ICRIER’S
PROGRAM ON CAPACITY BUILDING & KNOWLEDGE
   DISSEMINATION ON URBANIZATION IN INDIA
PREPARING FOR THE URBAN CHALLENGES OF THE
               21ST CENTURY
 SERVICE DELIVERY OF WATER AND SANITATION
- CHALLENGES FACED BY METROPOLITAN CITIES
              (SURAT CITY)
          FEBRUARY 06, 2013
                Mr.Jatin Shah, City Engineer,
                Surat Municipal Corporation
Surat : Water Supply System
Surat City
 Tapi River
Growth of Surat City
                               Year     Area in   Population
   Historical Development              Sq. Km
                               1951      8.18        223182
    Of Surat Dates Back To
                               1961      8.18        288026
    300 BC.                    1971     33.85        471656
                               1981     55.56        776583
   Municipality Established   1991    111.16      1498817
    In 1852 AD.                2001    112.27      2433785
                               2001*   326.51      2877241
   Municipal Corporation      2011    326.51     44.7 Lakhs
    Formed In 1966.
Surat : City Expansion
                        Unprecedented
                         growth in last four
                         decades.
                        10-fold population
8 Municipality &
                         rise in last 4
27 Village
                         decades.
Panchayats
                        3-fold increase in
                         area in 2006
                        Now ranks the 8th
                         most      populated
                         city in the country.
Water Supply – Present Status
   Source of Water: River Tapi
   Population covered under piped network*:-   94 %
    (out of 47 Lacs present pop. of city)
   Present installed capacity of Intake Wells:  1463
    MLD
   Present installed capacity of Water Works :  1178
    MLD
   Present gross daily average water supply:    840
    MLD
   Average Per capita Water Supply per day :    140
    lpcd
   Total storage capacity of all WDS & WW: 653 ML
 Water Supply Grid Network
 Water Works and WDS
   11
PAL W.D.S
                                   10
  VESU-2 W.D.S
   13
                 12 VESU-1 W.D.S
  Water Supply
  Increase in water supply since year 1995
                                         Est.        Gross Av.           %
Sr.                        Area
            Year                      Population    Daily Water       Population
No.                      (Sq.Km.)
                                        (Lacs)     Supply (MLD)       Coverage
 1          1995          112.28         19.00           180             59
 2          2000          112.28         24.00           440             88
 3          2005          112.28         30.00           580             95
      Area of city increased in year 2006 from 112.28 Sq.Km. to 326.51 Sq.km
                                                    780 domestic
            2013
 4                        326.51         47.00      + 60 Industrial     *94%
           Present
                                                     = 840 MLD
* Remaining area to be covered by Dec., 2013
 Water Supply Master Plan
   As per Water Supply Master Plan for Surat city
     Year               2026               2041
  Population          87.48 Lac         123.04 Lac
Projected Water
                    1682.63 MLD        2331.67 MLD
    demand
Water Supply:
Increase in water supply Infrastructure
                                      Present      Ongoing/    Ultimate
                                     Year 2013   tender works   capacity
                                                   Year2013   Master Plan
      Water Supply Components                                  Year 2041
                                       Cumulative capacity Increase
 1       Intake wells (in MLD)        1463          2033         2425
 2 Water Treatment Plants (in MLD)    1178          1468         1678
 3     UGSR Capacity (in ML)          624.7        680.9        726.7
 4       ESR Capacity (in ML)          28.6         70.9        124.3
 5    Distribution Network (in Km)    2750          3100         3400
      Preparing for Urban Challenges
      in 21st Century – Water Supply
   Efficient Water Supply Management
   Water Quality Monitoring
   Operation and Maintenance practices
   Energy Efficiency and savings measures
   NRW Reduction initiatives
   Water Conservation
Efficient Water Supply Management
    Strict Water Quality compliance in adherence to
     drinking water standard IS 10500
    Adequate water supply (meeting LPCD norms)
     through effective O&M Practices
    Water conservation and IEC activities
    Optimum O&M Cost with
        Lowest production cost (Rs./KL)
        Reduced energy consumption level (KWH/ML)
        Loss reduction / control
    Effective Service Delivery in sustainable manner
    100% cost recovery
100% Cost Recovery
                                 WATER SUPPLY
                        REVENUE INCOME V/S EXPENDITURE
