Chapter 12 Revision Highlights
Chapter 12 Revision Highlights
HIGHLIGHTS
Pages which have been revised are outlined below, together with the Highlights of the
Revision
--------------------------------------------------------------------------------------
CH/SE/SU C                REASON FOR CHANGE                        EFFECTIVITY
   PAGES
--------------------------------------------------------------------------------------
CHAPTER 12
__________
                                                        12-HIGHLIGHTS Page    1 of   3
                                                        REVISION NO. 05      May 01/11
   UZB
--------------------------------------------------------------------------------------
CH/SE/SU C                REASON FOR CHANGE                        EFFECTIVITY
   PAGES
--------------------------------------------------------------------------------------
             REVISED WORDING
             WARNING/NOTE/REASON FOR THE JOB AMENDED        ALL
                                                        12-HIGHLIGHTS Page    2 of   3
                                                        REVISION NO. 05      May 01/11
   UZB
--------------------------------------------------------------------------------------
CH/SE/SU C                REASON FOR CHANGE                        EFFECTIVITY
   PAGES
--------------------------------------------------------------------------------------
202, 211
                                                       12-HIGHLIGHTS Page    3 of   3
                                                       REVISION NO. 05      May 01/11
   UZB
                                              CHAPTER 12
                                              __________
SERVICING
                                                                           12-L.E.P. Page    1
                                                                                     May 01/11
   UZB
CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE
                                                                                 12-L.E.P. Page    2
                                                                                           May 01/11
   UZB
CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE
                                                                                 12-L.E.P. Page    3
                                                                                           May 01/11
   UZB
CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE
                                                                                 12-L.E.P. Page    4
                                                                                           May 01/11
   UZB
CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C   PAGE    DATE
                                                                                 12-L.E.P. Page    5
                                                                                           May 01/11
   UZB
CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE
                                                                                 12-L.E.P. Page    6
                                                                                           May 01/11
   UZB
CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C   PAGE    DATE
                                                                                 12-L.E.P. Page    7
                                                                                           May 01/11
   UZB
CH/SE/SU   C     PAGE    DATE      CH/SE/SU   C       PAGE    DATE      CH/SE/SU   C   PAGE    DATE
                                                                               12-L.E.P. Page    8
                                                                                         May 01/11
   UZB
                                        CHAPTER 12
                                        __________
SERVICING
                                    TABLE OF CONTENTS
                                    _________________
    _______
    SUBJECT                                      ________
                                                 CH/SE/SU   C
                                                            _   PAGE ___________
                                                                ____ EFFECTIVITY
    SERVICING - GENERAL
    ___________________                          12-00-00
        DESCRIPTION AND OPERATION                                  1   ALL
          General                                                  1   ALL
          NO STEP Areas                                          1   ALL
          Ground Service Connections                               1   ALL
          Drainage Points                                          4   ALL
     ____________________
      SERVICING - GENERAL                        12-00-00
        MAINTENANCE PRACTICES                                    201   ALL
          Installation of the Wingrip                            201   ALL
    ____________
    REPLENISHING                                 12-10-00
        DESCRIPTION AND OPERATION                                  1   ALL
          General                                                  1   ALL
    FUEL                                         12-11-00
        DESCRIPTION AND OPERATION                                  1   ALL
          General                                                  1   ALL
      FUEL SYSTEM                                12-11-28
        SERVICING                                                301   ALL
          General Refuel/Defuel Safety                           301   ALL
          Procedures
          Refuel/Defuel Safety Procedures                        307   ALL
          for use in the Hangar
          Pressure Refuel with Automatic                         309   ALL
          Control
          Pressure Refuel with Manual                            318   ALL
          Control
          Pressure Refuel without Electrical                     325   ALL
          Power
          Procedure to use the ADIRU to Find                     332   ALL
          the Pitch and Roll Data
          Procedure to use the FQIC Input                        335   ALL
          Parameters to Find the Pitch and
          Roll Data
          Use of Magnetic Level Indicators                       339   ALL
          (MLI)
                                                                  12-CONTENTS      Page 1
                                                                                May 01/10
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    SUBJECT
    _______                                    CH/SE/SU
                                               ________   C
                                                          _   ____ ___________
                                                              PAGE EFFECTIVITY
            Hydraulic Fluid Property                             4 ALL
            In-Service limits.
            Specifications of Mineral Base                       6   ALL
            Fluids
            Safety Precautions (Ref. TASK                        6   ALL
            29-00-00-910-00200).
      HYDRAULIC POWER                          12-12-29
        SERVICING                                              301   ALL
          Fill the Hydraulic Fluid Reservoir                   301   ALL
          with a Hand Pump
          Fill the Hydraulic Fluid Reservoir                   310   ALL
          with a Hydraulic Service Cart
      LANDING GEAR                             12-12-32
        SERVICING                                              301   ALL
          Check Shock Absorber Fluid Level                     301   ALL
          NLG Shock Absorber Oil                               332   ALL
          Replenishment and Nitrogen Filling
          (Aircraft on Jacks)
          Check of MLG Shock Absorber Fluid                    349   ALL
          Level
          Hydraulic Replenishment of the MLG                   358   ALL
          Two-Stage Shock Absorber
          Replenishment of the MLG Torque                      372   ALL
          Link Damper
          Check NLG Shock Absorber Fluid                       378   ALL
          Level and Charge Pressure
          (Two-Point Check - Aircraft on
          Jacks to start)
          Check NLG Shock Absorber Fluid                       390   ALL
          Level and Charge Pressure
          (Two-Point Check - Aircraft on
          Ground to start)
          Check of NLG Shock Absorber Charge                  A302   ALL
          Pressure and Fluid Level
          Check of NLG Shock Absorber Charge                  A316   ALL
          Pressure and Fluid Level
    OIL                                        12-13-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
      ELECTRICAL POWER                         12-13-24
        SERVICING                                              301   ALL
          Draining of the Oil from the IDG                     301   ALL
          IDG Servicing - Filling of the IDG                   308   ALL
          with Oil or Addition of Oil after
          a Level Check
                                                                12-CONTENTS      Page 2
                                                                              Aug 01/10
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    ________
                                               CH/SE/SU   C
                                                          _   PAGE ___________
                                                              ____ EFFECTIVITY
      FLIGHT CONTROLS                          12-13-27
        SERVICING                                              301   ALL
          Oil Replenishment of the THS                         301   ALL
          Actuator (9CE)
          Oil Replenishment of the Flap PCU                    308   ALL
          (6201CM) Gearbox
          Oil Replenishment of the Slat PCU                    313   ALL
          (6001CM) Gearbox
          Drain and Refill Flap Actuator                       318   ALL
          Assemblies with Semi-fluid
      HYDRAULIC POWER                          12-13-29
        SERVICING                                              301   ALL
          Servicing of the Ram Air Turbine                     301   ALL
          (RAT) 2GE
      APU                                      12-13-49
        SERVICING                                              301   ALL
          Check APU Oil Level and Replenish                    301   ALL
      ENGINE OIL                               12-13-79
        SERVICING                                              301   ALL
          Check oil level and replenish                        301   ALL
          Check Pop Out Indicator of EMCD
          (Electrical Master Chip Detector)
          Check oil level and replenish                        311   ALL
          (Pressure Filling)
          Oil Tank Draining                                    315   ALL
          Draining of the Accessory Drive                      320   ALL
          Section
          Flushing of Oil System                               325   ALL
    ENGINE STARTING                            12-13-80
        SERVICING                                              301   ALL
          Drain and Replenish Oil System                       301   ALL
          Replenish Oil System                                 306   ALL
    GAS                                        12-14-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
      HYDRAULIC POWER                          12-14-29
        SERVICING                                              301   ALL
          Fill the Hydraulic Power                             301   ALL
          Accumulators 1070GM/2070GM/3070GM
          with Nitrogen
      LANDING GEAR                             12-14-32
        SERVICING                                              301   ALL
          Nitrogen Filling of the Tires                        301   ALL
          Nitrogen Filling of the Yellow                       306   ALL
          Hydraulic System, Brake Pressure
                                                                12-CONTENTS      Page 3
                                                                              Aug 01/10
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    CH/SE/SU
                                               ________   C
                                                          _   PAGE ___________
                                                              ____ EFFECTIVITY
          Accumulator
          Check of MLG Shock Absorber Charge                   314   ALL
          Pressure
          Inspection of the MLG Shock                          344   ALL
          Absorbers Before Flight
          Check NLG Shock Absorber Charge                      348   ALL
          Pressure
          Check NLG Shock Absorber Bottoming                   380   ALL
      OXYGEN                                   12-14-35
        SERVICING                                              301   ALL
          Servicing of the                                     301   ALL
          Oxygen-Replenishing
    WATER                                      12-15-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
          Description                                            1   ALL
      POTABLE WATER                            12-15-38
        SERVICING                                              301   ALL
          Fill the Potable Water Tank System                   301   ALL
          (Aircraft Electrical Power
          Available)
          Fill the Potable Water Tank System                   307   ALL
          (Aircraft Electrical Power not
          Available)
    LAVATORY                                   12-16-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
          Description                                            1   ALL
      LAVATORY ARTICLE                         12-16-25
        SERVICING                                              301   ALL
          Servicing of the Liquid Soap                         301   ALL
          Dispenser
      TOILET SANITARY FLUID                    12-16-38
        SERVICING                                              301   ALL
          Servicing of the Toilet System                       301   ALL
                                                                12-CONTENTS      Page 4
                                                                              Aug 01/10
R
    UZB
                                       CHAPTER 12
                                       __________
SERVICING
                                    TABLE OF CONTENTS
                                    _________________
    SUBJECT
    _______                                     CH/SE/SU
                                                ________   C
                                                           _   PAGE ___________
                                                               ____ EFFECTIVITY
    ___________________
    SCHEDULED SERVICING                         12-20-00
        DESCRIPTION AND OPERATION                                 1   ALL
          General                                                 1   ALL
    CLEANING                                    12-21-00
        DESCRIPTION AND OPERATION                                 1   ALL
          General                                                 1   ALL
      EXTERNAL CLEANING                         12-21-11
        SERVICING                                               301   ALL
          External Cleaning                                     301   ALL
      INTERNAL CLEANING                         12-21-12
        SERVICING                                               301   ALL
          Cleaning of the Cockpit                               301   ALL
          Display-Units
          Cleaning of the Cockpit                               305   ALL
          Equipment/Furnishings
          Cleaning of the Carpets and                           311   ALL
          Non-Textile Floor Covering (NTF)
          Cleaning of the Plastic Surfaces                      317   ALL
          and Mirrors
          Cleaning of the Seat Covers and                       322   ALL
          the Curtains
          Cleaning of the Light Alloy and                       325   ALL
          Steel Components
          Cleaning of the Cargo Compartments                    327   ALL
          Cleaning of the Cabin Monitors and                    331   ALL
          Display Screens (if installed)
          Cleaning of the Plastic Wash Basin                    332   ALL
          in the Lavatories
          Cleaning of the Galleys                               336   ALL
          Disinfection of the Aircraft                          339   ALL
          Equipment and Furnishing
          Disinsectization of the Aircraft                      344   ALL
          Equipment and Furnishing
          Fumigation of the Fuselage                            350   ALL
          Pressurized Areas with
          Carbon-Dioxide (CO2 Gas)
          Special Precautions to Apply                          361   ALL
          Insecticide Agent in Auxiliary
          Area Compartments and Cargo
          Compartments, during Turn-Around
      DUST REMOVAL                              12-21-13
        CLEANING/PAINTING                                       701   ALL
          Cleaning of the Avionics                              701   ALL
          Compartment and the Cockpit
                                                                 12-CONTENTS      Page 5
                                                                               Feb 01/11
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    CH/SE/SU
                                               ________   C
                                                          _   ____ ___________
                                                              PAGE EFFECTIVITY
          Cleaning of the Grids of the 70VU,                   723 ALL
          103VU, 106VU and 107VU
    LUBRICATION                                12-22-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
            Equipment and Materials                              1   ALL
            Lubricant Grease Specifications                      1   ALL
            General Requirements                                 2   ALL
            Lubrication Symbols                                  2   ALL
      FLIGHT CONTROLS                          12-22-27
        SERVICING                                              301   ALL
          Lubrication of Trimmable                             301   ALL
          Horizontal Stabilizer Actuator
          Ball Screw Nut
          Lubricate all Carriage Rollers on                    309   ALL
          all Flap Tracks
          Lubrication of Spoiler No.1 to 5                     316   ALL
          Servo Control Bearings
          Lubrication of all Slat Track                        322   ALL
          Rollers, Pinion Bearings, Pinions
          and Rack Teeth
          Lubrication of the THS Mechanical                    329   ALL
          Control Chains
          Lubrication of the THS Rear Cable                    337   ALL
          (Area of Tension Regulator)
      HYDRAULIC POWER                          12-22-29
        SERVICING                                              301   ALL
          Lubrication of the Ram Air Turbine                   301   ALL
          (RAT) Door Hinges
      LANDING GEAR                             12-22-32
        SERVICING                                              301   ALL
          Lubrication of Main Landing Gear                     301   ALL
          and Doors
          Lubrication of Nose Landing Gear                     319   ALL
          and Doors
      DOORS                                    12-22-52
        SERVICING                                              301   ALL
          Lubrication of the FWD and AFT                       301   ALL
          Cargo-Compartment Doors
          Lubrication of the Door-Warning                      314   ALL
          Proximity-Switch
          Actuating-Mechanism
          Lubrication of the External                          318   ALL
          Control Handles of the FWD and AFT
          Passenger/Crew Doors
                                                                12-CONTENTS      Page 6
                                                                              May 01/11
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    CH/SE/SU
                                               ________   C
                                                          _   ____ ___________
                                                              PAGE EFFECTIVITY
          Lubrication of the BULK-Cargo                        323 ALL
          Compartment-Door Handle and Hinge
          Arms Bearings
          Lubrication of the Avionics                          328   ALL
          Compartment-Door Handles
          Lubrication of the FWD and AFT                       332   ALL
          Cargo-Compartment Door Handle
          Lubrication of Safety Pin Guide                      338   ALL
          Fitting and Door Arming/Disarming
          Mechanism
          Lubrication of the Hinge-Arm                         344   ALL
          Support-Fitting Bearings
      FUSELAGE                                 12-22-53
        SERVICING                                              301   ALL
          Lubrication of Trimmable                             301   ALL
          Horizontal Stabilizer Bearings and
          Attachment Fittings with Grease
          Mat. No. 04-004
          Lubrication of Trimmable                             305   ALL
          Horizontal Stabilizer Bearings and
          Attachment Fittings with Grease
          Mat. No. 04-037
      STABILIZERS                              12-22-55
        SERVICING                                              301   ALL
          Lubrication of Rudder Hinge                          301   ALL
          Bearing No. 6 with Grease Mat. No.
          04-004
          Lubrication of Rudder Hinge                          305   ALL
          Bearing No. 6 with Grease MAT. No.
          04-037
      WINDOWS                                  12-22-56
        SERVICING                                              301   ALL
          Lubrication of the Cockpit Sliding                   301   ALL
          Window Tracks
    DRAINAGE                                   12-24-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
             The drainage points and their                       1   ALL
             locations are specified in
             12-00-00 page 1.
      AIR DATA SYSTEM                          12-24-34
        SERVICING                                              301   ALL
          Bleeding of the Standby Air Data                     301   ALL
          System
      POTABLE WATER SYSTEM                     12-24-38
                                                                12-CONTENTS      Page 7
                                                                              Aug 01/10
R
    UZB
                                       CHAPTER 12
                                       __________
SERVICING
                                    TABLE OF CONTENTS
                                    _________________
    _______
    SUBJECT                                     CH/SE/SU
                                                ________   C
                                                           _   ____ ___________
                                                               PAGE EFFECTIVITY
        MAINTENANCE PRACTICES                                   201 ALL
          Draining of the Potable Water                         201 ALL
          System (with Electrical Power)
          Draining of the Potable Water                         207   ALL
          System (without Electrical Power)
    _____________________
    UNSCHEDULED SERVICING                       12-30-00
        DESCRIPTION AND OPERATION                                 1   ALL
          General                                                 1   ALL
                                                                 12-CONTENTS      Page 8
                                                                               Feb 01/11
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                     CH/SE/SU
                                                ________   C
                                                           _   PAGE ___________
                                                               ____ EFFECTIVITY
      POWER
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance -                           201   ALL
           Electrical Power
      COLD WEATHER MAINTENANCE -                12-31-25
      EQUIPMENT/FURNISHINGS
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance -                           201   ALL
           Equipment/Furnishings
      COLD WEATHER MAINTENANCE - FLIGHT         12-31-27
      CONTROLS
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance - Flight                    201   ALL
           Controls
      COLD WEATHER MAINTENANCE - FUEL           12-31-28
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance - Fuel                      201   ALL
      COLD WEATHER MAINTENANCE -                12-31-31
      INDICATING/RECORDING SYSTEMS AND
      NAVIGATION
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance -                           201   ALL
           Indicating/Recording systems and
           Navigation
      COLD WEATHER MAINTENANCE - LANDING        12-31-32
      GEAR
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance - Landing                   201   ALL
           Gear
      COLD WEATHER MAINTENANCE - OXYGEN         12-31-35
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance - Oxygen                    201   ALL
           System
      COLD WEATHER MAINTENANCE - WATER/         12-31-38
      WASTE
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance -                           201   ALL
           Water/Waste
      COLD WEATHER MAINTENANCE - AIRBORNE       12-31-49
      AUXILIARY POWER
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance -                           201   ALL
           Auxiliary Power Unit
      COLD WEATHER MAINTENANCE - STRUCTURE      12-31-51
        MAINTENANCE PRACTICES                                   201   ALL
           Cold Weather Maintenance -                           201   ALL
                                                                 12-CONTENTS      Page 9
                                                                               Nov 01/10
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    CH/SE/SU
                                               ________   C
                                                          _   PAGE ___________
                                                              ____ EFFECTIVITY
          Structure
      COLD WEATHER MAINTENANCE - DOORS         12-31-52
        MAINTENANCE PRACTICES                                  201   ALL
          Cold Weather Maintenance - Doors                     201   ALL
      COLD WEATHER MAINTENANCE - POWER PLANT   12-31-71
        MAINTENANCE PRACTICES                                  201   ALL
          Cold Weather Maintenance - Power                     201   ALL
          Plant
    PRE-CONDITIONING                           12-33-00
        DESCRIPTION AND OPERATION                                1   ALL
          General                                                1   ALL
      GROUND AIR PRE-CONDITIONING              12-33-21
        MAINTENANCE PRACTICES                                  201   ALL
          Pre-conditioning through the LP                      201   ALL
          Ground Connection
          Pre-conditioning through the HP                      205   ALL
          Ground Connection
          Pre-conditioning with the APU                        211   ALL
      GROUND AIR PRE-CONDITIONING              12-33-21
        SERVICING                                              301   ALL
          Pre-conditioning through the LP                      301   ALL
                                                                12-CONTENTS     Page 10
                                                                              May 01/11
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    CH/SE/SU
                                               ________   C
                                                          _   PAGE ___________
                                                              ____ EFFECTIVITY
          Ground Connection
                                                                12-CONTENTS     Page 11
                                                                              Feb 01/11
R
    UZB
                                      CHAPTER 12
                                      __________
SERVICING
                                   TABLE OF CONTENTS
                                   _________________
    _______
    SUBJECT                                    CH/SE/SU
                                               ________   C
                                                          _   PAGE ___________
                                                              ____ EFFECTIVITY
          System of the Slat Power
          Control-Unit (PCU) 6001CM.
          Flushing of the Blue Hydraulic                       365   ALL
          System of the Constant Speed
          Motor/Generator (CSM/G) 8XE
          Flushing of the Green Hydraulic                      371   ALL
          System of the Trimmable Horizontal
          Stabilizer (THS) Actuator 9CE
          Flushing of the Yellow Hydraulic                     377   ALL
          System of the Trimmable Horizontal
          Stabilizer (THS) Actuator 9CE
          Change of the Hydraulic Fluid in                     383   ALL
          the Green Hydraulic System - with
          Ground Cart Available
          Change of the Hydraulic Fluid in                     395   ALL
          the Yellow Hydraulic System - with
          Ground Cart Available
          Change of the Hydraulic Fluid in                    A307   ALL
          the Blue Hydraulic System - with
          Ground Cart Available
          Reclamation of the Hydraulic Fluid                  A316   ALL
          in the Green Hydraulic System
          Reclamation of the Hydraulic Fluid                  A322   ALL
          in the Yellow Hydraulic System
          Reclamation of the Hydraulic Fluid                  A328   ALL
          in the Blue Hydraulic System
          Clean the Fluid in the Green                        A332   ALL
          Hydraulic System
          Clean the Fluid in the Yellow                       A340   ALL
          Hydraulic System
          Clean the Fluid in the Blue                         A347   ALL
          Hydraulic System
          Change of the Hydraulic Fluid of                    A354   ALL
          the Yellow Hydraulic System with
          the Tool - Hydraulic Fluid Change
          (DH0501)
          Change of the Hydraulic Fluid of                    A369   ALL
          the Green Hydraulic System with
          the Tool - Hydraulic Fluid Change
          (DH0501)
          Change of the Hydraulic Fluid of                    A382   ALL
          the Blue Hydraulic System with the
          Tool - Hydraulic Fluid Change
          (DH0501)
                                                                12-CONTENTS     Page 12
                                                                              Feb 01/11
R
    UZB
                  SERVICING - GENERAL - DESCRIPTION AND OPERATION
                  _______________________________________________
  1. _______
     General
     This chapter provides the instructions related to the replenishing and
     scheduled and unscheduled servicing operations applicable to the aircraft.
     It is broken down as follows:
     - REPLENISHING (Ref. ATA 12-10),
     - SCHEDULED SERVICING (Ref. ATA 12-20),
     - UNSCHEDULED SERVICING (Ref. ATA 12-30).
  2. NO
     _______________
         STEP Areas
     (Ref. Fig. 001)
     On the aircraft, a black point strip shows the NO STEPareas.
     The position of the english or bilingual markings permits to read them when
     you go near the aircraft from either the front or the rear.
     It is permitted to walk on the THS in the center section only to use
     protective mat of 3/8 inch thick rubber.It is not permitted to walk on the
     leading/trailing edges and the tips.
  3. Ground
     __________________________
            Service Connections
     (Ref. Fig. 002)
  -------------------------------------------------------------------------------
  |ITEM|              DESIGNATION             |Mean Height from Ground in Meters|
  |    |                                      |              (ft. in.)          |
  |----|--------------------------------------|---------------------------------|
  | 1A |Forward Lavatory Service Door         |            2.35 (7.8)           |
  |    |    (If installed)                    |                                 |
  | 1B |Aft Lavatory Service Door             |            2.79 (9.1)           |
  | 2A |Potable Water Service Door            |            1.75 (5.8)           |
  | 2B |Potable Water Service Door            |            2.59 (8.6)           |
  | 3 |External Power Receptacle              |            2.00 (6.7)           |
  | 4 |Ground Service Conditioned Air         |            2.60 (8.6)           |
  |    |Connection                            |                                 |
  | 5 |HP Air Ground Connector                |            1.76 (5.7)           |
  | 6 |Hydraulic System Ground Service Panels|             1.76 (5.7)           |
  | 7 |Engine Oil Filling Connector :         |                                 |
  |    |- Gravity Filling Cap                 |            1.46 (4.9)           |
  |    |- Pressure Filling Connection         |            1.42 (4.7)           |
  | 8 |Refuel/Defuel Coupling                 |            3.40 (11.2)          |
  | 9A |Gravity Filling Panels (R. side)      |            3.60 (11.8)          |
  | 9B |Gravity Filling Panels (L. side)      |            3.60 (11.8)          |
  | 10 |Refuel/Defuel Control Panel           |            1.80 (5.9)           |
  | 11 |APU Oil Filling Connector             |            4.20 (13.7)          |
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                               NO STEP Areas
                                 Figure 001
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                     Page 2
                                                                  Feb 01/10
                                             
 UZB                                         
                          Ground Service Connections
                                  Figure 002
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                     Page 3
                                                                  Feb 01/10
                                              
 UZB                                          
  4. Drainage
     _______________
              Points
     (Ref. Fig. 003)
     ---------------------------------------------------------------------------
     | ITEM | DESIGNATION                | MEAN HEIGHT FROM GROUND IN METERS   |
     |      |                            |             ( ft. )                 |
     ---------------------------------------------------------------------------
     | 1A   | DRAIN MAST WATER           |   1.73   ( 5.69 )                   |
     | 1B   | DRAIN MAST FUEL            |   1.57   ( 5.16 )                   |
     | 1C   | DRAIN MAST WATER           |   1.73   ( 5.69 )                   |
     | 2    | FUEL WATER DRAIN           |   3.40   ( 11.2 )                   |
     | 2A   | FUEL WATER DRAIN           |   1.57   ( 5.16 )                   |
     | 4    | POTABLE WATER DRAIN        |   1.75   ( 5.80 )                   |
     | 5    | POTABLE WATER DRAIN        |   1.57   ( 5.16 )                   |
     | 6    | POTABLE WATER FULL DRAIN   |   2.59   ( 8.60 )                   |
     |      | WASTE DRAIN                |                                     |
     ---------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                           Page 4
                                                                        Feb 01/10
                                                
 UZB                                            
                               Drainage Points
                                 Figure 003
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                     Page 5
                                                                  Feb 01/10
                                             
 UZB                                         
                        SERVICING - GENERAL - MAINTENANCE PRACTICES
                        ___________________________________________
TASK 12-00-00-481-002
     WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
     _______
               NOTICES ARE IN POSITION.
     WARNING : MAKE SURE YOU ARE ALWAYS ATTACHED WHEN YOU ARE ON THE WING.
     _______
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                               Page 201
                                                                              Nov 01/10
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-00-00-866-051
           (1) Make sure that the flaps and the slats are retracted (Ref. TASK 27-
               50-00-866-009) (Ref. TASK 27-80-00-866-005).
Subtask 12-00-00-941-061
B. Safety Precautions
R          (1) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
               the flap and slat control lever.
Subtask 12-00-00-010-052
C. Get Access
           (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position at the
               wing.
     4. Procedure
        _________
Subtask 12-00-00-481-052
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                            Page 202
                                                                           Nov 01/10
                                                   
    UZB                                            
                          Installation of the Wingrip
                       Figure 201/TASK 12-00-00-991-003
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                   Page 203
                                                                  Feb 01/10
                                              
 UZB                                          
            (a) The Wingrip system includes the individual pad system or the
                multi-pad system.
                1
                _   Individual pad system
                    The individual pad system contains a Wingrip single-point
                    anchor (5) installed on the wing in an area near the working
                    zone. A primary hose (2) connects the Wingrip single-point
                    anchor (5) to the vacuum module (1). The body harness (3) is
                    attached to the Wingrip single-point anchor with the double
                    lanyard (4).
                2
                _   Multi-pad system
                    The multi-pad system contains two Wingrip end anchors (8). A
                    primary hose (7) connects the anchor (8) to the vacuum module
                    (6). The multi-pad system also contains Wingrip intermediate
                    anchors (9) and secondary hoses (13) (the quantity is related
                    to the system length). The body harness (10) (one for each
                    user) is attached to the Wingrip shuttle (12) with the double
                    lanyard (11).
  5. Close-up
     ________
Subtask 12-00-00-081-053
Subtask 12-00-00-942-056
        (4) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-00-00
                                                     
                                                                          Page 204
                                                                         Feb 01/10
                                                 
 UZB                                             
                     REPLENISHING - DESCRIPTION AND OPERATION
                     ________________________________________
  1. _______
     General
     This section provides all data for accomplishment of replenishing
     operations.
     It is divided as follows:
     - FUEL SYSTEM (Ref. ATA 12-11),
     - HYDRAULIC FLUIDS (Ref. ATA 12-12),
     - OIL (Ref. ATA 12-13),
     - GAS (Ref. ATA 12-14),
     - WATER (Ref. ATA 12-15),
     - TOILET SANITARY FLUID (Ref. ATA 12-16),
     - RAIN REPELLENT (Ref. ATA 12-17).
  
  EFF :
  
             ALL                                      12-10-00
                                                     
                                                                            Page 1
                                                                         Feb 01/10
                                                
 UZB                                            
                         FUEL - DESCRIPTION AND OPERATION
                         ________________________________
  1. General
     _______
Refer to (Ref. 20-31-00) for data on the types of fuel that can be used.
  
  EFF :
  
             ALL                                      12-11-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                                   FUEL SYSTEM - SERVICING
                                   _______________________
TASK 12-11-28-650-001
     WARNING : DO NOT SPILL FUEL ON THE ENGINES OR THE BRAKES. IF YOU SPILL FUEL ON
     _______
               ENGINES OR BRAKES THAT ARE HOT, IT CAN CAUSE FIRES.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
A. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-11-28-941-064
A. Not Applicable
     4. Procedure
        _________
Subtask 12-11-28-650-050
A. Safety Precautions
R          (1) You must obey the Fuel Safety Procedures (Ref. TASK 28-00-00-910-001)
R              when you refuel/defuel an aircraft.
           (2) Do not let the tanker go near the aircraft until the anti-collision
               lights have been set to OFF.
           (3) Before you start the refuel/defuel procedure, make sure that all the
               electrical circuits in the fuel system are complete.
           (4) Do not spill fuel on the engines or the brakes. If you spill fuel on
               engines or brakes that are hot, it can cause fires.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                              Page 301
                                                                             Aug 01/10
                                                     
    UZB                                              
            (5) Ground and bond the aircraft (Ref. TASK 12-34-24-869-001).
                NOTE : Bonding is mandatory. For grounding you must obey the local
                ____
                       area regulations.
            (6) Move all the equipment and material which is not necessary for the
                refuel/defuel procedure out of the safety area.
            (7) On the panel 400VU, make sure that the ACCU PRESS on the triple
                indicator has sufficient pressure. If necessary, pressurize the
                yellow hydraulic system (Ref. TASK 29-10-00-863-002).
R
R           (8) If the Main Landing Gear (MLG) doors are open during the refuel
                procedure:
                - visually examine the tires and shock absorbers
                - make sure you will have sufficient clearance to the ground after
                  the refuel is complete.
R (9) On the panel 110VU, make sure that the PARK BRK is ON.
R          (10) Make sure that the chocks are in position. The correct position for
R               the chocks are:
R                   NOTE : This makes sure that only chocks on one side of each tire
                    ____
R                          will be caught so that it is easier to release them.
           (11) Make sure that there is no equipment below the aircraft which can
                cause damage. The weight of the fuel can suddenly compress the
                landing gear and lower the aircraft.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                              Page 302
                                                                             Aug 01/10
                                                    
    UZB                                             
         (12) Before you start the refuel/defuel procedure make sure that these are
              available:
              - a fuelling supervisor or fuelling safety person
              - the correct fire-fighting equipment
              - approved persons to use the fire-fighting equipment.
         (13) Make sure that the overboard vent lines are not blocked. If they are
              blocked, damage to the fuel tanks can occur.
         (14) Make sure that the fuel tanker (or hydrant) contains the correct
              fuel. The correct fuels are shown in the Flight Manual (Ref. FM
              2.04.00).
         (15) Make sure that the fuel tanker or the pump unit (if you use a hydrant
              to refuel the aircraft) is in the correct position.
         (16) Make sure that, if there is an emergency, you can move the fuel
              tanker/pump unit and the other equipment away quickly.
         (18) Auxiliary Power Unit (APU) starts or shutdowns are permitted during
              refuel/ defuel procedures. If it is necessary to operate the APU, the
              limits that follow apply:
              (b) You must complete a normal APU shutdown if a fuel spill has
                  occurred during the refuel/defuel procedure.
         (19) Make sure that the electrical equipment you use will not cause a
              spark.
         (22) During the refuel/defuel procedure do not fill the oxygen system or
              change the oxygen bottles.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 303
                                                                          May 01/10
R                                                 
  UZB                                             
         (23) During the refuel/defuel procedure do only essential aircraft
              maintenance and/or servicing that will not cause a spark.
         (26) You are not permitted to remove, install or test aircraft batteries
              or related equipment during refuelling.
         (27) Do not use the microphone on the High Frequency (HF) transmitter
              during refuel/defuel operations.
(29) Obey the safety distances for 60 m (196.85 ft.) from aircraft:
              (a) Stop the fuel tanker 60 m (196.85 ft.) from the aircraft nose
                  while the weather radar operates. Do not operate the fuel
                  tanker/pump unit until you stop operation of the weather radar.
(30) Obey the safety distances for 30 m (98.42 ft.) from aircraft:
(31) Obey the safety distances for 15 m (49.21 ft.) from aircraft:
              (a) Put NO SMOKING warning notices around the work area not less
                  than 15 m (49.21 ft.) from the refuel/defuel equipment and
                  aircraft and aircraft tank vents.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                             Page 304
                                                                            May 01/10
R                                                 
  UZB                                             
         (32) Obey the safety distances for 6 m (19.68 ft.) from aircraft:
             (a) Ground power units (GPUs) can be operated when they are put not
                 less than 6 m (19.68 ft.) from:
                 - the aircraft filling and venting points
                 - the hydrant valves and other refuel/defuel equipment when in
                   use.
             (d) Do not operate the items that follow inside the 6 m (19.68 ft.)
                 zone:
                 - radios
                 - radio telephones (cell phones or mobile phones)
                 - pagers
                 - switches on lighting systems of other than intrinsically safe
                   types.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 305
                                                                          Aug 01/10
R                                                
  UZB                                            
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-11-28
                                                     
                                                                   Page 306
                                                                  May 01/10
                                             
 UZB                                         
  TASK 12-11-28-650-002
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  WARNING : DO NOT SPILL FUEL ON THE ENGINES OR THE BRAKES. IF YOU SPILL FUEL ON
  _______
            ENGINES OR BRAKES THAT ARE HOT, IT CAN CAUSE FIRES.
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-11-28-941-065
A. Not Applicable
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 307
                                                                        Feb 01/10
                                                
 UZB                                            
  4. Procedure
     _________
Subtask 12-11-28-650-051
A. Safety Precautions
        (1) Open all the hangar doors. Do not close the hangar doors until you
            have completed the refuel/defuel procedure.
(2) Make the limits of the safety area the limits of the hangar.
        (3) Put the safety barriers and the NO SMOKING warning notices at all
            the hangar entrances.
            (a) Move the equipment which is not necessary for the refuel/defuel
                procedure from between the aircraft and the hangar exit.
        (5) Make sure that the driver of the fuel tanker puts the fuel tanker in
            the correct position adjacent to the aircraft. Keep the exit of the
            hangar clear for the fuel tanker.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 308
                                                                          Feb 01/10
                                                
 UZB                                            
  TASK 12-11-28-650-003
  WARNING : STOP THE FUEL TANKER 60 m (196.85 ft) FROM THE AIRCRAFT NOSE WHILE
  _______
            THE WEATHER RADAR OPERATES.
            DO NOT OPERATE THE FUEL TANKER/PUMP UNIT UNTIL YOU STOP THE OPERATION
            OF THE WEATHER RADAR.
  WARNING : MAKE SURE THE AREA AROUND THE AIRCRAFT IS SAFE BEFORE YOU START THE
  _______
            REFUEL/DEFUEL PROCEDURE. IN THE SAFETY AREA, DO NOT:
            - SMOKE
            - MAKE SPARKS OR FIRE
            - USE ANY EQUIPMENT WHICH IS NOT APPROVED FOR REFUEL/DEFUEL
            PROCEDURES.
            AIRCRAFT FUEL IS FLAMMABLE.
  WARNING : DO NOT SPILL FUEL ON THE ENGINES OR THE BRAKES. IF YOU SPILL FUEL ON
  _______
            ENGINES OR BRAKES THAT ARE HOT, IT CAN CAUSE FIRES.
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 309
                                                                        Feb 01/10
                                                 
 UZB                                             
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-11-28-941-050
A. Safety Precautions
           (1) You must obey the refuel/defuel safety procedures (Ref. TASK 12-11-
               28-650-001) (Ref. TASK 12-11-28-650-002).
           (2) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE adjacent to the refuel
               coupling 40QM.
           (3) Make sure that the chocks do not touch the tires. The weight of the
               fuel can lower the aircraft and cause the chocks to catch.
Subtask 12-11-28-281-051
           (1) Make sure that a fuel sampling for water contamination check is done
               to the fuel in the fuel tanker/pump unit.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                             Page 310
                                                                            May 01/10
                                                     
    UZB                                              
                            Refuel/Defuel Coupling
R                      Figure 301/TASK 12-11-28-991-002
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 311
                                                                  May 01/10
                                              
    UZB                                       
           Refuel/Defuel Control Panel 800VU, Preselector 5QT and Indicator 6QT
R                            Figure 302/TASK 12-11-28-991-004
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                             Page 312
                                                                            May 01/10
                                                    
    UZB                                             
  Subtask 12-11-28-860-050
        WARNING : MAKE SURE THAT THE FUEL SUPPLY HOSE IS CORRECTLY CONNECTED TO
        _______
                  THE COUPLING BEFORE YOU REFUEL/DEFUEL THE AIRCRAFT. DO NOT
                  CONNECT THE FUEL SUPPLY HOSE IF THERE ARE SIGNS OF DAMAGE TO
                  THE AIRCRAFT COUPLING LUGS OR SLOTS.
        (1) Make sure that the aircraft and the fuel tanker/pump unit are
            grounded correctly (Ref. TASK 12-34-24-869-001) and electrically
            bonded together correctly.
        (3) Make sure that the coupling of the fuel supply-hose is clean, then
            connect it to the aircraft refuel coupling.
Subtask 12-11-28-010-051
D. Get Access
            NOTE : After the refuel control panel access door has opened, if you
            ____
                   use refuel battery power only:
                   - it is not possible to start the refuel sequence until after
                     approximately 35 to 40 seconds.
                     This is because the Fuel Quantity Indication Computer (FQIC)
                     and FLSS BITE sequences operate first.
                     Do not keep the door open longer than necessary because the
                     battery can discharge.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 313
                                                                          Feb 01/10
                                                
