Scope
.1 This Engineering Procedure specifies the minimum requirements for the testing,
and registration of Saudi Aramco welders working for
. For the purpose of this Engineering Procedure Maintenance shall
include to mean other proponent
orhttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlganizations
performing fabrication and
welding activities such as Operations Field Services, Pump Shops,
& Workover, etc.
specifically noted otherwise the term welder shall also mean welding
. 1.2
Applicable Documents
stated otherwise, all codes and standards referenced shall be the latest issue
Aramco Forms
3331-ENG
4758-ENG Test Supplement S07 for Welder Performance Qualification Test Supplement
S08 for Welder Performance Qualification Test Supplement S09 for Welder Performance
Qualification Test Supplement S10 for Welder Performance Qualification Test
Supplement S11 for Welder Performance Qualification Test Supplement S12 for Welder
Performance Qualification Test Supplement S13 for Welder Performance Qualification
Test Supplement S14 for Welder Performance Qualification Test Supplement S15 for
Welder Performance
Qualifichttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlation Test
Supplement S16 for Welder Performance Qualification Test Supplement S17 for Welder
Performance Qualification Welder Qualification Record Welder Qualification Card Job
Clearance Card Radiography Request/Performance/Interpretation
(tubular) electrode and the work. Shielding is provided by a flux contained in the
filler metal. Additional shielding can be obtained from an externally supplied
or gas mixture.
://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmllobular Transfer: In arc
welding, a type of metal transfer in which molten filler
is transferred across the welding arc in large droplets (applicable to the GMAW
FCAW welding processes).
Metal Arc Welding (GMAW): An arc welding process which produces
of metals by heating them with an arc between a continuous filler metal
文库下载 免费文档下载
https://www.wenkuxiazai.com/
(consumable) electrode and the work. Shielding is obtained entirely from an
externally
gas or gas mixture. Sometimes this process is referred to as MIG or CO2
(nonpreferred terms).
Tungsten Arc Welding (GTAW): An arc welding process which produces
of metals by heating them with an arc between a nonconsumable tungsten
and the work. Filler metal is added manually. Shielding is obtained from a
or gas mixture. It is sometimes referred to as TIG welding (a
nonhttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlpreferred term).
: Inspection Department.
Field Testing: Examination of the first production work produced by a welder
after WTC certification testing and OIU registration.
: Job Clearance Card (Form SA 4758-ENG).
Clearance Card (Form SA 4758-ENG): An identification card issued by OIU to
welder passing a CRWMO SMAW Ability Test. The JCC lists the welders name,
symbol and qualification limits of the major essential variables.
: Low Alloy Steel.
: Nickel.
: Operations Inspection Division.
: Operations Inspection Unit.
: Process Expiry Date.
Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders PT: Penetrant
Test.
: See preferred terms Welder Performance Qualification.
Card (Form SA 3331-ENG): A photo
identhttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlity card issued
by the WTC
a welder that lists all welding certifications held by the welder. Qualification
Cards
be carried at all times by the welder, and must be presented for review upon
文库下载 免费文档下载
https://www.wenkuxiazai.com/
.
Record (Form ): See preferred term welder certification.
Welder: See preferred term Certified Welder.
Test: The performance qualification test conducted by the WTC to
a revoked certification.
Welder: A welder whose certification has been reviewed, found to be
, and is on file with the Operations Inspection Unit.
: The act of registering a welder certification, or a photostatic copy
. Registration is performed by the responsible Inspection Authority.
: The repeat test that is permitted to be taken when a welder fails the initial
://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlrtification test to a Test
Supplement, or recertification test to reinstate a revoked
. Only one retest is permitted.
Polarity (DCEP, DCRP, DC or E ): The arrangement of direct current arc
leads with the work as the negative pole and the electrode as the positive pole
the welding arc.
Welder Certification: A certification that is no longer valid as a result of a
not welding with a welding process for six or more consecutive months or not
an Ability Test (does not include the Corrosion Resistant Overlay Welding
Test). When a certification with a process is revoked all certifications with that
are revoked (this does not apply to an Ability Test). Welders whose
with a process are revoked must pass a recertification test for each
Test Supplement (conducted
http://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlby the WTC) prior to
resuming production
with those Test Supplements.
Face (land): That portion of the groove face adjacent to the root of the joint.
Opening (gap): The separation between members to be joined at the root of the
.
Penetration (pipe): The distance a weld extends past the inside surface of the pipe
文库下载 免费文档下载
https://www.wenkuxiazai.com/
in a pipe groove weld.
Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders RT:
Radiographic Testing.
Gas: Protective gas used to prevent atmospheric contamination of the
weld metal in the vicinity of the welding arc.
