PLC Ladder Rung with Two Outputs :
                  ru
With ladder diagrams, there can be more than one output connected to a contact. Figure 1.20
          st
shows a ladder program with two output coils. When the input contacts close, both the coils give
outputs.
        In
Also Read: PLC Latching Output Configuration
Example: In Some cases it is required to start two pumps in parallel by pressing a single start
button then the above logic may be useful.
                                                                           InstrumentationTools.com
        Instrumentation Tools
        Learn Instrumentation and Control Engineering. Inst Tools covers topics of Industrial
        Instrumentation, PLC, DCS, SCADA, Field Instruments, Analyzers and so on.
        https://instrumentationtools.com
PLC Ladder Rung with two inputs & two outputs :
For the ladder rung shown in Figure 1.21, output A occurs when input A occurs. Output B only
occurs when both input A and input B occur.
                                                                  om
                                                       s     .c
                                                    ol
                                            To
                                 i        on
                              at
                            nt
Example: Say we have a Single Start button to Start two pumps in parallel. But we have extra
                    me
Start Permissive for Pump B only and it must be started on satisfying the permissive only. Note
that there is no permissive for Pump A in the above example. So Pump A will start on Pressing
                  ru
Start Button and Pump B will start on Satisfying the Start Permissive & with Start button
          st
pressing.
        In
PLC Sequence of Outputs or Sequence Logic
Such an arrangement enables a sequence of outputs to be produced, the sequence being in the
sequence with which contacts are closed. Figure 1.22 illustrates this with the same ladder
program in Mitsubishi and Siemens notations. Outputs A, B and C are switched
                                                                           InstrumentationTools.com
                                           Instrumentation Tools
                                           Learn Instrumentation and Control Engineering. Inst Tools covers topics of Industrial
                                           Instrumentation, PLC, DCS, SCADA, Field Instruments, Analyzers and so on.
                                           https://instrumentationtools.com
                                                                                                     om
                                                                                          s     .c
                                                                                       ol
                                                                               To
                                                                    i        on
                                                                 at
                                                               nt
                                                       me
                                                     ru
                                             st
                                           In
                                   on as the contacts in the sequence given by the contacts A, B and C are being closed. Until
                                   input A is closed, none of the other outputs can be switched on. When input A is closed, output
                                   A is switched on. Then, when input B is closed, output B is switched on. Finally, when input C is
                                   closed, output C is switched on.
                                   Example: The above logic will be useful in sequence logic’s. For example for conveyor belt
                                   action, Bag house logic, Sequence of on/off valves operation etc.