 UZB                                            
  Subtask 12-11-28-860-051
            WARNING : WHEN YOU REFUEL THE AIRCRAFT WITH BATTERY POWER, IT IS NOT
            _______
                      ALWAYS POSSIBLE TO REFUEL TO FULL CAPACITY. THIS IS BECAUSE
                      THE INTERCELL TRANSFER VALVES ARE NOT ALWAYS IN THE CORRECT
                      POSITION.
            (a) On the refuel/defuel control panel (800VU), put the BATT POWER
                switch to the ON position and release.
                NOTE : The HOT BUSS 701PP is energized for ten minutes only (this
                ____
                       is to prevent discharge of the aircraft batteries), unless
                       you put the MODE SELECT switch (on the refuel/defuel
                       panel) to REFUEL.
Subtask 12-11-28-740-050
  -------------------------------------------------------------------------------
                 ACTION                            RESULT
  -------------------------------------------------------------------------------
     - put the TEST switch to the LTS    - the HI LVL lights and the DEFUEL/XFR
       position and hold it there          OPEN lights are on and the CKPT and
                                           END lights come on
                                         - the FUEL QTY, PRESELECTED and ACTUAL
                                           displays show all 8s.
     - put the TEST switch to the HIGH   - the HI LVL lights change condition.
       position and hold it there          If they were on, they will go off. If
                                           they were off, they will come on
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 314
                                                                        Feb 01/10
                                                
 UZB                                            
     -------------------------------------------------------------------------------
                    ACTION                            RESULT
     -------------------------------------------------------------------------------
        - release the TEST switch.          - the HI LVL lights go back to their
                                              initial condition.
     4. Procedure
        _________
R       WARNING : MAKE SURE THAT YOU DO THE REFUEL PANEL TEST BEFORE OR DURING THE
        _______
R                 REFUEL PROCEDURE. DEFECTIVE HIGH-LEVEL SENSORS CAN CAUSE FUEL TO
R                 SPILL OVERBOARD. MAKE SURE THAT YOU COMPLETE THE REFUEL PANEL TEST
R                 BEFORE THE FUEL TANK IS 70 PERCENT FULL.
Subtask 12-11-28-650-074
           NOTE : It is recommended that all of the fuel pumps are switched to off
           ____
                  to do this procedure. This decreases the risk of possible fuel
                  spills. It is permitted for the wing-tank pumps to be switched to
                  on, if:
                  - there is a minimum of 750 kg (1653.4665 lb) of fuel in the
                    applicable wing-tank.
           (4) On the refuel/defuel control panel 800VU, put the MODE SELECT switch
               to the REFUEL position.
               CAUTION : DO NOT LET THE REFUEL PRESSURE BE MORE THAN THE MAXIMUM
               _______
                         SAFE PRESSURE OF 50psi (3.45bar).
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 315
                                                                           Aug 01/10
                                                   
    UZB                                            
         (6) On the preselector 5QT:
(a) Make sure that the numbers on the ACTUAL display increases.
(a) Make sure that the numbers on the FUEL QTY displays increase.
                 NOTE : Refer to the fuel tables for the maximum capacity of each
                 ____
                        tank and for the total fuel capacity (Ref. TASK 12-11-28-
                        650-007).
                 NOTE : Make sure that the outer wing fuel tanks are full. This
                 ____
                        will prevent the risk of structural damage.
  5. Close-up
     ________
Subtask 12-11-28-860-052
A. Refuel on Batteries
         (1) If you refueled the aircraft with battery power, on the refuel/defuel
             control panel (800VU), release the BATT POWER switch from the ON
             position. The switch will go back to the NORM position.
         (2) Make an entry in the aircraft technical log, to check the fuel
             configuration before the subsequent flight.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 316
                                                                         Feb 01/10
                                                  
 UZB                                              
  Subtask 12-11-28-410-050
B. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-11-28-862-050
Subtask 12-11-28-869-067
D. Aircraft Configuration
        (1) Disconnect the coupling of the fuel supply-hose from the aircraft
            refuel/defuel coupling.
            CAUTION : MAKE SURE THAT THE HANDLE OF THE REFUEL COUPLING CAP POINTS
            _______
                      AFT WHEN THE CAP IS CLOSED AND LOCKED.
Subtask 12-11-28-942-051
E. Removal of Equipment
        (4) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 317
                                                                        Feb 01/10
                                                
 UZB                                            
  TASK 12-11-28-650-004
  WARNING : STOP THE FUEL TANKER 60 m (196.85 ft) FROM THE AIRCRAFT NOSE WHILE
  _______
            THE WEATHER RADAR OPERATES.
            DO NOT OPERATE THE FUEL TANKER/PUMP UNIT UNTIL YOU STOP THE OPERATION
            OF THE WEATHER RADAR.
  WARNING : MAKE SURE THE AREA AROUND THE AIRCRAFT IS SAFE BEFORE YOU START THE
  _______
            REFUEL/DEFUEL PROCEDURE. IN THE SAFETY AREA, DO NOT:
            - SMOKE
            - MAKE SPARKS OR FIRE
            - USE ANY EQUIPMENT WHICH IS NOT APPROVED FOR REFUEL/DEFUEL
            PROCEDURES.
            AIRCRAFT FUEL IS FLAMMABLE.
  WARNING : DO NOT SPILL FUEL ON THE ENGINES OR THE BRAKES. IF YOU SPILL FUEL ON
  _______
            ENGINES OR BRAKES THAT ARE HOT, IT CAN CAUSE FIRES.
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 318
                                                                        Feb 01/10
                                                 
 UZB                                             
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-11-28-941-052
A. Safety Precautions
           (1) You must obey the refuel/defuel safety precautions (Ref. TASK 12-11-
               28-650-001) (Ref. TASK 12-11-28-650-002).
           (2) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE adjacent to the refuel
               coupling 40QM.
           (3) Make sure that the chocks do not touch the tires. The weight of the
               fuel can lower the aircraft and catch the chocks.
Subtask 12-11-28-281-052
           (1) Make sure that a fuel sampling for water contamination check is done
R              to the fuel in the fuel tanker/pump unit.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                             Page 319
                                                                            Nov 01/10
                                                     
    UZB                                              
   Subtask 12-11-28-860-053
         WARNING : MAKE SURE THAT THE FUEL SUPPLY HOSE IS CORRECTLY CONNECTED TO
         _______
                   THE COUPLING BEFORE YOU REFUEL/DEFUEL THE AIRCRAFT. DO NOT
                   CONNECT THE FUEL SUPPLY HOSE IF THERE ARE SIGNS OF DAMAGE TO
                   THE AIRCRAFT COUPLING LUGS OR SLOTS.
         (2) Make sure that the aircraft and the fuel tanker/pump unit are
             grounded correctly (Ref. TASK 12-34-24-869-001) and electrically
             bonded together correctly.
             NOTE : Bonding is mandatory. For grounding you must obey the local
             ____
                    area regulations.
         (3) Make sure that the coupling of the fuel-supply hose is clean, then
             connect it to the aircraft refuel coupling.
(6) On the panel 11VU, push (in) the FUEL pushbutton switch.
Subtask 12-11-28-010-053
D. Get Access
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 320
                                                                         May 01/10
R                                                  
  UZB                                              
   Subtask 12-11-28-860-057
             WARNING : WHEN YOU REFUEL THE AIRCRAFT WITH BATTERY POWER, IT IS NOT
             _______
                       ALWAYS POSSIBLE TO REFUEL TO FULL CAPACITY. THIS IS BECAUSE
                       THE INTERCELL TRANSFER VALVES ARE NOT ALWAYS IN THE CORRECT
                       POSITION.
             (a) On the refuel/defuel control panel (800VU), put the BATT POWER
                 switch to the ON position and release.
                 NOTE : The HOT BUSS 701PP is energized for ten minutes only (this
                 ____
                        is to prevent discharge of the aircraft batteries), unless
                        you put the MODE SELECT switch (on the refuel/defuel
                        panel) to REFUEL.
Subtask 12-11-28-740-051
   -------------------------------------------------------------------------------
                  ACTION                            RESULT
   -------------------------------------------------------------------------------
      - put the TEST switch to the LTS    - the High (HI) Level (LVL) lights and
        position and hold it there          the DEFUEL/XFR OPEN lights are on and
                                            the CKPT and END lights come on
                                          - the FUEL QTY, PRESELECTED and ACTUAL
                                            displays show all 8s.
      - put the TEST switch to the HIGH   - the HI LVL lights change their
        position and hold it there          condition. If they were on, they will
                                            go off. If they were off, they will
                                            come on
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 321
                                                                         May 01/10
R                                                
  UZB                                            
     -------------------------------------------------------------------------------
                    ACTION                            RESULT
     -------------------------------------------------------------------------------
        - release the TEST switch.          - the HI LVL lights go back to their
                                              initial condition.
     4. Procedure
        _________
R       WARNING : MAKE SURE THAT YOU DO THE REFUEL PANEL TEST BEFORE OR DURING THE
        _______
R                 REFUEL PROCEDURE. DEFECTIVE HIGH-LEVEL SENSORS CAN CAUSE FUEL TO
R                 SPILL OVERBOARD. MAKE SURE THAT YOU COMPLETE THE REFUEL PANEL TEST
R                 BEFORE THE FUEL TANK IS 70 PERCENT FULL.
Subtask 12-11-28-650-054
           NOTE : It is recommended that all of the fuel pumps are switched to off
           ____
                  to do this procedure. This decreases the risk of possible fuel
                  spills. It is permitted for the wing-tank pumps to be switched to
                  on, if:
                  - there is a minimum of 750 kg (1653.4665 lb) of fuel in the
                    applicable wing-tank.
           (1) To prevent a fuel spill, on the panel 40VU, make sure that:
               - the X FEED P/BSW 4QE is released out (OFF)
               - the MODE SEL P/BSW 48QA is in the AUTO position
               - the CTR TK PUMP 1 & 2 P/BSW are released out (OFF).
               (b) Put the REFUEL VALVES switch(es) for the applicable fuel tank(s)
                   to the OPEN position.
               (c) Put the REFUEL VALVES switch(es) for the tank(s) which will not
                   be refuelled to the SHUT position.
               CAUTION : DO NOT LET THE REFUEL PRESSURE BE MORE THAN THE MAXIMUM
               _______
                         SAFE PRESSURE OF 50psi (3.45bar).
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                              Page 322
                                                                             Aug 01/10
                                                   
    UZB                                            
         (4) On the refuel/defuel control panel 800VU:
             (a) Make sure that the numbers on the ACTUAL and the FUEL QTY
                 displays increase.
                 NOTE : Refer to the fuel tables for the maximum capacity of each
                 ____
                        fuel tank and for the total fuel capacity (Ref. TASK 12-
                        11-28-650-007).
                 NOTE : Make sure that the outer wing fuel tanks are full. This
                 ____
                        will prevent the risk of structural damage.
             (c) When each tank has the correct fuel quantity put its REFUEL VALVE
                 switch to the SHUT position.
         (5) When the fuel tank quantities are correct stop the pump on the fuel
             tanker/pump unit.
             (a) Put the MODE SELECT switch to the OFF position and put the guard
                 on the switch.
             (b) Put the applicable REFUEL VALVES switch(es) to the NORM position
                 and put the guard(s) on the switch(es).
         (7) If you have ground power available, make sure that the ECAM lower DU
             shows the correct fuel quantities.
   5. Close-up
      ________
Subtask 12-11-28-860-058
A. Aircraft Configuration
         (1) Make an entry in the aircraft technical log, to check the fuel
             configuration before the subsequent flight.
         (3) Disconnect the coupling of the fuel supply-hose from the aircraft
             refuel/defuel coupling.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 323
                                                                         May 01/10
R                                                
  UZB                                            
         (4) Install the coupling cap.
             CAUTION : MAKE SURE THAT THE HANDLE OF THE REFUEL COUPLING CAP POINTS
             _______
                       AFT WHEN THE CAP IS CLOSED AND LOCKED.
Subtask 12-11-28-410-052
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-11-28-942-053
C. Removal of Equipment
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 324
                                                                         May 01/10
R                                                
  UZB                                            
  TASK 12-11-28-650-005
  WARNING : STOP THE FUEL TANKER 60 m (196.85 ft) FROM THE AIRCRAFT NOSE WHILE
  _______
            THE WEATHER RADAR OPERATES.
            DO NOT OPERATE THE FUEL TANKER/PUMP UNIT UNTIL YOU STOP THE OPERATION
            OF THE WEATHER RADAR.
  WARNING : MAKE SURE THE AREA AROUND THE AIRCRAFT IS SAFE BEFORE YOU START THE
  _______
            REFUEL/DEFUEL PROCEDURE. IN THE SAFETY AREA, DO NOT:
            - SMOKE
            - MAKE SPARKS OR FIRE
            - USE ANY EQUIPMENT WHICH IS NOT APPROVED FOR REFUEL/DEFUEL
            PROCEDURES.
            AIRCRAFT FUEL IS FLAMMABLE.
  WARNING : DO NOT SPILL FUEL ON THE ENGINES OR THE BRAKES. IF YOU SPILL FUEL ON
  _______
            ENGINES OR BRAKES THAT ARE HOT, IT CAN CAUSE FIRES.
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 325
                                                                        Feb 01/10
                                                 
 UZB                                             
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-11-28-941-054
A. Safety Precautions
           (1) You must obey the refuel/defuel safety precautions (Ref. TASK 12-11-
               28-650-001) (Ref. TASK 12-11-28-650-002).
           (2) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE adjacent to the refuel
               coupling 40QM.
           (3) Make sure that the chocks do not touch the tires. The weight of the
               fuel can lower the aircraft and catch the chocks.
Subtask 12-11-28-281-053
           (1) Make sure that a fuel sampling for water contamination check is done
R              to the fuel in the fuel tanker/pump unit.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                             Page 326
                                                                            Nov 01/10
                                                     
    UZB                                              
                                 Refuel Valve
R                      Figure 303/TASK 12-11-28-991-006
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 327
                                                                  May 01/10
                                              
    UZB                                       
  Subtask 12-11-28-010-054
C. Get Access
        (3) Open the Main Landing Gear (MLG) door 744 (Ref. TASK 32-12-00-010-
            001).
        (4) Make sure that the SLEEVE - GROUND LOCK is on the applicable MLG door
            actuator.
Subtask 12-11-28-860-059
        WARNING : MAKE SURE THAT THE FUEL SUPPLY HOSE IS CORRECTLY CONNECTED TO
        _______
                  THE COUPLING BEFORE YOU REFUEL/DEFUEL THE AIRCRAFT. DO NOT
                  CONNECT THE FUEL SUPPLY HOSE IF THERE ARE SIGNS OF DAMAGE TO
                  THE AIRCRAFT COUPLING LUGS OR SLOTS.
        (1) Make sure that the aircraft and the fuel tanker/pump unit are
            grounded correctly (Ref. TASK 12-34-24-869-001) and electrically
            bonded together correctly.
            NOTE : Bonding is mandatory. For grounding you must obey the local
            ____
                   area regulations.
        (3) Make sure that the coupling of the fuel supply-hose is clean, then
            connect it to the aircraft refuel coupling.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 328
                                                                          Feb 01/10
                                                  
 UZB                                              
           (5) If the intercell transfer valves are open:
               - the inner and outer cells of the wing tanks fill together
               - the full capacity of the wing tank is less than normal
               - make an entry in the aircraft technical log, to check the fuel
                 configuration before the subsequent flight.
     4. Procedure
        _________
        WARNING : BE CAREFUL NOT TO FILL THE TANKS MORE THAN NECESSARY NEAR THE END
        _______
                  OF THE REFUEL. BECAUSE THERE IS NO ELECTRICAL POWER, THE
                  HIGH-LEVEL PROTECTION SYSTEM WILL NOT OPERATE.
        CAUTION : DO NOT LET THE REFUEL PRESSURE BE MORE THAN THE MAXIMUM SAFE
        _______
                  PRESSURE OF 50psi (3.45bar).
Subtask 12-11-28-650-056
           (2) Push and hold in the manual plunger(s) on the refuel valve(s) of the
               applicable fuel tank(s).
           (3) Use the MLIs to monitor the quantity of fuel in each tank (Ref. TASK
               12-11-28-650-007).
               NOTE : Refer to the fuel tables for the maximum capacity of each fuel
               ____
                      tank and for the total fuel capacity. If the intercell
                      transfer valves are open, the full capacity of a wing tank is
                      less than normal.
               NOTE : Make sure that the outer wing fuel tanks are full. This will
               ____
                      prevent the risk of structural damage.
           (4) When the quantity of fuel in a tank is correct, release the manual
               plunger on the related refuel valve.
           (5) When all the fuel quantities are correct, stop the pump on the fuel
               tanker/pump unit.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 329
                                                                           May 01/10
                                                     
    UZB                                              
        (6) Make an entry in the aircraft technical log, to check the fuel
            configuration before the subsequent flight.
  5. Close-up
     ________
Subtask 12-11-28-860-060
A. Aircraft Configuration
        (2) Disconnect the coupling of the fuel supply-hose from the aircraft
            refuel coupling.
Subtask 12-11-28-410-054
B. Close Access
            CAUTION : MAKE SURE THAT THE HANDLE OF THE REFUEL COUPLING CAP POINTS
            _______
                      AFT WHEN THE CAP IS CLOSED AND LOCKED.
            (a) Install the refuel coupling cap 41QM and close the access panel
                622JB.
        (2) If you have refuelled the center tank, close the MLG door 744
            (Ref. TASK 32-12-00-410-001).
Subtask 12-11-28-942-056
C. Removal of Equipment
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 330
                                                                        Feb 01/10
                                                
 UZB                                            
           (5) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
R
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 331
                                                                           May 01/10
                                                   
    UZB                                            
   TASK 12-11-28-860-001
Procedure to use the ADIRU to Find the Pitch and Roll Data
   1. __________________
      Reason for the Job
Self Explanatory
   2. ______________________
      Job Set-up Information
A. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-11-28-861-054
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 332
                                                                           May 01/10
R                                                  
  UZB                                              
   4. Procedure
      _________
Subtask 12-11-28-860-069
(1) On the panel 20VU set the 3 ADIRS switches to the NAV position:
   -------------------------------------------------------------------------------
                  ACTION                            RESULT
   -------------------------------------------------------------------------------
2. Push the MCDU MENU mode key. The MCDU MENU page comes into view.
      A. Push the line key adjacent to    The AIDS menu page comes into view.
         the AIDS indication.
      B. Push the line key adjacent to    The AIDS ALPHA CALL-UP page comes into
         the PARM ALPHA CALL-UP           view.
         indication.
   4. On the MCDU keypad enter the code   ROLL appears at the bottom of the
      for ROLL into the scratchpad.       display (scratchpad).
5. Push the 2L line key. The ROLL data shows - RECORD THE DATA.
   7. On the MCDU keypad enter the code   PITCH appears at the bottom of the
      for PTCH into the scratchpad.       display (scratchpad).
8. Push the 3L line key. The PITCH data shows - RECORD THE DATA.
   10. Push the line key adjacent to      The AIDS menu page comes into view.
       the CLEAR ALL indication.
(2) In Table 1, use the PITCH data to find the equivalent number.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 333
                                                                           May 01/10
R                                                
  UZB                                            
           (3) In Table 1, use the ROLL data to find the equivalent letter.
           (4) Put together the number and the letter to identify the square to use
               in the MLI procedure (Ref. TASK 12-11-28-650-007).
               TABLE 1
                                -------------------------------------------
                                |        Pitch | Ref |       Roll | Ref |
R                               -------------------------------------------
                                | minus    1.5 | 1    | minus 1.5 | A     |
                                |--------------|------|------------|------|
                                | minus    1.0 | 2    | minus 1.0 | B     |
                                |--------------|------|------------|------|
                                | minus    0.5 | 3    | minus 0.5 | C     |
                                |--------------|------|------------|------|
                                |          0.0 | 4    |       0.0 | D     |
                                |--------------|------|------------|------|
                                | plus     0.5 | 5    | plus 0.5 | E      |
                                |--------------|------|------------|------|
                                | plus     1.0 | 6    | plus 1.0 | F      |
                                |--------------|------|------------|------|
                                | plus     1.5 | 7    | plus 1.5 | G      |
                                -------------------------------------------
     5. Close-up
        ________
Subtask 12-11-28-860-070
           (1) On the panel 20VU set the 3 switches on the ADIRS to the OFF
               position.
(a) Push the RETURN key until the initial screen shows.
Subtask 12-11-28-862-054
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                               Page 334
                                                                              Nov 01/10
                                                    
    UZB                                             
   TASK 12-11-28-860-002
Procedure to use the FQIC Input Parameters to Find the Pitch and Roll Data
   1. __________________
      Reason for the Job
Self Explanatory
   2. ______________________
      Job Set-up Information
A. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-11-28-860-071
         (2) Do the Electronic Instrument System (EIS) start procedure (Ref. TASK
             31-60-00-860-001).
         (3) Get access to the SYSTEM REPORT/TEST Menu Page (Ref. TASK 31-32-00-
             860-001).
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 335
                                                                           May 01/10
R                                                  
  UZB                                              
   Subtask 12-11-28-865-054
   -------------------------------------------------------------------------------
   PANEL DESIGNATION                                               IDENT. LOCATION
   -------------------------------------------------------------------------------
     49VU FUEL/FQI/CHAN/1                                           1QT      A13
    121VU FUEL/FQI/CHANNEL/1 AND 2                                  8QT      L26
    121VU FUEL/FQI/CHAN/2                                           2QT      M27
   4. Procedure
      _________
Subtask 12-11-28-860-072
         NOTE : The FQIS input parameter pages are not automatically updated. The
         ____
                operation of the Fuel System can be monitored through the
                Centralized Fault Display System (CFDS) input parameter pages. The
                pages must be continuously updated. Use the NEXT PAGE control on
                the Multipurpose Control and Display Unit (MCDU) to cycle the
                pages to update the screen.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 336
                                                                         May 01/10
R                                                
  UZB                                            
           (1) When the SYSTEM REPORT/TEST Menu page comes into view, do this
               procedure:
     -------------------------------------------------------------------------------
                    ACTION                            RESULT
     -------------------------------------------------------------------------------
     1. Push the line key adjacent to the   - the FUEL Main Menu first page comes
        FUEL indication.                      into view.
     2. On the MCDU control panel push      - the FUEL Main Menu second page comes
        the NEXT PAGE key.                    into view.
     3. Push the line key adjacent to the   - the MCDU shows the page FQIS INPUT
        INPUT PARAMETER VALUES                PARAMETERS - RECORD THE PITCH AND
        indication.                           ROLL DATA.
(2) In Table 1, use the PITCH data to find the equivalent number.
(3) In Table 1, use the ROLL data to find the equivalent letter.
           (4) Put together the number and the letter to identify the square to use
               in the Magnetic Level Indicator (MLI) procedure (Ref. TASK 12-11-28-
               650-007).
               TABLE 1
                                -----------------------------------------
                                |        Pitch | Ref |       Roll | Ref |
R                               -----------------------------------------
                                | minus    1.5 | 1 | minus 1.5 | A |
                                |--------------|-----|------------|-----|
                                | minus    1.0 | 2 | minus 1.0 | B |
                                |--------------|-----|------------|-----|
                                | minus    0.5 | 3 | minus 0.5 | C |
                                |--------------|-----|------------|-----|
                                |          0.0 | 4 |          0.0 | D |
                                |--------------|-----|------------|-----|
                                | plus     0.5 | 5 | plus 0.5 | E |
                                |--------------|-----|------------|-----|
                                | plus     1.0 | 6 | plus 1.0 | F |
                                |--------------|-----|------------|-----|
                                | plus     1.5 | 7 | plus 1.5 | G |
                                -----------------------------------------
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                             Page 337
                                                                            Nov 01/10
                                                   
    UZB                                            
   5. Close-up
      ________
Subtask 12-11-28-860-073
             (a) On the MCDU, push the line key adjacent to the RETURN indication
                 until the MCDU Menu page comes into view.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 338
                                                                           May 01/10
R                                                
  UZB                                            
     TASK 12-11-28-650-007
     CAUTION : RETRACT THE MLIs AS SOON AS POSSIBLE. YOU CAN EASILY CAUSE DAMAGE TO
     _______
               AN EXTENDED MLI.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                              Page 339
                                                                             May 01/10
                                                     
    UZB                                              
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-11-28-941-058
A. Safety Precautions
           (1) You must obey the refuel/defuel safety precautions (Ref. TASK 12-11-
               28-650-001) (Ref. TASK 12-11-28-650-002).
Subtask 12-11-28-281-050
B. Fuel Sampling
           (1) Get a fuel sample from the aircraft (Ref. TASK 12-32-28-281-001) and
               measure its Specific Gravity (SG).
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 340
                                                                           May 01/10
                                                     
    UZB                                              
                        Magnetic Level Indicators (MLI)
R                      Figure 304/TASK 12-11-28-991-009
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 341
                                                                  May 01/10
                                              
    UZB                                       
     Subtask 12-11-28-010-058
C. Get Access
Subtask 12-11-28-860-066
           (1) Find and write down the aircraft attitude figure (pitch and roll
               data) as follows:
               - use the ADIRU to find the aircraft attitude figure (Ref. TASK 12-
                 11-28-860-001)
                 or
               - use the FQIC input parameters to find the aircraft attitude figure
                 (Ref. TASK 12-11-28-860-002).
     4. Procedure
        _________
Subtask 12-11-28-869-053
               (a) Use a screwdriver to push the applicable MLI and turn it through
                   90 deg.
               (b) Hold and carefully lower the MLI fully. Then carefully lift the
                   MLI until you feel the magnets engage.
               (c) Read the units mark nearest to the bottom-skin of the wing and
                   write down the number.
           (2) Retract the MLI and use a screwdriver to turn it through 90 deg. to
               lock it.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                            Page 342
                                                                           May 01/10
                                                   
    UZB                                            
                          How to Read a Wing Tank MLI
R                      Figure 305/TASK 12-11-28-991-012
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 343
                                                                  May 01/10
                                              
    UZB                                       
                            How to Read the CTR MLI
R                      Figure 306/TASK 12-11-28-991-024
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 344
                                                                  May 01/10
                                              
    UZB                                       
           (3) Find the volume of fuel in each tank as follows:
               (a) Use the applicable MLI stick number and the applicable aircraft
                   attitude grid-square letter to find the correct fuel quantity
                   table.
                   NOTE : For a
                   ____           grid reading of C3:
                          - use   the attitude monitor reading CLEFT WING column 3 for
                            the   LH wing
                          - use   the attitude monitor reading CRIGHT WING column 3
                            for   the RH wing.
               (b) Find the applicable MLI unit number row and the applicable
                   aircraft attitude (grid-square letter and number) row in the
                   table. Find the intersection of the applicable rows to give the
                   correct volume of fuel in the tank.
                   NOTE : Only even number MLI units are listed in the tables. To
                   ____
                          calculate the volume of fuel for uneven numbers,
                          interpolate between the nearest even numbers in the table.
R    ------------------------------------------------------------------------------
R    | Example: MLI stick No. 2 (LH Wing)                                         |
R    |          UNIT reading                          : 20                        |
R    |          Pitch and Roll attitude               : C3 on (attitude monitor) |
R    |          Fuel Quantity table reading (volumn) : 4000 liters                |
R    |          Specific gravity (SG) of fuel sample : 0.81 SG                    |
R    |----------------------------------------------------------------------------|
R    |          Actual fuel mass at 0.81 SG           = 4000 x 0.81 = 3240        |
R    ------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                              Page 345
                                                                             May 01/10
                                                     
    UZB                                              
                Fuel Quantity - MLI Stick No.2 Attitudes A and G
R                       Figure 307/TASK 12-11-28-991-025
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 346
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.3 Attitudes A and G
R                       Figure 308/TASK 12-11-28-991-015
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 347
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.4 Attitudes A and G
R                       Figure 309/TASK 12-11-28-991-026
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 348
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.5 Attitudes A and G
R                       Figure 310/TASK 12-11-28-991-036
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 349
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.2 Attitudes B and F
R                       Figure 311/TASK 12-11-28-991-027
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 350
                                                                   May 01/10
                                               
    UZB                                        
               - MLI Stick No.3 Attitudes B and F
R                (Ref. Fig. 312/TASK 12-11-28-991-017)
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 351
                                                                  May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.3 Attitudes B and F
R                       Figure 312/TASK 12-11-28-991-017
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 352
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.4 Attitudes B and F
R                       Figure 313/TASK 12-11-28-991-028
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 353
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.5 Attitudes B and F
R                       Figure 314/TASK 12-11-28-991-037
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 354
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.2 Attitudes C and E
R                       Figure 315/TASK 12-11-28-991-029
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 355
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.3 Attitudes C and E
R                       Figure 316/TASK 12-11-28-991-019
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 356
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.4 Attitudes C and E
R                       Figure 317/TASK 12-11-28-991-030
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 357
                                                                   May 01/10
                                               
    UZB                                        
                Fuel Quantity - MLI Stick No.5 Attitudes C and E
R                       Figure 318/TASK 12-11-28-991-038
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                    Page 358
                                                                   May 01/10
                                               
    UZB                                        
                    Fuel Quantity - MLI Stick No.2 Attitude D
R                       Figure 319/TASK 12-11-28-991-031
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 359
                                                                  May 01/10
                                               
    UZB                                        
                    Fuel Quantity - MLI Stick No.3 Attitude D
R                       Figure 320/TASK 12-11-28-991-034
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 360
                                                                  May 01/10
                                               
    UZB                                        
                    Fuel Quantity - MLI Stick No.4 Attitude D
R                       Figure 321/TASK 12-11-28-991-035
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 361
                                                                  May 01/10
                                               
    UZB                                        
                    Fuel Quantity - MLI Stick No.5 Attitude D
R                       Figure 322/TASK 12-11-28-991-039
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 362
                                                                  May 01/10
                                               
    UZB                                        
                    Fuel Quantity - CTR MLI Attitudes A and G
R                       Figure 323/TASK 12-11-28-991-021
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 363
                                                                  May 01/10
                                               
    UZB                                        
                    Fuel Quantity - CTR MLI Attitudes B and F
R                       Figure 324/TASK 12-11-28-991-032
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 364
                                                                  May 01/10
                                               
    UZB                                        
                    Fuel Quantity - CTR MLI Attitudes C and E
R                       Figure 325/TASK 12-11-28-991-022
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 365
                                                                  May 01/10
                                               
    UZB                                        
                      Fuel Quantity - CTR MLI Attitude D
R                      Figure 326/TASK 12-11-28-991-033
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                   Page 366
                                                                  May 01/10
                                              
    UZB                                       
         (4) Add together the values for each tank to find the total volume of
             fuel.
         (5) Multiply the total volume of the fuel by the SG of the fuel. The
             result is the total mass of the fuel.
             NOTE : MLI No. 5 can only record a maximum fuel reading of 850 l
             ____
                    (224.5444 USgal). The maximum capacity of the outer wing cell
                    is 880 l (232.4695 USgal).
   5. Close-up
      ________
Subtask 12-11-28-410-058
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-11-28-942-059
B. Removal of Equipment
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                          Page 367
                                                                         May 01/10
R                                                
  UZB                                            
           Fuel Quantity - MLI Stick No.2 Attitudes A and G (A321 Aircraft)
R                          Figure 327/TASK 12-11-28-991-056
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 368
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.3 Attitudes A and G (A321 Aircraft)
R                          Figure 328/TASK 12-11-28-991-057
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 369
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.4 Attitudes A and G (A321 Aircraft)
R                          Figure 329/TASK 12-11-28-991-058
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 370
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.2 Attitudes B and F (A321 Aircraft)
R                          Figure 330/TASK 12-11-28-991-061
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 371
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.3 Attitudes B and F (A321 Aircraft)
R                          Figure 331/TASK 12-11-28-991-062
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 372
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.4 Attitudes B and F (A321 Aircraft)
R                          Figure 332/TASK 12-11-28-991-063
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 373
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.2 Attitudes C and E (A321 Aircraft)
R                          Figure 333/TASK 12-11-28-991-066
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 374
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.3 Attitudes C and E (A321 Aircraft)
R                          Figure 334/TASK 12-11-28-991-067
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 375
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.4 Attitudes C and E (A321 Aircraft)
R                          Figure 335/TASK 12-11-28-991-068
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                           Page 376
                                                                          May 01/10
                                                  
    UZB                                           
           Fuel Quantity - MLI Stick No.2 Attitudes D (A321 Aircraft)
R                       Figure 336/TASK 12-11-28-991-071
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 377
                                                                        May 01/10
                                               
    UZB                                        
           Fuel Quantity - MLI Stick No.3 Attitudes D (A321 Aircraft)
R                       Figure 337/TASK 12-11-28-991-072
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 378
                                                                        May 01/10
                                               
    UZB                                        
           Fuel Quantity - MLI Stick No.4 Attitudes D (A321 Aircraft)
R                       Figure 338/TASK 12-11-28-991-073
  
  EFF :
  
             ALL                                      12-11-28
                                                     
                                                                         Page 379
                                                                        May 01/10
                                               
    UZB                                        
                   HYDRAULIC FLUIDS - DESCRIPTION AND OPERATION
                   ____________________________________________
  1. _______
     General
     The hydraulic fluid instructions give specifications and special
     instructions.
        (1) The aircraft hydraulic systems are filled with hydraulic fluids on
            phosphate ester base. The Material Numbers (Mat No.) are as follows:
            - 02-003,
            - 02-003A,
            - 02-003B,
            - 02-003C,
            - 02-003D.
            - 02-003E
        (2) The hydraulic fluid is specified by the operator. All fluids are to
            NSA 307110 specification. They can be mixed.
B. Fluid Monitoring
        (1) Hydraulic fluid with a high degree of cleanliness is required for the
            correct operation of the hydraulic systems and equipment.
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                             Page 1
                                                                          Feb 01/10
                                                  
 UZB                                              
           Characteristics of Phosphate Ester Base - Hydraulic Fluids
                               Figure 001 (SHEET 1)
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                           Page 2
                                                                        Feb 01/10
                                               
 UZB                                           
           Characteristics of Phosphate Ester Base - Hydraulic Fluids
                               Figure 001 (SHEET 2)
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                           Page 3
                                                                        Feb 01/10
                                               
 UZB                                           
            NOTE : The degree of cleanliness of the hydraulic fluid used for
            ____
                   replenishing (topping up of the hydraulic systems and
                   hydraulic cart reservoirs) must agree with class 7 of the NAS
                   specification 1638 (initial state).
        (1) The quality of the hydraulic fluid must be in the limits given in
            Fig. 002.
            (a) If the water or chlorine content of the hydraulic fluid are equal
                or more than the permitted values:
                Clean it with the HYDRAULIC PURIFIER (HSPA181-380J):
                - (Ref: 12-36-29-615-001)
                - (Ref: 12-36-29-615-002)
                - (Ref: 12-36-29-615-003)
                  Or change the hydraulic fluid:
                - (Ref: 12-36-29-600-001)
                - (Ref: 12-36-29-600-002)
                - (Ref: 12-36-29-600-003)
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                           Page 4
                                                                        Feb 01/10
                                                
 UZB                                            
                   Hydraulic Fluid Property In-Service Limits
                                   Figure 002
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                     Page 5
                                                                  Feb 01/10
                                               
 UZB                                           
               (c) If the conductivity of the hydraulic fluid is less than the
                   permitted value:
                   Change the hydraulic fluid:
                   - (Ref: 12-36-29-600-001)
                   - (Ref: 12-36-29-600-002)
                   - (Ref: 12-36-29-600-003)
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                              Page 6
                                                                           May 01/10
                                                   
    UZB                                            
                    Characteristics of Mineral Base Fluids
                                  Figure 003
  
  EFF :
  
             ALL                                      12-12-00
                                                     
                                                                     Page 7
                                                                  Feb 01/10
                                              
 UZB                                          
                                 HYDRAULIC POWER - SERVICING
                                 ___________________________
TASK 12-12-29-611-001
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 301
                                                                           Feb 01/11
                                                     
    UZB                                              
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                         Page 302
                                                                        Feb 01/10
                                                
 UZB                                            
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-12-29-860-051
           (3) Make sure that the hydraulic systems are depressurized and put them
               in the maintenance configuration.
               (Ref. TASK 29-00-00-864-001).
Subtask 12-12-29-010-054
B. Get Access
           (1) Open the left Main Landing Gear (MLG) door (Ref. TASK 32-12-00-010-
               001).
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                             Page 303
                                                                            May 01/11
                                                     
