Opp 23 6226085
Opp 23 6226085
______________________________________________________________________________
Customer Company Name: Seller Company Name:
OMV Tunisia ABB For Electrical Industries- ABB ARAB
______________________________________________________________________________
Tender Number: Quotation Number:
OPP-23-6226085
______________________________________________________________________________
Quotation Date: ABB Contact Person:
2023-07-31 Ahmed Hesham
ahmed.hesham@eg.abb.com
______________________________________________________________________________
Customer Address: Quotation type:
Commercial Training
______________________________________________________________________________
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
Country Egypt
Table of Contents
1. General conditions. _____________________________________________________ 3
1. General conditions.
Dear Sir, we are honored to receive your request, and replying with the most adequate
ABB solution. Please feel free to contact us back for any further requirements or inquiries.
Guarantee:
• All costs are in USD.
• The cost is including accommodation and transportation costs.
• Maximum number of candidates for one classroom are 8 Persons.
• Please find the course agenda attached.
• Please note that the course will be in English.
We reserve our right to adjust our prices if the exchange rate deviates at the PO date.
Order Confirmation: Our order Confirmation is the prevailing and final document in case
no reply received from your side within 48 hours this is a confirmation of acceptance of all
mentioned terms and conditions.
Any deviation in your PO from the above conditions or delay in advance payment will give
us the right not to execute unless approved in written from our sales responsible.
Other: - Please refer to the attached ABB general conditions.
Hoping that our offer meets your requirements; if you need any further clarification,
please do not hesitate to contact us.
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
3. Scope of Offer.
Yours faithfully,
ABB
GENERAL SALE CONDITIONS
شركة أيه بي بي
الشروط العامة للبيع
1) Validity of the offer: :) صالحية العرض1
1/1 The offer is valid for a period of (--) ( يومر تبرة من تاريخ--) يسرررر الع ض لمرة1/1
days starting from the offer date or .الع ض او ت يخ فتح المظ يف ايهم الحق
the date of opening the envelops
(whichever is latest)
1/2 The validity period of the offer can يمكن مة فت صالحية الع ض بن ء على طلب2/1
be extended upon a written request كت بي من العميل بش ط موافقة الش كة الكت بية
to be received from the Customer وو وة طلب العميل قبل انته ء مة الع ض
prior to the expiry of the original .األصلية
validity period provided a written
approval from the Company is
granted.
1/3 Beyond the validity period of the يحق للشر كة بعة انته ء المة األصرلية و المجةة3/1
offer, the Company shall be entitled تعةيل الشررر وط الع مة،لفت صرررالحية الع ض
to modify its General Sale للبيع واألسرررع وموعة التسرررلي و إلغ ء الع ض
Conditions, Delivery time and its . . كلي
prices or cancel the entire offer.
1/4 The Bid Bond, if any, shall not be ال يجوز تسرررييل خط ب الضرررم ن االبتةائي (إن4/1
forfeited unless the Customer has وجة) إال في ح لة إصةا العميل م ش اء و م
issued a purchase order/letter of إسرن ة بنفس شر وط الع ض إلى الشر كة ثن ء مة
award containing the same terms of صررالحية الع ض و فض الشرر كة قبوله و إب ا
the offer during its validity period وفي هذه الح لة تكون قيمة خط ب الضم ن.التع قة
which was rejected by the Company هي ك مل قيمة التعويض الذ يحصرل عليه العميل
or in the event where the Company من الشر كة لعة قبوله م الشر اء و م األسرن ة
refuses to execute the related .و التع قة
contract. In this case the value of the
Bid Bond shall be the total value of
يعتب م التو ية و اإلسررن ة الصرر ة من العميل
compensation due to the Customer
قبول منره لكر فرة الشرررر وط واألحكر الوا ة في
for rejecting the purchase
ع ض األسررررع وفي هذا المسررررتنة كم يلز ن
order/letter of award or contract.
