Annexure - A
Existing clauses of technical Specifications for UABAMS to be superseded by SCT
SN                 Existing Clause                             Modified clause
1.    5.1. The accelerometers mounted on           The accelerometers mounted on axle
      axle box level shall be capable to           box level shall be capable to measure
      measure accelerations up to +100g in         accelerations up to +100g in the
      the frequency range of 0-250 Hz and          frequency range of 0-500 Hz and
      accelerometers mounted on bogie shall        accelerometers mounted on bogie shall
      be capable to measure accelerations up       be capable to measure accelerations up
      to + 5g in the frequency range of 0-250      to + 5g in the frequency range of 0-100
      Hz.                                          Hz.
                                                   Or
                                                   Latest provision of EN 13848:part – I.
2.    5.2. As the expected range of frequency      As the expected range of frequency of
      of acceleration at axle and bogie level is   acceleration at axle box is up to 500 Hz
      up to 250 Hz, The sampling frequency         and bogie level is up to 100 Hz, The
      of acceleration shall not be less than       sampling frequency of acceleration shall
      the 2.5 times of the expected maximum        not be less than the 5 times of the
      frequency.      Thus     the   sampling      expected maximum frequency. Thus the
      frequency both at axle and Bogie level       sampling frequency at axle level shall
      shall not be less than 625 Hz.               not be less than 2500 Hz and Bogie level
                                                   shall not be less than 500 Hz.
                                                   Or
                                                   Latest provision of EN 13848:part – I.
3.    8. Warranty:                                 Warranty to be dealt as per relevant
      Each system and cloud/ processing            paras of SCT.
      station shall be under warranty for a
      period of 24 months from the date of
      commissioning of individual system and
      processing station.
4.    9. Penalty for down time of the system Issues of payment during downtime to
      during warranty and Maintenance be dealt as per relevant paras of SCT.
      period:
      The fault in the system shall be
      identified by the firm remotely. In case
      of detection of fault in the system
      during warranty and maintenance
      period of 05 years after warranty, if the
      system is not repaired and made
      functional with in the period of 12
      hours, at terminating base stations
      specified in clause 7.2 and 7.3, a
      penalty of Rs. 5000 per additional 24
      hours or part thereof will be levied for
      the systems for which fault has been
      detected remotely.
     9.1. The cloud based system/
     processing station should have an up-
     time of better than 99.5% i.e. an
     unplanned downtime
     of less than 44 hours per annum.
     Occurred failures of the cloud based
     system/processing station exceeding 44
     hours per year will attract a penalty of
     Rs 5000 per hour.
     9.2. The cloud based system or
     processing station shall be designed to
     receive data of all running systems
     which may be up to 40 in numbers
     having capability to expand up to 100
     systems.
     9.3. The firm is required to provide a
     user support helpdesk during user
     working hours (9 AM to 6 PM IST) six
     days a week except Sunday. Access to
     support system should be available
     through telephone and email.
     9.4. The firm is required to provide
     training to user to access data/
     information/ reports available at cloud
     based system or processing station. The
     training shall be initially given to
     a group of users. Subsequently trained
     user will further give the training to
     other users.
5.   10. Acceptance Tests: Firm shall              10. Acceptance Tests: Firm shall provide
     provide a lab and field validation            a lab and field validation scheme, which
     scheme, which will be approved by the         will be approved by the purchaser. The
     purchaser. The scheme shall include           scheme shall include the following;
     the following;                                a) Verification of test and calibration
     a) Verification of test and calibration       certificates for all the third party items.
     certificates for all the third party items.   b) The testing of hardware of system as
     b) The testing of hardware of system as       per approved procedure.
     per approved procedure.                       c) Verification of analog reports,
     c) Verification of analog reports,            exception reports and degradation
     exception reports and degradation             patterns.
     patterns.                                     d) Repeatability of acquired acceleration
     d)      Repeatability       of     acquired   data at same speed.
     acceleration data at same speed.              The      accuracy        of     acceleration
                                                   measurement in repeatability at same
                                                   speed and in identical conditions shall
                                                   1% of full scale offset (FSO) or better.