    UZB                                              
     Subtask 12-12-29-210-052
           (1) Make sure that the nitrogen fill pressure of the brake accumulator
               2582GM is correct (Ref. TASK 32-44-11-200-001).
           (2) Make sure that the hydraulic accumulators 1070GM, 2070GM and 3070GM
               have a nitrogen pressure of 130 bar (1885.4901 psi) at 20 DEG.C
               (68.00 DEG.F).
               If necessary, adjust the nitrogen pressure (Ref. TASK 12-14-29-614-
               001).
           (3) Make sure that the pressure on the indicator of the related reservoir
               is 3.5 +0.3 -0 bar (50.7631 +4.3511 -0.0000 psi). If necessary,
               pressurize the reservoir (Ref. TASK 29-14-00-614-002).
Subtask 12-12-29-863-050
           (1) Pressurize the Yellow hydraulic system with the Yellow E-pump
               (Ref. TASK 29-24-00-863-001) to pressurize the brake accumulator
               system to 206 bar (2987.7766 psi).
           (2) On the panel 110VU, put the parking brake control switch 73GG to the
               ON position.
           (3) Make sure that the pressure on the triple indicator 60GG shows the
               left and right pressure values.
R          (6) Put the WARNING NOTICE(S) on the panel 40VU in the cockpit to tell
R              persons not to pressurize the hydraulic systems.
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 304
                                                                           Feb 01/11
                                                     
    UZB                                              
     4. Procedure
        _________
Subtask 12-12-29-611-052
           (1) Remove the hand pump lever 3270GM from the service panel of the
               Yellow hydraulic system.
           (2) On the service panel of the Green hydraulic system, connect the hand
               pump lever 3270GM to the shaft of the hand pump 1009GM.
           (3) Remove the flexible hose 1699GM from the service panel compartment of
               the Green hydraulic system.
           (4) Remove the blanking cap and connect the flexible hose to the fill
R              valve 1698GM. Put the other end in the CONTAINER - HYDRAULIC FLUID
R              RESISTANT with one of these hydraulic fluids:
               - HYDRAULIC FLUIDS (Material No. 02-003)
               - HYDRAULIC FLUIDS (Material No. 02-003A)
               - HYDRAULIC FLUIDS (Material No. 02-003B)
               - HYDRAULIC FLUIDS (Material No. 02-003C)
               - HYDRAULIC FLUIDS (Material No. 02-003D)
               - HYDRAULIC FLUIDS (Material No. 02-003E).
           (5) Turn the selector 1134GQ to the position that is correct for the
               system you will fill.
           (6) Make sure that, on the quantity indicator 1834GQ, the colored light
               of the related system comes on.
               CAUTION : MAKE SURE THAT YOU DO NOT PUT TOO MUCH FLUID IN THE
               _______
                         RESERVOIR. IF THE RESERVOIR IS TOO FULL, YOU CANNOT
                         PRESSURIZE IT SUFFICIENTLY. LOW AIR PRESSURE CAN CAUSE THE
                         MESSAGE RSVR LO AIR PR TO SHOW IN FLIGHT ON THE UPPER AND
                         LOWER ECAM DISPLAY UNITS.
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 305
                                                                           Feb 01/11
                                                   
    UZB                                            
               Ground Service Panel of the Green Hydraulic System
                        Figure 301/TASK 12-12-29-991-001
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                     Page 306
                                                                    Feb 01/10
                                               
 UZB                                           
               (b) Monitor the increase of the fluid level of the related system on
                   the quantity indicator and do these steps:
                   1
                   _   Stop the flow of the hydraulic fluid when the pointer is
                       almost to the fill level given in the table.
                   2
                   _   Slowly continue to fill again, until the pointer shows almost
                       to the fill level given in the table.
     -------------------------------------------------------------------------------
R    |    SYSTEM/RESERVOIR     | QUANTITY | QUANTITY |             REMARKS         |
     |                         |   LITERS   |   US GAL   |                         |
     -------------------------------------------------------------------------------
     | GREEN SYSTEM            |            |            |                         |
     |                         |            |            |                         |
     | Total Capacity          |     23     |    6.1     |                         |
     | Max. Capacity shown on |             |            |                         |
     | the Gage                |     18     |    4.8     |                         |
     | Fill Level              |     14     |    3.7     | At 20 DEG.C (68 DEG.F) |
     | Low Level Warning       |      3     |    0.8     |                         |
     |-------------------------|------------|------------|-------------------------|
     | BLUE SYSTEM             |            |            |                         |
     |                         |            |            |                         |
     | Total Capacity          |     10     |    2.6     |                         |
     | Max. Capacity shown on |             |            |                         |
     | the Gage                |      8     |    2.1     |                         |
     | Fill Level              |      6     |    1.6     | AT 20 DEG.C (68 DEG.F) |
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                             Page 307
                                                                            May 01/11
                                                    
    UZB                                             
   -------------------------------------------------------------------------------
   |    SYSTEM/RESERVOIR     | QUANTITY | QUANTITY |             REMARKS         |
   |                         |   LITERS   |   US GAL   |                         |
   | Low Level Warning       |      2     |    0.5     |                         |
   |-------------------------|------------|------------|-------------------------|
   | YELLOW SYSTEM           |            |            |                         |
   |                         |            |            |                         |
   | Total Capacity          |     20     |    5.3     |                         |
   | Max. Capacity shown on |             |            |                         |
   | the Gage                |     18     |    4.8     |                         |
   | Fill Level              |     12     |    3.2     | At 20 DEG.C (68 DEG.F) |
   |                         |            |            | with the normal nitrogen|
   |                         |            |            | precharging pressure in |
   |                         |            |            | the brake accumulator   |
   |                         |            |            | 2582GM and the auxiliary|
   |                         |            |            | brake system pressurized|
   | Low Level Warning       |      3     |    0.8     |                         |
   -------------------------------------------------------------------------------
         (10) Make sure that the colored light on the quantity indicator 1834GQ
              goes off.
(11) Remove the flexible hose and install the blanking cap on the pump.
         (12) Put the flexible hose back in position in the service panel
              compartment of the Green hydraulic system.
         (13) Remove the hand pump lever 3270GM from the hand pump 1009GM. Then put
              the hand pump lever in position on the service panel of the Yellow
              hydraulic system.
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                             Page 308
                                                                            May 01/11
R                                                 
  UZB                                             
        (14) If you filled the hydraulic reservoir after:
             - Maintenance
             - Removal/installation of hydraulic components
             - Hydraulic fluid low level (loss of the hydraulic system)
             - High loss of hydraulic fluid,
  5. Close-up
     ________
Subtask 12-12-29-410-054
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
(2) Close the access panels 197CB, 198CB and if necessary 197EB.
Subtask 12-12-29-860-050
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                           Page 309
                                                                          Feb 01/10
                                                 
 UZB                                             
     TASK 12-12-29-611-002
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 310
                                                                           Feb 01/11
                                                     
    UZB                                              
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 311
                                                                           May 01/11
                                                   
    UZB                                            
     3. __________
        Job Set-up
Subtask 12-12-29-860-053
           (2) Make sure that the hydraulic systems are depressurized and put them
               in the maintenance configuration.
               (Ref. TASK 29-00-00-864-001).
Subtask 12-12-29-010-056
B. Get Access
           (2) Open the left Main Landing Gear (MLG) door (Ref. TASK 32-12-00-010-
               001).
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 312
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-12-29-210-053
           (1) Make sure that the nitrogen fill pressure of the brake accumulator
               2582GM is correct (Ref. TASK 32-44-11-200-001).
           (2) Make sure that the hydraulic accumulators 1070GM, 2070GM and 3070GM
               have a nitrogen pressure of 130 bar (1885.4901 psi) at 20 DEG.C
               (68.00 DEG.F).
           (4) Make sure that the pressure on the indicator of the related reservoir
               is 3.5 +0.3 -0 bar (50.7631 +4.3511 -0.0000 psi). If necessary,
               pressurize the reservoir (Ref. TASK 29-14-00-614-002).
Subtask 12-12-29-863-051
           (1) Pressurize the Yellow hydraulic system with the E-pump (Ref. TASK 29-
               24-00-863-001) to pressurize the brake accumulator system to 206 bar
               (2987.7766 psi).
           (2) On the panel 110VU, put the parking brake control switch 73GG to the
               ON position.
           (3) Make sure that the pressure on the triple indicator 60GG shows the
               left and right pressure values.
R          (5) Put the WARNING NOTICE(S) in the cockpit to tell persons not to
               pressurize the hydraulic systems.
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 313
                                                                           Feb 01/11
                                                     
    UZB                                              
     4. Procedure
        _________
Subtask 12-12-29-611-053
               CAUTION : BE CAREFUL WHEN YOU CONNECT THE GROUND HYDRAULIC CART. MAKE
               _______
                         SURE THAT THE SUPPLY PRESSURE AND THE FLOW RATE ARE LESS
                         THAN THESE LIMITS:
                         - THE SUPPLY PRESSURE MUST BE LESS THAN 30 BAR (435.1132
                         PSI).
                         - THE FLOW RATE MUST BE LESS THAN 12L/MIN (3.1700 US
                         GAL/MIN).
                         IF THE SUPPLY PRESSURE AND THE FLOW RATE ARE MORE THAN
                         THESE LIMITS, DAMAGE CAN OCCUR TO THE HYDRAULIC RESERVOIR.
R              (b) Connect a hydraulic service cart with one of the hydraulic fluids
R                  that follow to the reservoir fill connection 1007GM:
                   - HYDRAULIC FLUIDS (Material No. 02-003)
                   - HYDRAULIC FLUIDS (Material No. 02-003A)
                   - HYDRAULIC FLUIDS (Material No. 02-003B)
                   - HYDRAULIC FLUIDS (Material No. 02-003C)
                   - HYDRAULIC FLUIDS (Material No. 02-003D)
                   - HYDRAULIC FLUIDS (Material No. 02-003E).
           (2) Turn the selector valve 1134GQ to the correct position of the related
               hydraulic system which you will fill.
           (3) Make sure that on the quantity indicator 1834GQ the colored light of
               the related system comes on.
               CAUTION : MAKE SURE THAT YOU DO NOT PUT TOO MUCH FLUID IN THE
               _______
                         RESERVOIR. IF THE RESERVOIR IS TOO FULL, YOU CANNOT
                         PRESSURIZE IT SUFFICIENTLY. LOW AIR PRESSURE CAN CAUSE THE
                         MESSAGE RSVR LO AIR PR TO SHOW IN FLIGHT ON THE UPPER AND
                         LOWER ECAM DISPLAY UNITS.
               (a) Operate the hydraulic service cart with a minimum output pressure
                   of 7 bar (101.5263 psi).
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 314
                                                                           Feb 01/11
                                                    
    UZB                                             
               (b) Make sure that:
                   - The output pressure is not more than 30 bar (435.1131 psi)
                   - The flow rate is not more than 12 l.min (3.1700 USgal.mn).
               (c) Monitor the increase of the fluid level of the related system on
                   the quantity indicator and do these steps:
                   1
                   _   Stop the flow of the hydraulic fluid when the pointer is
                       almost to the fill level given in the table.
                   2
                   _   Slowly continue to fill again until the pointer shows almost
                       the fill level given in the table.
     -------------------------------------------------------------------------------
R    |   SYSTEM/RESERVOIR     | QUANTITY | QUANTITY |             REMARKS          |
R    |                        |   LITRES   |   US GAL   |                          |
     -------------------------------------------------------------------------------
     | GREEN SYSTEM           |            |            |                          |
     |                        |            |            |                          |
     | Total Capacity         |     23     |    6.1     |                          |
     | Max. Capacity shown on |            |            |                          |
     | the Gage               |     18     |    4.8     |                          |
     | Fill Level             |     14     |    3.7     | At 20 DEG.C (68 DEG.F)   |
     | Low Level Warning      |      3     |    0.8     |                          |
     |------------------------|------------|------------|--------------------------|
     | BLUE SYSTEM            |            |            |                          |
     |                        |            |            |                          |
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                             Page 315
                                                                            May 01/11
                                                    
    UZB                                             
   -------------------------------------------------------------------------------
   |   SYSTEM/RESERVOIR     | QUANTITY | QUANTITY |             REMARKS          |
   |                        |   LITRES   |   US GAL   |                          |
   | Total Capacity         |     10     |    2.6     |                          |
   | Max. Capacity shown on |            |            |                          |
   | the Gage               |       8    |    2.1     |                          |
   | Fill Level             |       6    |    1.6     | At 20 DEG.C (68 DEG.F)   |
   | Low Level Warning      |       2    |    0.5     |                          |
   |------------------------|------------|------------|--------------------------|
   |                        |            |            |                          |
   | YELLOW SYSTEM          |            |            |                          |
   |                        |            |            |                          |
   | Total Capacity         |    20      |    5.3     |                          |
   | Max. Capacity shown on |            |            |                          |
   | the Gage               |    18      |    4.8     |                          |
   | Fill Level             |    12      |    3.2     | At 20 DEG.C (68 DEG.F)   |
   |                        |            |            | with the normal nitrogen |
   |                        |            |            | precharging pressure in |
   |                        |            |            | the brake accumulator    |
   |                        |            |            | 2582GM and the auxiliary |
   |                        |            |            | brake system pressurized |
   | Low Level Warning      |     3      |    0.8     |                          |
   -------------------------------------------------------------------------------
         (5) If the reservoir is   filled too much, drain the unwanted hydraulic
             fluid:
             - For the reservoir   of the Green hydraulic system (Ref. TASK 29-10-
               00-680-001)
             - For the reservoir   of the Yellow hydraulic system (Ref. TASK 29-10-
               00-680-002)
             - For the reservoir   of the Blue hydraulic system (Ref. TASK 29-10-00-
               680-003).
         (7) Make sure that the colored light on the quantity indicator 1834GQ
             goes off.
         (8) Disconnect the hydraulic service cart from the reservoir fill
             connection 1007GM and install the blanking cap.
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                            Page 316
                                                                           May 01/11
R                                                  
  UZB                                              
             (a) Use the related bleeding procedure as follows:
                 - For the reservoir of the Green hydraulic system (Ref. TASK 29-
                   00-00-870-003)
                 - For the reservoir of the Yellow hydraulic system (Ref. TASK 29-
                   00-00-870-007)
                 - For the reservoir of the Blue hydraulic system (Ref. TASK 29-
                   00-00-870-008)
                   and
                   (Ref. TASK 29-00-00-870-009).
   5. Close-up
      ________
Subtask 12-12-29-410-055
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-12-29-860-052
  
  EFF :
  
             ALL                                      12-12-29
                                                     
                                                                          Page 317
                                                                         May 01/11
R                                                
  UZB                                            
                              LANDING GEAR - SERVICING
                              ________________________
TASK 12-12-32-611-001
   WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
   _______
             START A TASK ON OR NEAR:
             - THE FLIGHT CONTROLS
             - THE FLIGHT CONTROL SURFACES
             - THE LANDING GEAR AND THE RELATED DOORS
             - COMPONENTS THAT MOVE.
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS CAN GO
   _______
             THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN
             KILL YOU.
   1. __________________
      Reason for the Job
      NOTE : This procedure must be done a minimum of 2 hours after the last
      ____
             aircraft operation. This is to let the separation of nitrogen from
             the oil in the shock absorber occur.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 301
                                                                         Nov 01/10
R                                                
  UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                                Page 302
                                                                               May 01/11
                                                       
    UZB                                                
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-12-32-941-050
A. Safety Precautions
           (2) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
           (3) On panel 400VU, make sure that the landing-gear control-lever (6GA)
               is in the DOWN position.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 303
                                                                            Nov 01/10
                                                     
    UZB                                              
   Subtask 12-12-32-010-050
B. Get Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR DOORS ARE
         _______
                   CLEAR.
         (2) Install the SAFETY PIN - NLG DOOR (98D32203502000) in the linkage of
             each forward NLG door (Ref. TASK 32-00-00-481-002).
   4. Procedure
      _________
Subtask 12-12-32-614-074
             (a) Connect the hydraulic source hose (17) to the hydraulic power-
                 supply inflation bench - 200 bar (16).
             (b) Make sure that the control valves (13) and (19) of the three-way
                 valve (12) are closed.
             (c) Connect the hydraulic source hose (17) to the three-way valve
                 (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 304
                                                                         Aug 01/10
R                                                
  UZB                                            
R            NLG Shock Absorber Replenishment - Location and Detail
                        Figure 301/TASK 12-12-32-991-001
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                       Page 305
                                                                      May 01/10
                                               
    UZB                                        
                      NLG Shock Absorber - Filling System
                       Figure 302/TASK 12-12-32-991-012
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                   Page 306
                                                                  Feb 01/10
                                              
 UZB                                          
               (d) Connect the filling hose (11) to the three-way valve (12).
               (e) Remove the blanking cap (1) and the plug (5) from the FILLING
                   ASSEMBLY.
               (f) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
               (g) Connect the translucent bleed hose (14) between the three-way
                   valve (12) and the drain container (15).
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
               (i) Fill the hydraulic source (16) with HYDRAULIC FLUIDS (Material
                   No. 02-001) or HYDRAULIC FLUIDS (Material No. 02-004) or
                   HYDRAULIC FLUIDS (Material No. 02-006).
           (2) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). Install the seal (4) on the charging valve
                   (6).
           (3) Make sure that the charging equipment is correctly installed and does
               not leak.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 307
                                                                           May 01/11
                                                   
    UZB                                            
           (4) Deflate the shock absorber as follows:
               WARNING : MAKE SURE THAT THE AREA AROUND THE AIRCRAFT IS CLEAR OF
               _______
                         PERSONS AND EQUIPMENT. WHEN YOU PRESSURIZE/DEPRESSURIZE THE
                         SHOCK ABSORBER, WITH THE AIRCRAFT WEIGHT ON THE GROUND, THE
                         AIRCRAFT WILL MOVE.
               WARNING : DO NOT LET HIGH PRESSURE GAS TOUCH YOUR SKIN. GAS BUBBLES
               _______
                         IN YOUR BLOOD CAN KILL YOU.
               (a) Move the wrench (9) down and slowly turn counterclockwise to open
                   the charging valve (6).
                   NOTE : In the step that follows, make sure that you deflate the
                   ____
                          shock absorber slowly:
                          - to prevent possible shock when the shock absorber gets
                            to the lower limit of its travel
                          - so that the gas does not mix with the oil in the shock
                            absorber.
               (b) Slowly open the control valve (13) on the three-way valve (12) to
                   release the nitrogen pressure. This will let the shock absorber
                   fully deflate.
               (c) When all the nitrogen pressure is released, close the control
                   valve (13) of the three-way valve (12).
Subtask 12-12-32-611-053
           WARNING : MAKE SURE THAT THE AREA AROUND THE AIRCRAFT IS CLEAR OF PERSONS
           _______
                     AND EQUIPMENT. WHEN YOU PRESSURIZE/DEPRESSURIZE THE SHOCK
                     ABSORBER, WITH THE AIRCRAFT WEIGHT ON THE GROUND, THE AIRCRAFT
                     WILL MOVE.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 308
                                                                           Nov 01/10
                                                    
    UZB                                             
           WARNING : MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE L/G
           _______
                     SHOCK ABSORBER DURING REPLENISHMENT. THERE IS A RISK THAT
                     PRESSURIZED GASES OR FLUID CAN ESCAPE AND CAUSE INJURY OR
                     DAMAGE.
           (1) Fill the NLG shock absorber with HYDRAULIC FLUIDS (Material No. 02-
               001) or HYDRAULIC FLUIDS (Material No. 02-004) or HYDRAULIC FLUIDS
               (Material No. 02-006) as follows:
               CAUTION : WHEN YOU FILL THE SHOCK ABSORBER, MAKE SURE TO STOP THE
               _______
                         FLUID SUPPLY IMMEDIATELY AFTER THE SHOCK ABSORBER MOVES TO
                         ITS LIMITS. THIS WILL PREVENT INTERNAL DAMAGE CAUSED BY
                         OVERPRESSURE.
               NOTE : Hydraulic fluids 02-001, 02-004 and 02-006 can be mixed in all
               ____
                      applicable maintenance tasks and in all quantities.
               (a) Disconnect the filling hose (11) from the FILLING ASSEMBLY. Put
                   the free end of the filling hose (11) in the drain container
                   (15).
(c) Close the control valve (19) on the three-way valve (12).
(e) Open the control valve (19) of the three-way valve (12).
(g) Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 309
                                                                            Nov 01/10
                                                   
    UZB                                            
           (h) Do not continue the procedure for a minimum of ten minutes. This
               will make sure that all air is isolated from the hydraulic fluid.
(i) Slowly open the control valve (13) on the three-way valve (12).
           (j) Let the hydraulic fluid drain into the drain container (15) until
               the shock absorber is fully compressed.
R
           (k) Keep the shock absorber compressed fully and close the control
               valve (13) on the three-way valve (12).
           (l) Make sure that hydraulic fluid is released from the shock
               absorber during the shock absorber compression.
           (m) Make sure the fluid released from the shock absorber through the
               translucent bleed hose (14) does not contain gas bubbles or
               emulsion.
(n) Turn the wrench (9) clockwise to close the charging valve (6).
(o) Open the control valve (13) on the three-way valve (12).
           (p) Disconnect the hydraulic source hose (17) from the three-way
               valve (12).
           (q) Disconnect the filling hose (11) from the FILLING ASSEMBLY. Put
               the free end of the filling hose (11) in the drain container (15)
               to drain the hydraulic fluid.
(r) Close the control valve (13) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 310
                                                                         Nov 01/10
                                               
    UZB                                        
               (s) Remove the translucent bleed hose (14) from the three-way valve
                   (12).
(2) Fill the NLG shock absorber with nitrogen gas, as follows:
               WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
               _______
                         GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
                         THIS CONDITION CAN KILL YOU.
               CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
               _______
                         ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                         TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                         ABSORBER PRESSURE.
               (a) Connect the nitrogen source hose (18) of the nitrogen source to
                   the three-way valve (12).
(b) Open the control valve (19) on the three-way valve (12).
               (c) Slowly open the control valve of the nitrogen source to release
                   nitrogen pressure and bleed the circuit with dry nitrogen.
(e) Close the control valve (19) on the three-way valve (12).
               (i) Turn the wrench (9) counterclockwise to open the charging valve
                   (6).
               (j) Slowly open the control valve (19) on the three-way valve (12) to
                   inflate the shock absorber with nitrogen. Do this until the
                   dimension H is 30 mm (1.1811 in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 311
                                                                            May 01/11
                                                   
    UZB                                            
                       NLG Shock Absorber - Dimension H
                       Figure 303/TASK 12-12-32-991-034
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                   Page 312
                                                                  Feb 01/10
                                              
 UZB                                          
           (k) Close the control valve (19) on the three-way valve (12) and
               close the control valve of the nitrogen source.
           (l) Let the pressure become stable, open the control valve (19) after
               fifteen minutes to record the pressure. When the pressure has
               been recorded, close the control valve (19).
           (n) Open the control valve of the nitrogen source. Slowly open the
               control valve (19) on the three-way valve (12) to inflate the
               shock absorber. Do this until you get the correct H dimension
               plus 30 mm (1.1811 in.).
           (o) Close the control valve (19) on the three-way valve (12) and
               close the control valve of the nitrogen supply.
(p) Let the pressure become stable, continue after fifteen minutes.
           (q) Slowly open the control valve (13) on the three-way valve (12) to
               deflate the shock absorber. Do this until you get the correct H
               value given in step (m).
(r) Close the control valve (13) on the three-way valve (12).
           (t) Open the control valve (19) on the three-way valve (12) and
               measure:
               - the pressure shown on the pressure gage (10)
               - the dimension H.
           (v) Turn the wrench (9) clockwise to close the charging valve (6).
               Close the control valve (19) and open the control valve (13) to
               release the nitrogen from the filling system.
(w) Remove the filling hose (11) from the FILLING ASSEMBLY.
(x) Remove the FILLING ASSEMBLY from the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 313
                                                                         Aug 01/10
                                               
    UZB                                        
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 18 (SHEET 1)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 314
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 28 (SHEET 2)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 315
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 38 (SHEET 3)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 316
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 48 (SHEET 4)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 317
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 58 (SHEET 5)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 318
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 68 (SHEET 6)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 319
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 78 (SHEET 7)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 320
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 304/TASK 12-12-32-991-041- 88 (SHEET 8)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 321
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 18 (SHEET 1)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 322
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 28 (SHEET 2)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 323
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 38 (SHEET 3)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 324
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 48 (SHEET 4)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 325
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 58 (SHEET 5)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 326
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 68 (SHEET 6)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 327
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 78 (SHEET 7)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 328
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 305/TASK 12-12-32-991-042- 88 (SHEET 8)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 329
                                                                             Feb 01/11
                                                     
    UZB                                              
               (y) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24
                   and 70.79 lbf.in).
(aa) Install the blanking cap (7) on the charging valve (6).
     5. Close-up
        ________
Subtask 12-12-32-942-050
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-12-32-410-050
B. Close Access
           (1) Remove the SAFETY PIN - NLG DOOR from the linkage of each forward NLG
               door (Ref. TASK 32-00-00-481-001).
Subtask 12-12-32-942-051
C. Removal of Equipment
           (4) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 330
                                                                             Nov 01/10
                                                   
    UZB                                            
     Subtask 12-12-32-280-050
R          (1) Do a check   of the NLG shock absorber fluid level and charge pressure
R              (Ref. TASK   12-12-32-610-001) or (Ref. TASK 12-12-32-610-002). The
R              check must   be done between four and seven days after the first
R              subsequent   flight.
               NOTE : This check is necessary because the nitrogen will mix with the
               ____
                      oil and cause the pressure to decrease.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 331
                                                                             Feb 01/11
                                                     
    UZB                                              
   TASK 12-12-32-611-005
NLG Shock Absorber Oil Replenishment and Nitrogen Filling (Aircraft on Jacks)
   WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
   _______
             START A TASK ON OR NEAR:
             - THE FLIGHT CONTROLS
             - THE FLIGHT CONTROL SURFACES
             - THE LANDING GEAR AND THE RELATED DOORS
             - COMPONENTS THAT MOVE.
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS CAN GO
   _______
             THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN
             KILL YOU.
   1. __________________
      Reason for the Job
Self explanatory
      NOTE : This procedure can be done with the aircraft fully lifted on jacks
      ____
             (Ref. TASK 07-11-00-581-001) or lifted at the forward jacking point
             (Ref. TASK 07-11-00-581-003).
      NOTE : This procedure must be done a minimum of 2 hours after the last
      ____
             aircraft operation. This is to let the separation of nitrogen from
             the oil in the shock absorber occur.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 332
                                                                         Aug 01/10
R                                                
  UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   nitrogen source
     No specific                   safety barriers
     No specific                   standard charging equipment
R
     No specific                   drain container 15 l (3.9625 USgal)
     No specific                   hydraulic power-supply inflation bench - 200 bar
                                   200 bar (2900.7540 psi)
     No   specific                 trolley jack 500 mm (19.6850 in.)
     No   specific            AR   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific             1   GAGE 0 TO 2000 PSI (0 TO 138 BAR) - PRESSURE
     No   specific             1   RULER - STEEL
R    No   specific             1   THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F)
     No   specific             1   WARNING NOTICE(S)
     No   specific                 Torque Wrench : range 0.00 to 1.20 m.daN
                                                             (0.00 to 9.00 lbf.ft)
     M21930                    1   FILLING ASSEMBLY
     98D32203502000            2   SAFETY PIN - NLG DOOR
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                                Page 333
                                                                               May 01/11
                                                       
    UZB                                                
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-12-32-941-064
A. Safety Precautions
           (3) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 334
                                                                            Nov 01/10
                                                     
    UZB                                              
   Subtask 12-12-32-869-052
         (1) If the electrical power is not necessary for other maintenance tasks,
             de-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
             002). Then, it is not necessary to operate the LGCIU circuit
             breakers.
Subtask 12-12-32-582-052
         (1) Lift the aircraft on jacks (Ref. TASK 07-11-00-581-001) or (Ref. TASK
             07-11-00-581-003).
Subtask 12-12-32-010-052
D. Get Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR DOORS ARE
         _______
                   CLEAR.
         (2) Install the SAFETY PIN - NLG DOOR (98D32203502000) in the linkage of
             each forward NLG door (Ref. TASK 32-00-00-481-002).
         (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
             NLG.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 335
                                                                         Aug 01/10
R                                                
  UZB                                            
     4. Procedure
        _________
Subtask 12-12-32-614-059
R              (a) Connect the hydraulic source hose (17) to the hydraulic source
R                  (16).
               (b) Make sure the control valves (13) and (19) of the three-way valve
                   (12) are closed.
               (c) Connect the hydraulic source hose (17) to the three-way valve
                   (12).
(d) Connect the filling hose (11) to the three-way valve (12).
               (e) Remove the blanking cap (1) and the plug from the FILLING
                   ASSEMBLY.
               (f) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 336
                                                                            May 01/11
                                                    
    UZB                                             
               (g) Connect the translucent bleed hose (14) between the three-way
                   valve (12) and the drain container (15).
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 0 TO 2000 PSI (0 TO 138 BAR) - PRESSURE (10) on
R                  the three-way valve (12).
               (i) Fill the hydraulic source (16) with HYDRAULIC FLUIDS (Material
                   No. 02-001) or HYDRAULIC FLUIDS (Material No. 02-004) or
                   HYDRAULIC FLUIDS (Material No. 02-006).
           (2) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). Install the seal (4) on the charging valve
                   (6).
           (3) Make sure that the charging equipment is correctly installed and does
               not leak.
               WARNING : MAKE SURE THAT THE AREA AROUND THE AIRCRAFT IS CLEAR OF
               _______
                         PERSONS AND EQUIPMENT. WHEN YOU PRESSURIZE/DEPRESSURIZE THE
                         SHOCK ABSORBER, WITH THE AIRCRAFT WEIGHT ON THE GROUND, THE
                         AIRCRAFT WILL MOVE.
               WARNING : DO NOT LET HIGH PRESSURE GAS TOUCH YOUR SKIN. GAS BUBBLES
               _______
                         IN YOUR BLOOD CAN KILL YOU.
               (a) Move the wrench (9) down and turn counterclockwise to open the
                   charging valve (6).
               (b) Make sure that you deflate the shock absorber slowly. This is to
                   prevent fluid bleed from the shock absorber with the gas.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 337
                                                                           May 01/11
                                                   
    UZB                                            
             (c) Slowly open the control valve (13) on the three-way valve (12).
                 This is to release the nitrogen pressure and let the shock
                 absorber fully deflate.
             (d) When all the nitrogen pressure is released, close the control
                 valve (13) on the three-way valve (12).
Subtask 12-12-32-611-052
         WARNING : MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE L/G
         _______
                   SHOCK ABSORBER DURING REPLENISHMENT. THERE IS A RISK THAT
                   PRESSURIZED GASES OR FLUID CAN ESCAPE AND CAUSE INJURY OR
                   DAMAGE.
         (1) Fill the NLG shock absorber with HYDRAULIC FLUIDS (Material No. 02-
             001) or HYDRAULIC FLUIDS (Material No. 02-004) or HYDRAULIC FLUIDS
             (Material No. 02-006), as follows:
             NOTE : Hydraulic fluids 02-001, 02-004 and 02-006 can be mixed in all
             ____
                    applicable maintenance tasks and in all quantities.
             (a) Make sure that you compress/extend the shock absorber slowly:
                 - to prevent possible shock when the shock absorber gets to the
                   limit of its travel
                 - so that the gas does not mix with the oil in the shock
                   absorber.
             (b) If you use the hydraulic fluid source tank as the hydraulic
                 source (16) to fill the shock absorber, do the steps that follow:
                 1
                 _   Before you do the procedure make sure that the hydraulic
                     fluid-source tank (16) is in position above the charging valve
                     (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 338
                                                                          Aug 01/10
R                                                 
  UZB                                             
               2
               _   Put the trolley jack below the jacking dome of the shock
                   absorber.
               3
               _   Open the control valve (13) on the three-way valve (12).
               4
               _   Use the trolley jack to fully compress the shock absorber.
                   Dimension H must be 19 mm (0.7480 in.) plus or minus 2 mm
                   (0.0787 in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
               5
               _   Close the control valve (13) on the three-way valve (12).
               6
               _   Turn the wrench (9) clockwise and close the charging valve
                   (6).
               7
               _   Release the jack load and let the leg fully extend. Dimension
                   H must be 449 mm (17.6771 in.) plus or minus 2 mm (0.0787
                   in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
               8
               _   Let the shock absorber become stable, continue after a minimum
                   of fifteen minutes.
                   NOTE : The indication of the pressure gage (10) does not apply
                   ____
                          during this step.
               9
               _   Open the control valve (13) on the three-way valve (12).
              10
              __   Turn the wrench (9) counterclockwise to open the charging
                   valve (6).
              11
              __   Use the trolley jack to fully compress the shock absorber.
              12
              __   Close the control valve (13) on the three-way valve (12).
              13
              __   Open the control valve (19) on the three-way valve (12).
              14
              __   Release the jack load and let the leg fully extend for
                   hydraulic fluid to fill the shock absorber. Dimension H must
                   be 449 mm (17.6771 in.) plus or minus 2 mm (0.0787 in.).
R                  (Ref. Fig. 303/TASK 12-12-32-991-034)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page 339
                                                                        Aug 01/10
                                                
    UZB                                         
              15
              __   Let the hydraulic fluid fill the shock absorber, continue
                   after a minimum of ten minutes.
              16
              __   Close the control valve (19) on the three-way valve (12).
              17
              __   Open the control valve (13) on the three-way valve (12).
              18
              __   Use the trolley jack to fully compress the shock absorber.
                   Monitor the hydraulic fluid that goes into the drain container
                   (15) through the translucent bleed hose (14).
              19
              __   Close the control valve (13) on the three-way valve (12).
              20
              __   Open the control valve (19) on the three-way valve (12).
              21
              __   Release the jack load and let the leg fully extend for
                   hydraulic fluid to fill the shock absorber. Dimension H must
                   be 449 mm (17.6771 in.) plus or minus 2 mm (0.0787 in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
              22
              __   Let the hydraulic fluid fill the shock absorber, continue
                   after a minimum of twenty minutes.
              23
              __   Close the control valve (19) on the three-way valve (12).
              24
              __   Open the control valve (13) on the three-way valve (12).
              25
              __   Use the trolley jack to fully compress the shock absorber.
                   Monitor the hydraulic fluid that goes into the drain container
                   (15) through the translucent bleed hose (14).
              26
              __   The hydraulic fluid must be released from the shock absorber
                   during the shock absorber compression.
              27
              __   The fluid released from the shock absorber through the
                   translucent bleed hose (14) must not contain gas bubbles or
                   emulsion.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page 340
                                                                        Aug 01/10
R                                               
  UZB                                           
                   NOTE : If gas bubbles or emulsion are found, do steps 5_ thru
                   ____
                          25_ again.
              28
              __   Close the control valve (13) on the three-way valve (12).
              29
              __   Turn the wrench (9) clockwise to close the charging valve (6).
              30
              __   Disconnect the hydraulic source hose (17) from the three-way
                   valve (12).
              31
              __   Disconnect the filling hose (11) from the FILLING ASSEMBLY.
                   Put the free end of the filling hose (11) in the drain
                   container (15) to drain the hydraulic fluid.
              32
              __   Tighten the filling hose (11) on the FILLING ASSEMBLY.
              33
              __   Remove the translucent bleed hose (14) from the three-way
                   valve (12).
               1
               _   Put the trolley jack below the jacking dome of the shock
                   absorber.
               2
               _   Open the control valve (13) on the three-way valve (12).
               3
               _   Use the trolley jack to fully compress the shock absorber.
                   Dimension H must be 19 mm (0.7480 in.) plus or minus 2 mm
                   (0.0787 in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
               4
               _   Close the control valve (13) on the three way valve (12).
               5
               _   Turn the wrench (9) clockwise to close the charging valve (6).
               6
               _   Release the jack load and let the leg fully extend. Dimension
                   H must be 449 mm (17.6771 in.) plus or minus 2 mm (0.0787
                   in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
               7
               _   Let the shock absorber become stable, continue after a minimum
                   of fifteen minutes.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page 341
                                                                        Aug 01/10
R                                               
  UZB                                           
               8
               _   Open the control valve (13) on the three-way valve (12).
               9
               _   Turn the wrench (9) counterclockwise to open the charging
                   valve (6).
              10
              __   Use the trolley jack to fully compress the shock absorber.
              11
              __   Close the control valve (13) on the three-way valve (12).
              12
              __   Turn the wrench (9) clockwise to close the charging valve (6).
              13
              __   Disconnect the filling hose (11) from the FILLING ASSEMBLY.
                   Put the free end of the filling hose (11) in the drain
                   container to drain the hydraulic fluid.
              14
              __   Operate the hydraulic power-supply inflation bench (16) and
                   slowly open the control valve (19) on the three-way valve
                   (12). Bleed the filling hose (11) with hydraulic fluid.
              15
              __   Close the control valve (19) on the three-way valve (12).
              16
              __   Connect the filling hose (11) to the FILLING ASSEMBLY.
              17
              __   Turn the wrench (9) counterclockwise to open the charging
                   valve (6).
              18
              __   Close the control valve (13) on the three-way valve (12).
              19
              __   Open the control valve (19) on the three-way valve (12).
                   WARNING : MAKE SURE THAT THE TROLLEY JACK CANNOT TOUCH THE
                   _______
                             SHOCK ABSORBER DURING SHOCK ABSORBER EXTENSION.
              20
              __   Release the jack load and lower the trolley jack fully.
              21
              __   Operate the hydraulic power-supply inflation bench (16) and
                   slowly fill the shock absorber with fluid until the leg is
                   fully extended. Dimension H must be 449 mm (17.6771 in.) plus
                   or minus 2 mm (0.0787 in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
              22
              __   When the leg is fully extended, continue to inflate the shock
                   absorber until the pressure is 10 bar (145.0377 psi).
              23
              __   Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page 342
                                                                        Aug 01/10
R                                               
  UZB                                           
              24
              __   Slowly open the control valve (13) on the three-way valve
                   (12).
              25
              __   Use the trolley jack to slowly compress the shock absorber
                   until the dimension H is 300 mm (11.8110 in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
              26
              __   Close the control valve (13) on the three-way valve (12).
              27
              __   Turn the wrench (9) clockwise to close the charging valve (6).
              28
              __   Release the jack load and let the leg fully extend. Dimension
                   H must be 449 mm (17.6771 in.) plus or minus 2 mm (0.0787
                   in.).
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
              29
              __   Let the shock absorber become stable, continue after a minimum
                   of ten minutes.
              30
              __   Open the control valve (13) on the three-way valve (12).
              31
              __   Turn the wrench (9) counterclockwise to open the charging
                   valve (6).
              32
              __   Use the trolley jack to fully compress the shock absorber.
                   Monitor the hydraulic fluid that goes into the drain container
                   (15).
              33
              __   The hydraulic fluid must be released from the shock absorber
                   during the shock absorber compression.
              34
              __   The fluid released from the shock absorber through the
                   translucent bleed hose (14) must not contain gas bubbles or
                   emulsion.
              35
              __   Close the control valve (13) on the three-way valve (12).
              36
              __   Turn the wrench (9) clockwise to close the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page 343
                                                                        Aug 01/10
R                                               
  UZB                                           
                  37
                  __   Disconnect the hydraulic source hose (17) from the three-way
                       valve (12).
                  38
                  __   Disconnect the filling hose (11) from the FILLING ASSEMBLY.
                       Put the free end of the filling hose (11) in the drain
                       container (15) to drain the hydraulic fluid.
                  39
                  __   Remove the translucent bleed hose (14) from the three-way
                       valve (12).
(2) Fill the NLG shock absorber with nitrogen gas, as follows:
               WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE
               _______
                         GAS CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD.
                         THIS CONDITION CAN KILL YOU.
               CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
               _______
                         ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                         TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                         ABSORBER PRESSURE.
               (a) Connect the nitrogen source hose (18) of the nitrogen source to
                   the three-way valve (12).
(b) Open the control valve (19) on the three-way valve (12).
               (c) Slowly open the control valve of the nitrogen source to release
                   nitrogen pressure and bleed the circuit with dry nitrogen.
(e) Close the control valve (19) on the three-way valve (12).
               (g) Lower the trolley jack to let the shock absorber extend fully.
                   Dimension H must be 449 mm (17.6771 in.) plus or minus 2 mm
                   (0.0787 in.). Make sure that the jack is disengaged from the
                   shock absorber jacking dome.
                   (Ref. Fig. 303/TASK 12-12-32-991-034)
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 344
                                                                            May 01/11
                                                    