يتضررمن تع قة بين الط فين على هذه الش ر وط
واألحكرر كحرررة ةني لتنظي العالقرررة فيمرر بين
.الط فين
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
2/1 (--) % of the total price as an advance من جم لي السع كةفعه مقةمه بشيك% )--( 1/2
payment by a certified check .مقبول الةفع علي بنك مقبول من الش كة و نقةا
withdrawn on a bank acceptable to
the Company or in cash. إذا ل يقو العميل بسةاة الةفعة المقةمرة خالل
و/شه من ت يخ م الش اء و م اإلسن ة و
If the advance payment is not paid
يكون للش كة الحق فى- يه سبق- التع قة
by the customer within Month from
فسخ التع قة مع مط لبة العميل بتعويض إتف قي
the date of the purchase
. من قيمة الةفعة المقةمة%10 قة ه
order/letter of award and/or
contract execution, whichever is
earlier, the Company shall have the من جم لي السع كةفعه خي بشيك% )--(
right to terminate the contract and مقبول الةفع علي بنك مقبول من الش كة و نقةا
claim an agreed compensation of و ذلك عنة ت يخ اإلستال اإلبتةائي
10% of the value of the advance المعةات و من ت يخ اإلستال/لألعم ل
payment from the Customer. الحكمي (مضي سبوعين علي إخط العميل
المعةات ج هز للفحص و/بأن األعم ل
(--) % of the total price as a final األستال وتق عس العميل عن الفحص و
payment by certified check اإلستال الفعلي خالل األسبوعين الت ليين علي
withdrawn on a bank acceptable to .) اإلخط
the Company or in cash upon
provisional acceptance date of the
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
equipment/works or deemed
acceptance date (the lapse of two
weeks after notifying the Customer
that works/equipment are ready for
testing and delivery and the failure
of the Customer to comply within
the two weeks following the
notification).
2/2 Upon the Customer’s request, an عنة طلب المشت ى تقو الش كة بإصةا خط ب2/2
advance letter of guarantee will be ضم ن الةفعة المقةمة بنفس قيمة وعملة مبلغ
issued by the Company for the same يكون خط ب ضم ن الةفعة. الةفعة المقةمة
amount and currency of the advance المقةمة س ي حتى ت يخ تو ية معةات و تنفيذ
payment. The advance letter of عم ل تمثل ك مل قيمته علي ن يت تخفيض قيمته
guarantee will be valid up to the بقيمة م ت تسليمه من عم ل و معةات طبق لم،
date of delivering إستال هو ث بت بموجب مح ض
equipment/rendering works .األعم ل و الفواتي التج ية/التو ية
representing its total value. The
value of the said letter of guarantee عنة طلب المشت ى تقو الش كة بإصةا خط ب
shall be reduced by the value of the ضم ن ضم ن لتنفيذ األعم ل و تسلي المعةات
works/equipment delivered as علي ن تنتهي. ) من إجم لي السع5%( بنسبة
evidenced by the minutes of
صالحية هذا الخط ب في ت يخ اإلستال اإلبتةائي
receipts of delivery/works and the
. و في ت يخ األستال الحكمي الس بق تع يفه
related commercial invoices.
