Report of Thorough Examination of Lifting Equipment

This report summarizes the thorough examination of a 1 tonne, 3 meter web sling owned by Ballygorman Contracts Ltd. The examination found no defects and deemed the equipment safe to operate. The next examination must be completed by November 2nd, 2023. The report was prepared by Sean Haire and authenticated by his employer at their Dublin address.

Uploaded by

bydinamo69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
664 views1 page

Report of Thorough Examination of Lifting Equipment

This report summarizes the thorough examination of a 1 tonne, 3 meter web sling owned by Ballygorman Contracts Ltd. The examination found no defects and deemed the equipment safe to operate. The next examination must be completed by November 2nd, 2023. The report was prepared by Sean Haire and authenticated by his employer at their Dublin address.

Uploaded by

bydinamo69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GA1

REPORT OF THOROUGH EXAMINATION OF LIFTING EQUIPMENT


In accordance with the Safety, Health and Welfare at Work (General Applications) Regulations SI 299 of 2007
Date of Thorough Examination: 02/05/2023 Report #: Colour Code: NO COLOUR Job No: 12903
Date of Last Thorough Examination: Jan 19 2022 3:18PM 143208

Name and Address of employer for whom the thorough examination was Address of premises at which the examination was made:
made:

Ballygorman Contracts Ltd Ballygorman Contracts Ltd


Bree Bree
Malin Head Malin Head
Co. Donegal Co. Donegal

Description and identification of the equipment: Date of manufacture if known:

UNKNOWN
Description: 1 Ton x 3 Meter Web Sling
Serial #: 200729673
Category: Web Sling
Manufacturer: Liftking
Asset:

Safe Working Load/WLL/Load Test: Purpose of Examination:

1 Tonne, None Yes No


Periodic Examination ü
Examination before putting into use for the first time ü
Examination after installation or after assembly at a
new site or in a new location ü
Examination after repairs or alterations ü

Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect (If none state NONE):

NONE

Is the above a defect which is of immediate danger to persons? YES NO ü


In the case of a defect which is not yet but could become a danger to persons:
The time by which it could become a danger: N/A
Particulars of any repair, renewal or alteration required to remedy the defect identified above:

NONE

Identification of any parts not yet accessible for examination:

NONE

Particulars of any tests carried out as part of the examination: (If none state NONE):

NONE

IS THIS EQUIPMENT SAFE TO OPERATE? YES ü NO

Name of person making this report: Latest date by which next thorough
examination must be carried out:
Sean Haire.
02/11/2023

Name and address of employer of persons making and authenticating this report:
251 Richmond Rd, Fairview, Dublin 3, D03 AX66, Ireland