    UZB                                             
               (Ref. Fig. 301/TASK 12-12-32-991-001)
           (j) Turn the wrench (9) counterclockwise to open the charging valve
               (6).
           (l) Slowly open the control valve (19) on the three-way valve (12).
               This is to inflate the shock absorber up to the necessary charge
               pressure.
(m) Close the control valve (19) on the three-way valve (12).
           (o) Make sure that the pressure/temperature conditions are the same
               as in steps (h) and (i). If not, do steps (l) thru (o) again.
(p) Close the control valve (19) on the three-way valve (12).
(q) Turn the wrench (9) clockwise to close the charging valve (6).
           (s) Slowly open the control valve (13) on the three-way valve (12),
               to release the nitrogen pressure from the filling system.
           (t) Remove the filling hose (11) and the FILLING ASSEMBLY from the
               charging valve (6).
           (u) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24
               and 70.79 lbf.in).
(w) Install the blanking cap (7) on the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 345
                                                                         Aug 01/10
                                               
    UZB                                        
           Pressure/Temperature Table - Shock Absorber Fully Extended
R                       Figure 306/TASK 12-12-32-991-040
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page 346
                                                                        Aug 01/10
                                               
    UZB                                        
     Subtask 12-12-32-942-060
           (4) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-12-32-410-052
D. Close Access
           (1) Remove the SAFETY PIN - NLG DOOR from the linkage of each forward NLG
               door (Ref. TASK 32-00-00-481-001).
Subtask 12-12-32-869-053
E. Ground Configuration
           (1) If you opened the LGCIU circuit breakers, make sure that the flight
               configuration precautions with electrical power were obeyed
               (Ref. TASK 32-00-00-860-001).
Subtask 12-12-32-586-051
           (1) Lower the aircraft onto its wheels (Ref. TASK 07-11-00-586-002) or
               (Ref. TASK 07-11-00-586-001).
     5. Close-up
        ________
Subtask 12-12-32-942-061
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 347
                                                                           Nov 01/10
                                                   
    UZB                                            
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
Subtask 12-12-32-280-051
           (1) Do a check of the NLG shock absorber charge pressure (Ref. TASK 12-
R              14-32-614-004). The check must be done between four and seven days
R              after the first subsequent flight.
               NOTE : This check is necessary because the nitrogen will mix with the
               ____
                      oil and cause the pressure to decrease.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 348
                                                                           Feb 01/11
                                                   
    UZB                                            
     TASK 12-12-32-611-004
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 349
                                                                             May 01/11
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-12-32-941-063
A. Safety Precautions
           (2) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
     4. Procedure
        _________
Subtask 12-12-32-220-051
           WARNING : MAKE SURE THAT THE STANDARD CHARGING EQUIPMENT IS SAFE TO USE
           _______
                     ABOVE 140 BAR (2030.5278 PSI). THIS WILL PREVENT INJURY AND
                     DAMAGE.
           WARNING : MAKE SURE THAT THE AREA AROUND THE AIRCRAFT IS CLEAR OF PERSONS
           _______
                     AND EQUIPMENT. WHEN YOU PRESSURIZE/DEPRESSURIZE THE SHOCK
                     ABSORBER, WITH THE AIRCRAFT WEIGHT ON THE GROUND, THE AIRCRAFT
                     WILL MOVE.
           CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
           _______
                     ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE TEMPERATURE
                     WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK ABSORBER
                     PRESSURE.
           CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED PRESSURE
           _______
                     RANGE. THIS IS NECESSARY TO GET AN ACCURATE PRESSURE
                     MEASUREMENT.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 350
                                                                           May 01/11
                                                     
    UZB                                              
R                 . The charging equipment must be safe to use at over 140 bar
                  (2030.5278 psi).
           (1) Do the nitrogen filling of the MLG two-stage shock absorber (aircraft
               on jacks) (Ref. TASK 12-14-32-614-003).
           (3) Install the standard charging equipment on the top charging valve
               (1):
               (Ref. Fig. 308/TASK 12-12-32-991-030, 309/TASK 12-12-32-991-031)
(a) Remove the blanking cap (2) from the top charging valve (1).
(b) Make sure that the control valves (13) and (15) are closed.
(c) Connect the filling hose (11) to the three-way valve (12).
(d) Connect the filling hose (11) to the top charging valve (1).
               (e) Install the pressure gage 140 bar (2030.5278 psi) (10) on the
                   three-way valve (12).
           (5) At the top charging valve (1), read and record the pressure shown on
               the pressure gage (10).
R          (7) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure the
R              temperature of the MLG adjacent to the top charging valve (1).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 351
                                                                           May 01/11
                                                   
    UZB                                            
                   MLG Two Stage Shock Absorber - Dimension H
R                       Figure 307/TASK 12-12-32-991-033
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                   Page 352
                                                                  Aug 01/10
                                               
    UZB                                        
           MLG Two Stage Shock Absorber Charging Valves - Detail and Location
R                           Figure 308/TASK 12-12-32-991-030
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 353
                                                                           Aug 01/10
                                                   
    UZB                                            
              MLG Two Stage Shock Absorber - Typical Filling System
R                       Figure 309/TASK 12-12-32-991-031
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                       Page 354
                                                                      Aug 01/10
                                               
    UZB                                        
         (8) Find the dimension H for the pressure at the top-charging valve (1)
             for the measured temperature ((Ref. TASK 12-14-32-614-003) diagram
             1). Compare the H dimension given in ((Ref. TASK 12-14-32-614-003)
             diagram 1) to the measured dimension H and do one of the steps that
             follows:
         (9) If the measured H dimension is between +/- 15 mm (0.5905 in.) (of the
             dimension H given in (Ref. TASK 12-14-32-614-003) diagram 1), do the
             steps that follow:
             (b) Open the control valve (13) to release all pressure from the
                 filling hose (11).
(d) Remove the pressure gage (10) from the three-way valve (12).
             (e) Disconnect the filling hose (11) from the top charging valve (1)
                 and the three-way valve (12).
(f) Install the blanking cap (2) on the top charging valve (1).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 355
                                                                         May 01/11
R                                                
  UZB                                            
         (10) If the measured H dimension is not between +/- 15 mm (0.5905 in.) but
              is between +/- 30 mm (1.1811 in.) (of the dimension H given in
              (Ref. TASK 12-14-32-614-003) diagram 1), do one of the steps that
              follow:
              (a) Make sure that the control valve (15) is closed on the three-way
                  valve (12).
              (b) Open the control valve (13) on the three-way valve (12), to
                  release all pressure from the filling hose (11).
(c) Close the control valve (13) on the three-way valve (12).
(d) Remove the pressure gage (10) from the three-way valve (12).
              (e) Disconnect the filling hose (11) from the top charging valve (1)
                  and the three-way valve (12).
(f) Install the blanking cap (2) on the top charging valve (1).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 356
                                                                          May 01/11
R                                                 
  UZB                                             
   5. Close-up
      ________
Subtask 12-12-32-942-076
         (3) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 357
                                                                         May 01/11
R                                                
  UZB                                            
     TASK 12-12-32-611-008
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 358
                                                                             Nov 01/10
                                                     
    UZB                                              
         B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Expendable Parts
     -------------------------------------------------------------------------------
     FIG.ITEM |DESIGNATION                                        |IPC-CSN
     -------------------------------------------------------------------------------
D. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                               Page 359
                                                                              Aug 01/10
                                                    
    UZB                                             
     3. __________
        Job Set-up
Subtask 12-12-32-941-068
A. Safety Precautions
           (1) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
Subtask 12-12-32-582-055
           (2) Put the ACCESS PLATFORM 3M (10 FT) in position at the applicable
               shock absorber.
     4. Procedure
        _________
Subtask 12-12-32-611-059
           WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
           _______
                     REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
                     LOCKWIRE CAN CUT OR BLIND YOU.
           NOTE : As an alternative procedure to replenish the MLG you can use the
           ____
                  vacuum procedure in paragraph 4.B. The vacuum procedure will let
                  the MLG be replenished without extending and compressing the MLG
                  again and again.
(1) Remove the blanking cap (2) from the bottom charging valve (1).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 360
                                                                           Nov 01/10
                                                   
    UZB                                            
           MLG Two Stage Shock Absorber - Replenishment Location and Detail
R                          Figure 310/TASK 12-12-32-991-009
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 361
                                                                          Aug 01/10
                                                  
    UZB                                           
                  MLG Two Stage Shock Absorber - Filling System
R                       Figure 311/TASK 12-12-32-991-008
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                   Page 362
                                                                  Aug 01/10
                                               
    UZB                                        
         (2) Remove the blanking cap (3) from the top charging valve (4).
                 NOTE : During the steps that follow some oil can come out of the
                 ____
                        top charging valve (4).
         (4) Remove and discard the MISCELLANEOUS (Material No. 19-010) from the
             body of the top charging valve (4).
         (6) Remove and discard the packing (5) from the top charging valve
             assembly (4).
             (a) Install the filler adaptor (17) in the port of the top charging
                 valve.
             (b) TORQUE the filler adaptor (17) to between 1.13 and 1.58 m.daN
                 (99.99 and 139.82 lbf.in).
(d) Connect the filling hose (16) to the elbow fitting (18).
             (e) Install the 28 bar (406.1055 psi) pressure gage (15) on the
                 three-way valve (19).
(f) Connect the three-way valve (19) to the filling hose (16).
             (g) Connect the hydraulic pump (24) and the hydraulic fluid reservoir
                 (23) to the three-way valve (19) with the supply hose (25).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 363
                                                                         Aug 01/10
R                                                
  UZB                                            
             (h) Fill the hydraulic fluid reservoir with HYDRAULIC FLUIDS
                 (Material No. 02-001) or HYDRAULIC FLUIDS (Material No. 02-004)
                 or HYDRAULIC FLUIDS (Material No. 02-006).
             (i) Connect the bleed hose (21) between the three-way valve (19) and
                 the drain container (22).
(k) Bleed the filling system with the hydraulic pump (24).
         (8) Put the axle jack in position under the jacking dome (6) of the
             applicable landing gear. Make sure that the axle jack is free to move
             forward and aft.
             (b) Use the axle jack to fully compress the shock absorber. At the
                 same time, monitor the hydraulic fluid that goes into the drain
                 container (22).
(c) Close the control valve (20) and open the control valve (26).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 364
                                                                          Aug 01/10
R                                                
  UZB                                            
              (d) Use the hydraulic pump (24) to slowly increase the pressure of
                  the hydraulic supply to 13.8 bar (200.1520 psi). Let the pressure
                  become stable.
              (e) Keep the pressure of the hydraulic supply at 13.8 bar (200.1520
                  psi). At the same time, slowly lower the axle jack to let the
                  shock absorber fully extend.
              (f) When the shock absorber is fully extended, let the pressure
                  become stable at 13.8 bar (200.1520 psi).
(h) Close the control valve (26) and open the control valve (20).
         (10) Do the step (9) again until the hydraulic fluid from the bleed hose
              (21) contains no air. (There are no bubbles in the fluid).
(11) Use the axle jack to fully compress the shock absorber.
         (12) Keep the shock absorber compressed and the hydraulic pressure
              released.
         (13) Disconnect the hydraulic supply hose (25) from the three-way valve
              (19).
         (14) Loosen the elbow fitting (18) at the filler adaptor (17) and let the
              hydraulic fluid drain into the drain container (22).
(15) Remove the elbow fitting (18) from the filler adaptor (17).
         (16) Close the control valve (20) and remove the bleed hose (21) and the
              drain container (22).
(18) Install a new packing (5) to the top charging valve assembly (4).
         (19) Install the charging valve assembly (4) in the top charging valve
              port.
         (20) TORQUE the body of the top charging valve (4) to between 1.13 and
              1.58 m.daN (99.99 and 139.82 lbf.in).
         (21) Safety the body of the charging valve (4) with MISCELLANEOUS
              (Material No. 19-010).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 365
                                                                            Aug 01/10
R                                                 
  UZB                                             
         (22) Make sure that the bottom charging valve (1) and the top charging
              valve (4) are closed.
(23) Install the blanking cap (2) on the bottom charging valve (1).
(24) Install the blanking cap (3) on the top charging valve (4).
         (26) Do the nitrogen filling of the MLG two-stage shock absorber (aircraft
              on jacks) (Ref. TASK 12-14-32-614-003).
Subtask 12-12-32-611-069
          WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
          _______
                    REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
                    LOCKWIRE CAN CUT OR BLIND YOU.
(1) Remove the blanking cap (2) from the bottom charging valve (1).
(2) Remove the blanking cap (3) from the top charging valve (4).
                  NOTE : During the steps that follow some oil can come out of the
                  ____
                         top charging valve (4).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 366
                                                                            Aug 01/10
R                                                 
  UZB                                             
         (4) Remove the gas from the oil as follows:
             (a) Put the axle jack in position under the jacking dome (6) of the
                 applicable landing gear. Make sure that the axle jack is free to
                 move forward and aft.
             (b) Release all the nitrogen from the bottom charging valve assembly
                 (1).
(e) Use the axle jack to fully compress the shock absorber.
(g) Slowly lower the axle jack to fully extend the shock absorber.
             (h) When the shock absorber is fully extended, do not continue the
                 procedure for a minimum of 30 minutes (to let the shock absorber
                 become stable).
         (5) Remove and discard the lock wire from the body of the top charging
             valve (4).
         (7) Remove and discard the packing (5) from the top charging valve
             assembly (4).
             (a) Install the filler adaptor (17) in the port of the top charging
                 valve.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 367
                                                                           Aug 01/10
R                                                
  UZB                                            
            (b) TORQUE the filler adaptor (17) to between 1.13 and 1.58 m.daN
                (99.99 and 139.82 lbf.in).
(c) Connect the elbow fitting (18) to the filler adaptor (17).
(d) Connect the filling hose (16) to the elbow fitting (18).
            (e) Install the 28 bar (406.1055 psi) pressure gage (15) on the
                three-way valve (19).
(f) Connect the three-way valve (19) to the filling hose (16).
            (g) Connect the hydraulic pump (24) and the hydraulic fluid reservoir
                (23) to the three-way valve (19) with the supply hose (25).
            (i) Connect the bleed hose (21) between the three-way valve (19) and
                the drain container (22).
(k) Bleed the filling system with the hydraulic pump (24).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 368
                                                                         Aug 01/10
R                                                
  UZB                                            
              NOTE : 20 l (5.2833 USgal) of hydraulic fluid is necessary to fill
              ____
                     each shock absorber.
              (b) Use the axle jack to fully compress the shock absorber. At the
                  same time, monitor the hydraulic fluid that goes into the drain
                  container (22).
(c) Close the control valve (20) and open the control valve (26).
              (d) Use the hydraulic pump (24) to slowly increase the pressure of
                  the hydraulic supply to 13.8 bar (200.1520 psi). Let the pressure
                  become stable.
              (e) Keep the pressure of the hydraulic supply at 13.8 bar (200.1520
                  psi). At the same time, slowly lower the axle jack to let the
                  shock absorber fully extend.
              (f) When the shock absorber is fully extended, let the pressure
                  becomes stable at 13.8 bar (200.1520 psi). When the pressure
                  becomes stable, do not continue the procedure for a minimum of 5
                  minutes.
(h) Close the control valve (26) and open the control valve (20).
(10) Use the axle jack to slowly and fully compress the shock absorber.
         (11) Keep the shock absorber compressed and the hydraulic pressure
              released.
         (12) Disconnect the hydraulic supply hose (25) from the three-way valve
              (19).
         (13) Loosen the elbow-fitting (18) at the filler adaptor (17) and let the
              hydraulic fluid drain into the drain container (22).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 369
                                                                          Aug 01/10
R                                                 
  UZB                                             
         (14) Remove the elbow-fitting (18) from the filler adaptor (17).
         (15) Close the control valve (20) and remove the bleed hose (21) and the
              drain container (22).
(17) Install a new packing (5) to the top charging valve assembly (4).
         (18) Install the charging valve assembly (4) in the top charging valve
              port.
         (19) TORQUE the body of the top charging valve (4) to between 1.13 and
              1.58 m.daN (99.99 and 139.82 lbf.in).
         (20) Safety the body of the top charging valve (4) with MISCELLANEOUS
              (Material No. 19-010).
         (21) Make sure that the bottom charging valve (1) and the top charging
              valve are closed (4).
(22) Install the blanking cap (2) on the bottom charging valve (1).
(23) Install the blanking cap (3) on the top charging valve (4).
         (25) Do the nitrogen filling of the MLG two-stage shock absorber (aircraft
              on jacks) (Ref. TASK 12-14-32-614-003).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 370
                                                                            Aug 01/10
R                                                 
  UZB                                             
   5. Close-up
      ________
Subtask 12-12-32-586-053
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-12-32-942-067
         (2) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 371
                                                                         Aug 01/10
R                                                
  UZB                                            
     TASK 12-12-32-611-006
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 372
                                                                           May 01/11
                                                       
    UZB                                                
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 373
                                                                             Aug 01/10
                                                   
    UZB                                            
     3. __________
        Job Set-up
Subtask 12-12-32-941-067
A. Safety Precautions
           (2) Make sure that the ground safety locks are on the landing gear
               (Ref. TASK 32-00-00-481-001).
     4. Procedure
        _________
Subtask 12-12-32-611-054
           WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
           _______
                     REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
                     LOCKWIRE CAN CUT OR BLIND YOU.
           WARNING : BE CAREFUL WHEN YOU USE THE CONSUMABLE MATERIAL(S). YOU MUST
           _______
                     OBEY THE OPERATORS AND MANUFACTURERS HEALTH AND SAFETY
                     INSTRUCTIONS.
           (1) Remove the sealant from the bleed screw (1) and the bleed plug (2)
               with the SPATULA - NON METALLIC.
           (2) Remove and discard the lockwire from the cap assembly (6) and the
               bleed screw (1).
           (3) Clean the items that follow with MISCELLANEOUS (Material No. 19-003)
               made moist with CLEANING AGENTS (Material No. 11-003):
               - the bleed screw (1)
               - the bleed plug (2)
               - the bleed plug housing (8).
(4) Remove the cap assembly (6) and the bleed screw (1).
(5) Install the BLEED ADAPTOR (460006804) to the bleed plug (2).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 374
                                                                             Nov 01/10
                                                     
    UZB                                              
                              Torque Link Damper
R                      Figure 312/TASK 12-12-32-991-014
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                   Page 375
                                                                  Aug 01/10
                                              
    UZB                                       
            (6) Install the HOSE - BLEED on the BLEED ADAPTOR.
           (11) You must obey the hydraulic safety procedures (Ref. TASK 29-00-00-
                910-002).
           (12) Supply hydraulic fluid, at a pressure of between 2.42 bar (35 psi)
                and 2.75 bar (40 psi), to the check valve (7).
           (13) Keep the hydraulic pressure until you get an air-free flow of fluid
                from the bleed plug (2).
           (14) Increase the pressure of the hydraulic fluid to between 2.75 bar (40
                psi) and 3.45 bar (50 psi).
           (16) Make sure that the reservoir can (4) moves between 1.5 mm (0.05 in.)
                and 3.1 mm (0.12 in.) above the FULL level indicator line.
           (17) Keep the hydraulic pressure for a time of 3 minutes. During the 3
                minutes make sure that:
                - no external leakage of fluid occurs
                - the reservoir can (4) does not move.
           (20) Measure the quantity of hydraulic fluid that comes out of the check
                valve (7) during a time of 15 seconds. There must be no more than 15
                drops.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 376
                                                                            May 01/11
                                                    
    UZB                                             
           (21) Open the bleed plug (2) slowly until the reservoir can (4) becomes
                level with the FULL line. Close the bleed plug (2).
(23) Remove the bleed hose and the BLEED ADAPTOR from the bleed plug (2).
           (24) Make sure that the parts retained from the removed component are
                clean and in the correct condition.
(25) Install the cap assembly (6) on the check valve (7).
(26) Install the bleed screw (1) in the bleed plug (2).
           (27) TORQUE the bleed screw (1) to between 0.17 and 0.22 m.daN (15.04 and
                19.46 lbf.in).
           (28) TORQUE the cap assembly (7) to between 0.57 and 0.67 m.daN (50.44 and
                59.29 lbf.in).
           (29) Safety the items that follow with MISCELLANEOUS (Material No. 19-
                010):
                - the bleed screw (1) to the piston assembly (3)
                - the cap assembly (6) to the adjacent bolt (5).
           (30) Apply SEALANTS (Material No. 09-016) to the items that follow:
                - bleed screw (1)
                - the bleed plug (2)
                - the bleed plug housing (8).
     5. Close-up
        ________
Subtask 12-12-32-942-066
A. Removal of Equipment
            (1) Make sure that the work area is clean and clear of tool(s) and other
                items.
            (4) Remove the ground support and maintenance equipment, the special and
                standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 377
                                                                            Aug 01/10
                                                    
    UZB                                             
     TASK 12-12-32-610-001
     Check NLG Shock Absorber Fluid Level and Charge Pressure (Two-Point Check -
     Aircraft on Jacks to start)
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR AND DOORS.
     1. __________________
        Reason for the Job
R       NOTE : The Nose landing Gear (NLG) shock absorber charge pressure must be
        ____
R              measured with the aircraft lifted on jacks and on the ground. This
R              procedure does the aircraft-on-jacks check first and then the
               on-ground check. If necessary, the on-ground check can be done first
               followed by the on-jacks check with the procedure (Ref. TASK
R              12-12-32-610-001-01).
        NOTE : This procedure can be done with the aircraft fully lifted on jacks
        ____
               (Ref. TASK 07-11-00-581-001) or lifted at the forward jacking point
               (Ref. TASK 07-11-00-581-003).
        NOTE : This procedure must be done a minimum of 2 hours after the last
        ____
               aircraft operation. This will make sure that the shock absorber
               values recorded are accurate.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 378
                                                                             Aug 01/10
                                                     
    UZB                                              
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                                Page 379
                                                                               May 01/11
                                                       
    UZB                                                
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-12-32-941-073
A. Safety Precautions
         (2) Make sure that the ground safety locks are installed on the landing
             gear (Ref. TASK 32-00-00-481-001).
         (3) On panel 400VU, make sure that the landing-gear control-lever 6GA is
             in the DOWN position.
Subtask 12-12-32-010-054
B. Get Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR DOORS ARE
         _______
                   CLEAR.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 380
                                                                            May 01/11
R                                                   
  UZB                                               
         (2) Install the SAFETY PIN - NLG DOOR (98D32203502000) in the linkage of
             each forward NLG door (Ref. TASK 32-00-00-481-002).
   4. Procedure
      _________
Subtask 12-12-32-582-056
         (1) Lift the aircraft on jacks (Ref. TASK 07-11-00-581-001) or (Ref. TASK
             07-11-00-581-003).
Subtask 12-12-32-614-080
B. Adjust the Charge Pressure of the NLG Shock Absorber (Aircraft on Jacks)
         (1) Make sure that the shock absorber is fully extended. Dimension H must
             be between 447 mm (17.5984 in.) and 451 mm (17.7559 in.).
             (Ref. Fig. 303/TASK 12-12-32-991-034)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
             (b) Connect the nitrogen source hose (18) to the three-way valve
                 (12).
(c) Connect the filling hose (11) to the three-way valve (12).
             (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                 ASSEMBLY.
             (e) Connect the filling hose (11) to the end fitting (2) of the
                 FILLING ASSEMBLY.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 381
                                                                          May 01/11
R                                                 
  UZB                                             
                NLG Maintenance Plan - Aircraft on Jacks to Start
R                       Figure 313/TASK 12-12-32-991-024
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                     Page 382
                                                                    Aug 01/10
                                              
    UZB                                       
               (f) Slowly open the control valves (13) and (19) on the three-way
                   valve (12) and the control valve of the nitrogen source. Blow
                   nitrogen through the charging equipment to bleed the system with
                   nitrogen.
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve of the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 0 TO 2000 PSI (0 TO 138 BAR) - PRESSURE (10) on
                   the three-way valve (12).
           (3) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). This will install the seal (4) on the
                   charging valve (6).
               (a) Make sure that the charging valve (6) and the control valve (13)
                   on the three-way valve (12) are closed.
(b) Slowly open the control valve (19) on the three-way valve (12).
               (c) Slowly open the control valve of the nitrogen source. Add
                   nitrogen until the pressure shown on the pressure gage is 19 bar
                   (275.5716 psi).
               (e) Let the pressure become stable, continue after a minimum of five
                   minutes. This will make sure that there are no leaks in the
                   charging equipment.
(f) Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 383
                                                                            May 01/11
                                                   
    UZB                                            
           (5) Do a check of the NLG shock absorber charge pressure as follows:
               (b) Use the FILLING ASSEMBLY to open the charging valve (6). Open the
                   control valve (19) and record the pressure shown on the pressure
                   gage (10).
(c) Close the control valve (19) and the charging valve (6).
               (d) Refer to the table and use the recorded temperature value to
                   identify the correct charge pressure.
                   (Ref. Fig. 306/TASK 12-12-32-991-040)
               CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
               _______
                         ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                         TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                         ABSORBER PRESSURE.
(a) Open the control valve (19) on the three-way valve (12).
(b) Use the FILLING ASSEMBLY to open the charging valve (6).
               (c) Gradually open the control valve of the nitrogen source to adjust
                   the charge pressure in the shock absorber. Do this until you get
                   the correct value as identified in step (5)(d).
(d) Close the control valve (19) on the three-way valve (12).
(e) Use the FILLING ASSEMBLY to close the charging valve (6).
(f) Let the pressure become stable, continue after fifteen minutes.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 384
                                                                           May 01/11
                                                   
    UZB                                            
             (g) Open the control valve (19) on the three-way valve (12) and the
                 charging valve (6). Make sure that the pressure gage (10) shows
                 the same pressure as the correct pressure in step (5)(d) plus or
                 minus 0.5 bar (7.2518 psi).
(a) Close the control valve (19) on the three-way valve (12).
(b) Use the FILLING ASSEMBLY to close the charging valve (6).
             (d) Open the control valve (13) to release the pressure. Remove the
                 nitrogen source from the three-way valve (12). Close the control
                 valve (13).
             (f) Remove the FILLING ASSEMBLY and the standard charging equipment
                 from the charging valve (6).
             (g) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24
                 and 70.79 lbf.in).
(i) Install the blanking cap (7) on the charging valve (6).
Subtask 12-12-32-586-054
         (1) Lower the aircraft onto its wheels (Ref. TASK 07-11-00-586-002) or
             (Ref. TASK 07-11-00-586-001).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 385
                                                                           May 01/11
R                                                
  UZB                                            
     Subtask 12-12-32-614-081
(a) Connect the nitrogen source hose (18) to the nitrogen source.
               (b) Connect the nitrogen source hose (18) to the three-way valve
                   (12).
(c) Connect the filling hose (11) to the three-way valve (12).
               (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                   ASSEMBLY.
               (e) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
               (f) Slowly open the control valves (13) and (19) on the three-way
                   valve (12) and the control valve of the nitrogen source. Blow
                   nitrogen through the charging equipment to bleed the system with
                   nitrogen.
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve of the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 386
                                                                           May 01/11
                                                   
    UZB                                            
           (2) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). This will install the seal (4) on the
                   charging valve (6).
               (a) Make sure that the charging valve (6) and the control valve (13)
                   on the three-way valve (12) are closed.
(b) Open the control valve (19) on the three-way valve (12).
               (f) Gradually open the control valve of the nitrogen source. Do this
                   until the pressure gage (10) shows the necessary pressure plus or
                   minus 0.5 bar (7.2518 psi).
(i) Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 387
                                                                            May 01/11
                                                   
    UZB                                            
           (4) Do a check of the NLG shock absorber charge pressure as follows:
(b) Use the FILLING ASSEMBLY to slowly open the charging valve (6).
               (c) Open the control valve (19) and record the pressure shown on the
                   pressure gage (10).
               (e) Use the recorded pressure and temperature values to identify the
                   correct dimension H for the shock absorber extension. Compare
                   this value with the dimension H recorded in step (d).
                   (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
(a) Close the control valve (19) on the three-way valve (12).
(b) Use the FILLING ASSEMBLY to close the charging valve (6).
               (c) Open the control valve (13) to release the pressure. Remove the
                   nitrogen source from the three-way valve (12).
               (e) Remove the FILLING ASSEMBLY and the standard charging equipment
                   from the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 388
                                                                           May 01/11
                                                   
    UZB                                            
             (f) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24
                 and 70.79 lbf.in).
(h) Install the blanking cap (7) on the charging valve (6).
   5. Close-up
      ________
Subtask 12-12-32-410-054
A. Close Access
         (1) Remove the SAFETY PIN - NLG DOOR from the linkage of each forward NLG
             door (Ref. TASK 32-22-00-410-001).
Subtask 12-12-32-942-072
         (3) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 389
                                                                           May 01/11
R                                                
  UZB                                            
     TASK 12-12-32-610-001- 01
     Check NLG Shock Absorber Fluid Level and Charge Pressure (Two-Point Check -
     Aircraft on Ground to start)
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR AND DOORS.
     1. __________________
        Reason for the Job
        NOTE : The Nose Landing Gear (NLG) shock absorber charge pressure must be
        ____
               measured with the aircraft on the ground and lifted on jacks. This
               procedure does the aircraft-on-ground check first and then the
               on-jacks check. If necessary, the on-jacks check can be done first
               followed by the on-ground check with the procedure (Ref. TASK
               12-12-32-610-001).
        NOTE : This procedure can be done with the aircraft fully lifted on jacks
        ____
               (Ref. TASK 07-11-00-581-001) or lifted at the forward jacking point
               (Ref. TASK 07-11-00-581-003).
        NOTE : This procedure must be done a minimum of 2 hours after the last
        ____
               aircraft operation. This will make sure that the shock absorber
               values recorded are accurate.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page 390
                                                                             Aug 01/10
                                                     
    UZB                                              
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                                Page 391
                                                                               May 01/11
                                                       
    UZB                                                
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-12-32-941-074
A. Safety Precautions
         (2) Make sure that the ground safety locks are installed on the landing
             gear (Ref. TASK 32-00-00-481-001).
         (3) On panel 400VU, make sure that the landing-gear control-lever 6GA is
             in the DOWN position.
Subtask 12-12-32-010-055
B. Get Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR DOORS ARE
         _______
                   CLEAR.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 392
                                                                            May 01/11
R                                                   
  UZB                                               
         (2) Install the SAFETY PIN - NLG DOOR (98D32203502000) in the linkage of
             each forward NLG door (Ref. TASK 32-00-00-481-002).
   4. Procedure
      _________
Subtask 12-12-32-614-082
A. Adjust the Charge Pressure of the NLG Shock Absorber (Aircraft on Wheels)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
             (b) Connect the nitrogen source hose (18) to the three-way valve
                 (12).
(c) Connect the filling hose (11) to the three-way valve (12).
             (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                 ASSEMBLY.
             (e) Connect the filling hose (11) to the end fitting (2) of the
                 FILLING ASSEMBLY.
             (f) Slowly open the control valves (13) and (19) on the three-way
                 valve (12) and the control valve on the nitrogen source. Blow
                 nitrogen through the charging equipment to bleed the system with
                 nitrogen.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 393
                                                                          May 01/11
R                                                 
  UZB                                             
               NLG Maintenance Plan - Aircraft on Ground to start
R                       Figure 314/TASK 12-12-32-991-025
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                     Page 394
                                                                    Aug 01/10
                                               
    UZB                                        
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve of the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
           (2) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). This will install the seal on the charging
                   valve (6).
               (a) Make sure that the charging valve (6) and the control valve (13)
                   on the three-way valve (12) are closed.
(b) Open the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 395
                                                                            May 01/11
                                                   
    UZB                                            
               (f) Gradually open the control valve of the nitrogen source. Do this
                   until the pressure gage (10) shows the necessary charging
                   pressure plus or minus 0.5 bar (7.2518 psi).
(i) Close the control valve (19) on the three-way valve (12).
(b) Use the FILLING ASSEMBLY to slowly open the charging valve (6).
               (c) Open the control valve (19) and record the pressure shown on the
                   pressure gage (10).
               (e) Use the recorded pressure and temperature values to identify the
                   correct dimension H for the shock absorber extension. Compare
                   this value with the dimension H you recorded in step (d).
                   (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
               (f) If the measured H value is the same as the reference value plus
                   or minus 10 mm (0.3937 in.), go to step (6).
               CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
               _______
                         ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                         TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                         ABSORBER PRESSURE.
(a) Open the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page 396
                                                                           May 01/11
                                                   
    UZB                                            
            (b) Use the FILLING ASSEMBLY to open the charging valve (6).
            (c) Gradually open the control valve of the nitrogen source to adjust
                the shock absorber extension. Do this until you get the correct
                value as identified in step (4)(e).
(d) Close the control valve (19) on the three-way valve (12).
(e) Use the FILLING ASSEMBLY to close the charging valve (6).
(f) Let the pressure become stable, continue after fifteen minutes.
            (g) Repeat steps (a) to (f) until the measured dimension H agrees
                with the correct value plus or minus 10 mm (0.3937 in.).
(a) Close the control valve (19) on the three-way valve (12).
(b) Use the FILLING ASSEMBLY to close the charging valve (6).
            (d) Open the control valve (13) to release the pressure. Remove the
                nitrogen source from the three-way valve (12). Close the control
                valve (13).
            (f) Remove the FILLING ASSEMBLY and the standard charging equipment
                from the charging valve (6).
            (g) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24
                and 70.79 lbf.in).
(i) Install the blanking cap (7) on the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page 397
                                                                          May 01/11
R                                               
  UZB                                           
   Subtask 12-12-32-582-057
         (1) Lift the aircraft on jacks (Ref. TASK 07-11-00-581-001) or (Ref. TASK
             07-11-00-581-003).
Subtask 12-12-32-614-083
C. Measure the Charge Pressure of the NLG Shock Absorber (Aircraft on Jacks)
         NOTE : The aircraft-on-jack measurement must be done less than eight days
         ____
                after the on-ground measurement.
         (1) Make sure that the shock absorber is fully extended. Dimension H must
             be between 447 mm (17.5984 in.) and 451 mm (17.7559 in.).
             (Ref. Fig. 303/TASK 12-12-32-991-034)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
             (b) Connect the nitrogen source hose (18) to the three-way valve
                 (12).
(c) Connect the filling hose (11) to the three-way valve (12).
             (d) Remove the blanking cap (1) and the plug (7) from the FILLING
                 ASSEMBLY.
             (e) Connect the filling hose (11) to the end fitting (2) of the
                 FILLING ASSEMBLY.
             (f) Slowly open the control valves (13) and (19) on the three-way
                 valve (12) and the control valve on the nitrogen source. Blow
                 nitrogen through the charging equipment to bleed the system with
                 nitrogen.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page 398
                                                                         May 01/11
R                                                
  UZB                                            
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve on the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 0 TO 2000 PSI (0 TO 138 BAR) - PRESSURE (10) on
                   the three-way valve (12).
           (3) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). This will install the seal (4) on the
                   charging valve (6).
               (a) Make sure that the charging valve (6) and the control valve (13)
                   on the three-way valve (12) are closed.
(b) Slowly open the control valve (19) on the three-way valve (12).
               (c) Slowly open the control valve of the nitrogen source. Add
                   nitrogen until the pressure shown on the pressure gage is 19 bar
                   (275.5716 psi).
               (e) Let the pressure become stable, continue after a minimum of five
                   minutes. This will make sure that there are no leaks in the
                   charging equipment.
(f) Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                             Page 399
                                                                            May 01/11
                                                   