2/3 The Company shall provide the تلتز الشر كة بمواف العميل ب ل سروم ت الفنية3/2
Customer with the technical اإلسن ة/ ) يو من ت يخ م التو ية15( خالل
drawings within (15) days from date و تر يخ التوقيع على العقرة و ذلرك إلعتمر ةهر
of the purchase order/letter of
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
award or the date of executing the وفي جميع الح الت لن تشرررتمل هذه.من العميل
contract for Customer’s approval. In وسرروف. ال سرروم ت علي سرروم ت التصررنيع
no event shall the said drawings تظل هذه ال سرروم ت ملكية خ لصررة للشر كة إال
include manufacturing drawings. ن العميررل لرره الحق في إسرررررتخررةامهر إلقر مررة
The property of the said drawings األعم ل و المعةات و بةء تشررغيله و إصررالحه
shall remain with the Company . و تعةيله و تشغيله و صي نته
however the Customer shall have
the right to use them with regard to يلتز العميرل برإعتمر ة ال سرررررومر ت الفنيرة خالل
erection, commissioning, repair, .) يوم من ت يخ إ س له إليه.15(
alteration, operation and
maintenance of the
works/equipment
2/4 In the event of a delay by the إذا تأخ العميل في اعتم ة ال سروم ت الفنية عن4/2
Customer in the approval of the المة المشرر إليه في الفق السرر بقة يت توقيع
technical drawings beyond the ) عن كل سررربو تأخي%0,5( غ امة تأخي
period referenced in the previous تحتسررررررب علي كر مررل قيمررة التعر قررة و م
sub-article, a delay liquidated ) من%5( األسرررن ة وبحة قصررري/الشررر اء
damages of (0.5%) per completed .األسرررن ة/إجم لى قيمة التع قة و م الشرر اء
week will be applied on the total كم يحق للش ر كة إذا م زاةت مة التأخي عن
contract value or purchase
- عشر سر بيع – ب إلضر فة إلي غ امة التأخي
order/letter of award. The
األسرن ة و مط لبة/ن تلغي العقة و م الشر اء
maximum liquidated damage for
العميل ب لتعويض المن سرب لجب المصر يف و
delay according to this sub-article
األضر ا المت تبة نتيجة لإللغ ء و ن تعتب ن
shall not exceed (5%) of the total
العميل قة وافق علي ال سروم ت حكمي و من ث
contract value or purchase
تسرررررتم في التنفيرذ و في هرذ الحر الت تمترة مرة
order/letter of award. In the event
.التنفيذ بمة تأخي العميل
where the delay exceeds 10 weeks,
the Company shall, in addition to
the delay liquidated damages, be إذا تأخ ت الشر كة في التو ية عن المة المشر
entitled to cancel the contract or إليهر في المر ة الثر لثرة يت توقيع غ امرة ترأخي
purchase order/letter of award and ) عن كل سربو تأخي تحتسرب%0,5( بواقع
claim an adequate compensation to علي سرررررع الجزء الرذ ت الترأخي قي تو يرةه
cover all costs and damages related ) من إجم لى قيمة التع قة و%5( وبحة قصري
to the cancellation or proceed with تعتب غ امة التأخي هي.األسن ة/م الش اء
execution as if the drawings have
been approved. In this event the التعويض الوحية للعميل بسبب التأخي و اليحق
له مط لبة الش كة بتعويض عن الض و فسخ
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
period of delivery shall be extended التع قة اال بعة اسررررتنف ذ الحة االقصرررري لغ امة
by the period of Customer’s delay. . الت خي
This quotation has been prepared in EGP . المنتج ت. ت إعةاة ع ض األسع ب لجنيه المص
The offered products inclusive of المع وضة تحتو علي مكون ت يت تصنيعه وتسليمه من
components are being manufactured and .المص نع ال ئيسية لةين في الخ ج
delivered from our feeder factories
abroad.
وفق لسع،سع الص ف المستخة في هذا الع ض
The exchange rate used in this offer , as per الص ف ال سمي اليومي الذ ت نش ه من قبل البنك
official spot rate published by Local .) في نفس ت يخ الع ضCIB( المص المحلي
Egyptian Bank (CIB) on same date of offer.
سيت إع ة حس ب سع العقة النه ئي وتعةيله ب ستخةا
The final contract prices will be سع الص ف الس ئة في وقت ط ح م الش اء وخالل
recalculated and adjusted using the عن سع٪2 -/+ فت التسلي في ح لة اختالف االسع
prevailing exchange rate at the time of سيؤة ذلك إلى تعةيل ين سب هذا، الص ف المط وح
purchase order placement and through the . الع ض/ المن قصة/ االختالف في سع العط ء
delivery period incase the deviation +/- 2%
from the spot rate quoted, this shall result
in an appropriate adjustment in that
portion of the tender/bid/offer price.