Polarity (DCEN, DCSP, DC- or E-): The arrangement of direct current arc
leads in which the work is the positive pole and the electrode the negative pole
the welding arc.
Metal Arc Welding (SMAW): An arc welding process
thttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlhat produces
of metals by heating them with an arc between a covered metal electrode
the work. Shielding is obtained from the decomposition of the electrode covering.
Transfer: A type of metal transfer in which molten filler metal is propelled
across the arc in small droplets (applicable to the GMAW and FCAW welding
).
: Stainless Steel.
Arc Welding (SAW): An arc welding process which produces
of metals by heating them with an arc between a bare metal electrode or
and the work. The arc is shielded by a blanket of granular, fusible material
Responsibilities
.1 Inspection Department
.1.2 The NDE & Welder Testing Unit of the Operations Inspection Division
responsible for:
)
) administering all welder performance qualification tests; keeping track of the
status of all Saudi Aramco welders.
文库下载 免费文档下载
https://www.wenkuxiazai.com/
.1.3 The Welder Test Center (WTC) of the NDE & Welder Testing Unit is
for:
) conducting performance
qualificahttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmltion
testing of welders in
with approved Test Supplements;
) conducting recertification testing of welders with revoked
;
)
)
)
) preparing certifications (Form ) for welders that pass performance qualification
or recertification tests; inputting certification results (Form ) in the WTS for
welders that take performance qualification or recertification; obtaining welder
symbols (assigned automatically) from WTS for all welders who take the performance
qualification tests; preparing new or updating old Qualification Cards for welders
passing certification tests;
Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders g) conducting
Anniversary Recertification testing of welders every
years;
)
) sending welder certification information to the WTS Administrator; generating new
or updating welder
rehttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlcords/data in WTS.
Instructions
.1.2.2 The test coupon shall be secured in the test position at a height
eighteen (18") inches above the floor of the test booth. The
shall not begin until the WTC welding inspector has
the test position. The welder shall not move the test
until told to do so by the WTC welding inspector at the
of the test.
.1.2.3 The WTC welding inspector shall inspect the completed root
of all SMAW and GTAW pipe test coupons prior to the
of the hot pass. If grinding of the groove side of the test
://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.html is required (i.e., root
passes welded with E6010
) the WTC welding inspector shall also inspect the
grinding. If the root pass work is acceptable the
shall be permitted to weld the fill and cap. If the root
work is unacceptable it shall be cause for rejection of the
(test failure).
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders 6.1.2.4
Grinding, back gouging, welding or any other alteration
shall not be performed on the backside of a root pass
specifically required as part of the performance
test. When back gouging or grinding is required
the performance qualification test, the backside of the
groove shall be inspected by the WTC welding
. If the work is acceptable the welder shall be given
to start weldhttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmling the
second side. Excessive or
back gouging, grinding, welding or any other
dressing is considered unacceptable and shall be
for rejection of the coupon (test failure).
.1.3.2 Welhttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmld
reinforcement and root penetration shall not exceed the
as shown in Table 1.
Coupon
Thickness
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders 6.1.3.4
Underfill not exceeding 1/16" in depth shall be permitted for a
length of 2" maximum. Underfill exceeding 1/16" in
is not be permitted
.1.4.1 Test coupons that meet the visual acceptance criteria of Section
文库下载 免费文档下载
https://www.wenkuxiazai.com/
.1.3 shall be radiographically examined.
.1.5.2 Four guided bend specimens shall be prepared and tested for
posithttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlion tested as
per Table 2.
Coupon Thickness
than 3/8"
3/8" but less than 3/4"
or greater than 3/4"
and Type 2F and 2R 2F and 2R, or 4S 4S
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders 6.1.5.4
Testing shall be performed in accordance with requirements of
QW-162, of the ASME SEC IX B&PV Code.
.1.5.5 Test
http://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlacceptance criteria
shall be as specified in paragraph
文库下载 免费文档下载
https://www.wenkuxiazai.com/
of the ASME SEC IX B&PV Code.
.1.6 Retest
.1.6.1 Welders are permitted to take one (1) retest per Test
provided they receive the minimum training
in Appendix 5 prior to the retest.
.1.6.2 Welders that fail the initial performance qualification test for
causes shall undergo a total minimum retraining time
to the sum of the minimum retraining times for each of
causes given in Appendix 5 prior to the retest.
.1.6.5 Welders that fail the retest shall not be permitted to take a
retest and shall be prohibited from retaking that
performance qualification test sooner than three (3)
from the date of the failed retest. During the waiting
the welder shall be given additional training by the
Organization. If the Maintenance Organization
the welder to retake the test at the end of three (3)
the Maintenance Superintendent shall certify in writing
the welder has received sufficient training and is fully
to take the Supplement Test (the letter shall be
to the request for test submitted by the OIU to the
).