    UZB                                            
R                 part of the cylinder (through the vent hole) at the aft part of
R                 the main fitting.
                  (Ref. Fig. 301/TASK 12-12-32-991-001)
(b) Use the FILLING ASSEMBLY to slowly open the charging valve (6).
              (c) Open the control valve (19) and record the pressure shown on the
                  pressure gage (10).
              (d) Use the table to identify the correct pressure value for the
                  recorded temperature. Compare this value with the pressure
                  recorded in step (c).
                  (Ref. Fig. 306/TASK 12-12-32-991-040)
(a) Close the control valve (19) on the three-way valve (12).
(b) Use the FILLING ASSEMBLY to close the charging valve (6).
              (c) Open the control valve (13) to release the pressure. Remove the
                  nitrogen source from the three-way valve (12).
              (e) Remove the FILLING ASSEMBLY and the standard charging equipment
                  from the charging valve (6).
              (f) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24
                  and 70.79 lbf.in).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                          Page A300
                                                                          May 01/11
                                                  
    UZB                                           
             (g) Use SPECIAL MATERIALS (Material No. 05-004B) to do a leak check
                 of the charging valve (6).
(h) Install the blanking cap (7) on the charging valve (6).
Subtask 12-12-32-586-055
         (1) Lower the aircraft onto its wheels (Ref. TASK 07-11-00-586-002) or
             (Ref. TASK 07-11-00-586-001).
   5. Close-up
      ________
Subtask 12-12-32-410-055
A. Close Access
         (1) Remove the SAFETY PIN - NLG DOOR from the linkage of each forward NLG
             door (Ref. TASK 32-22-00-410-001).
Subtask 12-12-32-942-073
         (3) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A301
                                                                           Aug 01/10
R                                                
  UZB                                            
     TASK 12-12-32-610-002
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR AND DOORS.
     1. __________________
        Reason for the Job
        NOTE : The NLG shock absorber nitrogen pressure and fluid level must be
        ____
               measured with the aircraft in heavy configuration and light
               configuration. This procedure does at first the heavy configuration
               check and then the light configuration check. If necessary, the light
               configuration check can be done first followed by the heavy
               configuration check in Task 12-12-32-610-002-01.
        NOTE : To get the necessary Center of Gravity (CG) weight and configuration
        ____
               for this task, refer to TSM Task 32-31-00-810-876. This task will
               give the H values for each aircraft weight and CG.
        NOTE : This procedure must be done a minimum of 2 hours after the last
        ____
               aircraft operation. This will make sure that the shock absorber
               values recorded are accurate.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A302
                                                                           Aug 01/10
                                                   
    UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                               Page A303
                                                                               May 01/11
                                                       
    UZB                                                
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-12-32-941-075
A. Safety Precautions
         (2) Make sure that the ground safety locks are installed on the landing
             gear (Ref. TASK 32-00-00-481-001).
         (3) On panel 400VU, make sure that the landing-gear control-lever 6GA is
             in the DOWN position.
Subtask 12-12-32-010-056
B. Get Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR DOORS ARE
         _______
                   CLEAR.
         (2) Install the SAFETY PIN - NLG DOOR in the linkage of each forward NLG
             door (Ref. TASK 32-00-00-481-002).
(3) Put the ACCESS PLATFORM 2M (6 FT) in position below the NLG.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page A304
                                                                         May 01/11
R                                                  
  UZB                                              
     4. Procedure
        _________
Subtask 12-12-32-614-084
        A. Measure the NLG Shock Absorber Nitrogen Pressure and Fluid Level in Heavy
           Aircraft Configuration
R          (2) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R              record the temperature adjacent to the charging valve (6). Make sure
R              that the thermometer touches the shock absorber outer-cylinder. If
R              possible, measure the temperature at the top part of the cylinder
R              (through the vent hole) at the aft part of the main fitting.
               (Ref. Fig. 301/TASK 12-12-32-991-001)
           (3) Read the values H1 and H2 in the related diagram for the recorded
               temperature and the aircraft. Make sure that the measured dimension H
               is between the values H1 and H2.
               (Ref. Fig. 303/TASK 12-12-32-991-034, 316/TASK 12-12-32-991-026)
               CAUTION : MAKE SURE THAT THE AIRCRAFT WEIGHT AND BALANCE STAY IN THE
               _______
                         SPECIFIED LIMITS WHILE YOU SELECT A CORRECT CONFIGURATION.
           (4) If the recorded dimension H is not between the values H1 and H2, the
               aircraft is not in a correct configuration. Put the aircraft in a
               heavy configuration so that dimension H is between H1 and H2.
               (Ref. Fig. 303/TASK 12-12-32-991-034)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
               (b) Connect the nitrogen source hose (18) to the three-way valve
                   (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A305
                                                                           May 01/11
                                                   
    UZB                                            
           NLG Maintenance Plan - Aircraft in Heavy Configuration to Start
R                         Figure 315/TASK 12-12-32-991-038
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                        Page A306
                                                                        Aug 01/10
                                                 
    UZB                                          
                           Limit of the H Dimension
R                      Figure 316/TASK 12-12-32-991-026
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                  Page A307
                                                                  Aug 01/10
                                              
    UZB                                       
               (c) Connect the filling hose (11) to the three-way valve (12).
               (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                   ASSEMBLY.
               (e) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
               (f) Slowly open the control valves (13) and (19) on the three-way
                   valve (12) and the control valve on the nitrogen source. Blow
                   nitrogen through the charging equipment to bleed the system with
                   nitrogen.
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve on the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
           (6) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). This will install the seal (4) on the
                   charging valve (6).
               (a) Make sure that the charging valve (6) and the control valve (13)
                   on the three-way valve (12) are closed.
(b) Open the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A308
                                                                           May 01/11
                                                   
    UZB                                            
                (c) Measure and record the shock absorber extension, dimension H.
                    (Ref. Fig. 303/TASK 12-12-32-991-034)
                (d) Use the recorded dimension H and the temperature measured in step
                    (2) to identify the correct pressure for the shock absorber
                    extension.
                    (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
                (e) Gradually open the control valve of the nitrogen source. Do this
                    until the pressure gage shows the correct pressure plus or minus
                    0.5 bar (7.2518 psi).
(h) Close the control valve (19) on the three-way valve (12).
(8) Turn the wrench (9) counterclockwise to open the charging valve (6).
(9) Slowly open the control valve (19) on the three-way valve (12).
(11) Close the control valve (19) on the three-way valve (12).
R          (12) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R               record the temperature adjacent to the charging valve (6). Make sure
R               that the thermometer touches the shock absorber outer-cylinder. If
R               possible, measure the temperature at the top part of the cylinder
R               (through the vent hole) at the aft part of the main fitting.
                (Ref. Fig. 301/TASK 12-12-32-991-001)
           (14) Use the recorded pressure and temperature values to identify the
                correct dimension H for the shock absorber extension. Compare this
                value with the dimension H you recorded in step (13).
                (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
           (15) If the correct dimension H is the same as the value recorded in step
                (1) plus or minus 10 mm (0.3937 in.), go to step (17).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A309
                                                                            May 01/11
                                                    
    UZB                                             
           (16) If the difference between the recorded dimension H and the correct H
                value is higher than 10 mm (0.3937 in.), continue as follows:
                CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
                _______
                          ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                          TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                          ABSORBER PRESSURE.
(a) Open the control valve (19) on the three-way valve (12).
                (b) Inflate the shock absorber until it gets to the correct dimension
                    H plus or minus 10 mm (0.3937 in.).
(c) Close the control valve (19) on the three-way valve (12).
                (d) Let the shock absorber become stable, continue after fifteen
                    minutes.
(e) Open the control valve (19) on the three-way valve (12).
                (f) Measure and record the pressure shown on the pressure gage (10)
                    and the shock absorber extension, dimension H.
                    (Ref. Fig. 303/TASK 12-12-32-991-034)
(g) Close the control valve (19) on the three-way valve (12).
                (h) Use the new recorded pressure and temperature values to identify
                    in the related table the correct dimension H for the shock
                    absorber extension.
R                   (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
                (i) Do steps (a) to (h) again until the recorded dimension H is the
                    same as the correct H value identified in step (14)(h) plus or
                    minus 10 mm (0.3937 in.).
           (17) When the dimension H is correct, turn the wrench (7) clockwise to
                close the charging valve (6).
           (18) Close the control valve of the nitrogen source. Open the control
                valve (13) on the three-way valve (12) to release the pressure in the
                charging system.
                NOTE : Do not remove the charging equipment and the filling assembly
                ____
                       if you do the light aircraft configuration measurement after
                       the heavy aircraft configuration measurement. If you do not
                       remove the charging equipment and the filling assembly go to
                       Para.4.B.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A310
                                                                            Aug 01/10
                                                    
    UZB                                             
           (19) Remove the nitrogen source hose (18) from the nitrogen source.
(21) Remove the FILLING ASSEMBLY and the standard charging equipment.
           (22) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24 and
                70.79 lbf.in).
(24) Install the blanking cap (7) on the charging valve (6).
Subtask 12-12-32-614-086
        B. Measure the NLG Shock Absorber Nitrogen Pressure and Fluid Level in Light
           Aircraft Configuration
R           (2) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R               record the temperature adjacent to the charging valve (6). Make sure
R               that the thermometer touches the shock absorber outer-cylinder. If
R               possible, measure the temperature at the top part of the cylinder
R               (through the vent hole) at the aft part of the main fitting.
                (Ref. Fig. 301/TASK 12-12-32-991-001)
            (3) Read the values H3 and H4 in the related diagram for the recorded
                temperature and the aircraft. Make sure that the dimension H is
                between the values H3 and H4.
                (Ref. Fig. 303/TASK 12-12-32-991-034, 316/TASK 12-12-32-991-026)
                CAUTION : MAKE SURE THAT THE AIRCRAFT WEIGHT AND BALANCE STAY IN THE
                _______
                          SPECIFIED LIMITS WHILE YOU SELECT A CORRECT CONFIGURATION.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A311
                                                                            May 01/11
                                                    
    UZB                                             
           (4) If the recorded dimension H is not between the values H3 and H4, the
               aircraft is not in a suitable configuration. Put the aircraft in a
               light configuration so that dimension H is between H3 and H4.
               (Ref. Fig. 303/TASK 12-12-32-991-034, 316/TASK 12-12-32-991-026)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
               (b) Connect the nitrogen source hose (18) to the three-way valve
                   (12).
(c) Connect the filling hose (11) to the three-way valve (12).
               (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                   ASSEMBLY.
               (e) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
               (f) Slowly open the control valves (13) and (19) on the three-way
                   valve (12) and the control valve of the nitrogen source. Blow
                   nitrogen through the charging equipment to bleed the system with
                   nitrogen.
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve of the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
           (6) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A312
                                                                           May 01/11
                                                   
    UZB                                            
                (b) Move the wrench (9) up to the knurled shoulder (3) and install
                    the FILLING ASSEMBLY on the charging valve (6).
                (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                    knurled shoulder (3). Install the seal (4) on the charging valve
                    (6).
                (a) Make sure the charging valve (6) and the control valve (13) on
                    the three-way valve (12) are closed.
(b) Open the control valve (19) on the three-way valve (12).
                (d) Use the recorded dimension H and the temperature measured in step
                    (2) to identify the correct pressure for the shock absorber
                    extension.
R                   (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
                (e) Gradually open the control valve of the nitrogen source. Do this
                    until pressure gage (10) shows the correct pressure plus or minus
                    0.5 bar (7.2518 psi).
                (h) Close the control valve (19) on the three-way valve (12).
                    (Ref. Fig. 302/TASK 12-12-32-991-012)
(8) Turn the wrench (9) counterclockwise to open the charging valve (6).
(9) Slowly open the control valve (19) on the three-way valve (12).
(11) Turn the wrench (9) clockwise to close the charging valve (6).
(12) Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A313
                                                                            Aug 01/10
                                                    
    UZB                                             
R          (13) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R               record the temperature adjacent to the charging valve (6). Make sure
R               that the thermometer touches the shock absorber outer-cylinder. If
R               possible, measure the temperature at the top part of the cylinder
R               (through the vent hole) at the aft part of the main fitting.
                (Ref. Fig. 301/TASK 12-12-32-991-001)
           (15) Use the recorded pressure and temperature values to identify the
                correct dimension H for the shock absorber extension. Compare this
                value with the dimension H you recorded in step (14).
                (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
           (17) If the difference between the two values is higher than 10 mm (0.3937
                in.), do the NLG shock absorber oil replenishment and nitrogen
                filling procedure (Ref. TASK 12-12-32-611-005).
           (18) If the pressure and the extension are correctly related, remove the
                pressure gage (10).
(19) Remove the FILLING ASSEMBLY and the standard charging equipment.
           (20) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24 and
                70.79 lbf.in).
(22) Install the blanking cap (7) on the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A314
                                                                            May 01/11
                                                    
    UZB                                             
     5. Close-up
        ________
Subtask 12-12-32-410-056
A. Close Access
           (1) Remove the SAFETY PIN - NLG DOOR from the linkage of each forward NLG
               door (Ref. TASK 32-00-00-081-002).
Subtask 12-12-32-942-074
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A315
                                                                           Nov 01/10
                                                   
    UZB                                            
     TASK 12-12-32-610-002- 01
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR AND DOORS.
     1. __________________
        Reason for the Job
        NOTE : The NLG shock absorber nitrogen pressure and fluid level must be
        ____
               measured with the aircraft in light configuration and heavy
               configuration. This procedure does at first the light configuration
               check and then the heavy configuration check. If necessary, the heavy
               configuration check can be done first followed by the light
               configuration check in Task 12-12-32-610-002.
        NOTE : To get the necessary weight and Center of Gravity (CG) configuration
        ____
               for this task, refer to TSM Task 32-31-00-810-876. This task will
               give the H values for each aircraft weight and CG.
        NOTE : This procedure must be done a minimum of 2 hours after the last
        ____
               aircraft operation. This will make sure that the shock absorber
               values recorded are accurate.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A316
                                                                           Aug 01/10
                                                   
    UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                               Page A317
                                                                               May 01/11
                                                       
    UZB                                                
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-12-32-941-076
A. Safety Precautions
         (2) Make sure that the ground safety locks are installed on the landing
             gear (Ref. TASK 32-00-00-481-001).
         (3) On panel 400VU, make sure that the landing-gear control-lever 6GA is
             in the DOWN position.
Subtask 12-12-32-010-057
B. Get Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR DOORS ARE
         _______
                   CLEAR.
         (2) Install the SAFETY PIN - NLG DOOR in the linkage of each forward NLG
             door (Ref. TASK 32-00-00-481-002).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                         Page A318
                                                                         May 01/11
R                                                  
  UZB                                              
     4. Procedure
        _________
Subtask 12-12-32-614-085
        A. Measure the NLG Shock Absorber Nitrogen Pressure and Fluid Level in Light
           Aircraft Configuration.
R          (2) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R              record the temperature adjacent to the charging valve (6). Make sure
R              that the thermometer touches the shock absorber outer-cylinder. If
R              possible, measure the temperature at the top part of the cylinder
R              (through the vent hole) at the aft part of the main fitting.
               (Ref. Fig. 301/TASK 12-12-32-991-001)
           (3) Read the values H3 and H4 in the related diagram for the recorded
               temperature and the aircraft. Make sure that the measured dimension H
               is between the values H3 and H4.
               (Ref. Fig. 303/TASK 12-12-32-991-034, 316/TASK 12-12-32-991-026)
               CAUTION : MAKE SURE THAT THE AIRCRAFT WEIGHT AND BALANCE STAY IN THE
               _______
                         SPECIFIED LIMITS WHILE YOU SELECT A CORRECT CONFIGURATION.
           (4) If the recorded dimension H is not between the values H3 and H4, the
               aircraft is not in a correct configuration. Put the aircraft in a
               light configuration so that dimension H is between H3 and H4.
               (Ref. Fig. 303/TASK 12-12-32-991-034, 316/TASK 12-12-32-991-026)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
               (b) Connect the nitrogen source hose (18) to the three-way valve
                   (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A319
                                                                           May 01/11
                                                   
    UZB                                            
           NLG Maintenance Plan - Aircraft in Light Configuration to Start
R                         Figure 317/TASK 12-12-32-991-039
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                        Page A320
                                                                        Aug 01/10
                                                 
    UZB                                          
               (c) Connect the filling hose (11) to the three-way valve (12).
               (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                   ASSEMBLY.
               (e) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
               (f) Slowly open the control valves (13) and (19) on the three-way
                   valve (12) and the control valve of the nitrogen source. Blow
                   nitrogen through the charging equipment to bleed the system with
                   nitrogen.
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve on the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
           (6) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
               (b) Move the wrench (9) up to the knurled shoulder (3) and install
                   the FILLING ASSEMBLY on the charging valve (6).
               (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (3). Install the seal (4) on the charging valve
                   (6).
               (a) Make sure the charging valve (6) and the control valve (13) on
                   the three-way valve (12) are closed.
(b) Open the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A321
                                                                           May 01/11
                                                   
    UZB                                            
                (c) Measure and record the shock absorber extension, dimension H.
                    (Ref. Fig. 303/TASK 12-12-32-991-034)
                (d) Use the recorded dimension H and the temperature measured in step
                    (2) to identify the correct pressure for the shock absorber
                    extension.
                    (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
                (e) Gradually open the control valve of the nitrogen source. Do this
                    until the pressure gage shows the correct pressure plus or minus
                    0.5 bar (7.2518 psi).
(h) Close the control valve (19) on the three-way valve (12).
(8) Turn the wrench (9) counterclockwise to open the charging valve (6).
(9) Slowly open the control valve (19) on the three-way valve (12).
(10) Read and record the pressure shown on the pressure gage (10).
(11) Close the control valve (19) on the three-way valve (12).
R          (12) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R               record the temperature adjacent to the charging valve (6). Make sure
R               that the thermometer touches the shock absorber outer-cylinder. If
R               possible, measure the temperature at the top part of the cylinder
R               (through the vent hole) at the aft part of the main fitting.
                (Ref. Fig. 301/TASK 12-12-32-991-001)
           (14) Use the recorded pressure and temperature values to identify the
                correct dimension H for the shock absorber extension. Compare this
                value with the dimension H you recorded in step (13).
                (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
           (15) If the correct dimension H is the same as the value recorded in step
                (13) plus or minus 10 mm (0.3937 in.), go to step (17).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A322
                                                                            May 01/11
                                                    
    UZB                                             
           (16) If the difference between the recorded dimension H and the correct H
                value is higher than 10 mm (0.3937 in.), proceed as follows:
                CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
                _______
                          ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                          TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                          ABSORBER PRESSURE.
(a) Open the control valve (19) on the three-way valve (12).
                (b) Inflate the shock absorber until it gets to the correct dimension
                    H plus or minus 10 mm (0.3937 in.).
(c) Close the control valve (19) on the three-way valve (12).
                (d) Let the shock absorber become stable, continue after fifteen
                    minutes.
(e) Open the control valve (19) on the three-way valve (10).
                (f) Measure and record the pressure shown on the pressure gage (10)
                    and the shock absorber extension, dimension H.
                    (Ref. Fig. 303/TASK 12-12-32-991-034)
(g) Close the control valve (19) on the three-way valve (12).
                (h) Use the new recorded pressure and temperature values to identify
                    the correct dimension H for the shock absorber extension in the
                    related table.
R                   (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
                (i) Do steps (a) to (h) again until the dimension H is the same as
                    the correct H value read at step (14)(h) plus or minus 10 mm
                    (0.3937 in.).
           (17) When the dimension H is correct, turn the wrench (9) clockwise to
                close the charging valve (6).
           (18) Close the control valve of the nitrogen source. Open the control
                valve (13) on the three-way valve (12) to release the pressure in the
                charging system.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                              Page A323
                                                                              Aug 01/10
                                                      
    UZB                                               
           (19) Remove the nitrogen source hose (18) from the nitrogen source.
(21) Remove the FILLING ASSEMBLY and the standard charging equipment.
           (22) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24 and
                70.79 lbf.in).
(24) Install the blanking cap (7) on the charging valve (6).
Subtask 12-12-32-614-087
        B. Measure the NLG Shock Absorber Nitrogen Pressure and Fluid Level in Heavy
           Aircraft Configuration.
R           (2) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R               record the temperature adjacent to the charging valve (6). Make sure
R               that the thermometer touches the shock absorber outer-cylinder. If
R               possible, measure the temperature at the top part of the cylinder
R               (through the vent hole) at the aft part of the main fitting.
                (Ref. Fig. 301/TASK 12-12-32-991-001)
            (3) Read the values H1 and H2 in the related diagram for the recorded
                temperature and the aircraft. Make sure that the measured dimension H
                is between the values H1 and H2.
                (Ref. Fig. 316/TASK 12-12-32-991-026)
                CAUTION : MAKE SURE THAT THE AIRCRAFT WEIGHT AND BALANCE STAY IN THE
                _______
                          SPECIFIED LIMITS WHILE YOU SELECT A CORRECT CONFIGURATION.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A324
                                                                            May 01/11
                                                    
    UZB                                             
           (4) If the recorded dimension H is not between the values H1 and H2, the
               aircraft is not in a suitable configuration. Put the aircraft in a
               heavy configuration so that dimension H is between H1 and H2.
               (Ref. Fig. 303/TASK 12-12-32-991-034, 316/TASK 12-12-32-991-026)
(a) Connect the nitrogen source hose (18) to the nitrogen source.
               (b) Connect the nitrogen source hose (18) to the three-way valve
                   (12).
(c) Connect the filling hose (11) to the three-way valve (12).
               (d) Remove the blanking cap (1) and the plug (5) from the FILLING
                   ASSEMBLY.
               (e) Connect the filling hose (11) to the end fitting (2) of the
                   FILLING ASSEMBLY.
               (f) Slowly open the control valves (13) and (19) on the three-way
                   valve (12) and the control valve on the nitrogen source. Blow
                   nitrogen through the charging equipment to bleed the system with
                   nitrogen.
               (g) Close the control valves (13) and (19) on the three-way valve
                   (12) and the control valve of the nitrogen source.
                   CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                   _______
                             PRESSURE RANGE. THIS IS NECESSARY TO GET AN ACCURATE
                             PRESSURE MEASUREMENT.
R              (h) Install the GAGE 200 BAR (2900 PSI) - PRESSURE (10) on the
                   three-way valve (12).
           (6) Install the FILLING ASSEMBLY on the charging valve (6) as follows:
               (Ref. Fig. 301/TASK 12-12-32-991-001)
(a) Remove the blanking cap (7) from the charging valve (6).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                           Page A325
                                                                           May 01/11
                                                   
    UZB                                            
                (b) Move the wrench (9) up to the knurled shoulder (3) and install
                    the FILLING ASSEMBLY on the charging valve (6).
                (c) Turn the core (8) of the FILLING ASSEMBLY clockwise with the
                    knurled shoulder (3). Install the seal (4) on the charging valve
                    (6).
                (a) Make sure the charging valve (6) and the control valve (13) on
                    the three-way valve (12) are closed.
(b) Open the control valve (19) on the three-way valve (12).
                (d) Use the recorded dimension H and the temperature measured in step
                    (2) to identify the correct pressure for the shock absorber
                    extension.
R                   (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
                (e) Gradually open the control valve of the nitrogen source. Do this
                    until the pressure gage shows the correct pressure plus or minus
                    0.5 bar (7.2518 psi).
                (h) Close the control valve (19) on the three-way valve (12).
                    (Ref. Fig. 302/TASK 12-12-32-991-012)
(8) Turn the wrench (9) counterclockwise to open the charging valve (6).
(9) Slowly open the control valve (19) on the three-way valve (12).
(11) Turn the wrench (9) clockwise to close the charging valve (6).
(12) Close the control valve (19) on the three-way valve (12).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A326
                                                                            Aug 01/10
                                                    
    UZB                                             
R          (13) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure and
R               record the temperature adjacent to the charging valve (6). Make sure
R               that the thermometer touches the shock absorber outer-cylinder. If
R               possible, measure the temperature at the top part of the cylinder
R               (through the vent hole) at the aft part of the main fitting.
                (Ref. Fig. 301/TASK 12-12-32-991-001)
           (15) Use the recorded pressure and temperature values to identify the
                correct dimension H for the shock absorber extension. Compare this
                value with the dimension H you recorded in step (14).
                (Ref. Fig. 304/TASK 12-12-32-991-041, 305/TASK 12-12-32-991-042)
           (16) If the recorded dimension H is the same as the correct H value plus
                or minus 10 mm (0.3937 in.), go to step (18).
           (18) If the pressure and the extension are correctly related, remove the
                pressure gage (10).
(19) Remove the FILLING ASSEMBLY and the standard charging equipment.
           (20) TORQUE the charging valve (6) to between 0.5 and 0.8 m.daN (44.24 and
                70.79 lbf.in).
(22) Install the blanking cap (7) on the charging valve (2).
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                            Page A327
                                                                            May 01/11
                                                    
    UZB                                             
  5. Close-up
     ________
Subtask 12-12-32-410-057
A. Close Access
        (1) Remove the SAFETY PIN - NLG DOOR from the linkage of each forward NLG
            door (Ref. TASK 32-00-00-081-002).
Subtask 12-12-32-942-075
        (3) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-12-32
                                                     
                                                                        Page A328
                                                                        Aug 01/10
                                                
 UZB                                            
                          OIL - DESCRIPTION AND OPERATION
                          _______________________________
  1. _______
     General
     This section provides instructions related to oil replenishing of the engine
     and the accessories such as the IDG, the pneumatic starter etc...
  
  EFF :
  
             ALL                                      12-13-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                                ELECTRICAL POWER - SERVICING
                                ____________________________
TASK 12-13-24-680-040
     WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
     _______
               THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
               ONE HOUR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                              Page 301
                                                                             May 01/11
                                                     
    UZB                                              
       B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
C. Expendable Parts
   -------------------------------------------------------------------------------
   FIG.ITEM |DESIGNATION                                        |IPC-CSN
   -------------------------------------------------------------------------------
D. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                           Page 302
                                                                          Feb 01/11
R                                                 
  UZB                                             
     3. __________
        Job Set-up
Subtask 12-13-24-861-057
Subtask 12-13-24-941-063
R       B. Safety Precautions
R
           (2) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
               (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                   pushbutton switch is off.
Subtask 12-13-24-010-060
Subtask 12-13-24-481-054
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                            Page 303
                                                                           May 01/11
                                                   
    UZB                                            
     4. Procedure
        _________
Subtask 12-13-24-864-059
           WARNING : POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT
           _______
                     THE HOSE TO THE OVERFLOW DRAIN VALVE. THIS WILL PREVENT BURNS
                     FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES AND
                     SKIN.
           CAUTION : DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE
           _______
                     FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE
                     DAMAGE TO THE OVERFLOW DRAIN-VALVE SEAT.
R (1) Put a CONTAINER 10 L(2 1/2 USGAL) below the IDG (5).
(2) Remove the dust cap (3) from the overflow drain valve (4).
R          (3) Put the end of the overflow drain hose (6) of the FILLING EQUIPMENT -
R              TANK OIL, DH13PM TYP in the CONTAINER 10 L(2 1/2 USGAL).
               (a) Connect the overflow drain hose (6) of the FILLING EQUIPMENT -
                   TANK OIL, DH13PM TYP to the overflow drain valve (4).
                    NOTE : Some oil can come out of the overflow drain hose (6) of
                    ____
                           the FILLING EQUIPMENT - TANK OIL, DH13PM TYP when you
                           connect it.
R Subtask 12-13-24-680-059-A
R          WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
           _______
R                    REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
R                    LOCKWIRE CAN CUT OR BLIND YOU.
R (1) Cut and remove the lockwire from the case drain plug (1).
R              NOTE : Approximately 5.73 l (1.5136 USgal) of oil will flow into the
               ____
R                     container.
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                             Page 304
                                                                            May 01/11
                                                    
    UZB                                             
                   IDG Servicing - IDG Drain and Fill Ports
                       Figure 301/TASK 12-13-24-991-300
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                   Page 305
                                                                  Feb 01/10
                                              
 UZB                                          
R          (3) Remove the O-ring (2) and discard it.
R              (a) If the drained oil has a fuel odor, do the servicing of the IDG
R                  after oil chemical contamination (Ref. TASK 24-21-00-612-043).
Subtask 12-13-24-640-053
C. Lubricate the new O-ring (2) with OILS (Material No. 03-002).
Subtask 12-13-24-420-059
(1) Install the new O-ring (2) on the case drain plug (1).
           (3) TORQUE the case drain plug (1) to between 55 and 75 lbf.in (0.62 and
               0.84 m.daN).
           (4) Safety the case drain plug (1) with Lockwire (Material No. CP8001)
               0.032 in. (0.8127 mm) dia..
Subtask 12-13-24-420-065
           (1) Remove the overflow drain hose (6) of the FILLING EQUIPMENT - TANK
               OIL, DH13PM TYP from the overflow drain valve (4).
(2) Install the dust cap (3) on the overflow drain valve (4).
Subtask 12-13-24-612-065
        F. Fill the IDG with oil or add oil to the IDG after a level check
           (Ref. TASK 12-13-24-612-041), if you must not remove the IDG.
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                              Page 306
                                                                             May 01/11
                                                   
    UZB                                            
   5. Close-up
      ________
Subtask 12-13-24-440-051
      A. Make the thrust reverser serviceable after maintenance (Ref. TASK 78-30-
         00-081-041).
Subtask 12-13-24-410-062
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-13-24-862-057
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                          Page 307
                                                                         May 01/11
R                                                
  UZB                                            
     TASK 12-13-24-612-041
     IDG Servicing - Filling of the IDG with Oil or Addition of Oil after a Level
     Check
     WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
     _______
               THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
               ONE HOUR.
     CAUTION : USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO
     _______
               THE IDG.
               THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST
               DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.
     CAUTION : DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT
     _______
               (PUMP, HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.
               CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE
               OIL AND WILL DECREASE THE LIFE OF THE IDG.
     1. __________________
        Reason for the Job
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                            Page 308
                                                                           May 01/11
                                                   
    UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                              Page 309
                                                                             May 01/11
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-13-24-861-054
Subtask 12-13-24-941-066
R       B. Safety Precautions
R
           (2) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
               (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                   pushbutton switch is off.
Subtask 12-13-24-010-062
Subtask 12-13-24-481-053
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                            Page 310
                                                                           May 01/11
                                                   
    UZB                                            
     4. Procedure
        _________
Subtask 12-13-24-864-061
           WARNING : POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT
           _______
                     THE HOSE TO THE OVERFLOW DRAIN VALVE. THIS WILL PREVENT BURNS
                     FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES AND
                     SKIN.
           CAUTION : DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE
           _______
                     FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE
                     DAMAGE TO THE OVERFLOW DRAIN-VALVE SEAT.
R (1) Put a CONTAINER 10 L(2 1/2 USGAL) below the IDG (5).
(2) Remove the dust cap (3) from the overflow drain valve (4).
R          (3) Put the end of the overflow drain hose (7) of the FILLING EQUIPMENT -
R              TANK OIL, DH13PM TYP in the CONTAINER 10 L(2 1/2 USGAL).
               (a) Connect the overflow drain hose (7) of the FILLING EQUIPMENT -
                   TANK OIL, DH13PM TYP to the overflow drain valve (4).
                    NOTE : Some oil can come out of the overflow drain hose (7) of
                    ____
                           the FILLING EQUIPMENT - TANK OIL, DH13PM TYP when you
                           connect it.
Subtask 12-13-24-612-062
R (1) Remove the dust cap (2) from the pressure fill half-coupling (6).
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                             Page 311
                                                                            May 01/11
                                                    
    UZB                                             
                   IDG Servicing - Filling of the IDG with Oil
                  Figure 302/TASK 12-13-24-991-301- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                    Page 312
                                                                   Feb 01/10
                                               
 UZB                                           
                   IDG Servicing - Filling of the IDG with Oil
                  Figure 302/TASK 12-13-24-991-301- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                    Page 313
                                                                   Feb 01/10
                                               
 UZB                                           
           (2) Connect the pressure fill hose (1) of the FILLING EQUIPMENT - TANK
R              OIL, DH13PM TYP to the pressure fill half-coupling (6).
           (3) Fill the IDG with filtered OILS (Material No. 03-002) at a maximum
               pressure of 35 psi (2.4131 bar).
               NOTE : The AMM 20-34-00 gives a list of approved oil brand-names for
               ____
                      IDG servicing.
           (4) Stop this operation when the quantity of oil collected from the
               overflow drain hose (7) of the FILLING EQUIPMENT - TANK OIL, DH13PM
               TYP is 0.95 l (0.2509 USgal) minimum.
Subtask 12-13-24-080-062
R          (1) Disconnect the pressure fill hose (1) of the FILLING EQUIPMENT - TANK
R              OIL, DH13PM TYP from the pressure fill half-coupling (6).
R (2) Install the dust cap (2) on the pressure fill half-coupling (6).
           (3) When only drops of oil come out of the overflow drain hose (7) of the
               FILLING EQUIPMENT - TANK OIL, DH13PM TYP, remove the hose (7).
R (4) Install the dust cap (3) on the overflow drain half-coupling (4).
Subtask 12-13-24-710-055
Subtask 12-13-24-210-056
           NOTE : Before you do a check of the oil level, we recommend that you do
           ____
                  dry motoring for two minutes (Ref. TASK 71-00-00-710-001).
                  Alternatively, you can do the check after an engine run at minimum
                  idle (Ref. TASK 71-00-00-710-003). This is to make sure you get
                  maximum filling of the external oil circuit.
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                            Page 314
                                                                           May 01/11
                                                   
    UZB                                            
R          (1) Inspection of the oil level with dry motoring
               CAUTION : IF YOU DRY-MOTOR THE ENGINE, MAKE SURE THAT THE OIL LEVEL
               _______
                         IS STABLE BEFORE YOU DO THE INSPECTION. IN AMBIENT AIR
                         TEMPERATURES OF LESS THAN 20⁰C, THE OIL LEVEL WILL BECOME
                         STABLE ONLY AFTER 30 MINUTES. THUS THE LEVEL INDICATIONS ON
                         THE SIGHTGLASS WILL NOT BE CORRECT BEFORE THE END OF THIS
                         PERIOD. IF YOU ADD OIL WHEN IT IS NOT NECESSARY, THERE IS A
                         RISK THAT YOU WILL CAUSE FAILURE OF THE IDG.
R                  1
                   _   If the oil is cold:
R                      - If the oil level is at or near the top of the green band,
R                        oil servicing is not necessary.
R                      - If the oil level is below the green band, do the steps 4.A.
R                        thru 4.D. again.
R                      - If the oil level is above the green band, do the steps 4.A.
R                        and 4.C. again.
R                  2
                   _   If the oil is hot:
R                      - If the oil level   is at or near the top of the yellow band,
R                        oil servicing is   not necessary.
R                      - If the oil level   is below the yellow band, do the steps 4.A.
R                        thru 4.D. again.
R                      - If the oil level   is above the yellow band, do the steps 4.A.
R                        and 4.C. again.
(a) Let the oil in the IDG become stable for 5 minutes.
R                  1
                   _   If the oil is cold:
R                      - If the oil level is at or near the top of the green band,
R                        oil servicing is not necessary.
R                      - If the oil level is below the green band, do the steps 4.A.
R                        thru 4.D. again.
R                      - If the oil level is above the green band, do the steps 4.A.
R                        and 4.C. again.
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                               Page 315
                                                                              May 01/11
                                                      
    UZB                                               
R                  2
                   _   If the oil is hot:
R                      - If the oil level   is at or near the top of the yellow band,
R                        oil servicing is   not necessary.
R                      - If the oil level   is below the yellow band, do the steps 4.A.
R                        thru 4.D. again.
R                      - If the oil level   is above the yellow band, do the steps 4.A.
R                        and 4.C. again.
     5. Close-up
        ________
Subtask 12-13-24-410-059
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-13-24-862-054
  
  EFF :
  
             ALL                                      12-13-24
                                                     
                                                                               Page 316
                                                                              May 01/11
                                                      
    UZB                                               
                                 FLIGHT CONTROLS - SERVICING
                                 ___________________________
TASK 12-13-27-612-001
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                              Page 301
                                                                             Nov 01/10
                                                     
    UZB                                              
      B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Expendable Parts
  -------------------------------------------------------------------------------
  FIG.ITEM |DESIGNATION                                        |IPC-CSN
  -------------------------------------------------------------------------------
D. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                          Page 302
                                                                         Feb 01/10
                                                 