The Company shall have the right to يحق للشرررر كة مط لبة العميل بمصرررر يف التخزين في
charge storing costs to the Customer in ح لة تأخ و فض العميل إسررتال األعم ل و المعةات
case he is delayed in or reject to receive مشررررمول م الشرررر اء و التع قة من اليو الت لي لت يخ
the works/equipment contents of the . عاله1/2 اإلستال الحكمي المش إليه في البنة
purchase order or contract as of the day
following deemed acceptance date
referenced in 2/1 above.
4) Taxes : : الضــــــــرائب )4
The offer excludes the following : : ض األسع ال يشمل األتي ع
- Value Added Tax. ضرخبة القيمة المضرفة -
- Any other applicable taxes and stamp .ةمغ ت و ض ائب خ واجبة التطبيق -
duties.
5) Special conditions for variations: : ) شروط خاصة بالتعديالت5
The Customer shall, within one week يحق للعميل في خالل اسررربو من ت يخ م الشررر اء
from the purchase order and/or contract المعرةات/او التعر قرة طلرب تعرةيالت علي االعمر ل/و
date, be entitled to request variations to من قيمرة م%15 بر لنقص و الزير ة و في حرةوة
the requested works/equipment و التع قة و بحيث تكون التعةيالت المطلوبة/الشر اء و
providing it is limited to (+or- 15%) of
و/وا ة علي عم ل و معةات مسع في العقة و
the value of the purchase order and/or
م الشر اء و بشر ط موافقة الط فين الكت بية علي قيمة
contract and the said variations are
التعةيالت المطلوبة و ط يقة السرةاة و المة اإلضر فية
related to works or equipment priced in
الالزمرة لتنفيرذهر و التعرةيالت الالزمرة علي خطر بر ت
the contract and/or purchase order. The
. الضم ن قبل البةء في تنفيذ هذه التعةيالت
said variations shall require the written
approval of both parties on the value of
requested variations, method of
payment, extra time needed to execute it
and any variations related to the
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
The Company shall also have the right to كم يحق للشر ر كة يضر ر الحصرررول علي تعةيل كت بي
obtain a written variation order for the ، بمر في ذلرك مرة التنفيرذ، و التعر قرة/ألم الشرررر اء و
purchase order and/or contract,
:من العميل في الح الت األتية
including execution time, from the
Customer in the following events:
5/1 If the Company was delayed in its إذا ترأخ ت الشرررر كرة في ةاء إلتزامر تهر نتيجرة1/5
performance as a result of و إمتن عن تصر ف من قبل العميل/لتصر ف و
Customer’s act and/or omissions, .و نتيجة لعة تنفيذ العميل أل من إلتزام ته
or failure to fulfill any of its
obligations.
5/2 In the event where there is a change إذا حرةث تعرةيرل في القوانين و اللوائح بعرة تر يخ2/5
in the laws or regulations after the التعر قرة و علي م الشرررر اء نتج عنهر زير ة في
date of the Contract or purchase و/عب ء الشرررر كة الم لية الم تبطة بتنفيذ العقة و
order result in increasing the م الشرر اء و تأخي الشرر كة في مواعية تسررلي
Company’s financial liabilities in .المعةات/األعم ل
association with executing the
Contract and/or purchase order or
result in delaying the Company in
delivering the works/equipment.
When a defect in a part of the works إذا ت معر لجرة العيرب الموجوة في األعمر ل المقرةمرة
supplied by the Company has been فأن الشر ر كة تكون مسرررئولة عن، من قبل الشر ر كة
remedied, the Company shall be العيوب في الجزء المسررررتبةل و الذ ت إصررررالحة
liable for defects in the repaired or .بنفس شر وط الضرم ن األصرلي لمة سرنة واحة فقط
replaced part under the same terms م ب لنسررربة لب قي جزاء األعم ل فأن فت الضرررم ن
and conditions as those applicable سررررروف تمرة لفت ممر ثلرة للفت التي كر نرت األعمر ل
to the original works for a period of . فيه ال تعمل نتيجة لوجوة العيب
one year. For the remaining parts of
the works the warranty period shall يصرررة العميل شررره ة القبول النه ئية للشررر كة في
be extended only by a period equal to خالل سرربو من ت يخ نه ية فت الضررم ن المش ر
the period during which the works .إليه عاله
have been out of operation as a
result of the defect.