                        10000
                         9000
                         8000
Rs. in Lacs
                         7000
                         6000
                         5000
                         4000
                         3000
                         2000
                         1000
                            0
                                         2005-     2006-     2007-     2008-     2009-     2010-     2011-
                                          06        07        08        09        10        11        12
              Revenue Income        0   3651.14   4388.58   4857.34   6109.16   6370.15   6906.67   9164.00
              Revenue Expenditure       4330.39   5048.84   6302.59   6690.65   7105.16   7304.81    9016
                                                                YEAR
                                             Revenue Income            Revenue Expenditure
Water Quality Monitoring
Testing Parameters & Testing Frequency
 Sr.     Location      Frequency                            Parameter                                    Stage
                                                                                                Raw Water,
                      Round the     pH, Turbidity, TDS, Free Residual Chlorine (FRC),
 1                                                                                              Treated / Supply Water
                          Clock     Dissolved Oxygen (DO)
                                                                                                from Water Works
                                                                                                Raw Water, Treated
 2                    Hourly        pH, Turbidity, Free Residual Chlorine (FRC)
                                                                                                Water
        Generation                  pH, Turbidity, Colour Index, Taste, FRC, TDS, Alkalinity,   Raw Water, Treated
 3                    Shift wise
        (more than                  DO                                                          Water, Supply Water
       445 samples)
                                    pH, Turbidity, Colour Index, Taste, FRC, TDS, Alkalinity,
                                    DO, Total Hardness, Nitrate, Iron, Fluoride, Ammonical      Raw Water, Treated
 4                    Weekly
                                    Nitrogen, Chloride, Chlorine Demand, BOD, COD, MPN          Water, Supply Water
                                    Index (17 parameters)
                                    All heavy metals as per IS 10500 including above 17         Raw Water, Treated /
 5                    Quarterly
                                    parameters                                                  Supply water
                      Twice in                                                                  Supply water to
 1                                  Turbidity, FRC
                      Supply hour                                                               consumer from WDS
           WDS
       (12 samples)                 pH, Turbidity, Colour Index, Taste, FRC, TDS, Alkalinity,
                                                                                                Supply water to
 2                    Weekly        DO, Total Hardness, Nitrate, Iron, Fluoride, Ammonical
                                                                                                consumer from WDS
                                    Nitrogen, Chloride, MPN Index (17 parameters)
         Consumer
 1      (more than    Daily         Odour, pH, TDS, Ammonical Nitrogen, FRC                     Consumer samples
       660 samples)
Operation & Maintenance Practices
Installation of SCADA System at WTP
   Installed SCADA (Supervisory Control          Benefits of SCADA
    and Data Acquisition) System at,
                                                      Optimization in deployment of
       Intake well machinery operations
                                                       manpower
       Booster / Pump House in water works
                                                      Remote monitoring and
       Water Treatment Plant – Plant unit             control
        operations                                    Reduction in overall
           250 MLD capacity WTP at Rander             maintenance and in down
            Water Works                                time, helps better inventory
           200 MLD capacity WTP at Sarthana           management for spares,
            Water Works                                consumables etc.
           150 MLD capacity WTP at Katargam          Rationalization in Utilization
            Water Works                                of equipments / machineries
                                                       (Transformers, pump sets
           150 MLD capacity WTP at Sarthana
                                                       etc.)
