0% found this document useful (0 votes)
79 views1 page

Subway Level

This document appears to be a floor plan layout with labeling of different rooms and sections. It includes labeling of different rooms like R-2, R-10, R-12, R-19 and sections A, B, C, and D. It also includes labeling of different areas in square meters and some numbers that could represent costs, measurements or other data. The document provides a schematic view of the layout of various rooms and sections of a building or structure.

Uploaded by

Manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views1 page

Subway Level

This document appears to be a floor plan layout with labeling of different rooms and sections. It includes labeling of different rooms like R-2, R-10, R-12, R-19 and sections A, B, C, and D. It also includes labeling of different areas in square meters and some numbers that could represent costs, measurements or other data. The document provides a schematic view of the layout of various rooms and sections of a building or structure.

Uploaded by

Manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

TO SHIVAJI NAGAR STATION R-2 R-10 R-12 R-19

67200 16800 58800


A A

R-B

B B

16800
R-D

35950
C C

19150
D 03 04 05 06 D
5500 5501 5502 U44 5503
WATER TANK & PUMP ROOM
264.76 m²

A
ME21.1 AS PER MMTH
AS PER MMTH ME23.1 SOFT WATER
RELIEF FFL 568.040 m FFL 568.040 m RELIEF TANK-02
15.00 m²
15.00 m² A''
3

11000
ME30.1 FS-01 ME41 WALL ELEVATIONS
EXHAUST AIR PL10.1 6303 PL12 FRESH AIR SOFT WATER
E 13.00 m²
ES-01
PHE SHAFT ATRIUM
PHE SHAFT 13.00 m²
INCLUDING SLAB TANK-01 E
WALL ELEVATIONS 1.71 m²
CUTOUT
1.71 m² REQUIRED
INCLUDING SLAB LIFT-02 FIRE SHAFT RAW WATER
01 REQUIRED DN 2300 2300 TANK-01
4100

3900
5100 FHC ø 14000 700 RAW WATER
B
350

1600 RELIEF ELEC. SHAFT TANK-02


LIFT-01 CUTOUT

22000
1200

1200
FHC FHC ABOVE MS-03
PL10.2 1600 DN UPS RELIEF STAIRCASE FIRE WATER
PHE SHAFT SPF CUTOUT ST10 CUTOUT CUTOUT 22.24 m² TANK-02

11000
ME40.1
1.95 m² 700 S&T SHAFT ABOVE ABOVE
FRESH AIR UP
1550 1.71 m²
13.00 m²
FIRE WATER
F 02 UP FFL 568.040 m UP
DN TANK-01 B'
F
5200 ME20.1
AS PER MMTH FHC
RELIEF
15.00 m² ES-01.1 FS-01.1
C

AS PER UP 2200 ME30 ME22.1


EXHAUST UTILITY
4615

MMTH EXHAUST AIR RELIEF


21950 CUTOUT 15.00 m² SHAFT
13.00 m²
LIFT 04 ABOVE
DN

82690
G G

PL13
FIRE & PHE SHAFT
1.38 m²
EL14
ELE SHAFT & DB ROOM
183500 1.08 m²
8000 14300 11250 4750 10000 19450 12000 12000 12000 12000 19450 10000 4750 11250 14300 8000