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders a)
文库下载 免费文档下载
https://www.wenkuxiazai.com/
verifying whether newly tested welder is available in the WTS or
. If yes, WTC is only to update the welder's certification
on the WTS, by selecting "New Cert" icon. If the welder is
found in the WTS, WTC is to select the "New Welder" icon
the certification screen of the WTS;
the welder's performance qualification test records in the
(applies to all welders) and obtaining the welder symbol from
, which is assigned automatically for all welders. The welder
is unique and is not transferable. When a welder leaves the
of the company or his job title is permanently changed to
job dehttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlscription, that
welder's symbol shall be retired and
from WTS database through a written request submitted
Maintenance Organization and sent to both WTC and the WTS
, and a copy should also be sent to the OIU;
Welder and Welding Operator Qualification Record
. The original shall be kept on file with the
. Copies shall be sent to the WTS Administrator and the OIU;
.3.1.1 The first three (3) production pressure retaining butt welds
by each newly certified welder, employing each newly
certification, shall be 100% radiographed. The OIU
shall witness the welding of at least one of these
. Radiographic acceptance shall be as specified by the
design code governing the work.
文库下载 免费文档下载
https://www.wenkuxiazai.com/
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders 6.3.1.2
If the radiographs
http://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlare all acceptable
the welder shall be
to continue production welding. Subsequent
welding shall be radiographed at normal job
levels. All RT inspection results shall be entered
OIU in the WTS utilizing the radiography request form .
.3.1.3 If radiography shows that one or two of the first three (3) welds
unacceptable, the OIU inspector shall visually examine all
welds and their corresponding radiographs. If the weld
is poor, that particular certification shall be revoked. If
weld quality is borderline, the welder may be permitted to
production welding provided all subsequent welding
is 100% radiographed. If the weld quality improves, the
shall be reduced to normal job monitoring levels.
the weld quality does not improve, the newly qualified
://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlrcertification shall be
revoked.
.3.1.4 If radiography shows that all three welds are unacceptable the
qualified certification shall be revoked.
.3.1.7 Initial Field Test radiographs shall be kept on file by the OIU
at least one (1) year.
文库下载 免费文档下载
https://www.wenkuxiazai.com/
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders 6.3.2.1
A flow chart showing the steps involved in maintaining welder
is shown in Appendix 2.
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders
surrendered to the WTC at the time of testing. An updated
Card shall be issued by the WTC after
of testing.
Note:
welder will be placed in the Inactive welders list if he did not
for Anniversary Exam (ARD) within 90 days. The
will be in the Separated welders list if he did not appear
ARD after the 90 days period; subsequently to reinstate him
the WTS, a letter from his perspective Maintenance Division
explaining the welder's case shall be sent to the
Inspection Division head of the
Inspecthttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlion
.
.3.2.9 The OIU shall also maintain a record of the groove welds made
each welder with each process or combination thereof.
and yearly repair rates shall be calculated on a butt
and/or lineal inch basis. The method for calculating
rate limits shall be as defined in the Saudi Aramco
Welding Standards. Welders with high repair
shall have their certifications with the applicable welding
or processes revoked.
.4.1 Welders whose certification with a process becomes revoked shall not be
to weld on production work with the process until they have
and passed the required Recertification Test(s). The
Test(s) shall be conducted by the WTC in accordance
the requirements of Section 6.1 of this Engineering Procedure.
.4.2 The welder Recertification Test shall be scheduled by the OIU with the
in writing. It shall not be scheduled sooner than three (3) months
the date the certification was revoked. When the welder is ready to
the Recertificahttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmltion
Test the Maintenance Superintendent shall
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders certify
in writing that the welder has been given the required training and
fully capable of passing the Recertification Test.
.4.3 Welders that fail the initial Recertification Test shall be permitted to take
retest.
.4.4 Welders that pass the Recertification Test or retest shall be certified and
in accordance with the requirements of Section 6.2 of this
Procedure. Subsequent production work shall meet the
of Section 6.3.1 (Initial Field Testing).
.4.5 Welders that fail the retest shall have all of their certifications with the
(es) tested revoked if the certifications were originally revoked as
result of welding inactivity. If the certification was originally
revoked://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmla result of a
failed Ability Test, only the particular certification tested
be revoked.
.4.6 Welders that fail the retest shall not be permitted to retake the
Test for a period of at least three (3) months. The WTC
inform the OIU and WTS Administrator of the test results in
.
(4") by one inch (1"). The thickness of the overlay and number
layers shall be as specified in the WPS.