b) The warranty shall be revoked if the ب) يلغي الضرررررمر ن في حر لرة قير العميرل بعمرل ى
Customer has undertaken تعةيالت و إصالح ت للمعةات و األعم ل المو ة
modifications or repairs on the سرواء بمع فته و بواسرطة ط ف ث لث ةون موافقة
supplied equipment or works by .كت بية مسبقة من الش كة
itself or by using a third party
without a prior written consent from
the Company.
7) Tests: : ) االختبــــــــــــارات7
The company shall conduct routine tests تقو الشررر كررررررررة بإج اء اإلختب ات ال وتينية على
on the manufactured equipment in IEC المهم ت المصرنعرررررره طبق للمواصرف ت القي سرية
accordance with IEC standard وعرررررررررلى سرررر س، ب لنسرررربه لإلختب ات ال وتينيه
specifications for routine tests and on المواصررف ت المتع قة عليه كم تقو الش ر كة ب صررةا
the basis of the contracted .شه ةه إختب تفية بذلك
specifications. The company shall
accordingly issue a test certificate
evidencing the same.
و ترقرر عرس الرعرمريرررل عرن حضرررررو لرن يرعريرق ترررأخر
The delay or failure of the Customer to اإلختبر ات في الموعرة المحرةة من قبرل الشرررر كرة عن
attend the tests in the time set by the يحق للشرر كة.إتم اإلختب ات و إعتب نت ئجه ةقيقة
Company shall not obstruct the Company
المعرةات اإلختبر ات/في حر لرة عرة إجتير ز األعمر ل
from proceeding with the tests and deem
و/بتك ا ه قبل ن يحق للعميل فسرررخ م الشرر اء و
its results accurate. The Company, in the
event of tests failure, shall have the right .التع قة
to repeat the tests before the Customer
becomes entitled to terminate the
purchase order and/or contract.
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
c) The Parties are aware of the shortage of جر) الط ف ن على ة اية ت مة ب لنقص في المواة الخ
raw materials, electronic components والمكون ت اإللكت ونية و ع اقيل الشحن في جميع نح ء
worldwide which is likely to last for the ، والذ من المحتمل ن يستم في المستقبل الق يب، الع ل
foreseeable future, as well as of market فضال عن التقلب ت التي يع ني منه السوق فيم يتعلق بتواف
fluctuations in the availability and cost وتكلفة المواة الخ األخ ى والسلع والمكون ت األخ ى ب لغة
of other raw materials, commodities, و التقلب ت التي يع ني منه/ وكذلك العجز في و،األهمية
other critical components as well as قة ات/السوق فيم يتعلق بتواف وتكلفة القة ات اللوجستية
shortage and/or market fluctuation in / بغض النظ عن ّ شيء يخ لف ذلك في العقة.النقل
availability and cost of بعة- إذا ط ت ّ تغيي ات، م الش اء/ الش وط واألحك
logistic/transportation capacities. ع ض ش كة إيه بي بي و خالل فت تنفيذ/ت يخ مقت ح
Notwithstanding anything to the و تواف المكون ت/ على وض السوق و- م الش اء/العقة
contrary in the contract/terms and
اإللكت ونية والمواة الخ والسلع وقة ات النقل بم قة يؤث
conditions/purchase order, if after the
على تنفيذ ش كة إيه بي- سواء بشكل مب ش و غي مب ش-
) اللتزام ته بم يعة قو ق ه خ جة عن آ اةABB( بي
date of ABB’s proposal / offer or during
تستحق ش كة إيه بي بي تمةيةا في الجةول الزمني،الط ف ن
the term of the performance of the
لتنفيذ و تسلي نط ق األعم ل التي تأث ت بشكل مب ش و
contract/purchase order there are any
وفي مثل هذه. م الش اء/غي مب ش بموجب العقة
changes to availability and / or market
يجتمع الط ف ن ةون تأخي ويتن قش بحسن نية،الظ وف
conditions for electronic components,
مع إج اء التعةيالت الع ةلة على،إليج ة حل مقبول للط فين
raw materials, commodities and
يق. م الش اء/توا يخ التسلي و اإلنج ز بموجب العقة
transportation capabilities directly or
ويوافق العميل على نه في ح لة حةوث الظ وف المذكو
indirectly affecting ABB’s performance,
فقة ال تتمكن ش كة إيه بي بي من االمتث ل للجةول الزمني
ABB shall be entitled to relief in the