            Water Works
Operation & Maintenance Practices
Water Treatment Plants & Grid Network
   GRID System
       All Water Works and Water Distribution Stations are
        interlinked
       Any water works can feed water to any water distribution
        station
       Helped to restore entire water supply system within 36 hours
        during the floods of August 2006
Energy Efficiency and savings
measures
    Installation of thyristor based APFC panels
    Coating for Energy Saving to various pumps
    Rationalisation of contract demand at WW/ WDS etc.
    Replacement of pumps and trimming of impellers of pumpsets at
     various Water Works and Water Distribution Stations after energy
     audit.
    Replacement of Zero Velocity Valve
    Re-engineering in Water Supply routes
    Various Energy Saving measures        reduced specific energy
     consumption in water supply (Specific Energy Consumption has
     reduced from 355 KWH/ML to 279 KWH/ML)
Renewable Energy for Water Supply
Wind Power Generation:
•   Installed 2nos. of 1.5 MW Wind Power Plant
    at Village : Gosa, Dist.: Porbander
•   Total Expected energy generation: - 6.40 GWH/ annum
•   Total Expected energy saving : - Rs.2.83 Cr. per annum
•   Total Capital Investment: -           Rs.18.43 Cr.
•   Total O & M cost up to 10 years: - Rs.3.76 Cr.
•   Actual energy generated till Jan -2013: - 1.76 Crore Unit
•   Effective energy saving till Jan -2013: - Rs. 8.48 Crore
Renewable Energy for Water Supply
Wind Power Generation:
(Expected to be commissioned by Feb 2013 End)
• 8.4 MW capacity Wind Power Plant
• Total Expected energy generation: -
                           1.72 Crore units/ annum
•   Total Expected energy saving : -
                           Rs.7.4 Crore per annum
•   Total Capital Investment: -
                           Rs.52.18 Crore
Energy Efficiency
Total Energy Savings in Water Supply
        Conventional energy efficiency measures, re-
         engineering of water supply routes and wind
         energy generation, the total savings have
         reached a level of
          1.26 CroreKWH/ annum
          Rs. 5.96 Crores/ annum
            Energy Efficiency and savings measures -
             Results
                                           Water Supply (in MLD) Vs. Specific Energy Consumption
                                                                 (kWH/ML)
                              900.00
                                                                                                                                                                                                 836.42
                              800.00
                                                                                                                                                                                   789.10
                                                                                                                                                                     744.53
                                                                                                                                                       710.46
                                                                                                                                         689.81
                              700.00
                                                                                                                           655.31
(in Million Liters per Day)
                                                                                                             596.94
                              600.00                                                           567.09
      Water Supply
                                                                                 514.33
                              500.00                               478.58
                                                     454.60
                                       406.13
                              400.00
                              300.00
                                            355.99
                                                          349.08
                                                                        343.98
                                                                                      334.81
                              200.00
                                                                                                                  316.95
                                                                                                    316.03
                                                                                                                                305.04
                                                                                                                                              291.78
                                                                                                                                                                                                      285.07
                                                                                                                                                            280.43
                                                                                                                                                                          279.88
                                                                                                                                                                                        279.17
                              100.00
                                0.00
                                        2001-02       2002-03       2003-04       2004-05       2005-06       2006-07       2007-08       2008-09       2009-10       2010-11       2011-12       2012-13
Energy Savings in Operation and Maintenance
      Cost – Water Supply: FY 2011-12
                                                   Total Energy Cost is
             Depreciati
              on, 18.2                              Rs. 43.1 Crore
      Others, 4.6
                                                   Recurring Energy
Repairs & Raw                                       Saving by all means
                                 Electricity,
Maintenan Water
                                    47.8            is Rs.5.96 Crore.