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders 6.5.1.5
The filler metals (size and type), preheat (if required), and
(stringer or weave) specified in the approved project
shall be used in the test.
.5.2.3 Upon completion of the test, the WTC welding inspector shall
examine the test coupon. The surface of the weld shall
smooth and even, and the bead spacing uniform.
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders test
coupon and tested by the WTC welding inspector. The
criteria shall be as specified in paragraph QW-163 of
ASME SEC IX B&PV Code.
.5.3.2 The JCC shall remain valid for the duration of the project
the welders certification with the SMAW process
not become either EXPIRED or REVOKED.
.5.3.3 After completion of the project the JCC shall be returned to the
.
.6.2 The corrosion resistant strip lining test shall be conducted by the WTC
witnessed by the WTC welding inspector.
.6.4 The welder shall fit up the test assembly as instructed by the WTC
inspector, who shall check and approve the fit up. The gap
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders between
the strip lining and base material shall not exceed one sixteenth
(1/16").
.6.5 The welder shall secure the test assembly in the test booth and shall not
welding until instructed by the WTC welding inspector. The
inspector shall observe the welding of the entire test assembly.
welder shall remove the slag from each weld bead. The end of each
bead shall be brushed clean prior to the start of welding with the
electrode. Grinding of stop/starts and
arehttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlas of tightly
adhering slag
permitted and should be encouraged. Beads shall not start or end at
. After completion of the welding the welder shall brush clean
entire assembly. All arc strikes shall be removed by grinding. Failure
文库下载 免费文档下载
https://www.wenkuxiazai.com/
a welder to adequately perform these tasks shall be cause for rejection
(test failure).
.6.6 After completion of the welding the WTC welding inspector shall
inspect the test assembly. The surface of the weld beads shall be
in appearance. Undercut and underfill in excess of that permitted
Section 6.1.3 is not permitted. Welds that do not meet these criteria
be rejected (test failure).
.6.7 Test assemblies that pass the visual inspection shall be leak tested by the
welding inspector and the welder. A small hand pump (or bulb)
be used to apply five (5)
pshttp://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.htmlig pressure through
the 1/4" leak test
in the strip lining while leak detection solution is applied over the
. Leaks are not permitted (test failure).
.6.8 Leaks shall be repaired by the welder under the supervision of the WTC
inspector. After repairs are complete the welder shall be
to take one retest. The retest may be rescheduled immediately.
.6.9 Welders that fail the retest shall not be permitted to retake the
Test for a period of at least one (1) month.
.6.10 Welders that pass the initial test or the immediate retest shall be certified
accordance with the requirements of Chapter 6.2 of this Engineering
.
Summary
July 2008 Revised the "Next Planned Update". Reaffirmed the contents of
the document, and reissued
no other changes.
[此处图片未下载成功]
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders
文库下载 免费文档下载
https://www.wenkuxiazai.com/
2 – Flow Chart for Maintaining Welder Certification
[此处图片未下载成功]
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders
3 – List of Approved Welding Test Supplements
==========http://www.wenkuxiazai.com/doc/1f83479f581b6bd97e19ea05.html==RESERVED
FOR FUTURE TEST SUPPLEMENTS=============
X's in the filler metal classifications indicate that multiple ASME SEC IIC Filler
Metal Specifications are applicable. For example, EXX18 represents E7018, E8018-B1,
E8018-C2, E9018, etc. Al = Aluminum Cat-"D" = Category "D"
Service as defined in ASME B31.3 CS = Carbon steel Cu = Copper LAS = Low alloy steel
Ni = Nickel SS = Stainless steel
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders
4 – Performance Qualification Testing Prerequisites
E
S10 ___ ___ ___ ___ ___
E
T
S14 ___ ___ ___ ___ ___
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders
5 – Minimum Retraining Times for
Taking the Performance Qualification Retest
Next Planned Update: 1 July 2013 and Certification of Saudi Aramco Welders
6 – Welder Experience Record
文库下载 免费文档下载
https://www.wenkuxiazai.com/
Code ____________
Recertification Date _____________
_____ _____ _____ _____ _____ Month _____ 1 _____ _____ _____ _____ _____ _____
_____ _____ _____ _____ _____ _____
(A) 2 3 4 5 6 7 8 9 10 11 12
文库下载网是专业的免费文档搜索与下载网站,提供行业资料,考试资料,教
学课件,学术论文,技术资料,研究报告,工作范文,资格考试,word 文档,
专业文献,应用文书,行业论文等文档搜索与文档下载,是您文档写作和查找
参考资料的必备网站。
文库下载 https://www.wenkuxiazai.com/
上亿文档资料,等你来发现