للتسلي و اإلنج ز المتفق عليه في البةاية و ن ش كة إيه بي
schedule of the performance or delivery
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
of the directly or indirectly affected ّ تعويض ت مقطوعة و فعلية في بي لن تكون مسؤولة عن
scope of work under the .هذا الشأن
contract/purchase order. In such
circumstances, the Parties shall meet
without delay and discuss in good faith
to find a mutually agreeable solution,
with equitable adjustment to the
contract/purchase order date of delivery
or completion. Customer hereby
acknowledges and agrees that in said
circumstances ABB may not be able to
comply with the originally agreed
delivery or completion schedule and that
ABB shall not be liable for any liquidated
or actual damages in connection
thereto.”
12.1.1 abandon the contract and/or م الشرررر اء و الفشرررررل في برةء/ عرة تنفيرذ العقرة1/1/12
purchase order or fail to commence the يو بعرة تحقق كرل30 األعمر ل و تصرررررنيع المعرةات لمرة
works or manufacturing the equipment الش وط الوا ة في الفق األولي من الم ة الث لثة عاله ; و
for thirty (30) days after the fulfilment of
all the requirement referenced in para-
one of clause 3 above; or
12.1.2 fails to remedy a material default 60 خالل الفشرررررل في معر لجرة خطرأ جوه2/1/12
within 60 days after receiving a notice يوم من ت يخ إسررتال إخط من العميل موضررح الخطأ و
from the Customer specifying the default . مط لب الش كة ب لبةء في عالجه في خالل عش ي
and requesting the Company to
commence remedy within 10 days. م الشر اء بمج ة/ففي هذه الح الت يحق للعميل إنه ء العقة
.اإلخط الكت بي
Then the Customer shall have the right to
terminate the Contract and/or purchase
كمرر يحق للعميررل تعويض عن األضرررر ا لتغطيررة ك ر فررة
order forthwith by simple written notice.
The Customer shall be entitled to .المص يف اإلض فية المت تبة علي اإلنه ء
damages, covering all additional costs,
the Customer may incur due to the و/ب ل غ مم تقة فأن العميل ليس له الحق في إنه ء العقة و
termination. م الش ر اء نتيجة للتأخي في التسررلي و عيوب التصررنيع إال
. إذا ستنفذت الغ ام ت الم تبطة به
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
The Customer has the right to terminate و م/ إنه ء العقة و- يحق للعميل – حسررب غبته المنف ة
the Contract and/or purchase order or الشرررر اء و جزء منهم بةون بةاء سررررب ب في وقت
any part thereof without cause at any
.بمج ة اإلخط الكت بي للش كة
time at the Customer’s sole discretion by
written notice to the Company.
سرروف تقو الش ر كة فو إسررتال األخط المش ر إليه عاله
Immediately upon receipt of such notice
وفي هذه الح لة سروف يقو العميل بتعويض.بإيق ف األعم ل
the Company shall stop all progress of الشرر كة عن قيمة األعم ل التي ت تنفيذه حتي ت يخ اإلنه ء
the works. بح بر إلضررر ر فرة إلي تكر ليف إلغر ء عقوة%10 بمر في ذلرك
In this case, the Customer shall pay the الب طن و مشررت ي ت تكون قة طلبت بمع فة الشرر كة و ت
Company for work executed to date of تسررررليمه و التي يلز علي الشرر ر كة ق نون إسررررتالمه (هذه
termination including 10% profit, costs المشرت ي ت تصربح ملكية العميل بمج ة سرةاة العميل ثمنه ) و
due to cancellation of subcontracts and كذلك ك فة المصرر يف المب شرر و الغي مب شرر المت تبة
for purchases ordered before the كم يحق للشرر كة يضرر المط لبة بنسررة.علي إيق ف األعم ل
termination which have been delivered or . و م الش اء/ من قيمة العقة و%10
which the Company is legally bound to
accept delivery of (such purchases will
upon payment become the property of
the Customer) and other verified
reasonable direct and indirect additional
expenses for discontinuing the Works.
