Early Production Facilities –
Offshore Leasing Options
Presented By:
Darren Strengers
GENERAL SALES PRESENTATION 2015
Early Production Facilities –
Offshore Leasing Options
Presented By:
Darren Strengers
GENERAL SALES PRESENTATION 2015
Meet our expert
20 years Oil & Gas experience in Process Engineering
and Project Delivery for upstream, downstream,
chemicals and new technology developments.
Specialising in fast delivery, modular facility design and
innovative project delivery options including
Early Production Facilities
Darren Strengers My role at SUEZ is to provide:
Rental, EPF,
Pre-engineered turnkey Oil and Gas solutions for Lease,
Fast Track Solutions
Darren.strengers@suez-oilandgas.com
Sale or Lease to Own basis.
01 00 00 00 00 Early Production facility solutions for oil production
enhancement, low finance field development, or early
production prior to permanent plant installation.
Wellhead services assistance with high pressure wellhead
desanders and rental equipment supply.
3 I Supporting the growth of industry - SUEZ
EARLY PRODUCITON FACILITIES
OVERVIEW
What is an Early Production Facility (EPF)?
Early Production facilities traditionally grew from Extended Well test which provided Early Production.
Now the term is used for:
SMALL RENTAL PRODUCTION FACILITIES or RENTAL or LEASE PACAKGE or
LARGER PRE-ENGINEERED PRODUCTION SOLUTIONS ON A LEASE OR SALE BASIS or
TURNKEY FACILITIES PROVIDED FAST TRACK
What is different about an EPF vs an EPC supply?
TRADITIONALLY SUPPLIED BY THE SERVICE INDUSTRY
TRADITIONALLY TEMPORARY
FUNDING COMES FROM PRODUCTION/DRILLING BUDGET - AVOIDING A CAPITAL PROJECT
TRADITIONALLY STANDARD API SPECS ONLY, 150# OIL SYTEMS, 600# GAS SYSTEMS
AN EPF PROVIDES GUARANTEED ADDITIONAL PRODUCTION WITH A NOMINAL CAPACITY BUT GENERALLY
NO PROCESS GUARANTEE ON SPECIFICATIONS
4 I GENERAL SALES PRESENTATION 2015
EARLY PRODUCITON FACILITIES
MARKET DIRECTION
Market Direction
EARLY PRODUCTION FACILITIES ARE NOW DESIRED BY OPERATORS
FOR THE FOLLOWING REASONS:
TRUE FAST TRACK SOLUTION (12 - 36 WEEKS ON MOST PROJECTS)
OPEX RATHER THAN CAPEX SPENDING
SHORT TERM PRODUCTION INCREASE WITHOUT CAPITAL PROJECTS
A DESIRE FOR THE QUALITY OF AN EPC DELIVERY BUT WITH THE QUALITY COST /
SCHEDULE SAVINGS OF AN EPF
OPPORTUNE MARKET AREAS ARE:
LOW OIL PRICE COST SAVINGS TO MAINTAIN PRODUCTION
PROVIDE EARLY PRODUCTION PRIOR TO A LARGE EPC PROJECT
AS A OPPORTUNITY TO MAKE REVENUE TO PROGRESS TO A LARGER DEVELOPMENT
5 I GENERAL SALES PRESENTATION 2015
EARLY PRODUCTION FACILITIES
SUEZ – SUPPLY OPTIONS
What does SUEZ Oil and Gas Provide?
PRE-ENGINEERED TURNKEY OIL AND GAS SOLUTIONS FOR
LEASE & LEASE OPERATE MAINTAIN (LOM)
SALE
LEASE TO OWN BASIS (BOT)
EARLY PRODUCTION FACILITY SOLUTIONS FOR
OIL PRODUCTION ENHANCEMENT
LOW FINANCE FIELD DEVELOPMENT
EARLY PRODUCTION PRIOR TO PERMANENT PLANT INSTALLATION
WELLHEAD SERVICES ASSISTANCE WITH
HIGH PRESSURE WELLHEAD DESANDERS AND
RENTAL EQUIPMENT SUPPLY
6 I GENERAL SALES PRESENTATION 2015
MARKET OPPORTUNITIES
Size Type of Asset
SMALL - <8 MMSCFD/ Existing Asset – Short-term
10 kBOPD/ 16.7 kBWPD
Existing Asset – Long-term
MEDIUM - 20 mmscfd / Jack Up - MOPU
20-30 kBOPD / 30-50 kBWPD
LARGE - 30-50 mmscfd / Floating – Barge mounted
50 kBOPD / 50 – 100 kBWPD Floating – Tanker Conversion
Floating – FPSO
Type of Facility
EPF Well Services - Rental
Offshore Oil/Gas/Water
Onshore Oil / Water
Offshore Produced water Treatment & Commercial Model
Injections
Rental
Offshore Sea Water Injection
Short Lease (LOM)
Desanding and Wellhead services
Equipment Mid term Lease
Associated Solids disposal (SUEZ) Lease to Own / BOT
Fast track Sale/Pre-Engineered
Solution
7 I GENERAL SALES PRESENTATION 2015
MARKET OFFERINGS
PRE-ENGINEERED SOLUTION PRE-ENGINEERED SOLUTION
SMALL - LEASE/RENTAL LARGE - LEASE/LEASE TO OWN/SALE
WUU/LPS – WELL UNLOADING UNIT / LOW MOPU/JACK UP – SOLUTIONS
PRESSURE SEPARATION & BOOSITNG
GAS PROCESSING FACILITY
MINI COMPRESSORS PWT – LARGE PRODUCED WATER
PPW – PORTABLE PRODUCED WATER TREATMENT
TSWI – TEMPORARY SEA WATER INJECTION SWI – LARGE SEA WATER INJECTION