 UZB                                             
     3. __________
        Job Set-up
Subtask 12-13-27-941-052
A. Safety Precautions
Subtask 12-13-27-860-051
           (1) Pressurise the Green and the Yellow hydraulic systems (Ref. TASK 29-
               23-00-863-001) and (Ref. TASK 29-23-00-863-002).
           (2) Move the Trimmable Horizontal Stabilizer (THS) fully UP to fully DOWN
               more than three times then back to the zero position (Ref. TASK 27-
               41-00-220-003).
           (3) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-10-
               00-864-001) (Ref. TASK 29-10-00-864-002).
R          (5) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
               the THS.
               NOTE : At approximately one hour (after the last movement of the THS
               ____
                      actuator) you can do a check of the level of the oil. This
                      time is necessary for the level of the oil to become stable.
                      The level of the oil in the THS actuator housing changes with
                      differences in the housing temperature. At a THS actuator
                      housing temperature of 20 deg.C (68.00 deg.F) the level of the
                      oil must be at the maximum mark.
(6) On the tail cone, make sure the THS is opposite the 0 mark.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                              Page 303
                                                                             Nov 01/10
                                                   
    UZB                                            
                                 THS Actuator
                       Figure 301/TASK 12-13-27-991-001
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
  Subtask 12-13-27-865-051
  -------------------------------------------------------------------------------
  PANEL DESIGNATION                                               IDENT. LOCATION
  -------------------------------------------------------------------------------
    49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY                          15CE1     B11
    49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
   105VU FLT CTL/ELAC1/STBY SPLY                                  16CE1     A01
   121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
   121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
Subtask 12-13-27-010-053
D. Get Access
(1) Put the ACCESS PLATFORM 5M (16 FT) in position below zone 310.
  4. Procedure
     _________
Subtask 12-13-27-612-050
        WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
        _______
                  REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
                  LOCKWIRE CAN CUT OR BLIND YOU.
(1) Remove the cap (4) from the oil fill plug (3).
(2) Install the TOOL - FILL, THSA (0U190363) on the oil fill plug (3).
        (3) If necessary (or if the THS actuator gearbox was drained), cut and
            discard the lockwire from the plug (1).
(4) Remove the plug (1) and the O-ring (2). Discard the O-ring (2).
        (5) Monitor the oil level indicator (5) and fill the THS actuator gearbox
            with Material No: OILS (Material No. 03-003), until the quantity is
            correct. The correct quantity is when the oil level is at the MAXI
            mark.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                         Page 305
                                                                        Feb 01/10
                                                
 UZB                                            
        (6) Remove the TOOL - FILL, THSA (0U190363).
        (7) Clean the cap (4) with a clean lint free cloth MISCELLANEOUS
            (Material No. 19-003).
(9) If the plug (1) has been removed, do the steps that follow:
(a) Make sure that the plug (1) and the plug interface are clean.
(b) Apply OILS (Material No. 03-003) to the new o-ring (2).
            (c) Install the new o-ring (2) on the plug (1) with CONE - MOUNTING,
                THS ACTUATOR (0U145506).
            (e) TORQUE the plug (1) to between 1.4 and 1.6 m.daN (10.32 and 11.79
                lbf.ft).
(f) Safety the plug (1) with MISCELLANEOUS (Material No. 19-018).
  5. Close-up
     ________
Subtask 12-13-27-410-052
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-13-27-865-052
     B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        15CE1, 16CE1, 19CE1, 19CE2, 19CE3.
Subtask 12-13-27-942-051
C. Removal of Equipment
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                           Page 306
                                                                          Feb 01/10
                                                
 UZB                                            
        (3) Remove the access platform(s).
        (4) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                         Page 307
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-13-27-612-002
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                              Page 308
                                                                             May 01/11
                                                     
    UZB                                              
      C. Expendable Parts
  -------------------------------------------------------------------------------
  FIG.ITEM |DESIGNATION                                        |IPC-CSN
  -------------------------------------------------------------------------------
D. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-13-27-941-053
A. Safety Precautions
Subtask 12-13-27-010-054
B. Get Access
(1) Open the main gear door (RH) (Ref. TASK 32-12-00-010-001).
         (2) Make sure that the SLEEVE - GROUND LOCK (460005835) is on the
             applicable main gear door actuator.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                           Page 309
                                                                          Feb 01/10
                                                   
 UZB                                               
                       Flap Power-Control Unit (6201CM)
                       Figure 302/TASK 12-13-27-991-002
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                   Page 310
                                                                  Feb 01/10
                                              
 UZB                                          
     Subtask 12-13-27-864-050
           (1) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-10-
               00-864-001) (Ref. TASK 29-10-00-864-002).
Subtask 12-13-27-865-053
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1                     6CV      B07
      121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2                     8CV      Q21
     4. Procedure
        _________
Subtask 12-13-27-612-051
           (4) Slowly add OILS (Material No. 03-003) to the flap PCU gearbox while
               measuring the quantity of oil being added. Immediately stop adding
               oil when the oil starts to come out of the oil-fill hole.
               NOTE : Record the quantity of oil added to the PCU gearbox. If:
               ____
                      - less than 50 cm3 (3.05 in.3) of oil was added, no
                        maintenance action is necessary
                      - between 50 cm3 (3.05 in.3) and 70 cm3 (4.27 in.3) of oil was
                        added, replace the PCU at (or before) the next scheduled
                        maintenance check. This must be no more than 600 flight
                        hours or 750 flight cycles or 100 days.
                      - more than 70 cm3 (4.27 in.3) of oil was added, replace the
                        PCU before 20 flight cycles have been completed.
R          (5) Clean the oil-fill plug (1) with a clean MISCELLANEOUS (Material No.
R              19-003).
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                            Page 311
                                                                           May 01/11
                                                    
    UZB                                             
          (6) Lubricate the new packing (2) with OILS (Material No. 03-003).
(7) Install the new packing (2) on the oil-fill plug (1).
          (8) Install the oil-fill plug (1) and TORQUE it to between 2.0 and 2.5
              m.daN (14.74 and 18.43 lbf.ft).
          (9) Remove the unwanted oil from near the oil-fill plug (1) with a clean
              cloth.
   5. Close-up
      ________
Subtask 12-13-27-410-053
A. Close Access
          (1) Make sure that the work area is clean and clear of tool(s) and other
              items.
(2) Close the main gear door (RH) (Ref. TASK 32-12-00-410-001).
Subtask 12-13-27-865-054
      B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
         breaker(s):
         6CV, 8CV.
Subtask 12-13-27-942-055
C. Removal of Equipment
          (3) Remove the ground support and maintenance equipment, the special and
              standard tools and all other items.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                             Page 312
                                                                            May 01/10
R                                                 
  UZB                                             
     TASK 12-13-27-612-003
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                              Page 313
                                                                             May 01/11
                                                     
    UZB                                              
      C. Expendable Parts
  -------------------------------------------------------------------------------
  FIG.ITEM |DESIGNATION                                        |IPC-CSN
  -------------------------------------------------------------------------------
D. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-13-27-941-054
A. Safety Precautions
Subtask 12-13-27-010-055
B. Get Access
(1) Open the main gear door (RH) (Ref. TASK 32-12-00-010-001).
         (2) Make sure that the SLEEVE - GROUND LOCK (460005835) is on the
             applicable main gear door actuator.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                           Page 314
                                                                          Feb 01/10
                                                   
 UZB                                               
                       Slat Power-Control Unit (6001CM)
                       Figure 303/TASK 12-13-27-991-003
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                   Page 315
                                                                  Feb 01/10
                                              
 UZB                                          
     Subtask 12-13-27-864-051
           (1) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-10-
               00-864-001) (Ref. TASK 29-10-00-864-002).
Subtask 12-13-27-865-055
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1                     5CV      B06
      121VU FLIGHT CONTROLS/SLT/CTL/SYS2                              7CV      R21
     4. Procedure
        _________
Subtask 12-13-27-612-052
           (4) Slowly add OILS (Material No. 03-003) to the slat PCU gearbox while
               measuring the quantity of oil being added. Immediately stop adding
               oil when the oil starts to come out of the oil-fill hole.
               NOTE : Record the quantity of oil added to the PCU gearbox. If:
               ____
                      - less than 50 cm3 (3.05 in.3) of oil was added no maintenance
                        action is necessary
                      - between 50 cm3 (3.05 in.3) and 70 cm3 (4.27 in.3) was added,
                        replace the PCU at (or before) the next scheduled
                        maintenance check. This must be no more than 600 flight
R                       hours or 750 flight cycles or 100 days.
                      - more than 70 cm3 (4.27 in.3) of oil was added, replace the
R                       PCU before 20 flight cycles have been completed.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                            Page 316
                                                                           May 01/10
                                                    
    UZB                                             
R           (5) Clean the oil-fill plug (1) with a clean MISCELLANEOUS (Material No.
R               19-003).
(6) Lubricate the new packing (2) with OILS (Material No. 03-003).
(7) Install the new packing (2) on the oil-fill plug (1).
            (8) Install the oil-fill plug (1) and TORQUE it to between 2.0 and 2.5
                m.daN (14.74 and 18.43 lbf.ft).
            (9) Remove the unwanted oil from near the oil-fill plug (1) with a clean
                cloth.
     5. Close-up
        ________
Subtask 12-13-27-410-054
A. Close Access
            (1) Make sure that the work area is clean and clear of tool(s) and other
                items.
(2) Close the main gear door (RH) (Ref. TASK 32-12-00-410-001).
Subtask 12-13-27-865-056
        B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
           5CV, 7CV.
Subtask 12-13-27-942-056
C. Removal of Equipment
            (3) Remove the ground support and maintenance equipment, the special and
                standard tools and all other items.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                               Page 317
                                                                              May 01/11
                                                    
    UZB                                             
  TASK 12-13-27-612-005
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  _______
            - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
            - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
            - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
            INCORRECT INSTALLATION CAN CAUSE DAMAGE.
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                           Page 318
                                                                          Feb 01/10
                                                    
 UZB                                                
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                            Page 319
                                                                           Aug 01/10
                                                   
    UZB                                            
  3. __________
     Job Set-up
Subtask 12-13-27-941-056
A. Safety Precautions
        (1) Put a warning notice in position in the cockpit to tell persons not
            to operate the flight controls.
        (2) Put a warning notice in position to tell persons not to operate the
            landing gear doors.
Subtask 12-13-27-860-054
        WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
        _______
                  CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                  AND/OR DAMAGE.
        (2) Make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION
            (98D27803000000) is in position on the flap/slat control lever in the
            cockpit.
Subtask 12-13-27-865-059
  -------------------------------------------------------------------------------
  PANEL DESIGNATION                                               IDENT. LOCATION
  -------------------------------------------------------------------------------
    49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1                     6CV      B07
   121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2                     8CV      Q21
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                          Page 320
                                                                         Feb 01/10
                                                  
 UZB                                              
  Subtask 12-13-27-010-057
D. Get Access
            (a) Open the applicable Main Landing Gear (MLG) door 734, 744
                (Ref. TASK 32-12-00-010-001).
            (b) Make sure that the SLEEVE - GROUND LOCK (460005835) is installed
                on the applicable MLG door actuating-cylinder.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                         Page 321
                                                                        Feb 01/10
                                                
 UZB                                            
  4. Procedure
     _________
Subtask 12-13-27-612-061
        (1) Fill the flap actuator No.1 6205CM(6255CM) with clean COMMON GREASE
            (Material No. 04-025) as follows:
(b) Remove the vent plug (1) from the flap actuator.
(c) Remove the drain plug (2) from the flap actuator.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                          Page 322
                                                                         Feb 01/10
                                                 
 UZB                                             
                            Flap Actuator - Track 1
                       Figure 304/TASK 12-13-27-991-005
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                   Page 323
                                                                  Feb 01/10
                                              
 UZB                                          
                        Flap Actuators - Tracks 2 thru 4
                  Figure 305/TASK 12-13-27-991-006- 13 (SHEET 1)
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                    Page 324
                                                                   Feb 01/10
                                               
 UZB                                           
                        Flap Actuators - Tracks 2 thru 4
                  Figure 305/TASK 12-13-27-991-006- 23 (SHEET 2)
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                    Page 325
                                                                   Feb 01/10
                                               
 UZB                                           
                        Flap Actuators - Tracks 2 thru 4
                  Figure 305/TASK 12-13-27-991-006- 33 (SHEET 3)
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                    Page 326
                                                                   Feb 01/10
                                               
 UZB                                           
           (d) Connect the REPLENISHMENT KIT (A663160) to fill the flap
               actuator, as follows:
               1
               _   Install the vent plug adaptor 3/8 UNF (A663159) in the vent
                   plug hole of the flap actuator.
               2
               _   Install the drain plug adaptor 3/8 UNF (A663159) in the drain
                   plug hole of the flap actuator.
               3
               _   Assemble the semi-fluid pump (A663130/3) to the semi-fluid
                   container (A663130/7).
               4
               _   Connect the supply hose from the semi-fluid pump to the vent
                   plug adaptor.
               5
               _   Assemble the waste lid (A663130/5) to the used fluid container
                   (A663130/6).
               6
               _   Connect the waste hose from the waste lid to the drain plug
                   adaptor.
           (e) Operate the semi-fluid pump and slowly fill the flap actuator
               with clean COMMON GREASE (Material No. 04-025). Operate the pump
               handle through its full travel until clean semi-fluid flows from
               the drain hose.
(f) Disconnect the supply hose from the vent plug adaptor.
(g) Remove the vent plug adaptor from the flap actuator.
(h) Disconnect the waste hose from the drain plug adaptor.
(i) Remove the drain plug adaptor from the flap actuator.
               NOTE : The vent plug (1) and the drain plug (2) are torque
               ____
                      tightened at the end of this procedure.
           (j) Install (but do not torque tighten) the vent plug (1) in the flap
               actuator.
           (k) Install (but do not torque tighten) the drain plug (2) in the
               flap actuator.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                         Page 327
                                                                        Feb 01/10
                                                
 UZB                                            
R          (2) Do the steps (1)(a) thru (1)(k) and fill the:
Subtask 12-13-27-612-062
           (1) Operate the flaps through their full range of travel five times
               (Ref. TASK 27-50-00-866-011) and (Ref. TASK 27-50-00-866-012). After
               the last operation, make sure that the flaps are in the fully
               extended position.
           (2) Remove unwanted semi-fluid from the flap actuator No.1 6205CM(6255CM)
               as follows:
(a) Remove the vent plug (1) from the flap actuator.
(b) Remove the drain plug (2) from the flap actuator.
               (c) Install the vent plug adaptor 3/8 UNF (A663159) in the vent plug
                   hole of the flap actuator.
               (d) Install the drain plug adaptor 3/8 UNF (A663159) in the drain
                   plug hole of the flap actuator.
               (e) Connect the waste hose from the waste lid (A663130/5) to the
                   drain plug adaptor.
(f) Connect the empty oil gun (A663130/4) to the vent plug adaptor.
               (g) Operate the empty oil gun 15 times to put air into the flap
                   actuator and push out unwanted semi-fluid. Make sure that you
                   operate the oil gun handle through its full range each time.
(h) Disconnect the oil gun from the vent plug adaptor.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                            Page 328
                                                                           May 01/10
                                                     
    UZB                                              
             (i) Remove the vent plug adaptor from the flap actuator.
(j) Disconnect the waste hose from the drain plug adaptor.
(k) Remove the drain plug adapter from the flap actuator.
             (l) Install (but do not torque tighten) the vent plug (1) in the flap
                 actuator.
             (m) Install (but do not torque tighten) the drain plug (2) in the
                 flap actuator.
         (3) Do the   steps (2)(a) thru (2)(m) and remove unwanted semi-fluid from
             the:
             - flap   actuator No.2 6211CM(6261CM)
             - flap   actuator No.3 6221CM(6271CM)
             - flap   actuator No.4 6233CM(6283CM).
         (4) Operate the flaps through their full range of travel five times again
             (Ref. TASK 27-50-00-866-011) and (Ref. TASK 27-50-00-866-012). After
             the last operation, make sure that the flaps are in the fully
             extended position.
(6) Torque tighten the vent plug (1) of each flap actuator as follows:
(a) Remove the vent plug (1) from the flap actuator.
             (c) Install the vent plug (1) in the offset gearbox. TORQUE the vent
                 plug (1) to between 0.54 and 0.66 m.daN (47.78 and 58.40 lbf.in).
(7) Torque tighten the drain plug (2) of each flap actuator as follows:
(a) Remove the drain plug (2) from the flap actuator.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                            Page 329
                                                                           May 01/10
R                                                    
  UZB                                                
               (c) Install the drain plug (2) in the offset gearbox. TORQUE the
                   drain plug (2):
                   - flap actuator No.1 to between 0.54 and 0.66 m.daN (47.78 and
                     58.40 lbf.in)
                   - flap actuator No.2 to between 0.54 and 0.66 m.daN (47.78 and
                     58.40 lbf.in)
                   - flap actuator No.3 to between 0.36 and 0.44 m.daN (31.85 and
                     38.93 lbf.in)
                   - flap actuator No.4 to between 0.36 and 0.44 m.daN (31.85 and
                     38.93 lbf.in)
     5. Close-up
        ________
Subtask 12-13-27-410-056
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
               (b) Close the applicable MLG door 734, 744 (Ref. TASK 32-12-00-410-
                   001).
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                            Page 330
                                                                           May 01/10
                                                   
    UZB                                            
R              (f) FOR 6283CM
R                  close the access door 675FB
Subtask 12-13-27-865-060
        B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
           6CV, 8CV.
Subtask 12-13-27-860-055
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
           _______
                     CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                     AND/OR DAMAGE.
           (2) Remove the LOCKING TOOL-FLAP SLAT LEVER,INT. POSITION from the
               flap/slat control lever (Ref. TASK 27-00-00-080-002).
Subtask 12-13-27-942-058
D. Removal of Equipment
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-13-27
                                                     
                                                                              Page 331
                                                                             May 01/10
                                                   
    UZB                                            
                                  HYDRAULIC POWER - SERVICING
                                  ___________________________
TASK 12-13-29-600-001
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Expendable Parts
     -------------------------------------------------------------------------------
     FIG.ITEM |DESIGNATION                                        |IPC-CSN
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-29
                                                     
                                                                                 Page 301
                                                                                Feb 01/11
                                                      
    UZB                                               
        D. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-29-860-050
(2) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
Subtask 12-13-29-010-050
B. Get Access
Subtask 12-13-29-865-050
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU HYD/RAT/CTL                                            2801GE      D14
      106VU CSM/G /EV/MAN/SPLY                                        6XE      B04
      121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1                           2803GE      P33
  
  EFF :
  
             ALL                                      12-13-29
                                                     
                                                                             Page 302
                                                                            Feb 01/11
                                                     
    UZB                                              
  4. Procedure
     _________
Subtask 12-13-29-612-050
(1) Remove and discard the lockwire from the oil fill plug (1).
        (3) Fill the RAT gearbox with OILS (Material No. 03-003), until it spills
            from the fill port.
        (4) Clean the oil fill plug (1) with a clean lint-free cloth
            MISCELLANEOUS (Material No. 19-003).
(5) If necessary install a new packing (2) on the fill plug (1).
(6) Install the fill plug (1) in the lower gearbox (3).
        (7) TORQUE the fill plug (1) to between 9.2 and 12.5 lbf.ft (1.24 and
            1.69 m.daN).
        (8) Safety the oil fill plug (1) with the lockwire MISCELLANEOUS
            (Material No. 19-010).
  5. Close-up
     ________
Subtask 12-13-29-865-051
     A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        2801GE, 2803GE, 6XE
Subtask 12-13-29-410-050
B. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-13-29
                                                     
                                                                           Page 303
                                                                          Feb 01/10
                                                
 UZB                                            
                                Ram Air Turbine
                       Figure 301/TASK 12-13-29-991-001
  
  EFF :
  
             ALL                                      12-13-29
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
     Subtask 12-13-29-860-051
  
  EFF :
  
             ALL                                      12-13-29
                                                     
                                                                   Page 305
                                                                  Feb 01/11
                                                   
    UZB                                            
                                       APU - SERVICING
                                       _______________
TASK 12-13-49-612-001
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
A. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-49-860-054
A. Not applicable
     4. Procedure
        _________
Subtask 12-13-49-612-050
  
  EFF :
  
             ALL                                      12-13-49
                                                     
                                                                                Page 301
                                                                               Aug 01/10
                                                     
    UZB                                              
                                  ENGINE OIL - SERVICING
                                  ______________________
TASK 12-13-79-610-002
     Check oil level and replenish Check Pop Out Indicator of EMCD (Electrical
     Master Chip Detector)
     WARNING : DO NOT REMOVE THE FILLER CAP OF THE OIL TANK IMMEDIATELY AFTER ENGINE
     _______
               OPERATION. LET THE OIL PRESSURE DECREASE FOR A MINIMUM OF 5 MINUTES
               AFTER THE ENGINE SHUTDOWN.
               IF YOU OPEN THE FILLER CAP WHEN THERE IS PRESSURE IN THE TANK THE OIL
               CAN BURN YOU DANGEROUSLY.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific             1 DETECTOR-COMBUSTIBLE GAS
     No specific             1 VISCOMETER
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                             Page 301
                                                                            May 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-79-941-068
A. Safety Precautions
           (1) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
Subtask 12-13-79-010-065
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                             Page 302
                                                                            May 01/11
                                                    
    UZB                                             
     4. Procedure
        _________
Subtask 12-13-79-210-065
A. Check oil level and master Magnetic Chip Detector (MCD) visual indicator.
           NOTE : In order to reduce burden for nuisance EMCD pop out indication,
           ____
                  the inspection of the Electrical Master Chip Detector can be
                  deferred to the next convenient maintenance opportunity where
                  trained personnel can performed the inspection without interfering
                  with revenue service operation.
           (1) Check the visual indicator of the MCD. If the pop-out is extended
               (Ref. TASK 79-00-00-281-002).
           (2) Check oil level on the sight gage, if oil level is below full mark
               add oil as follows:
Subtask 12-13-79-100-051
           CAUTION : MAKE SURE THAT THE OIL TANK SCUPPER IS CLEAN TO PREVENT
           _______
                     CONTAMINATION OF THE TANK DURING THE SERVICING OPERATIONS.
R          (1) Clean the oil tank scupper with a MISCELLANEOUS (Material No. 19-003)
               before you remove the oil tank filler cap.
Subtask 12-13-79-010-066
           WARNING : AFTER ENGINE SHUTDOWN, LET THE OIL TANK PRESSURE BLEED OFF FOR
           _______
                     A MINIMUM OF 5 MINUTES BEFORE YOU REMOVE THE TANK FILLER CAP.
                     IF YOU DO NOT, PRESSURIZED HOT OIL CAN FLOW OUT OF THE TANK AND
                     CAUSE DANGEROUS BURNS.
           CAUTION : DO NOT TRY TO PULL THE HANDLE OF THE OIL-TANK FILLER-CAP OUT OF
           _______
                     ITS STOP LIMITS.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                            Page 303
                                                                           May 01/11
                                                   
    UZB                                            
                       Removal of the Oil Tank Filler Cap
                  Figure 301/TASK 12-13-79-991-306- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                    Page 304
                                                                   Feb 01/10
                                               
 UZB                                           
                       Removal of the Oil Tank Filler Cap
                  Figure 301/TASK 12-13-79-991-306- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                    Page 305
                                                                   Feb 01/10
                                               
 UZB                                           
                              Oil Tank Sight Gage
                       Figure 302/TASK 12-13-79-991-301
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                   Page 306
                                                                  Feb 01/10
                                              
 UZB                                          
                      Measuring the Viscosity of the Oil
                       Figure 303/TASK 12-13-79-991-305
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                   Page 307
                                                                  Feb 01/10
                                              
 UZB                                          
           (1) Raise oil tank filler cap handle to vertical (unlocked) position.
           (2) Turn the handle of the filler cap counterclockwise 45⁰ against its
               stop to disengage the locking device and remove the cap.
               NOTE : If it is difficult to open the filler cap, you must stay for 5
               ____
                      more minutes at least to do step (2) again.
               CAUTION : BEFORE YOU ADD OIL IN THE OIL TANK DURING ITS SERVICING,
               _______
                         MAKE SURE THE OIL IN TANK DOES NOT CONTAIN FUEL. IF IT
                         SMELLS OF FUEL, REPLACE THE MAIN OIL/FUEL HEAT EXCHANGER
                         AND SERVO FUEL HEATER THEN FLUSH THE ENGINE OIL SYSTEM.
               CAUTION : IF YOU THINK THERE ARE FUEL FUMES WHEN YOU REMOVE THE OIL
               _______
                         FILLER CAP, DO A CHECK FOR FUEL IN THE OIL. IF THERE IS
                         FUEL IN THE OIL TANK, REPLACE THE MAIN OIL/FUEL HEAT
                         EXCHANGER AND THE SERVO FUEL HEATER THEN FLUSH THE ENGINE
                         OIL SYSTEM.
               (a) If you think there is fuel in the oil, use one of the following
                   available on-site test kit to examine the oil:
                   - VISCOMETER (measuring the viscosity of the oil),
                   - DETECTOR-COMBUSTIBLE GAS (checking for presence of a
                   combustible vapor).
                   1
                   _   If the test fails then fuel is found, do these steps:
                       a
                       _   Replace the Main Oil/Fuel Heat Exchanger (Ref. TASK 79-21-
R                          20-000-002) (Ref. TASK 79-21-20-400-002).
                       b
                       _   Replace the servo fuel heater (Ref. TASK 73-11-20-000-002)
                           (Ref. TASK 73-11-20-400-002).
                   2
                   _   If the test passes, no fuel is found.
Subtask 12-13-79-612-070
           (1) Add engine oil Ref. SB CFM 79-001 (Material No. CP2442) by pouring
               into oil tank fill port up to full mark.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                              Page 308
                                                                             May 01/11
                                                     
    UZB                                              
  Subtask 12-13-79-210-066
     E. Before you install oil tank filler cap, ensure that the Oring seal is in
        good condition or does not show sign of leakage. If not, replace the
        Oring seal (Ref. TASK 79-11-10-300-003).
Subtask 12-13-79-410-066
        WARNING : IN THIS POSITION, THE HANDLE OF THE FILLER CAP CAN ACCIDENTALLY
        _______
                  MOVE TO ITS VERTICAL (UNLOCKED) POSITION. IF IT DOES THIS,
                  THERE IS A RISK THAT PRESSURIZED HOT OIL WILL FLOW OUT OT THE
                  TANK AND CAUSE INJURY (DANGEROUS BURNS).
        CAUTION : MAKE SURE THAT THE OIL-TANK FILLER-CAP IS LOCKED. ITS HANDLE
        _______
                  MUST POINT TO THE OIL QUANTITY TRANSMITTER.
        CAUTION : A BAD SUPPLY PRESSURE OF THE OIL LUBRICATION UNIT DURING ENGINE
        _______
                  OPERATION CAN OCCUR.
        CAUTION : DO NOT USE FORCE TO MOVE THE HANDLE OF THE FILLER CAP. DAMAGE
        _______
                  CAN OCCUR TO ITS LOCKING DEVICE.
        CAUTION : DO NOT TRY TO PULL THE HANDLE OF THE FILLER CAP OUT OF ITS STOP
        _______
                  LIMITS.
(1) Install the oil tank filler cap with handle in vertical position.
        (2) Turn the handle of the oil tank filler cap clockwise 45⁰ against its
            stop to engage the locking device.
            NOTE : If the locking device is correctly engaged, the cap can not be
            ____
                   pulled from tank.
(3) Push hinged oil tank cap handle down flat into the locked position.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 309
                                                                        Feb 01/10
                                                
 UZB                                            
  5. Close-up
     ________
Subtask 12-13-79-410-065
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 310
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-13-79-610-002- 01
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-79-941-069
A. Safety Precautions
           (1) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                              Page 311
                                                                             Aug 01/10
                                                     
    UZB                                              
     Subtask 12-13-79-010-067
     4. Procedure
        _________
Subtask 12-13-79-210-067
A. Check oil level and master Magnetic Chip Detector (MCD) visual indicator.
           NOTE : In order to reduce burden for nuisance EMCD pop out indication,
           ____
                  the inspection of the Electrical Master Chip Detector can be
                  defeered to the next convenient maintenance opportunity where
                  trained personnel can performed the inspection without interfering
                  with revenue service operation.
           (1) Check the visual indicator of the MCD. If the pop-out is extended
               (Ref. TASK 79-00-00-281-002).
           (2) Check oil level on the sight gage, if oil level is below full mark
               add oil as follows:
Subtask 12-13-79-612-071
           (2) Attach hose coupling from CART - SERVICING, OIL to remote oil filling
               port. Attach plastic transparent overflow hose to oil overflow port.
               CAUTION : DURING FILLING, THE MAXIMUM OIL PUMP FLOW RATE MUST NOT
               _______
                         EXCEED 66 US GAL/HR (250L/HR), OR OVERSERVICING OF OIL
                         SYSTEM MAY RESULT.
               CAUTION : REMOVAL OF DRAIN LINE BEFORE FLOW OF OIL FROM OVERFLOW HOSE
               _______
                         STOPS MAY RESULT IN AN OVERSERVICED TANK.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                            Page 312
                                                                           May 01/11
                                                     
    UZB                                              
                        Oil Tank Remote Filling System
                       Figure 304/TASK 12-13-79-991-302
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                   Page 313
                                                                  Feb 01/10
                                              
 UZB                                          
            NOTE : Use of a plastic transparent hose in place of an opaque hose
            ____
                   will allow detection of oil at overflow port location (oil
                   tank full) and give visual indication to stop filling
                   sooner.
            (a) Add engine oil Ref. SB CFM 79-001 (Material No. CP2442) through
                oil service system until oil is visible through plastic
                transparent hose at the oil overflow port location.
        (3) When oil flow from overflow hose stops, disconnect oil service system
            and check for oil leakage from the coupling. Slightly wetted surface,
            insufficient to form a drop, is permitted.
  5. Close-up
     ________
Subtask 12-13-79-410-067
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 314
                                                                        Feb 01/10
                                                
 UZB                                            
  TASK 12-13-79-610-003
  WARNING : DO NOT REMOVE THE FILLER CAP OF THE OIL TANK IMMEDIATELY AFTER ENGINE
  _______
            OPERATION. LET THE OIL PRESSURE DECREASE FOR A MINIMUM OF 5 MINUTES
            AFTER THE ENGINE SHUTDOWN.
            IF YOU OPEN THE FILLER CAP WHEN THERE IS PRESSURE IN THE TANK THE OIL
            CAN BURN YOU DANGEROUSLY.
  CAUTION : MAKE SURE THAT THE OIL TANK SCUPPER IS CLEAN TO PREVENT CONTAMINATION
  _______
            OF THE TANK DURING THE SERVICING OPERATIONS.
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                           Page 315
                                                                          Feb 01/10
                                                  
 UZB                                              
       C. Expendable Parts
  -------------------------------------------------------------------------------
  FIG.ITEM |DESIGNATION                                        |IPC-CSN
  -------------------------------------------------------------------------------
D. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  12-13-79-610-002             Check oil level and replenish Check Pop Out Indicator
                               of EMCD (Electrical Master Chip Detector)
  12-13-79-610-002             Check oil level and replenish (Pressure Filling)
  71-13-00-010-040             Opening of the Fan Cowl Doors
  71-13-00-410-040             Closing of the Fan Cowl Doors
  12-13-79-991-303             Fig. 305
  3. __________
     Job Set-up
Subtask 12-13-79-941-057
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
          (2) Make sure that the engine 1(2) shutdown occurred not less than 5
              minutes before you do this procedure.
              (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                  pushbutton switch is off.
              (b) Put a warning notice to tell persons not to energize the FADEC
                  1(2).
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                            Page 316
                                                                           Feb 01/10
                                                   
 UZB                                               
  Subtask 12-13-79-010-059
  4. Procedure
     _________
Subtask 12-13-79-680-054
        WARNING : HOT OIL CAN CAUSE DEEP BURNS. AVOID CONTACT WITH OIL SPLASHES
        _______
                  WHEN YOU REMOVE DRAIN PLUGS.
        (1) Put a container 24L (6USgal) capacity under the drain port of the oil
            tank.
(2) Remove the lockwire which attaches the drain plug to the oil tank.
Subtask 12-13-79-420-051
        (1) Lubricate a new O-ring (10) with engine oil (Material No. CP2442).
            Install the O-ring in the groove of the drain plug.
(2) Install the drain plug in the drain port of the oil tank.
        (3) TORQUE the drain plug to between 135 and 150 lbf.in (1.52 and 1.69
            m.daN). Safety with lockwire 0.032in. (0.8mm) dia. (Material No.
            CP8001) or lockwire 0.032in. (0.8mm) dia. (Material No. CP8002)
        (4) Fill the oil tank with new engine oil (Material No. CP2442)
            (Ref. TASK 12-13-79-610-002) or (Ref. TASK 12-13-79-610-002).
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 317
                                                                        Feb 01/10
                                                 
 UZB                                             
                              Oil Tank Drain Plug
                       Figure 305/TASK 12-13-79-991-303
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                   Page 318
                                                                  Feb 01/10
                                              
 UZB                                          
  5. Close-up
     ________
Subtask 12-13-79-410-059
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 319
                                                                        Feb 01/10
                                                
 UZB                                            
  TASK 12-13-79-610-004
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Expendable Parts
  -------------------------------------------------------------------------------
  FIG.ITEM |DESIGNATION                                        |IPC-CSN
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                            Page 320
                                                                           Feb 01/10
                                                   
 UZB                                               
     D. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-13-79-941-058
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
        (2) Make sure that the engine 1(2) shutdown occurred not less than 5
            minutes before you do this procedure.
            (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                pushbutton switch is off.
            (b) Put a warning notice to tell persons not to energize the FADEC
                1(2).
Subtask 12-13-79-010-060
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 321
                                                                        Feb 01/10
                                                 
 UZB                                             
  4. Procedure
     _________
Subtask 12-13-79-680-055
        WARNING : HOT OIL CAN CAUSE DEEP BURNS. AVOID CONTACT WITH OIL SPLASHES
        _______
                  WHEN YOU REMOVE DRAIN PLUGS.
        (2) Cut and remove lockwire, remove drain plugs (50 and 60) and
            completely drain oil.
(3) Remove O-rings (20 and 30) from grooves and discard.
Subtask 12-13-79-420-052
        (1) Install the TOOL SET SEAL FITTING AGB-TGB (856A2794G01) on the drain
            plugs (50 and 60).
        (2) Apply a thin layer of engine oil (Material No. CP2442) to the outer
            surface of TOOL SET SEAL FITTING AGB-TGB (856A2794G01) to prevent
            damage to the O-rings.
        (3) Apply a thin layer of engine oil (Material No. CP2442) to the
            O-rings.
        (4) Install a new O-ring (20) and new O-ring (30) in the groove of each
            drain plug.
        (5) Remove the TOOL SET SEAL FITTING AGB-TGB (856A2794G01) from the drain
            plugs (50 and 60).
        (6) Apply a thin layer of engine oil (Material No. CP2442) to the threads
            of the drain plugs.
        (7) Install the AGB drain plug (60). TORQUE to between 185 and 205 lbf.in
            (2.09 and 2.31 m.daN) and wirelock the drain plug with lockwire 0.032
            in. (0.8mm) dia. (Material No. CP8001).
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                           Page 322
                                                                          Feb 01/10
                                                
 UZB                                            
                   Location of Drain Plugs on Accessory Drive
                        Figure 306/TASK 12-13-79-991-304
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                   Page 323
                                                                  Feb 01/10
                                               
 UZB                                           
R          (8) Install the Transfer Gearbox (TGB) drain plug (50). TORQUE to between
R              110 and 130 lbf.in (1.24 and 1.46 m.daN) and wirelock the drain plug
               with lockwire 0.032 in. (0.8mm) dia. (Material No. CP8001) or
               lockwire 0.032 in. (0.8mm) dia. (Material No. CP8002).
     5. Close-up
        ________
Subtask 12-13-79-410-060
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                            Page 324
                                                                           May 01/10
                                                   
    UZB                                            
   TASK 12-13-79-610-005
   WARNING : DO NOT REMOVE THE FILLER CAP OF THE OIL TANK IMMEDIATELY AFTER ENGINE
   _______
             OPERATION. LET THE OIL PRESSURE DECREASE FOR A MINIMUM OF 5 MINUTES
             AFTER THE ENGINE SHUTDOWN.
             IF YOU OPEN THE FILLER CAP WHEN THERE IS PRESSURE IN THE TANK THE OIL
             CAN BURN YOU DANGEROUSLY.
   1. __________________
      Reason for the Job
      NOTE : Refer to SB CFM 79-001 for conditions that require flushing of the
      ____
             oil system.
      You must flush the oil system when the type of oil is changed or when the
      oil system is contaminated.
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   12-13-79-610-002            Check oil level and replenish Check Pop Out Indicator
                               of EMCD (Electrical Master Chip Detector)
   12-13-79-610-002            Check oil level and replenish (Pressure Filling)
   12-13-79-610-003            Oil Tank Draining
   12-13-79-610-004            Draining of the Accessory Drive Section
   71-00-00-710-001            Dry Motoring Check
   71-00-00-710-006            Minimum Idle Check
   71-13-00-010-040            Opening of the Fan Cowl Doors
   71-13-00-410-040            Closing of the Fan Cowl Doors
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                            Page 325
                                                                           Aug 01/10
R                                                  
  UZB                                              
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-79-941-059
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
           (2) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
               (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                   pushbutton switch is off.
               (b) Put a warning notice to tell persons not to energize the FADEC
                   1(2).
Subtask 12-13-79-010-061
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                             Page 326
                                                                            Aug 01/10
                                                    
