighting
Systems.
▪ Responsible of the submission of all the Inspection related to Electrical work and attend the inspections with
consultant.
▪ Responsible of the submission of the inspections for the Delivered Materials on the site and attend the
inspections with consultant.
▪ Manage a team of Engineers and Forman’s to achieve the required goal.
▪ Attend the meeting with consultant in weekly basis to demonstrate the progress of the work.
▪ Coordinate on regular basis with the Main Contractor/Consultant Coordinators.
▪ Ensure project completion within the agreed schedule and budget.
PROJECTS HANDLED
▪ Adani Mumbai HVDC Station Kudus and Aarey Station.
▪ WE Energies Wisconsin LNG Project (Ixonia & Bluff Creek), Wisconsin-USA
▪ City of Medicine Hat Unit 17 65 MW Simple Cycle Power Plant, Alberta-Canada.
▪ Echo River and Sunshine Gateway 35 MW battery storage project.
▪ Manlove Peoples Gas station Project, Fisher Illinois-USA
▪ Lonesome Creek Unit #6, Watford City, ND
▪ Huntington Wastewater Treatment Plant, Utah-USA
▪ Involved in Detailed Engineering of NTPC 2x800MW Telangana Super Thermal Power Project Power Plant
in Ramagundam Balance of the Plant package.
▪ Involved in Detailed Engineering of NUPPL 3x660MW Nevyveli Uttar Pradesh Power Limited in Uttar
Pradesh Boiler package.
▪ High rise building Electrification work from transformer to Sub Distribution board, including design,
inspectional approval from local inspectorate and connection approval from electricity boards.
▪ Paper printing industry electrification from transformer to machinery terminal point, including design,
inspectional approval from local inspectorate and connection approval from electricity boards.
EDUCATION
▪ 2019: Pursuing Executive Diploma in Cost & Management Accounting for Engineers (EDCME) under The
Institute Of Cost Accountants Of India.
▪ 2017: Post Graduate Diploma Course in Sub-Transmission & Distribution with National Power Training
Institute Bangalore under The Ministry of Power with 85%.
▪ 2013: Bachelor of Engineering, Electrical and Electronics Engineering, Dr NGP Institute of Technology,
Coimbatore with 6.82 CGPA
▪ 2009: State board, Vijayamatha Higher Secondary Convent, Palakkad, Kerala with 81.5 %.
▪ 2007: State board, Muslim Vocational Higher Secondary School, Palakkad, Kerala with 70%.
CERTIFICATIONS
▪ Undergone a training program in ‘BASIC PLC’ conducted at Dr. N G P Institute of Technology for 5 days,
fulltime from 25-01-2011 to 29-01-2011by the ‘Sitrain India’ Siemens Ltd. Mumbai in the year 2011.
▪ Undergone a training program in ‘BASIC Wincc SCADA’ conducted at Dr. N G P Institute of Technology for 6
days, fulltime from 30-01-2012 to 04-02-2012 by the ‘Sitrain India’ Siemens Ltd. Mumbai in the year 2012.
▪ Effectively participated in the three days in plant Training in Siemens Ltd. Thane.
▪ MV Transformer Factory (Half Day Training).
▪ LV Switchgear Factory (Half Day Training).
▪ MV Switchboard Factory (Half Day Training).
▪ AC Motor Factory (Half Day Training).
▪ Short training Session on Motors & Switchgear (One day).
This training was coordinated by SITRAIN-INDIA, at Kalwa Works during 15.06.11 to 17.06.11.
PERSONAL DETAILS
Date of Birth: 04th April 1991.
Address: “PRANAVAM”, Kinassery (PO), Palghat-678701.
Languages: English, Hindi, Malayalam,Tamil.
DECLARATION
I hereby declare that all the information furnished above is true to the best of my knowledge and belief.
Nair Pranav Prakash