 ce, 4.0 Charges
          (Water                                   Hence, through
          Cess),
           3.3
                                                    energy savings
              Wages &
                          Chemicals
                                                    measures, 13.83%
               Salary,
                 17.7          &                    savings towards
                          Consumab
                           les , 4.4
                                                    Electricity cost is
                                                    realized
    Total Annual O&M Cost : Rs.90.16 Crore
NRW reduction initiatives
•    Establishment of NRW Cell- Tasks on
    hand
    • Planning for comprehensive Water Audit
    •   Flow measurement & Metering
        •   Generations (100% implemented) – Non contact
            type – ultrasonic flow meters
        •   Distribution Stations (100% implemented) –
            Electromagnetic flow meters
        •   Consumer metering
             •   Consumers having connection sizes more than 0.5” are
                 metered
             •   All Industrial connections are metered (Electromagnetic
    WATER CONSERVATION PRACTICES
   Promoting Rain water harvesting system for ground
    water recharging
     As per DCR – Gujarat, it is mandatory to install RWH in
      all new development permission for High rise building and
      plot area more than 4000 m2.
     Rebate scheme for Rain Water Harvesting
       Residential societies, apartments
       Industrial units
       Open plots
       Subsidy offered by SMC for People participation – 50%
         of actual amount or Rs. 2000/- (whichever is less).
     SMC’s own premises/ buildings -198 Nos 6” to 8” dia.
      RWH completed till date.
Water Conservation – IEC Activity
   IEC Activities related to Water Conservation
       Designing & Execution of campaign
       Awareness program for water conservation
       Seminar, Workshop
       Survey
Water Conservation – IEC Activity
   Imparting Education: Visit of
     School going Children to all water works on
      continuous basis
     Colleges
     NGOs
                SLB – Water Supply
Target Vs. Achievement FY 2012-13 (Till Dec 2012)
                                                     Achievement   Service
                                           Target
         Performance Indicator                        2012-13 till  Level
                                          2012-13
                                                       Dec-2012 Benchmark
   Coverage                                 93%          94.2%       100%
   Per Capita Supply of Water             140 lpcd      140 lpcd    135 lpcd
   Extent of Metering                      5.8%          2.4%        100%
                                         Can be known after Water
   Extent of Non-revenue Water                                        15%
                                              audit results.
   Continuity of water supply            3.5 Hours     3.5 Hours     24x7
   Eff. in redressal of customer
                                            95%          98.5%        80%
   complaints
   Quality of Water Supplied               99.5%         99.9%       100%
   Cost Recovery                           100%          100%        100%
   Eff. In Collection of Water Charges      88%           90%         90%
Water Supply : Challenges of 21st Century
   To reduce sole dependency on surface
    source water, SMC has planned in the
    direction of alternate source of water in
    following ways;
     Construction   of 2 Radial collecting wells in
      river bed
     Construction of Balloon Barrage on the
      downstream of existing weir on river Tapi to
      create a water reservoir.
     Laying of pipeline from Kakrapar to Surat
Water Supply : Challenges of 21st Century
   To maintain the financial self sustainability
    by 100% recovery of O&M Cost by;
     100%  metering
     Creating public awareness for willingness to
      pay for the service of water.
     Regular revision of water charges
     Reducing NRW & UFW below 20%
     Encouraging PPP model for comprehensive
      O&M of 24x7 water supply system
Water Supply : Challenges of 21st Century
   To cope up with haphazard rapid urbanization on
    the outskirts of the city;
     Comprehensive Water Supply Master Plan is
      prepared for long term – up to year 2041
     Synchronized Water Supply Planning in Coordination
      with Urban Development Authority for the area
      surrounding the city.
   Better Water Supply Management by
     Utility Mapping in GIS (in progress)
     Phase-wise Implementation of 24x7 water supply
      system
     Technological up-gradation like SCADA for whole
      water supply system (presently it is already installed
      at Water Works)
Surat : Sewerage System
              Sewerage Scenario in Surat
                   Year 2012-13              Year 2014
Coverage           149 sq. km. (i.e. 76 % of 204 sq.km. (i.e. 100 % of
                   present habitable area & present habitable area)
                   92 % of total Population)
Length of sewer    1428 km.                   ~ 1600 km.
network
Sewage Pumping     35 Nos (1483.78 MLD)       58 Nos (1949.98 MLD)
Stations
Sewage Treatment   9 Nos. (726.5 MLD)         12 Nos (992.50 MLD)
Plants
                       Sewerage Zones and STPs
Total Existing Sewage Treatment Plants 9 nos.