The Company shall also have the right to
claim a termination fee on the basis of
10% of the total Contract and/or
purchase order price.
12.3 Termination by the Company for اإلنهـاء بمعرفـة الشـــــركـة لمخـالفـة العميـل شـــــروط3/12
default by the Customer أمر الشراء/العقد
The Company shall have the right to و م الشر ر اء في ح لة مخ لفة/يحق للشر ر كة إنه ء العقة و
terminate the Contract and/or purchase و م الشر ر اء/العميل أل من إلتزام ته الوا ة في العقة و
order in the event where the Customer . يوم90 و ستم اإلخالل لمة
fails to comply with any of its obligations
MOSE
ABB FOR ELECTRICAL INDUSTRIES – ABB ARAB
it considers necessary if the Customer – علي سررررربيرل المثر ل ال الحصرررر – تسرررر يح المعرةات و
default in any of its obligations األشرررخ ص و إع ةته و كذلك تك ليف إيق ف وام الشررر اء
referenced in the contract and/or التي صرررة ته الشررر كة كم سرررتشرررتمل هذه التك ليف علي
purchase order including timely making مصررررر يف الحفر ظ علي المعرةات و األعمر ل و تخزينهر و
due payments to the Company. و في جميع الح الت سرروف تمنح الشر كة فت. التأمين عليه
إضر فية لتسرلي األعم ل تسر و فت اإليق ف و تسر و فت
The Company shall be compensated by الترأخي في تنفيرذ األعمر ل إذا كر نرت فت الترأخي تتعرة فت
the Customer for payments for . اإليق ف ذاته
Works/equipment performed prior to
suspension and for the additional direct و في جميع الحر الت سرررررواء كر ن اإليقر ف اجع للعميرل و
and indirect costs incurred by the و م الشر اء/ سرروف يحق للشر كة إنه ء العقة و، الشر كة
Company in giving effect to the
. يوم90 إذا م تعةت فت اإليق ف
Customer’s instructions under this
article. This will include but not be
limited to demobilization/
remobilization costs and the costs
related to suspended purchase orders.
Such costs shall also include the costs of
protection, storage and insurance of
equipment/works. In all events the
Company shall be granted a time
extension corresponding to the period
of suspension or to the period of delay in
the execution of the Works/equipment if
it exceeds the period of suspension
itself.
In the event where the Customer في حر لرة تع ض العميرل أل مطر لبرة من ط ف ثر لرث ثنر ء
receives third party claim/s, during the فت الضرم ن تخص المعةات المقةمة من الشر كة علي سر س
warranty period, related to the نهر تخ لف حقوق الملكية الفك ية لهذا الط ف فأن الشرررر كة
Company’s breach of the intellectual تلتز إم بإسررتبةال المعةات بأخ ليس به مخ لفة و تعةيل
property rights of that said party, then المعةات بحيث تصربح غي مخ لفة و الحصرول علي خصرة
the Company shall be responsible to و في جميع الحر الت تكون مسرررررؤوليرة. من مر لرك العالمرة
either replace the equipment or adjust الشر كة في هذا الشرأن ضرمن إجم لي حةوة المسرئولية الوا ة
the equipment so it becomes non- ) من هذه الشرررر وط كم ن الشرررر كة التكون10( في الم ة
infringing or get a license from the مسرررررؤولرة عن يرة مطر لبر ت تحرةث بعرة تر يخ إنتهر ء فت
owner of the Intellectual Property Rights. .الضم ن
In all events the liability of the Company
shall be part of the total liability of the
company as referenced in Article 10
herein mentioned and the Company will
not be liable for any claims after the
expiry of the warranty period.