PUMPING SOLUTIONS MFP PLATFORM – MINIMUM FACILITIES
PLATFORM TOPSIDES
WELLHEAD DESANDERS
PUMPING SOLUTIONS
WELLSERVICES EQUIPMENT RENTAL
CANTILEVER SOLUTIONS
CANTILEVER SOLUTIONS
8 I GENERAL SALES PRESENTATION 2015
Early Production Facilities (EPF)
For Production Enhancement
(Short-term Lease)
Capacities
GAS: 4-8 MMSCFD OIL :<10,000 BPD
WATER: 16,666 BWPD SWI 10,000 – 20,000 BWPD
Solutions
WUU – Well Unloading Units Rental Zone 2 Power
PPW – Portable Produced Water Well Services
TSWI – Temporary Sea Water Injection
Description
Short Term Lease on a day rate
Suitable for Mature LP or constrained fields
Temporary : Not unsimilar to Well Service equipment
Light weight: All Lifts < 10 ton
Short delivery time < 16-20 weeks
9 I GENERAL SALES PRESENTATION 2015
EPF/Fast Track & Pre-Engineered Turnkey
Facilities - for Strategic Field Development
OFFSHORE
Capacities
GAS: 5-20 MMSCFD OIL :10 – 40 kBPD
WATER: 16.7 – 60 kBWPD SWI 50 – 100 kBWPD
Solutions
MOPU – Jack up based Production/Treatment facility
BARGE – Barge based Production/Treatment facility
FLOATING– Tanker conversion or FPSO base
Production/Treatment facility
Description
Mid Term Lease on a day rate / Lease to Own basis
Suitable for Early Production or Field development or EOR
waterflood purposes
Marine Asset integration provided
Delivery time < 26-39 weeks
10 I GENERAL SALES PRESENTATION 2015
Innovative EPF/Fast Track &
Pre-Engineered Turnkey solutions
Cantilever Solution:
Pre-Engineered Solution – Turnkey Cantilever module
Minimum. Interface pre-engineered hangers
Thunder Crane compatible (TC20/50/90)
Removable (5-7 Year lease) or Permanent
Meets higher standard process safety/HSE/integrated
permanent facility requirement with permanent tie ins
Solutions
WUU - Low pressure boosting
PPW - Separation and Injection
Pumping Solutions – Gas/Liquid separation & pumping
Unzoned Area addition – Power Generation & Fuel Other Options - Strap on additions:
Manning Area addition –Control room, MCC Caisson Replacement Well bay concept
Temporary/Overnight accommodation
Additional Riser Risers & Metering
11 I GENERAL SALES PRESENTATION 2015
Rental Well Services and
Desanding Equipment
Capacities
DESANDERS: API 5k / 10k / 15k / 20k
OIL/WATER PUMPING:
5,000 / 10,000 / 20,000 BPD
100 psi diff.
500 & 1500 diff (on DEMAND)
Solutions
Wellhead Desanders
Pump / Pump skid Rental
Rental Zone 2 Power
Solids handling equipment
Description
Short Term Rental on a day rate
12 I GENERAL SALES PRESENTATION 2015
EARLY PRODUCITON FACILITIES
SUEZ – WHAT WE CAN DELIVER
Why SUEZ Oil and Gas?
Tier 1 & 2 EPC package fabrication background means quality and process safety focused
Company Size means we are flexible and responsive to client needs
Track Record in Early Production Facility Solutions and EPF fabricated Packages
In house industry leading technical expertise in:
Gas Processing/Dehydration and CO2 removal
Electrostatic Coalescers/Desalters
Fired Heaters
Cyclonic water/Oil separation
Cyclonic Sand separation
Now with the backing of the Global SUEZ group we have superior access to
Technology and the Skills & Delivery Record of SUEZ and former Degremont Water
Treatment groups.
13 I GENERAL SALES PRESENTATION 2015
PRE-ENGINEERED STANDARD
COMPONENT PARTS
FULL SUPPLY LISTING
STANDARDISED COMPONENTS
BOOSTER PUMP SKIDS FLARE SYSTEMS DESANDING
EXPORT PUMPING OILY WATER SYSTEMS FRAC WATER TREATMENT
INJECTION PUMPING FUEL GAS SYSTEMS TRIPLEX/ENGINE DRIVEN
PUMPS
TANKERLOAD OUT POWER GEN
TANKFARM 20K WELL TEST SEPARATORS
MCC
TANKFARM 10K CONTAINERISED TANKS
CONTROL SYSTEMS
DESALTING/COALESCER WELLHEAD DESANDERS
UTILITIES
HEATERS/EXCHANGERS PNEUMATIC CONTROL
SDV/CV SKIDS PANELS
PROD. WATER TREATMENT TRAINS PIPERACKS FLARE BOOMS
SEA WATER TREATMENT TRAINS CHEMICAL INJECTION
GAS PROCESSING TRAINS
GAS COMPRESSION
MINI COMPRESSORS
LPG STORAGE
14 I GENERAL SALES PRESENTATION 2015
Early Production Facilities (EPF)
For Production Enhancement
Questions & Discussion
Thank you for your time!
Suez Oil & Gas (previously Process Group International)
Melbourne, Abu Dhabi, Singapore, Houston
15 I GENERAL SALES PRESENTATION 2015