    UZB                                             
  4. Procedure
     _________
Subtask 12-13-79-170-051
        (2) Completely drain oil from accessory drive section (Ref. TASK 12-13-
            79-610-004).
        (3) Fill oil system with new oil engine oil (Material No. CP2442)
            (Ref. TASK 12-13-79-610-002) or (Ref. TASK 12-13-79-610-002).
            NOTE : A half full oil tank is sufficient enough to flush the oil
            ____
                   system.
Subtask 12-13-79-710-052
Subtask 12-13-79-680-056
C. Drain completely:
        (2) Completely drain oil from accessory drive section (Ref. TASK 12-13-
            79-610-004).
Subtask 12-13-79-210-057
     D. Examine the magnetic chip detector, the scavenge screens and the supply
        filter. If deposits are normal (non-metallic chips) clean and install. If
        deposits are abnormal (metal chips) do the AMM task (Ref. TASK 79-00-00-
        281-002).
Subtask 12-13-79-612-056
     E. Fill oil system with new oil engine oil (Material No. CP2442) (Ref. TASK
        12-13-79-610-002) or (Ref. TASK 12-13-79-610-002).
Subtask 12-13-79-710-053
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 327
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-13-79-210-058
Subtask 12-13-79-160-052
H. Remove, clean and install magnetic chip detector and supply filter.
Subtask 12-13-79-210-059
Subtask 12-13-79-612-057
     K. Fill oil tank to maximum level (Ref. TASK 12-13-79-610-002) or (Ref. TASK
        12-13-79-610-002).
  5. Close-up
     ________
Subtask 12-13-79-410-061
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-13-79
                                                     
                                                                         Page 328
                                                                        Feb 01/10
                                                
 UZB                                            
                                 ENGINE STARTING - SERVICING
                                 ___________________________
TASK 12-13-80-610-001
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                              Page 301
                                                                             Nov 01/10
                                                     
    UZB                                              
R       C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-80-941-052
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
           (2) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
               (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                   pushbutton switch is off.
               (b) Put a warning notice to tell persons not to energize the FADEC
                   1(2).
Subtask 12-13-80-010-052
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                            Page 302
                                                                           Nov 01/10
                                                    
    UZB                                             
  4. Procedure
     _________
Subtask 12-13-80-680-051
(1) Remove the filler plug (10). Discard the O-ring (20).
        (3) Put a container below the starter. Cut and remove the lockwire.
            Remove the drain plug (70), and let the oil drain in the container 2l
            (0.5 USgal) . Discard the O-ring (80).
            (a) If the oil quantity is more than 0.5 l (0.1320 USgal), the
                starter is serviceable.
            (b) If the quantity is less than 0.5 l (0.1320 USgal), replace the
                stater (Ref. TASK 80-11-10-000-002) (Ref. TASK 80-11-10-400-002).
        (5) Carefully examine the oil removed from the starter and the magnetic
            plug (50) for metal particles (Ref. TASK 80-11-10-210-001). Then,
            remove and discard the two O-rings (60).
            NOTE : Fine metal particles show normal wear. Large pieces of metal
            ____
                   show internal damage.
        (6) Clean the drain plug (70). Apply a thin layer of engine oil (Material
            No. CP2442) to a new O-ring (80) , and install the O-ring on the
            drain plug.
        (7) Install the drain plug (70). TORQUE the plug to between 65 and 85
            lbf.in (0.73 and 0.96 m.daN).
        (8) Safety the drain plug (70) to the starter housing with lockwire 0.032
            in. (0.8 mm) dia. (Material No. CP8001) or lockwire 0.032 in. (0.8
            mm) dia. (Material No. CP8002)
        (9) Clean the knurled magnetic plug (50). Apply a thin layer of engine
            oil (Material No. CP2442) on the two new O-rings (60) and install the
            two O-rings on the knurled magnetic plug.
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                         Page 303
                                                                        Feb 01/10
                                                
 UZB                                            
                          Pneumatic Starter Servicing
                       Figure 301/TASK 12-13-80-991-300
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
         (10) Install the knurled magnetic plug (50):
Subtask 12-13-80-612-052
          (1) Remove overflow plug (40), push inward and simultaneously turn
              counter clockwise to disengage locking device. Discard O-ring (30).
          (2) Fill starter housing through filler port until the engine oil
              (Material No. CP2442) flows from the overflow port.
              NOTE : The quantity of oil used will be less than 0.8 l (0.21 USgal)
              ____
          (3) Clean the filler plug (10) and overflow plug (40). Apply a thin layer
              of engine oil (Material No. CP2442) on the new O-ring (20) and new O-
              ring (30) , and install the O-rings on the filler plug and the
              overflow plug.
          (4) Install the filler plug (10) and overflow plug (40) push inward and
              simultaneously turn clockwise to engage locking device.
   5. Close-up
      ________
Subtask 12-13-80-410-052
A. Close Access
          (1) Make sure that the work area is clean and clear of tool(s) and other
              items.
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                           Page 305
                                                                          Nov 01/10
R                                                 
  UZB                                             
     TASK 12-13-80-610-002
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
R C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-13-80-941-053
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                            Page 306
                                                                           Nov 01/10
                                                     
    UZB                                              
         (2) Make sure that the engine 1(2) shutdown occurred not less than 5
             minutes before you do this procedure.
             (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                 pushbutton switch is off.
             (b) Put a warning notice to tell persons not to energize the FADEC
                 1(2).
Subtask 12-13-80-010-053
   4. Procedure
      _________
Subtask 12-13-80-010-054
         (1) Remove the filler plug (10), and overflow plug (40). Push inward and
             simultaneously turn counter clockwise to disengage locking device.
             Discard O-rings (20 and 30).
Subtask 12-13-80-610-050
         (1) Fill the starter housing with engine oil (Material No. CP2442)
             through the filler port until the oil flows from the overflow port.
             NOTE : The quantity of oil used will be less than one quart
             ____
                    (approximately 0.8 l)
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                            Page 307
                                                                           Nov 01/10
R                                                
  UZB                                            
   Subtask 12-13-80-410-053
         (1) Clean the filler plug (10) and overflow plug (40). Apply a thin layer
             of engine oil (Material No. CP2442) on the new O-ring (20) and O-ring
             (30), and install the new O-ring on the filler plug and the overflow
             plug.
         (2) Install the filler plug (10) and overflow plug (40) push inward and
             simultaneously turn clockwise to engage locking device.
   5. Close-up
      ________
Subtask 12-13-80-410-054
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
  
  EFF :
  
             ALL                                      12-13-80
                                                     
                                                                          Page 308
                                                                         Nov 01/10
R                                                
  UZB                                            
                         GAS - DESCRIPTION AND OPERATION
                         _______________________________
  1. _______
     General
     This section gives information about the servicing of the:
     - Hydraulic Power (Refer to 12-14-29 Page 301),
     - Landing Gear (Refer to 12-14-32) Page 301),
     - Oxygen (Refer to 12-14-35 Page 301).
  
  EFF :
  
             ALL                                      12-14-00
                                                     
                                                                     Page 1
                                                                  Feb 01/10
                                                
 UZB                                            
                                 HYDRAULIC POWER - SERVICING
                                 ___________________________
TASK 12-14-29-614-001
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
     _______
               OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                                 Page 301
                                                                                Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-14-29-010-052
A. Get Access
Subtask 12-14-29-860-050
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                             Page 302
                                                                            Aug 01/10
                                                    
    UZB                                             
               (b) FOR 3070GM
                   depressurize the Yellow hydraulic system (Ref. TASK 29-10-00-864-
                   002).
R (3) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the MLG bay.
     4. Procedure
        _________
Subtask 12-14-29-614-052
           (1) Do a check of the nitrogen pressure gage, before you fill the
               applicable accumulator:
(2) Remove the blanking cap (1) from the charging valve (2).
           (5) Open the control valve slowly and fill the hydraulic power
               accumulator with MISCELLANEOUS (Material No. 19-014) to the correct
               pressure for the ambient temperature.
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                            Page 303
                                                                           Feb 01/11
                                                   
    UZB                                            
                     Hydraulic Power Accumulators - Location
                  Figure 301/TASK 12-14-29-991-001- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                    Page 304
                                                                   Feb 01/10
                                               
 UZB                                           
                     Hydraulic Power Accumulators - Location
                  Figure 301/TASK 12-14-29-991-001- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                    Page 305
                                                                   Feb 01/10
                                               
 UZB                                           
                  Hydraulic Power Accumulator - Pressure Graph
                        Figure 302/TASK 12-14-29-991-003
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                   Page 306
                                                                  Feb 01/10
                                               
 UZB                                           
           NITROGEN PRESSURE
                   -------------------------    -----------------------
                   | deg.F     |   PSI     |    |    deg.C |    PSI   |
R                  -------------------------    -----------------------
                   |   -5      |   1570    |    |   -20    |   1570   |
                   |    0      |   1580    |    |   -15    |   1595   |
                   |   +5      |   1595    |    |   -10    |   1620   |
                   |   +10     |   1610    |    |   -5     |   1670   |
                   |   +15     |   1620    |    |    0     |   1710   |
                   |   +20     |   1650    |    |   +5     |   1755   |
                   |   +25     |   1680    |    |   +10    |   1800   |
                   |   +30     |   1710    |    |   +15    |   1840   |
                   |   +35     |   1725    |    |   +20    |   1890   |
                   |   +40     |   1750    |    |   +25    |   1930   |
                   |   +45     |   1775    |    |   +30    |   1970   |
                   |   +50     |   1800    |    |   +35    |   2015   |
                   |   +55     |   1820    |    |   +40    |   2060   |
                   |   +60     |   1850    |    |   +45    |   2095   |
                   |   +65     |   1870    |    |   +50    |   2130   |
                   |   +70     |   1890    |    |   +55    |   2175   |
                   |   +75     |   1920    |    |   +60    |   2220   |
                   |   +80     |   1940    |    |          |          |
                   |   +85     |   1970    |    |          |          |
                   |   +90     |   1990    |    |          |          |
                   |   +95     |   2010    |    |          |          |
                   |   +100    |   2040    |    |          |          |
                   |   +105    |   2060    |    |          |          |
                   |   +110    |   2085    |    |          |          |
                   |   +115    |   2105    |    |          |          |
                   |   +120    |   2130    |    |          |          |
                   |   +125    |   2145    |    |          |          |
                   |   +130    |   2170    |    |          |          |
                   |   +135    |   2195    |    |          |          |
                   |   +140    |   2220    |    |          |          |
                   -------------------------    -----------------------
                                            Table I
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                        Page 307
                                                                       Feb 01/11
                                               
    UZB                                        
            (6) When the pressure is stable and correct, tighten the charging valve
                nut (2).
R           (7) TORQUE the charging valve nut (2) to between 0.3 and 0.6 m.daN (26.54
R               and 53.09 lbf.in).
R           (8) Make sure that the pressure shown on the pressure gage (3) is
                correct.
R           (9) Stop the supply and remove the nitrogen filling system from the
                charging valve (2).
R (10) Install the blanking cap (1) on the charging valve (2).
     5. Close-up
        ________
Subtask 12-14-29-410-052
A. Close Access
            (1) Make sure that the work area is clean and clear of tool(s) and other
                items.
Subtask 12-14-29-860-051
            (3) Remove the ground support and maintenance equipment, the special and
                standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-29
                                                     
                                                                             Page 308
                                                                            Aug 01/10
                                                    
    UZB                                             
                               LANDING GEAR - SERVICING
                               ________________________
TASK 12-14-32-614-001
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-14-32-941-062
A. Safety Precautions
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 301
                                                                          Feb 01/10
                                                    
 UZB                                                
     Subtask 12-14-32-941-051
R B. Preparation
           WARNING : LET THE BRAKES AND THE WHEELS BECOME COOL BEFORE YOU GO NEAR
           _______
                     THE LANDING GEAR. DO NOT APPLY A LIQUID OR GAS FIRE
                     EXTINGUISHER DIRECTLY ON A HOT WHEEL OR BRAKE UNIT. THIS COULD
                     CAUSE AN EXPLOSION.
           WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS
           _______
                     CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS
                     CONDITION CAN KILL YOU.
R          WARNING : USE ONLY DRY NITROGEN OR OTHER INERT GASES TO INFLATE THE TIRES
           _______
R                    ON THE MAIN GEAR WHEELS.
R                    THE OXYGEN IN THE GAS USED TO INFLATE THESE TIRES MUST NOT BE
R                    MORE THAN 5% (VOLUME).
R                    IF THE AIRCRAFT IS FAR FROM ITS BASE AND NO DRY NITROGEN IS
R                    AVAILABLE, YOU CAN USE AIR FOR THE SERVICING OF THE TIRES IF:
R                    - THE OXYGEN IN THE TIRES IS NOT MORE THAN 5% (VOLUME)
R                    OR
R                    - MAINTENANCE PERSONNEL REMOVE THE AIR FROM THE TIRES AND
R                    INFLATE THEM WITH DRY NITROGEN BEFORE 15 HOURS TIME SERVICE.
R                    A CHEMICAL REACTION BETWEEN THE OXYGEN IN THE TIRES AND GASES
R                    FROM THE INNER LINER CAN CAUSE A TIRE EXPLOSION.
R          (1) Put the CART - INFLATION, TIRE, NITROGEN near the tire to be
               inflated.
R          (3) Install the tire inflation adaptor and pressure gage on the tire
               inflation valve. Connect the tire inflation cart to the tire
               inflation adaptor.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 302
                                                                           Nov 01/10
                                                     
    UZB                                              
R          (4) If there is a large temperature decrease between the departure and
               the destination airports, you must adjust the tire pressure for the
               colder airport before the flight. If the temperature difference is
               equal to or greater than 25 deg.C lower, do this procedure:
               (a) Increase the given tire pressures 3.7% for each 10 deg.C of
                   temperature difference.
     -------------------------------------------------------------------------------
     |          EXAMPLE     Temperature at departure airport = 20 deg.C            |
     |                      Temperature at arrival airport    = -10 deg.C          |
     |                      Temperature difference            = 30 deg.C           |
     |-----------------------------------------------------------------------------|
     |          Increase the tire pressure: 30/10 x 3.7%      = 11.1%              |
     |-----------------------------------------------------------------------------|
     |          If the loaded tire pressure is 13.0 bar, increase the              |
     |          tire pressure: 13.0 bar + (13.0 bar x 11.1%) = 14.4 bar            |
     -------------------------------------------------------------------------------
     4. Procedure
        _________
        WARNING : USE ONLY NITROGEN FOR TIRE INFLATION. IF THE BRAKES OVERHEAT,
        _______
                  OTHER GASES CAN CAUSE AN EXPLOSION.
        NOTE : In the tables that follow the term loaded means with the aircraft
        ____
               weight on the wheels. The term unloaded is when the applicable
               wheel is off the ground (jacked).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 303
                                                                           Nov 01/10
                                                   
    UZB                                            
     Subtask 12-14-32-614-056
           (1) Refer to the table to find the correct NLG tire pressure. If
               necessary, inflate the tire(s) with nitrogen (from an approved
               source) to the correct pressure.
     ------------------------------------------------------------------------------
R    | A/C MAXIMUM |     TIRE DIMENSION   |INFLATION PRESSURE |INFLATION PRESSURE |
R    | RAMP WEIGHT |       AND TYPE       |     UNLOADED      |      LOADED       |
R    |     (MRW)     |                    |    BARS (PSI)     |    BARS (PSI)     |
R    ------------------------------------------------------------------------------
R
     |    75900 kg   |    30 X 8.8 - 15   | 11.8 (171) normal | 12.3 (178) normal |
     | (167330 lb) |      CONVENTIONAL    | 12.4 (180) max    | 12.9 (187) max    |
     |---------------|--------------------|-------------------|-------------------|
     |    75900 kg   |    30 X 8.8 R15    | 11.8 (171) normal | 12.3 (178) normal |
     | (167330 lb) |         RADIAL       | 12.4 (180) max    | 12.9 (187) max    |
     ------------------------------------------------------------------------------
Subtask 12-14-32-614-057
           (1) Refer to the table to find the correct MLG tire pressure. If
               necessary, inflate the tire(s) with nitrogen (from an approved
               source) to the correct pressure.
     ------------------------------------------------------------------------------
R    | A/C MAXIMUM | TIRE DIMENSION | INFLATION PRESSURE | INFLATION PRESSURE |
R    | RAMP WEIGHT |       AND TYPE     |      UNLOADED      |       LOADED       |
R    |     (MRW)     |                  |     BARS (PSI)     |     BARS (PSI)     |
R    ------------------------------------------------------------------------------
R
     |    75900 kg   |   46 X 17 R20    | 13.3 (193) normal | 13.8 (200) normal |
     | (167330 lb) |       RADIAL       | 14.0 (203) max     | 14.5 (210) max     |
     |---------------|------------------|--------------------|--------------------|
     |    75900 kg   |   49 X 19 R20    | 9.9 (144) normal | 10.3 (149) normal |
     | (167330 lb) |       RADIAL       | 10.4 (151) max     | 10.8 (157) max     |
     |---------------|------------------|--------------------|--------------------|
     |    75900 kg   |   46 X 16 - 20   | 13.3 (193) normal | 13.8 (200) normal |
     | (167330 lb) |     CONVENTIONAL   | 14.0 (203) max     | 14.5 (210) max     |
     |---------------|------------------|--------------------|--------------------|
     |    75900 kg   |   49 X 17 - 20   | 11.0 (160) normal | 11.4 (165) normal |
     | (167330 lb) |     CONVENTIONAL   | 11.5 (167) max     | 12.0 (174) max     |
     |---------------|------------------|--------------------|--------------------|
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 304
                                                                           May 01/11
                                                   
    UZB                                            
     ------------------------------------------------------------------------------
     | A/C MAXIMUM | TIRE DIMENSION |              INFLATION   PRESSURE           |
     | RAMP WEIGHT |        AND TYPE    |-----------------------------------------|
     |     (MRW)     |                  |      UNLOADED      |        LOADED      |
     |               |                  |     BARS (PSI)     |      BARS (PSI)    |
     ------------------------------------------------------------------------------
     |    75900 kg   |   49 X 19 - 20   | 9.9 (144) normal | 10.3 (149) normal |
     | (167330 lb) |     CONVENTIONAL   | 10.4 (151) max     | 10.8 (157) max     |
     ------------------------------------------------------------------------------
     5. Close-up
        ________
Subtask 12-14-32-942-051
A. Removal of Equipment
           (3) Install the tire inflation-valve cap. TORQUE the valve cap to between
               0.05 and 0.1 m.daN (4.42 and 8.84 lbf.in).
           (5) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 305
                                                                           Nov 01/10
                                                   
    UZB                                            
     TASK 12-14-32-614-002
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                                 Page 306
                                                                                Nov 01/10
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-14-32-941-052
A. Safety Precautions
R          (2) Put a WARNING NOTICE(S) on the panel 198CB to tell persons not to
               pressurize the Yellow hydraulic system.
Subtask 12-14-32-860-052
           (1) On panel 400VU, make sure that the L/G control-lever is in the DOWN
               position.
           (2) On panel 110VU, make sure that the GRAVITY GEAR EXT handle is in the
               stowed position.
           (3) Make sure that pressure in the brake accumulator of the Yellow
               hydraulic system is released.
Subtask 12-14-32-865-050
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG                         3700GD      Q37
      121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL                          3701GD      Q36
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 307
                                                                           Nov 01/10
                                                   
    UZB                                            
     4. Procedure
        _________
Subtask 12-14-32-420-050
           WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS
           _______
                     CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS
                     CONDITION CAN KILL YOU.
           (1) Connect the supply hose D to the nitrogen source E and to the three
               way valve C.
           (3) Remove the blanking plug (3) from the charging valve (1) of the brake
               accumulator assembly.
           (4) Connect the filling hose A to the charging valve (1) of the brake
               accumulator assembly.
           (5) Slowly open the control valves B and F on the three way valve C and
               open the control valve on the nitrogen source E. Blow nitrogen
               through the standard charging equipment to bleed the system.
           (6) Close the control valve B and then close the control valve F on the
               three way valve C.
Subtask 12-14-32-614-052
           WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS
           _______
                     CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS
                     CONDITION CAN KILL YOU.
R          NOTE : When you fill the Yellow hydraulic system, brake pressure
           ____
R                 accumulator, you must use MISCELLANEOUS (Material No. 19-014).
R                 This will make sure that the oxygen level stays low.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 308
                                                                             Nov 01/10
                                                   
    UZB                                            
                  Brake Accumulator - Filling System Schematic
                        Figure 301/TASK 12-14-32-991-001
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                   Page 309
                                                                  Aug 01/10
R                                              
  UZB                                          
                Brake Accumulator Assembly - Detail and Location
                        Figure 302/TASK 12-14-32-991-002
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                    Page 310
                                                                   Aug 01/10
R                                              
  UZB                                          
                Yellow System Brake Accumulator - Pressure Graph
                        Figure 303/TASK 12-14-32-991-003
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                    Page 311
                                                                   Aug 01/10
R                                              
  UZB                                          
R          (2) Open the control valve (F) slowly and fill the brake pressure
R              accumulator to the correct pressure for the ambient temperature. Make
R              sure that the fill pressure is as follows:
     -------------------------------------------------------------------------------
     |      deg. C       |      deg. F        |      bar       |       psi         |
R    -------------------------------------------------------------------------------
     |       -20         |         -4         |      61        |       885         |
     |       -10         |        +14         |      63        |       914         |
     |         0         |        +32         |      65        |       943         |
     |       +10         |        +50         |      68        |       986         |
     |       +20         |        +68         |      70        |      1015         |
     |       +30         |        +86         |      72        |      1044         |
     |       +40         |       +104         |      75        |      1088         |
     |       +50         |       +122         |      77        |      1117         |
     |       +60         |       +140         |      80        |      1160         |
     -------------------------------------------------------------------------------
           (3) When the pressure is stable, check that the pressure is correct for
               the ambient temperature.
           (4) Make sure that the pressure is not more than or not less than 3.4 bar
               (49.3128 psi) from the correct pressure. If necessary, pressurize the
               brake accumulator again until the pressure is correct.
(5) Close the control valve (F) and tighten the charging valve nut (2).
               NOTE : Do not use too much force when you tighten the charging valve
               ____
                      nut (2). Leakage from the charging valve (1) can occur if the
                      valve seat is damaged.
(6) TORQUE the charging valve nut (2) to 0.11 m.daN (9.73 lbf.in).
Subtask 12-14-32-020-050
           WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS
           _______
                     CAN GO THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS
                     CONDITION CAN KILL YOU.
           NOTE : Make sure the control valve on the nitrogen source E is closed.
           ____
           (1) Slowly open the control valves B and F on the three way valve C to
               remove nitrogen from the standard charging system.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 312
                                                                            Nov 01/10
                                                   
    UZB                                            
           (2) Close the control valves B and F on the three way valve C.
           (3) Remove the filling hose A from the charging valve (1) of the brake
               accumulator assembly.
           (5) Install the blanking cap (3) on the charging valve (1) of the brake
               accumulator assembly.
     5. Close-up
        ________
Subtask 12-14-32-865-051
        A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
           3700GD, 3701GD, 3801GX, 3802GX, 3803GX.
Subtask 12-14-32-942-054
B. Removal of Equipment
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
           (5) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 313
                                                                            Nov 01/10
                                                   
    UZB                                            
     TASK 12-14-32-614-003
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS CAN GO
     _______
               THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN
               KILL YOU.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     WARNING : MAKE SURE THAT THE STANDARD CHARGING EQUIPMENT IS SAFE TO USE ABOVE
     _______
               140 BAR (2030.5278 PSI). THIS WILL PREVENT INJURY AND DAMAGE.
     1. __________________
        Reason for the Job
        NOTE : You can complete this procedure with the aircraft on the ground or on
        ____
               jacks. If the aircraft is on jacks, it must be positioned correctly
               (Ref. TASK 07-11-00-581-001).
        NOTE : This procedure should be done a minimum of 2 hours after the last
        ____
               aircraft operation. This will make sure that the shock absorber
               values recorded are accurate.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 314
                                                                           Aug 01/10
                                                   
    UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                                 Page 315
                                                                                May 01/11
                                                     
    UZB                                              
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-14-32-941-064
A. Safety Precautions
           (1) Make sure that the ground safety locks are installed on the landing
               gear.
           (5) Put an ACCESS PLATFORM 3M (10 FT) in position below the applicable
               shock absorber.
           (6) If the aircraft is on the ground, make sure that the wheel chocks are
               in position at the Main Landing Gear (MLG) wheels. Do not put a chock
               at the nosewheels.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 316
                                                                           Nov 01/10
                                                     
    UZB                                              
     4. Procedure
        _________
Subtask 12-14-32-210-054
           (2) If there is a leak from the gland housing and the sliding tube
               interface or from the gland housing and the main fitting interface:
                    1
                    _   If there is damage, replace the shock absorber (Ref. TASK 32-
                        11-13-000-001) and (Ref. TASK 32-11-13-400-001).
                    2
                    _   If there is no damage:
                        - replace the shock absorber gland seals (Ref. TASK 32-11-13-
                          000-003) and (Ref. TASK 32-11-13-400-003)
                          or
                        - replace the shock absorber (Ref. TASK 32-11-13-000-001) and
                          (Ref. TASK 32-11-13-400-001)
                          or
                        - close the spare seal activating-valve (Ref. TASK 32-11-13-
                          860-001).
Subtask 12-14-32-614-080
        B. Check of MLG Shock Absorber Charge Pressure and Fill with Nitrogen
           (Aircraft on Ground)
           (Ref. Fig. 306/TASK 12-14-32-991-004, 307/TASK 12-14-32-991-021, 308/TASK
           12-14-32-991-005, 309/TASK 12-14-32-991-025)
           WARNING : MAKE SURE THAT THE AREA AROUND THE AIRCRAFT IS CLEAR OF PERSONS
           _______
                     AND EQUIPMENT. WHEN YOU PRESSURIZE/DEPRESSURIZE THE SHOCK
                     ABSORBER, WITH THE AIRCRAFT WEIGHT ON THE GROUND, THE AIRCRAFT
                     WILL MOVE.
R          CAUTION : MAKE SURE THAT THE STANDARD CHARGING EQUIPMENT IS SAFE TO USE
           _______
                     ABOVE 140 BAR (2030.5278 PSI). DO NOT USE EQUIPMENT WITH A
                     SIGHT GLASS. THIS WILL PREVENT INJURY AND DAMAGE.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 317
                                                                             Feb 01/11
                                                     
    UZB                                              
                 Possible Points of Leakage from the Gland Seals
                        Figure 304/TASK 12-14-32-991-019
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                    Page 318
                                                                   Nov 01/10
R                                             
  UZB                                         
                   Details of the Spare-Seal Activating-Valve
                        Figure 305/TASK 12-14-32-991-020
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                   Page 319
                                                                  Nov 01/10
R                                              
  UZB                                          
         MLG Two Stage Shock Absorber Charging Valves - Detail and Location
                          Figure 306/TASK 12-14-32-991-004
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                          Page 320
                                                                         Aug 01/10
R                                                
  UZB                                            
              MLG Two Stage Shock Absorber - Typical Filling System
                        Figure 307/TASK 12-14-32-991-021
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                       Page 321
                                                                      Aug 01/10
R                                              
  UZB                                          
         MLG Two-Stage Shock Absorber - Pressure/Extension Graph (Metric Units)
                      Figure 308/TASK 12-14-32-991-005- 13 (SHEET 1)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 322
                                                                           Aug 01/10
R                                                  
  UZB                                              
        MLG Two-Stage Shock Absorber - Pressure/Extension Graph (Metric Units)
                     Figure 308/TASK 12-14-32-991-005- 23 (SHEET 2)
R
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 323
                                                                          Aug 01/10
                                                  
 UZB                                              
         MLG Two-Stage Shock Absorber - Pressure/Extension Graph (Metric Units)
                      Figure 308/TASK 12-14-32-991-005- 33 (SHEET 3)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 324
                                                                           Aug 01/10
R                                                  
  UZB                                              
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-14-32
                                                     
                                                                   Page 325
                                                                  Aug 01/10
                                             
 UZB                                         
         MLG Two Stage Shock Absorber - Pressure Extension Graph (Imp. Units)
                     Figure 309/TASK 12-14-32-991-025- 13 (SHEET 1)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 326
                                                                          Aug 01/10
R                                                 
  UZB                                             
         MLG Two Stage Shock Absorber - Pressure Extension Graph (Imp. Units)
                     Figure 309/TASK 12-14-32-991-025- 23 (SHEET 2)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 327
                                                                          Aug 01/10
R                                                 
  UZB                                             
         MLG Two Stage Shock Absorber - Pressure Extension Graph (Imp. Units)
                     Figure 309/TASK 12-14-32-991-025- 33 (SHEET 3)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 328
                                                                          Aug 01/10
R                                                 
  UZB                                             
           CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
           _______
                     ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE TEMPERATURE
                     WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK ABSORBER
                     PRESSURE.
           CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED PRESSURE
           _______
                     RANGE. THIS IS NECESSARY TO GET AN ACCURATE PRESSURE
                     MEASUREMENT.
           NOTE : This procedure should be done a minimum of 2 hours after the last
           ____
                  aircraft operation. This will make sure that the shock absorber
                  values recorded are accurate.
R          NOTE : When you fill the MLG shock absorber, you must use MISCELLANEOUS
           ____
R                 (Material No. 19-014). This will make sure that the oxygen level
R                 stays low.
           (2) Install the first standard charging equipment on the top charging
               valve (1):
(a) Remove the blanking cap (2) from the top charging valve (1).
(b) Make sure that the control valves (23) and (25) are closed.
(c) Connect the filling hose (21) to the three-way valve (22).
(d) Connect the filling hose (21) to the top charging valve (1).
               (e) Install the first pressure gage 140 bar (2030.5278 psi) (20) on
                   the three-way valve (22).
           (4) At the top charging valve, read and record the pressure shown on the
               pressure gage.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 329
                                                                           Nov 01/10
                                                    
    UZB                                             
R          (6) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure the
R              temperature of the MLG adjacent to the top charging valve.
           (7) Use diagram 1 to find the dimension H for the pressure at the top
               charging valve for the measured temperature.
               (b) Open the control valve (23) to release all pressure from the
                   filling hose (21).
(d) Remove the pressure gage (20) from the three-way valve (22).
               (e) Disconnect the filling hose (21) from the top charging valve (1)
                   and the three-way valve (22).
               (f) TORQUE the charging valve (1) to between 0.57 and 0.79 m.daN
                   (50.44 and 69.91 lbf.in).
(g) Install the blanking cap (2) on the top charging valve (1).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 330
                                                                           May 01/11
                                                   
    UZB                                            
         (10) Install the second standard charging equipment on the bottom charging
              valve (3):
(a) Remove the blanking cap (4) from the bottom charging valve (3).
(b) Make sure that the control valves (23) and (25) are closed.
(c) Connect the filling hose (21) to the three-way valve (22).
(d) Connect the filling hose (21) to the bottom charging valve (3).
              (e) Install the second pressure gage 140 bar (2030.5278 psi) (20) on
                  the three-way valve (22).
         (12) At the top charging valve (1), read and record the pressure shown on
              the pressure gage (20).
         (15) At the bottom charging valve (3), read and record the pressure shown
              on the pressure gage (20).
         (17) The pressure at the bottom charging valve (3) must be 18 bar
              (261.0678 psi) more than the pressure at the top charging valve (1).
              If not, do the steps that follow:
              NOTE : This makes sure that the floating piston is at the top of the
              ____
                     second stage cylinder before you do the nitrogen filling.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 331
                                                                          Nov 01/10
R                                                   
  UZB                                               
                (a) Make sure that the control valves (23) and (25) are closed.
                (b) Connect the nitrogen supply hose (24) to the three-way valve (22)
                    which is connected to the bottom charging valve (3).
                (d) Slowly open the control valve (25) to increase the nitrogen
                    pressure at the bottom charging valve (3).
                (f) The pressure at the bottom charging valve (3) must be between 18
                    bar (261.0678 psi) and 21 bar (304.5791 psi) more than the
                    pressure at the top charging valve (1).
                (h) After ten minutes (to let the pressure and temperature become
                    stable), check that the condition at step (f) is the same.
(i) If it is not the same, do the steps (d) thru (h) again.
                (k) Close the supply valve on the nitrogen source and remove the
                    nitrogen supply hose (24) from the three-way valve (22).
                (m) At the top charging valve (1), read and record the pressure shown
                    on the pressure gage (20).
                (o) If the difference in pressure at the top charging valve (1) and
                    the bottom charging valve (3) is less than 11 bar (159.5414 psi),
                    do the steps (a) thru (n) again.
R          (18) Use a THERMOMETER -45 TO 70 DEG.C (-49 TO 158 DEG.F) to measure the
R               temperature of the MLG adjacent to the top charging valve (1).
           (19) Use the diagram 2 to find the dimension H for the pressure at the top
                charging valve (1) at the measured temperature.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                               Page 332
                                                                              May 01/11
                                                    
    UZB                                             
         (20) If the measured dimension H is more than you found in diagram 2, do
              these steps:
(b) Slowly open the control valve (23) to release some nitrogen.
              (c) Immediately the shock absorber starts to move, close the control
                  valve (23).
              (d) After five minutes, measure the temperature and the pressure at
                  the top charging valve (1).
              (e) Use the diagram 2 to find the dimension H needed for the
                  conditions found in step (d).
(f) Slowly open the control valve (23) to release some nitrogen.
              (g) When the dimension H is the same as you found in step (e) (+/-
                  2.0 mm (0.0787 in.)), close the control valve (23).
              (a) Connect the nitrogen supply hose (24) to the three-way valve (22)
                  which is connected to the top charging valve (1).
              (e) Immediately the shock absorber starts to move, close the control
                  valve (25).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 333
                                                                          Nov 01/10
R                                                   
  UZB                                               
              (f) After five minutes, measure the pressure and the temperature at
                  the top charging valve (1).
              (g) Use the diagram 2 to find the dimension H needed for the
                  conditions found in step (f).
              (h) Slowly open the control valve (25) to increase the nitrogen
                  pressure.
              (i) When the dimension H is the same as you found in step (g) (+/-
                  2.0 mm (0.0787 in.)), close the control valve (25).
         (22) After five minutes, open the top charging valve (1) and the bottom
              charging valve (3).
         (24) Use the pressure and the temperature you measured at the top charging
              valve (1) to find the correct dimension H in diagram 2. Make sure
              that the dimension H in diagram 2 and the dimension H found in step
              (23) are the same +/- 2.0 mm (0.0787 in.).
         (25) Check the pressure you measured at the top charging valve (1) and at
              the bottom charging valve (3). Make sure that the difference between
              these pressures is more than 11 bar (159.5414 psi).
         (26) If the conditions at step (24) or step (25) are incorrect, do the
              procedure again from step (17).
(27) Close the top charging valve (1) and the bottom charging valve (3).
         (28) To get the correct charge pressure at the bottom charging valve, do
              the applicable step (29) or (30).
         (29) Refer to the diagram 3. If the pressure at the top charging valve (1)
              is on or below the graph line (for the measured temperature), do
              these steps:
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 334
                                                                          Nov 01/10
R                                                 
  UZB                                             
              (b) Slowly open the control valve (25) (to increase the nitrogen
                  pressure), or slowly open the control valve (23) (to remove
                  nitrogen).
              (c) Make sure that the pressure at the bottom charging valve (3) is
                  the same as the pressure shown on the graph line (for the
                  measured temperature) +/- 1 bar (14.5037 psi).
              (e) After five minutes, open the bottom charging valve (3). Make sure
                  that the pressure at the bottom charging valve (3) is the same as
                  the pressure shown on the graph line (for the measured
                  temperature) +/- 1 bar (14.5037 psi).
         (30) Refer to the diagram 3. If the pressure at the top charging valve (1)
              is above the graph line (for the measured temperature), do these
              steps:
(c) Slowly open the control valve (23) to release some nitrogen.
              (d) Immediately the shock absorber starts to move, close the control
                  valve (23).
(e) After five minutes, open the top charging valve (1).
              (f) At the top charging valve (1), measure the pressure and the
                  temperature.
              (g) Use the diagram 1 to find the dimension H that you need for the
                  conditions at step (f).
              (h) Slowly open the control valve (23) (to release nitrogen) until
                  the dimension H is the same as the dimension H found in diagram
                  1, +/- 2.0 mm (0.0787 in.).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 335
                                                                          Nov 01/10
R                                                   
  UZB                                               
              (i) Close the bottom charging valve (3) and the control valve (23).
              (j) After five minutes, open the top charging valve (1) and read and
                  record the pressure.
              (l) Open the bottom charging valve (3) and read and record the
                  pressure.
              (n) Make sure that the pressures at the top charging valve (1) and
                  the bottom charging valve (3) are the same +/- 1.5 bar (21.7556
                  psi). If the pressures are not in this limit, do the procedure
                  from step (17) again.
(31) Remove the nitrogen supply hose (24) from the three-way valve (22).
(32) Remove the filling hoses (21) from the charging valves (1) and (3).
         (33) TORQUE the charging valves (1) and (3) to between 0.57 and 0.79 m.daN
              (50.44 and 69.91 lbf.in).
(35) Install the blanking cap (2) on the top charging valve (1).
(36) Install the blanking cap (4) on the bottom charging valve (3).
         (37) Remove the pressure gages (20) and the filling hoses (21) from the
              three-way valves (22).
(38) Do the Para. 4.B again for the other shock absorber.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 336
                                                                            Nov 01/10
R                                                 
  UZB                                             
     Subtask 12-14-32-614-081
        C. Check of MLG Shock Absorber Charge Pressure and Fill with Nitrogen
           (Aircraft on Jacks)
           (Ref. Fig. 306/TASK 12-14-32-991-004, 307/TASK 12-14-32-991-021)
R          CAUTION : MAKE SURE THAT THE STANDARD CHARGING EQUIPMENT IS SAFE TO USE
           _______
                     ABOVE 140 BAR (2030.5278 PSI). DO NOT USE EQUIPMENT WITH A
                     SIGHT GLASS. THIS WILL PREVENT INJURY AND DAMAGE.
           CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
           _______
                     ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE TEMPERATURE
                     WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK ABSORBER
                     PRESSURE.
           CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED PRESSURE
           _______
                     RANGE. THIS IS NECESSARY TO GET AN ACCURATE PRESSURE
                     MEASUREMENT.
           NOTE : When you fill the MLG shock absorber, you must use MISCELLANEOUS
           ____
                  (Material No. 19-014). This will make sure that the oxygen level
                  stays low.
           (1) Make sure that the aircraft is positioned correctly on the jacks
               (Ref. TASK 07-11-00-581-001).
           (2) Make sure that the shock absorber is fully extended and that the
               dimension H is between 496.7 mm (19.5551 in.) and 500.5 mm (19.7047
               in.).
               (a) If you do this procedure after you have replenished the shock
                   absorber with hydraulic oil (Ref. TASK 12-12-32-611-008), you
                   must:
                   1
                   _   Charge the top charging valve (first stage of the cylinder)
                       with nitrogen to a maximum pressure of 5.0 bar (72.5188 psi).
                   2
                   _   Make sure that the shock absorber is fully extended. Refer to
                       Para. 4.C.(2) and make sure that dimension H is correct.
               (b) Release all the pressure from the top charging valve (first stage
                   of the cylinder).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 337
                                                                            Feb 01/11
                                                    