Total Existing Capacity :726.5 MLD
     STP Under Augmentation– 3 Nos. –150 MLD
     STP Under Construction – 1 Nos.–66 MLD
      STP Under Planning– 2 Nos.–53 MLD
Preparing for Urban Challenges
in 21st Century – Sewerage
    Sewage Treatment Plants : Utilization of Latest Technologies
        compliance with the Discharge Norms of GPCB for Sewage
         Treatment
    Cost Effective Implementation : Sewage Pumping Station and
     Rising (Pumping) Main
    Energy Efficiency Reforms
        Sewage Gas Based Power Plant
        Carbon Credit : Clean Development Mechanism
    SCADA and Automation
    PPP Initiatives
        Common Effluent Treatment Plant
        Wastewater Recycling Project
    Efficient O&M Practices for Sewerage System
Sewage Treatment Plants :
 Utilization of Latest Technologies
 Sr.                  Year of      Capacity (MLD)
       STP Location                                     Process
 No                   commission   Design   Utilizing
 1     Anjana            1995       82.5        85      Conventional Activated Sludge
 2     Bhesan            1995       100        70       Conventional Activated Sludge
 3     Bhatar            1999      120+42     108       Conventional Activated Sludge+
                                                        SBR technology
 4     Karanj            1999       100        98       Conventional Activated Sludge
 5     Singanpore        2003      100+55     100       Conventional Activated Sludge+
                                                        SBR technology
 6     Bamroli           2002       100        65       UASB + Extended Aeration
 7     Asharma           2009        15         8       Moving Bed Bio Reactor
 8     Khajod            2009        25        15       Moving Bed Bio Reactor
 9     Variav-Kosad      2012        84        35       UASB + Moving Bed Bio Reactor
 10    Dindoli          Under        66         --      Conventional Activated Sludge
                       execution
 TOTAL                              726.5
                                              584
                                    +163
Sewage Pumping Stations
• Submersible Type Sewage Pumping Station
   •   Use of High Efficiency Sewage Submersible pumps
   •   Only Wet-Well is required – No Dry Well – Cost of Civil
       Construction and construction time is reduce substantially
Green Energy Generation
Sewage Gas Based Power Plants
    GAS SUCTION BLOWERS     H2S SCRUBBER SYSTEM   SEWAGE GAS HOLDER
   ENGINE FEEDING BLOWER   ENGINE-GENERATOR SET    FLARE STACK
Initiatives
Sewage Gas Based Power Plant:
     • First Sewage Gas to Electricity Generation at Anjana Sewage Treatment Plant of 0.5 MWe
         capacity was set up in 2003.
     • 3 another Sewage Gas based power plants each of 1 MWe capacity were commissioned in
         2008.
     • Additional two sewage gas based power plants each of 0.55 MWe and 0.75 MWe are installed
         and on verge of commissioning.
     • The total electricity generated till Dec 2012 from sewage gas is
          • 3.87 Crore units
          • worth Rs. 17.96 Crore
Carbon Credit:
     •    The proposal to get the carbon credit from 3 Sewage Gas Based Power Plant is approved by
          Ministry of Environment & Forest and is under process for validation and project registration
          at UNFCCC. It is estimated that the project would generate 58586 CER (Certified Emission
          Reduction).
Energy Efficiency
Total Energy Savings in Sewerage System
        Through Energy efficiency measures and Green
         Energy Generation through Sewage Gas has
         resulted the total savings of
          68.7 Lac unit per annum
          Rs. 3.18 Crores/ annum
Initiatives
  SCADA (Supervisory Control And Data Acquisition)
     • On existing 23 SPS and 6 STPs at project cost of Rs. 33 cr.