Company liability for indemnification shall يقتص ر إلتزا الش ر كة ب لتعويض في المسررئولية المةنية على
be limited to death or injury to persons and حر الت الوفر واإلصرررر برة البرةنيرة وكرذلرك األضرررر ا المر ةيرة
loss of or damage to tangible third party . لممتلك ت الغي
property.
The third party right to claim ينتهى حق الغي فى المطر لبرة بر لتعويض عنرة إنتهر ء فت
indemnification expires at the end of .الضم ن
warranty period.
In the event where a third party raises a في حر لرة قير ط ف ثر لرث بمطر لبرة العميرل بتعويض عن
claim against the Customer for the 17( من هذه الم ة2 األضرررر ا المشرررر إليه في الفق
damages referenced in paragraph 2 of this يحق للشرر كة الةف عن نفسررره وتمثيل نفسررره،)التعويض
Article (17 Indemnification), the Company .م المحكمة المختصة
shall have the right to defend and represent
itself before competent court.
invalidate all the commitments, الط فين والم تبطة ب لموضررررو محل هذا المسررررتنة ويمثل
representations, understandings, and .حص ي ك مل االتف ق والتف ه بين الط فين
agreements between the parties relating
to the subject matter here of and sets for
the entire and exclusive agreement and
understanding between the parties hereto
relating to the subject matter hereof.
Note: :ملحوظة
The documents produced at a later date المسرتنةات ذات الت يخ الالحق سروف تسربق المسرتنةات ذات
shall take precedence over a document of .الت يخ الس بق
an earlier date.
الجةاول المتضررمنة معلوم ت فنية مضررمونة والمعة بمع فة
Schedules containing guaranteed technical و المعةات سررروف تسررربق المواصرررف ت/المو ة لألعمرل و
data for works and/or equipment (filled in
.الفنية للعميل
by the supplier) shall be placed on higher
priority than the Customer’s technical data.
21. Confidentiality of Information ) سرية المعلومات21
Both parties shall be obligated to protect يلتز كال الط فين ب ر لمح ر فظررة علي سرررر يررة المعلوم ر ت
the confidential information (written and (المكتوبرة والمحفوظرة الكت ونير ) الخر صرررررة بر لط ف األخ
electronically kept) of the other party for و م/لمة سررنة الحقة على ت يخ االنته ء من تنفيذ العقة و
a period of one year following the delivery الشر ر اء على ن يسرررتبعة من هذا االلتزا المعلوم ت المت حة
of the subject matter of the contract .للع مة والتي ت الحصول عليه بط يق مش وعة
and/or purchase order. The said
obligation excludes material which is
publicly available and legally obtained.
In case these amicable attempts fail, the م ل ينص على غي ذلك وتطبيق الق نون المةني المصرر ر
Egyptian Civil Law shall be applied under .في التع قة
the jurisdiction of Cairo courts unless
mentioned otherwise in the contract.
23.The Customer shall provide the Company حةيثة من يتعين على العميل مواف الشرررر كة بصررررو23
with a recent copy of the following :المستنةات اآلتية
documents: 6 (ل يمض على ت يخ صرةو ه ) السرجل التج
a) commercial register (less than 6 .) شه
months old). ب) البط قة الض يبية
b) Tax Card ج) البط قة الشررخصررية للمةي المسررؤول حسررب م هو
c) The ID of the authorized signatory as وا ة في السجل التج
per the commercial register. ة) خلزم وجوة تفويض كتر بي و توكيرل سرررررمي في حر لرة
d) a proxy or an official power of
و م الشررر اء بمع فة شرررخص غي/التوقيع على العقة و
attorney shall be required if the
. الوا ة سمه في السجل التج
person signing the contract and/or
purchase order is different from
that referenced in the commercial
register.