H 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 H
EXPANSION
JOINT
UGC-02

UGC-02
UGC-04

UGC-04

I I

1 SUBWAY LEVEL KEY PLAN


1300 Scale: 1 : 250

KEY PLAN REVISION SCHEDULE


REV. NO. DATE DESCRIPTION SIGN.
CIVIL BUDHWA B03 17/03/2021 Sump pits revised & track staircase added
J RPETH THIS IS CERTIFIED THAT CONCENT OF MAHA METRO HODS OF CONCERNED DEPARTMENT HAS BEEN TAKEN BY GC EXPERTS.
J
COURT Booster fans updated, UPS cutouts shown
EGRESS
SWARGATE B03.1 04/09/2021 Updated RCC wall around E. Staircase
SHAFT
as per Structural Requirements
MANDAI Chief MEP Expert Chief Telecom Expert PHE Expert Chief Lift/Escalator Expert
B03.2 04/09/2021 Updated Brick wall under Public Staircase
SHIVAJI
NAGAR
AFC Expert Structural Expert Signalling Expert T/ PSI Expert TVS/ ECS Expert
AECOM-SYSTRA-CEG
NOTES:
THE RESPONSIBILITY OF CONTROL, CHECK & VERIFICATION OF ACCURACY, CORRECTNESS, COMPLETENESS,
1. THIS DRAWING MUST BE READ CONJUCTION WITH ALL RELEVENT ARCHITECTURAL, STRUCTURAL,
PLUMBING & FIRE FIGHTING, ELETRICAL, AND TRAFFIC MANAGEMENT DRAWING. INTEGRATION & FULL COMPLIANCE OF THE CONTRACT PROVISIONS IN RESPECT OF DESIGN, ANALYSIS AND
THIS DRAWING INCLUDING ITS DESIGN AND DETAILING HAS BEEN
PROOF CHECKED INDEPENDENTLY AND FOUND SUITABLE FOR
Proof checked by GC PROJECT: PUNE METRO RAIL PROJECT
2. ALL LEVELS ARE IN METERS AND DIMENSIONS ARE IN MILLIMETER. DRAWINGS RESTS WITH THE DETAILED DESIGN CONSULTANT / DETAILED DESIGN CONSULTANT & CONTRACTOR. COUNTER
3. GROUND LEVEL WHERE SHOWN, ARE INDICATIVE. ACTUAL LEVELS SHALL BE TAKEN FROM SURVEY
THE EXECUTION PURPOSE AND IS RECOMMENDED FOR GFC/ NO
Being Given No Objection The Orion Building, 1st Floor, Opposite Don Bosco
K OBJECTION. SIGNED BY K
4.
DRAWINGS AND SHALL BE CONFIRMED AT SITE.
RCC DIMENSIONS OF EXTERNAL ELEMENTS ARE INDICATIVE ONLY AND SUBJECT TO STRUCTURAL
IT IS CERTIFIED THAT THERE IS NO CHANGE IN THIS GFCD FROM THE ALREADY APPROVED CR DWG NO. ".................................REV......." APPROVED ON DATE ................
MAHA METRO Center, Near Saint Mira's Girls College, Koregaon
DESIGN.
PROOF CONSULTANT Issued As Good For Construction. Park, Pune - 411001, Maharashtra, India
5. RAIL LEVEL SHOWN IN ARCHITECTURAL DRAWING IS INDICATIVE ONLY.ABSOLUTE RAIL LEVEL SHALL DDC / CONTRACTOR CONTRACTOR

ARCHITECTURE
BE DERIVED FROM THE ALIGNEMENT DRAWING.
6. DIAPHRAGM WALL TO SUIT THE FINAL TRACK ALIGNMENT.
7. INFORMATION ON ACTUAL SIZE OF CUTOUT AND OPENINGS SHALL BE AS PER E&M DESIGN. SIGN: SIGN: SIGN: SIGN: SIGN: SIGN: SIGN: SIGN: SIGN:
8. ESCALATOR AND LIFT SIZES ARE INDICATIVE ONLY,AND FINAL SIZES SHALL BE AS PER
MANUFACTURER'S REQUIREMENT AS FINALIZED BY MAHA METRO AND THEIR PIT DRAINAGE TO BE AS DATE: 15.09.2020 DATE: 15.09.2020 DATE: 15.09.2020 DATE: 15.09.2020 DATE: DATE: DATE: DATE: DATE:
CLIENT: MAHARASHTRA METRO RAIL CORPORATION LTD.
/A
PER E&M DRAWINGS.
9. REFER PLUMBING DRAWINGS FOR PLUMBING AND DRAINAGE LAYOUT.
10. STRUCTURAL WALL PROFILE AND TBM SHAFT SIZES TO SUIT THE FINAL TRACK ALIGNMENT AND AS
PER CONTRACTOR'S DESIGN.
NAME: Abhishek Raj NAME:Suraj Kaurav NAME:Shubhi Agrawal NAME: Anand Selvaraj NAME: NAME:
NNAME: NAME: NAME: LOCATION: SWARGATE STATION
11. ALL ABOVE GROUND STRUCTURES TO BE DESIGNED AS PER DETAILED ARCHITECTURAL DWGS.
12. FOR FINISHES REFER FINISHED DRAWINGS AND TYPICAL DETAIL DRAWINGS.
DRAWN BY DESIGN BY CHECKED BY APPROVED BY ACCEPTED BY REVIEWED BY (STRUCT. ENGG.) APPROVED BY (TEAM LEADER) REVIEWED BY APPROVED BY DY. HOD
13. THIS DRAWING WILL BE REVISED ON FINALIZATION OF FINISHES AND ABOVE GROUND STRUCTURES. TITLE: SUBWAY LEVEL KEY PLAN
L AECOM-SYSTRA-CEG L
SCALE: 1:250 DATE: 15.09.2020 STATUS: GOOD FOR CONSTRUCTION REVISION NO:
AECOM India PVt. Ltd.
(GENERAL CONSULTANT TO HOD
B03 03.09.2021 Revised as per GC's Comments
9/F, Infinity Tower C, DLF Cyber City, Phase II, PUNE METRO RAIL PROJECT) DRG NO:
B02 20.09.2020 GFC drawings revised
Gurgaon 122 002, India Tel: 91 124 483 0100 P4D02 - ACM - AR - PRM - SGT - SW - DRP - 1300 B02
REV NO DATE DESCRIPTION SIGN Fax: 91 124 483 0108, www.aecom.com
1 2 3 4 5 6 7 8 9 10 11 12 plot scale
15 16
50mm

You might also like