     • On line Data Monitoring and Controlling.
     • Advance Planning for preventive maintenance and reduced
       break down period
     • On line electrical data to be used to improve energy
       efficiency and energy audit
PPP Initiatives
PPP Initiatives
Common Effluent Treatment Plant (CETP)
 • Estimated Cost : Rs. 119.00 Crores
 • Project Components
     • Wastewater Collection Network – 21 km
     • Pumping Station - 140 MLD
     • Conveyance Line - 3.5 km
     • CETP - 100 MLD
 • Public Private Partnership :
     • Expenditure for Wastewater Collection Network, Pumping Station and
       Conveyance line will be borne by SMC
     • Expenditure for CETP will be borne by Pandesara Industries.
 • Commissioned in January 2011
                                                                     60
PPP Initiatives
Common Effluent Treatment Plant (CETP)
                    •   Effluent Pumping Station
           •   Common Effluent Treatment Plant (CETP)
                                                        61
Initiatives – Waste Water Recycling Project
Tertiary Treatment Plant
•   40 MLD Industrial Grade Tertiary Treated Water supply to Industries
    at Pandesara GIDC from Bamroli STP is under execution.
•   Commissioning of this project will help to reduce the load on
    drinking water resources.
                             Tertiary               Pandesara WDS
            Bamroli                                     UGSR                         Pandesara
                            Treatment
              STP                                   Industrial Grade                   Users
                              Plant                      Water
                                                                                 Pandesara WDS
                                                                                      UGSR
                                                                                   Potable Use
                      Existing facility                         New Facility to be developed,
                      Rehabilitate, Maintain, Use               maintained and used
Operation and Maintenance Cost – Sewerage System
                    FY 2011-12
     O & M Cost Break-up in %                     Total Energy Cost is
                     Others, 3                     Rs. 23.50 Crore
           Repairs &
          Maintenance                             Recurring Energy
              , 14
                                                   Saving by all means is
       Establishme                 Energy          Rs.3.18 Crore.
          nt, 19                 charges, 51
                                                  Hence, through
                                                   energy savings
           Depreciation,
               13                                  measures, 13.53%
                                                   savings towards
                                                   Electricity cost is
                                                   realized
    Total O&M Cost : Rs.46.02 Crore
                      SLB – Sewerage
            Target Vs. Achievement FY 2012-13
                                                Achievement
                                       Target
      Performance Indicator                      2012-13 (till Benchmark
                                      2012-13
                                                   Dec-12)
Coverage of Toilets                    98%          92%         100%
Coverage of Sewerage Network           98%          92%         100%
Collection efficiency of Network       96%         100%         100%
Adequacy of Sewage Treatment           100%        100%         100%
Quality of Sewage Treatment            96%        92.28%        100%
Extent of reuse and recycling of
                                       2.5%        2.29%        20%
Sewage
Efficiency in redressal of customer
                                       95%          98%         80%
complaints
Cost Recovery                          100%         95%         100%
Eff. In Collection of Sewage
                                       88%          90%         90%
Charges
Sewerage: Challenges of 21st Century
   To cope up against the challenge of rapid
    urbanization; following points are planned;
       No disposal of sewage to be allowed in open gutter/
        Nallah /ground by covering 100% city area under
        sewage network.
       Reuse & Recycle of sewage (zero disposal concept)
       Protection of water bodies/ ground water against
        pollution
       Conservation of ground water quality & quantity
       Controlled generation of sewage by imposing sewage
        tax
       To enhance public awareness about ill-effects of open
        defecation
Sewerage: Challenges of 21st Century
   To cope up with haphazard rapid
    urbanization on the outskirts of the city;
     Comprehensive Sewerage Master Plan is
     being prepared for long term – up to year
     2044.
     SynchronizedPlanning in Coordination with
     Urban Development Authority.
Thank You