    UZB                                             
         (3) Install the standard charging equipment:
(a) Remove the blanking cap (2) from the top charging valve (1).
             (b) Make sure that the control valves (23) and (25) of the three-way
                 valve (22) are closed.
(c) Connect the filling hose (21) to the three-way valve (22).
(d) Connect the filling hose (21) to the top charging valve (1).
             (e) Install the pressure gage 17 bar (246.5640 psi) (20) on the
                 three-way valve (22).
(f) Remove the blanking cap (4) from the bottom charging valve (3).
             (g) Make sure that the control valves (23) and (25) of the three-way
                 valve (22) are closed.
(h) Connect the filling hose (21) to the three-way valve (22).
(i) Connect the filling hose (21) to the bottom charging valve (3).
             (j) Install the pressure gage 140 bar (2030.5278 psi) (20) on the
                 three-way valve (22).
         (4) Measure the temperature of the MLG adjacent to the top charging valve
             (1).
         (6) At the bottom charging valve (3), read and record the pressure shown
             on the pressure gage (20).
         (8) Refer to the Table 1 and compare the nitrogen pressure that you read
             from the pressure gage (20). If the two pressures are not the same
             (+/- 1 bar (14.5037 psi) for the measured temperature, do these
             steps:
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                          Page 338
                                                                         Nov 01/10
R                                                
  UZB                                            
              (a) Connect the nitrogen supply hose (24) to the three-way valve (22)
                  which is connected to the bottom charging valve (3).
              (h) Close the supply valve on the nitrogen source and remove the
                  nitrogen supply hose (24) from the three-way valve (22).
         (10) At the top charging valve (1), read and record the pressure shown on
              the pressure gage (20).
         (12) Refer to the Table 2 and compare the nitrogen pressure that you read
              from the pressure gage (20). If the two pressures are not the same
              (+/- 1 bar (14.5037 psi) for the measured temperature, do these
              steps:
              (a) Connect the nitrogen supply hose (24) to the three-way valve (22)
                  which is connected to the top charging valve (1).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 339
                                                                          Nov 01/10
R                                                 
  UZB                                             
                     Charging Pressures - Weight off Wheels
                  Figure 310/TASK 12-14-32-991-027- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                    Page 340
                                                                   Aug 01/10
R                                              
  UZB                                          
                     Charging Pressures - Weight off Wheels
                  Figure 310/TASK 12-14-32-991-027- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                    Page 341
                                                                   Aug 01/10
R                                              
  UZB                                          
              (b) Open the supply valve on the nitrogen source.
              (f) After 15 minutes, measure the pressure at the top charging valve
                  (1) again. Make sure that the pressure is correct.
         (13) After one hour, do these steps to make sure the pressures are
              correct:
              (a) Measure the temperature of the MLG adjacent to the top charging
                  valve (1).
              (c) At the bottom charging valve (3), read and record the pressure
                  shown on the pressure gage (20).
              (f) At the top charging valve (1), read and record the pressure shown
                  on the pressure gage (20).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                           Page 342
                                                                          Nov 01/10
R                                                 
  UZB                                             
                (h) Make sure that the pressures are correct with the values in
                    Tables 1 and 2 for the measured temperature.
(14) Remove the filling hoses (21) from the charging valves (1) and (3).
           (15) TORQUE the charging valves (1) and (3) to between 0.57 and 0.79 m.daN
                (50.44 and 69.91 lbf.in).
(17) Install the blanking cap (2) on the top charging valve (1).
(18) Install the blanking cap (4) on the bottom charging valve (3).
           (19) Remove the pressure gages (20) and the filling hoses (21) from the
                three-way valves (22).
(20) Do the Para. 4.C. again for the other shock absorber.
     5. Close-up
        ________
Subtask 12-14-32-942-061
A. Removal of Equipment
            (4) Remove the ground support and maintenance equipment, the special and
                standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                               Page 343
                                                                              Nov 01/10
                                                    
    UZB                                             
     TASK 12-14-32-200-001
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 344
                                                                             Aug 01/10
                                                     
    UZB                                              
   3. __________
      Job Set-up
Subtask 12-14-32-941-065
A. Safety Precautions
         (2) Make sure that the ground safety locks are installed on the landing
             gear (Ref. TASK 32-00-00-481-001).
         (4) Make sure that the wheel chocks are in position at the Main Landing
             Gear (MLG) wheels. Do not put a chock at the nosewheels.
   4. Procedure
      _________
Subtask 12-14-32-220-062
         (1) Measure the dimension H for each MLG shock absorber and do the
             applicable step that follows:
                   1
                   _   Do the fluid check of the MLG shock absorber (Ref. TASK 12-12-
                       32-611-004).
or
             (b) If the difference between each MLG shock absorber H dimension
                 is more than 45 mm (1.7716 in.):
                   1
                   _   Do the fluid check of the MLG shock absorber before 5 flight
                       cycles have been completed (Ref. TASK 12-12-32-611-004).
or
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 345
                                                                            Aug 01/10
R                                                   
  UZB                                               
                   MLG Two-Stage Shock Absorber - Dimension H
                        Figure 311/TASK 12-14-32-991-024
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                   Page 346
                                                                  Aug 01/10
R                                              
  UZB                                          
               (c) If the difference between each MLG shock absorber H dimension
                   is between 30 mm (1.1811 in.) and 45 mm (1.7716 in.):
                   1
                   _   Check the charge pressure of the MLG shock absorber (Ref. TASK
                       12-14-32-614-003) at the next available maintenance check.
or
               (d) If the difference between each MLG shock absorber H dimension
                   is less than 30 mm (1.1811 in.), no maintenance is necessary.
     5. Close-up
        ________
Subtask 12-14-32-942-062
A. Removal of Equipment
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 347
                                                                            Feb 01/11
                                                    
    UZB                                             
   TASK 12-14-32-614-004
   WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
   _______
             START A TASK ON OR NEAR:
             - THE FLIGHT CONTROLS
             - THE FLIGHT CONTROL SURFACES
             - THE LANDING GEAR AND THE RELATED DOORS
             - COMPONENTS THAT MOVE.
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   WARNING : DO NOT PUT COMPRESSED GAS IN CONTACT WITH YOUR SKIN. THE GAS CAN GO
   _______
             THROUGH THE SKIN AND MAKE BUBBLES IN THE BLOOD. THIS CONDITION CAN
             KILL YOU.
   1. __________________
      Reason for the Job
      NOTE : This task should be completed if the fluid level in the NLG shock
      ____
             absorber is correct (Ref. TASK 12-12-32-610-001) or (Ref. TASK
             12-12-32-611-005) or (Ref. TASK 12-12-32-611-001).
      NOTE : You must do this procedure a minimum of 2 hours after the last
      ____
             aircraft operation. This will let the gas and the oil separate.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                          Page 348
                                                                         Feb 01/11
R                                                
  UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                                   Page 349
                                                                                  May 01/11
                                                         
    UZB                                                  
     3. __________
        Job Set-up
Subtask 12-14-32-941-057
A. Safety Precautions
           (2) If the aircraft is on jacks, put the ACCESS PLATFORM 3M (10 FT) in
               position.
           (5) Make sure that the ground safety locks are installed on the landing
               gears and doors.
Subtask 12-14-32-010-051
B. Get Access
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
           _______
     4. Procedure
        _________
Subtask 12-14-32-614-059
           NOTE : Do not do the check immediately after the aircraft is lifted. The
           ____
                  shock absorber charge pressure should not be measured until the
                  aircraft has been on jacks for 2 hours. This will let the shock
                  absorber pressure become stable and make sure that the value
                  recorded is accurate.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 350
                                                                           Feb 01/11
                                                     
    UZB                                              
                   NLG Charging Valve - Detail and Location
                       Figure 312/TASK 12-14-32-991-006
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                   Page 351
                                                                  Aug 01/10
R                                             
  UZB                                         
                      NLG Shock Absorber - Filling System
R                      Figure 313/TASK 12-14-32-991-017
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                   Page 352
                                                                  Aug 01/10
                                              
    UZB                                       
           Pressure/Temperature Table - Shock Absorber Fully Extended
R                       Figure 314/TASK 12-14-32-991-030
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                         Page 353
                                                                        Aug 01/10
                                               
    UZB                                        
                       NLG Shock Absorber - Dimension H
R                      Figure 315/TASK 12-14-32-991-031
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                   Page 354
                                                                  Aug 01/10
                                              
    UZB                                       
         NOTE : When you fill the NLG shock absorber, you must use MISCELLANEOUS
         ____
                (Material No. 19-014). This will make sure that the oxygen level
                stays low.
         (1) Make sure that the shock absorber is extended fully and the dimension
             H is between 447 mm (17.5984 in.) and 451 mm (17.7559 in.).
             (Ref. Fig. 315/TASK 12-14-32-991-031)
(a) Connect the nitrogen supply hose (16) to the nitrogen source.
             (b) Connect the nitrogen supply hose (16) to the three-way valve
                 (13).
(c) Connect the filling hose (12) to the three-way valve (13).
                 NOTE : The filling hose (12) length must not be more than 3 m
                 ____
                        (9.84 ft.).
             (d) Remove the blanking cap (9) and the plug (3) from the FILLING
                 ASSEMBLY.
             (e) Connect the filling hose (12) to the end fitting (8) of the
                 FILLING ASSEMBLY.
             (f) Slowly open the control valves (14) and (15) on the three-way
                 valve (13) and the control valve on the nitrogen source. Blow
                 nitrogen through the charging equipment to bleed the system.
             (h) Close the control valves (14) and (15) on the three-way valve
                 (13).
                 CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                 _______
                           PRESSURE RANGE (0 BAR TO 30 BAR AND ACCURATE TO +/- 0.2
                           BAR). THIS IS NECESSARY TO GET AN ACCURATE PRESSURE
                           MEASUREMENT.
             (i) Install the applicable pressure gage (11) on the three-way valve
                 (13).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                          Page 355
                                                                         Feb 01/11
R                                                
  UZB                                            
           (3) Install the FILLING ASSEMBLY on the charging valve (2) as follows:
               (Ref. Fig. 312/TASK 12-14-32-991-006)
(a) Remove the blanking cap (1) from the charging valve (2).
               (b) Move the wrench (6) up to the knurled shoulder (7) and install
                   the FILLING ASSEMBLY on the charging valve (2).
               (c) Turn the core (4) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (7). This will install the seal (5) on the
                   charging valve (2).
               (a) Make sure that the charging valve (2) and the control valve (14)
                   on the three-way valve (13) are closed.
(b) Slowly open the control valve (15) on the three-way valve (13).
               (c) Slowly open the control valve of the nitrogen source. Add
                   nitrogen until the pressure read on the pressure gage is 19 bar
                   (275.5716 psi)
               (e) After the pressure has been adjusted, wait for a minimum of 5
                   minutes to make sure that the pressure is stable. This will make
                   sure that there are no leaks in the charging equipment.
(f) Close the control valve (15) on the three-way valve (13).
(b) Slowly open the charging valve (2) with the FILLING ASSEMBLY.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 356
                                                                            May 01/11
                                                   
    UZB                                            
             (c) Slowly open the control valve (15) on the three-way valve (13).
                 Read and record the pressure shown on the pressure gage (11).
             (d) Close the control valve (15) on the three-way valve (13) and the
                 charging valve (2) with the FILLING ASSEMBLY.
             (e) Refer to the table and use the recorded temperature value to
                 identify the correct charge pressue.
                 (Ref. Fig. 314/TASK 12-14-32-991-030)
             CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
             _______
                       ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                       TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                       ABSORBER PRESSURE.
(a) Slowly open the control valve (15) on the three-way valve (13).
(b) Slowly open the charging valve (2) with the FILLING ASSEMBLY.
             (c) Slowly open the control valve of the nitrogen source. Adjust the
                 charge pressure in the shock absorber to the correct value as
                 recorded in step (5)(e).
(d) Close the control valve (15) on the three-way valve (13).
(e) Close the charging valve (2) with the FILLING ASSEMBLY.
             (f) After the pressure has been adjusted, wait for a minimum of 15
                 minutes to let the pressure become stable.
             (g) Slowly open the control valve (15) on the three-way valve (13)
                 and the charging valve (2) with the FILLING ASSEMBLY. Check that
                 the pressure read on the pressure gage (11) compares with the
                 correct pressure +/- 0.5 bar (7.2518 psi) as recorded in step
                 (5)(e).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 357
                                                                           Feb 01/11
R                                                
  UZB                                            
            (7) Remove the standard charging equipment and FILLING ASSEMBLY as
                follows:
(a) Close the control valve (15) on the three-way valve (13).
(b) Close the charging valve (2) with the FILLING ASSEMBLY.
                (d) Slowly open the control valve (14) to release the pressure and
                    remove the nitrogen source from the three-way valve (13).
                (f) Remove the FILLING ASSEMBLY and the standard charging equipment
                    from the charging valve (2).
            (8) TORQUE the charging valve nut (2) to between 0.5 and 0.8 m.daN (44.24
                and 70.79 lbf.in).
(10) Install the blanking cap (1) on the charging valve (2).
R               NOTE : If the NLG shock absorber has been fully deflated and inflated
                ____
R                      again, it is recommended that you:
R                      - do a check of the NLG shock absorber charging pressure (Ref.
R                        TASK 12-14-32-614-004) between four and seven days after the
R                        first subsequent flight. This is because the nitrogen can be
R                        absorbed into the oil and the charge pressure can change.
Subtask 12-14-32-614-055
            NOTE : When you fill the NLG shock absorber, you must use MISCELLANEOUS
            ____
                   (Material No. 19-014). This will make sure that the oxygen level
                   stays low.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                               Page 358
                                                                              Feb 01/11
                                                    
    UZB                                             
         (1) Install the standard charging equipment on the FILLING ASSEMBLY as
             follows:
             (Ref. Fig. 312/TASK 12-14-32-991-006, 313/TASK 12-14-32-991-017)
(a) Connect the nitrogen supply hose (16) to the nitrogen source.
             (b) Connect the nitrogen supply hose (16) to the three-way valve
                 (13).
(c) Connect the filling hose (12) to the three-way valve (13).
                 NOTE : The filling hose (12) length must not be more than 3 m
                 ____
                        (9.84 ft.).
             (d) Remove the blanking cap (9) and the plug (3) from the FILLING
                 ASSEMBLY.
             (e) Connect the filling hose (12) to the end fitting (8) of the
                 FILLING ASSEMBLY.
             (f) Slowly open the control valves (14) and (15) on the three-way
                 valve (13) and the control valve on the nitrogen source. Blow
                 nitrogen through the charging equipment to bleed the system.
             (h) Close the control valves (14) and (15) on the three-way valve
                 (13).
                 CAUTION : MAKE SURE THAT YOU USE A GAGE WITH THE SPECIFIED
                 _______
                           PRESSURE RANGE (0 BAR TO 200 BAR AND ACCURATE TO +/-
                           0.5 BAR). THIS IS NECESSARY TO GET AN ACCURATE PRESSURE
                           MEASUREMENT.
             (i) Install the applicable pressure gage (11) on the three-way valve
                 (13).
         (2) Install the FILLING ASSEMBLY on the charging valve (2) as follows:
             (Ref. Fig. 312/TASK 12-14-32-991-006)
(a) Remove the blanking cap (1) from the charging valve (2).
             (b) Move the wrench (6) up to the knurled shoulder (7) and install
                 the FILLING ASSEMBLY on the charging valve (2).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                          Page 359
                                                                         Feb 01/11
R                                                
  UZB                                            
               (c) Turn the core (4) of the FILLING ASSEMBLY clockwise with the
                   knurled shoulder (7). This will install the seal (5) on the
                   charging valve (2).
               (a) Make sure that the charging valve (2) and the control valve (14)
                   on the three-way valve (13) are closed.
(b) Slowly open control valve (15) on the three-way valve (13).
               (f) Slowly open the control valve of the nitrogen source. Add
                   nitrogen until the pressure read on the pressure gage is the same
                   as the required charging pressure +/- 0.5 bar (7.2518 psi).
               (h) After the pressure has been adjusted, wait for a minimum of 5
                   minutes to make sure that the pressure is stable. This will make
                   sure that there are no leaks in the charging equipment.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                             Page 360
                                                                            May 01/11
                                                   
    UZB                                            
                 NOTE : If possible, measure the temperature at the top of the
                 ____
                        cylinder (through the vent hole) at the aft part of the
                        main fitting.
                        (Ref. Fig. 312/TASK 12-14-32-991-006)
(b) Slowly open the charging valve (2) with the FILLING ASSEMBLY.
             (c) Slowly open the control valve (15) on the three-way valve (13).
                 Read and record the pressure shown on the pressure gage (11).
             (e) Use the recorded pressure and temperature values to identify the
                 correct dimension H for the shock absorber extension. Compare
                 this value with the dimension H you recorded in step (4)(d).
                 (Ref. Fig. 316/TASK 12-14-32-991-032, 317/TASK 12-14-32-991-033)
             CAUTION : ALWAYS ADD NITROGEN SLOWLY WHEN YOU PRESSURIZE THE SHOCK
             _______
                       ABSORBER. IF YOU ADD THE NITROGEN TOO QUICKLY, THE
                       TEMPERATURE WILL INCREASE AND HAVE AN EFFECT ON THE SHOCK
                       ABSORBER PRESSURE.
             (a) Slowly open the control valve of the nitrogen source. Inflate the
                 shock absorber with nitrogen until the dimension H is correct as
                 recorded in step (4)(e).
             (b) Continue to inflate the shock absorber until the shock absorber
                 extends by 30 mm (1.1811 in.) more.
             (c) When the pressure has become stable, record the pressure shown on
                 the pressure gage (11).
             (d) Slowly open the control valve (14) on the three-way valve (13).
                 Deflate the shock absorber until the dimension H is correct as
                 recorded in step (4)(e).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                          Page 361
                                                                         May 01/11
R                                                
  UZB                                            
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 18 (SHEET 1)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 362
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 28 (SHEET 2)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 363
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 38 (SHEET 3)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 364
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 48 (SHEET 4)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 365
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 58 (SHEET 5)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 366
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 68 (SHEET 6)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 367
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 78 (SHEET 7)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 368
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Positive Temperatures
                        Figure 316/TASK 12-14-32-991-032- 88 (SHEET 8)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 369
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 18 (SHEET 1)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 370
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 28 (SHEET 2)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 371
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 38 (SHEET 3)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 372
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 48 (SHEET 4)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 373
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 58 (SHEET 5)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 374
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 68 (SHEET 6)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 375
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 78 (SHEET 7)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 376
                                                                             Feb 01/11
                                                     
    UZB                                              
R          NLG Pressure/Extension Data (Weight on Wheels) - Negative Temperatures
                        Figure 317/TASK 12-14-32-991-033- 88 (SHEET 8)
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 377
                                                                             Feb 01/11
                                                     
    UZB                                              
                 NOTE : Steps (b) thru (d) are to decrease the effect of the
                 ____
                        friction in the shock absorber on the measured value of
                        the dimension H.
(e) Close the control valve (15) on the three-way valve (13).
             (g) Open the control valve (15) and measure and record the pressure
                 on the pressure gage (11).
             (h) Check that the dimension H compares with the correct dimension H
                 +/- 10 mm (0.3937 in.) as recorded in step (4)(e).
(a) Close the control valve (15) on the three-way valve (13).
(b) Close the charging valve (2) with the FILLING ASSEMBLY.
             (d) Slowly open the control valve (14) to release the pressure and
                 remove the nitrogen source from the three-way valve (13).
             (f) Remove the FILLING ASSEMBLY and the standard charging equipment
                 from the charging valve (2).
         (7) TORQUE the charging valve nut (2) to between 0.5 and 0.8 m.daN (44.24
             and 70.79 lbf.in).
(9) Install the blanking cap (1) on the charging valve (2).
             NOTE : If the
             ____            NLG shock absorber has been fully deflated and inflated
                    again,   it is recommended that you:
                    - do a   check of the NLG shock absorber charging pressure (Ref.
                      TASK   12-14-32-614-004) between four and seven days after the
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 378
                                                                           May 01/11
R                                                  
  UZB                                              
                        first subsequent flight. This is because the nitrogen can be
                        absorbed into the oil and the charge pressure can change.
   5. Close-up
      ________
Subtask 12-14-32-410-051
A. Close Access
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
         _______
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-14-32-942-056
B. Removal of Equipment
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 379
                                                                           May 01/11
R                                                  
  UZB                                              
     TASK 12-14-32-200-002
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                              Page 380
                                                                             Nov 01/10
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-14-32-941-070
A. Safety Precautions
           (2) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
           (4) Make sure that the wheel chocks are in position at the Main Landing
               Gear (MLG) wheels. Do not put a chock at the nose wheels.
     4. Procedure
        _________
Subtask 12-14-32-220-063
               (a) If:
                   - the dimension H is less than 26 mm (1.0236 in.), when the
                     ambient temperature is less than 0 DEG.C (32.00 DEG.F)
                     or
                   - the dimension H is less than 48 mm (1.8897 in.), when the
                     ambient temperature is between 0 DEG.C (32.00 DEG.F) and 30
                     DEG.C (86.00 DEG.F)
                     or
                   - the dimension H is less than 72 mm (2.8346 in.), when the
                     ambient temperature is more than 30 DEG.C (86.00 DEG.F), do
                     step (2).
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 381
                                                                           Nov 01/10
                                                     
    UZB                                              
           (2) Do one of the steps that follows:
               (a) Do a check of the NLG shock absorber fluid level and charge
                   pressure (Ref. TASK 12-12-32-610-001).
                   or
               (b) Do the NLG shock absorber oil replenishment and nitrogen filling
                   (Ref. TASK 12-12-32-611-001) or (Ref. TASK 12-12-32-611-005).
     5. Close-up
        ________
Subtask 12-14-32-942-064
A. Removal of Equipment
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-14-32
                                                     
                                                                            Page 382
                                                                           Feb 01/11
                                                   
    UZB                                            
                                  OXYGEN - SERVICING
                                  __________________
TASK 12-14-35-600-001
  WARNING : KEEP ALL HYDROCARBONS (FUELS, LUBRICANTS, ETC.) AWAY FROM ALL SOURCE
  _______
            OF OXYGEN. OXYGEN BECOMES EXPLOSIVE WHEN IT TOUCHES HYDROCARBONS.
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                         Page 301
                                                                        Feb 01/10
                                                  
 UZB                                              
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-14-35-010-052
A. Get Access
(1) Put the access platform in position at the access door 812.
Subtask 12-14-35-941-051
     B. Safety Precautions
        (Ref. Fig. 301/TASK 12-14-35-991-001)
(1) Make sure that the overboard discharge indicator shows green.
        (2) Put the warning notice in the work area to tell persons that the
            oxygen filling operation is dangerous.
        (3) Make sure that the date of the test given on the cylinder is in the
            permitted time limit.
Subtask 12-14-35-865-050
  -------------------------------------------------------------------------------
  PANEL DESIGNATION                                               IDENT. LOCATION
  -------------------------------------------------------------------------------
    49VU OXYGEN/CREW/OXY/SPLY                                      1HT     HA01
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                           Page 302
                                                                          Feb 01/10
                                                 
 UZB                                             
                         Location of the Oxygen System
                       Figure 301/TASK 12-14-35-991-001
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
  Subtask 12-14-35-860-051
        (2) Make sure that the oxygen line end-fittings and the electrical
            connectors are in the correct condition.
  4. Procedure
     _________
Subtask 12-14-35-614-051
(1) Remove the blanking plug from the oxygen filling port 5769HM.
(2) Connect the filling assembly to the oxygen filling port 5769HM.
        (3) Measure the Outside Air Temperature (OAT) and the cockpit temperature
            with a thermometer.
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                           Page 304
                                                                          Feb 01/10
                                                
 UZB                                            
                               Filling Pressure
                       Figure 302/TASK 12-14-35-991-003
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                   Page 305
                                                                  Feb 01/10
                                              
 UZB                                          
                       Location of the Oxygen Fill Port.
                       Figure 303/TASK 12-14-35-991-002
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                   Page 306
                                                                  Feb 01/10
                                              
 UZB                                          
        (4) Find the filling pressure. To do this, refer to the temperatures and
            the aircraft placards.
        (5) Slowly pressurize the system. Make sure that the filling pressure is
            correct on the pressure gage of the cylinder.
Subtask 12-14-35-210-055
B. Test
        (1) Remove the safety clip(s) and the tag(s) and close this(these)
            circuit breaker(s):
            1HT
        (3) Make sure that the pressure shown on the filling indicator 5HT is the
            same as the pressure gage of the cylinder.
  5. Close-up
     ________
Subtask 12-14-35-860-052
        (2) Disconnect the filling system. Put the blanking plug on the filling
            port.
        (5) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                         Page 307
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-14-35-410-050
B. Close Access
  
  EFF :
  
             ALL                                      12-14-35
                                                     
                                                                   Page 308
                                                                  Feb 01/10
                                            
 UZB                                        
                         WATER - DESCRIPTION AND OPERATION
                         _________________________________
  1. _______
     General
     This section gives the instructions for the servicing of the potable water
     tank 3000MM.
  2. ___________
     Description
     To fill the potable water system with electrical power (Ref. TASK
     12-15-38-613-001).
     To fill the potable water system without electrical power (Ref. TASK
     12-15-38-613-002).
  
  EFF :
  
             ALL                                      12-15-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                              POTABLE WATER - SERVICING
                              _________________________
TASK 12-15-38-613-001
Fill the Potable Water Tank System (Aircraft Electrical Power Available)
  WARNING : DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER
  _______
            SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE
            POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
  WARNING : BEFORE YOU DO WORK ON THE POTABLE WATER SYSTEM, CLEAN YOUR HANDS WITH
  _______
            SOAP AND WATER. THIS WILL PREVENT INFECTION. (CONTAMINATION FROM
            TOILET WASTE IS DANGEROUS TO HEALTH).
  CAUTION : THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0 PSI) A
  _______
            PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE DAMAGE.
  CAUTION : MAKE SURE THAT THE DRAIN VALVES REMAIN OPEN AFTER YOU DRAIN THE
  _______
            POTABLE WATER SYSTEM IF :
            - THE BLEED AIR SYSTEM IS OFF AND
            - THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
            THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
  NOTE : To Fill the potable water system, if electrical power is not available
  ____
         (Ref. TASK 12-15-38-613-002).
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                         Page 301
                                                                        Feb 01/10
                                                 
 UZB                                             
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-15-38-861-050
Subtask 12-15-38-865-053
  -------------------------------------------------------------------------------
  PANEL DESIGNATION                                               IDENT. LOCATION
  -------------------------------------------------------------------------------
  2000VU WATER SYSTEM-QANT-IND                                     1MA      B01
  2001VU WATER-SYS-DRAIN                                           1MP      B05
Subtask 12-15-38-618-050
        (1) Obey the cold weather maintenance procedure (Ref. TASK 12-31-38-660-
            001).
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                          Page 302
                                                                         Feb 01/10
                                                 
 UZB                                             
     Subtask 12-15-38-010-050
D. Get Access
(3) Open the POTABLE WATER FILL AND DRAIN port on the service panel.
     4. Procedure
        _________
Subtask 12-15-38-613-054
           (1) During the potable water servicing, you can also add chlorine to the
               potable water (Ref. SIL 38-040).
           (2) You can use an in-line water filter cartridge to filter the potable
               water supplied to the A/C (Ref. SIL 38-041).
Subtask 12-15-38-613-050
R    -------------------------------------------------------------------------------
R    | CAUTION : THE OVERFLOW VALVE OPEN LIGHT 6MP ON THE SERVICE PANEL 2023VU   |
R    |           MUST BE ON WHEN THE OVERFLOW VALVE 8MP IS OPEND.                  |
R    -------------------------------------------------------------------------------
               NOTE : If the indication system does not operate and electrical power
               ____
                      is necessary on aircraft, you can open the CB 1MA (water
                      system quantity indicator) (Ref. TASK 12-15-38-613-002).
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                            Page 303
                                                                           May 01/10
                                                   
    UZB                                            
                      Potable Water Service-Panel 2023VU
                       Figure 301/TASK 12-15-38-991-001
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
           (2) Connect the fill hose of the CART - SERVICING, WATER, POTABLE to the
               POTABLE WATER FILL AND DRAIN port.
           (4) If the OVERFLOW VALVE OPEN light 6MP does not come on:
               - Examine the position of the overflow valve 8MP.
               CAUTION : THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0
               _______
                         PSI) A PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE
                         DAMAGE.
R    -------------------------------------------------------------------------------
R    | CAUTION : THE OVERFLOW VALVE OPEN LIGHT 6MP ON THE SERVICE PANEL 2023VU   |
R    |           MUST BE OFF WHEN THE OVERFLOW VALVE 8MP IS CLOSED.                |
R    -------------------------------------------------------------------------------
                   NOTE : If there is too much water in the tank, water will flow
                   ____
                          from the TANK OVERFLOW port.
                   1
                   _   If the OVERFLOW VALVE OPEN light 6MP does not go off:
                       - Examine the overflow valve 8MP.
                   2
                   _   Stop the water service vehicle.
                   3
                   _   Disconnect the hose from the POTABLE WATER FILL AND DRAIN
                       port.
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                             Page 305
                                                                            May 01/10
                                                    
    UZB                                             
                 4
                 _   Clean and dry the service panel and the adjacent area.
                 5
                 _   Visually examine the connections for leaks. Leaks are not
                     permitted.
                 6
                 _   Put the cap on the POTABLE WATER FILL AND DRAIN port.
   5. Close-up
      ________
Subtask 12-15-38-410-050
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
             NOTE : Make sure that the latches are correctly locked and that the
             ____
                    door makes a continuous surface with the skin of the aircraft.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
Subtask 12-15-38-862-050
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                           Page 306
                                                                          May 01/10
R                                                 
  UZB                                             
  TASK 12-15-38-613-002
Fill the Potable Water Tank System (Aircraft Electrical Power not Available)
  CAUTION : THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0 PSI) A
  _______
            PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE DAMAGE.
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-15-38-618-051
        (1) Obey the cold weather maintenance procedure (Ref. TASK 12-31-38-660-
            001).
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                           Page 307
                                                                          Feb 01/10
                                                  
 UZB                                              
  Subtask 12-15-38-010-051
        (3) Open the POTABLE WATER FILL AND DRAIN port on the service panel
            2023VU.
  4. Procedure
     _________
Subtask 12-15-38-613-055
        (1) During the potable water servicing, you can also add chlorine to the
            potable water (Ref. SIL 38-040).
        (2) You can use an in-line water filter cartridge to filter the potable
            water supplied to the A/C (Ref. SIL 38-041).
Subtask 12-15-38-613-052
        CAUTION : THE WATER PRESSURE MUST NOT BE MORE THAN 3.45 BARS (50.0 PSI) A
        _______
                  PRESSURE MORE THAN 3.45 BARS (50.0 PSI) CAN CAUSE DAMAGE.
        (1) Connect the fill hose of the CART - SERVICING, WATER, POTABLE to the
            POTABLE WATER FILL AND DRAIN port.
        (4) Operate the water service vehicle and fill the potable water tank
            until water comes from the TANK OVERFLOW port.
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                          Page 308
                                                                         Feb 01/10
                                                
 UZB                                            
                      Potable water Service-Panel 2023VU
                       Figure 302/TASK 12-15-38-991-002
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                   Page 309
                                                                  Feb 01/10
                                              
 UZB                                          
         (5) Stop the water service vehicle.
         (6) Push in and then turn the FILL AND DRAIN handle to the NORMAL
             position.
         (7) Disconnect the hose of the water service vehicle from the fill and
             drain port.
(9) Clean and dry the overflow port and the adjacent area.
(10) Visually examine the connections for leaks. Leaks are not permitted.
(11) Close the fill and drain port on the service panel.
  5. Close-up
     ________
Subtask 12-15-38-410-051
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
             NOTE : Make sure that the latches are correctly locked and that the
             ____
                    door makes a continuous surface with the skin of the aircraft.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-15-38
                                                     
                                                                          Page 310
                                                                         Feb 01/10
                                                 
 UZB                                             
                       LAVATORY - DESCRIPTION AND OPERATION
                       ____________________________________
  1. _______
     General
     This section gives the instructions for the servicing of the toilet system.
  2. ___________
     Description
     To drain flush and fill the toilet system (Ref. TASK 12-16-38-613-001).
  
  EFF :
  
             ALL                                      12-16-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                           LAVATORY ARTICLE - SERVICING
                           ____________________________
TASK 12-16-25-613-001
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
No specific 1 FUNNEL
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-16-25
                                                     
                                                                           Page 301
                                                                          Feb 01/10
                                                  
 UZB                                              
  3. __________
     Job Set-up
Subtask 12-16-25-861-050
  4. Procedure
     _________
     CAUTION : DO NOT USE INDUSTRIAL HAND CLEANERS, NATURAL SOAPS AND CLEANING
     _______
               AGENTS THAT CONTAIN ABRASIVES, SOLVENTS OR A LARGE PROPORTION OF
               DISINFECTANT.
               THESE MATERIALS CAN CAUSE THE PUMP MECHANISM TO WEAR MORE QUICKLY.
Subtask 12-16-25-613-050
            (a) Turn the pump assembly (1) counter-clockwise with your hand and
                remove it from from the soap outlet (2).
(b) Use a FUNNEL and fill the bottle with weak liquid soap.
            (c) Install the pump assembly (1) in the soap outlet (2) and tighten
                it with your hand.
            (d) Operate the pump assembly (1) several times until soap comes out
                of the soap outlet (2).
            (f) Make sure that the work area is clean and clear of tool(s) and
                other items.
  
  EFF :
  
             ALL                                      12-16-25
                                                     
                                                                           Page 302
                                                                          Feb 01/10
                                                 
 UZB                                             
                                Soap Dispenser
                       Figure 301/TASK 12-16-25-991-001
  
  EFF :
  
             ALL                                      12-16-25
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
  5. Close-up
     ________
Subtask 12-16-25-862-050
  
  EFF :
  
             ALL                                      12-16-25
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                                
 UZB                                            
                          TOILET SANITARY FLUID - SERVICING
                          _________________________________
TASK 12-16-38-613-001
  WARNING : AFTER YOU DO WORK ON THE TOILET WASTE SYSTEM, DO NOT DO SERVICING OF
  _______
            THE POTABLE WATER SYSTEM. THIS WILL PREVENT CONTAMINATION OF THE
            POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-16-38
                                                     
                                                                           Page 301
                                                                          Feb 01/10
                                                  
 UZB                                              
     C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-16-38-861-050
Subtask 12-16-38-680-051
     B. You must drain the toilet waste tanks when the outside air temperature is
        as shown in the cold weather maintenance - procedure (Ref. TASK 12-31-38-
        660-001).
Subtask 12-16-38-010-050
C. Get Access
  4. Procedure
     _________
Subtask 12-16-38-680-050
        CAUTION : MAKE SURE THAT THE VACUUM PRESSURE IS NOT MORE THAN 6 PSI (0,4
        _______
                  BAR) MAXIMUM, IF YOU USE A VACUUM OPERATED TOILET SERVICE
                  VEHICLE. A HIGHER VACUUM PRESSURE CAN CAUSE DAMAGE TO THE
                  VACUUM TOILET SYSTEM.
  
  EFF :
  
             ALL                                      12-16-38
                                                     
                                                                          Page 302
                                                                         Feb 01/10
                                                 
 UZB                                             
                           Service Panel - Location
                       Figure 301/TASK 12-16-38-991-001
  
  EFF :
  
             ALL                                      12-16-38
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
           (1) Open the cap of the toilet drain connection and the fill and rinse
               connection.
           (4) Move the drain valve control-handle 3341MM from the CLOSE to the OPEN
               position.
Subtask 12-16-38-170-050
           (1) Connect the flush/fill hose (1-inch diameter) of the toilet service
               vehicle to the fill and rinse connection.
R          (3) Flush the waste tank with a maximum of 57 l (15.0576 USgal) of water
R              with a maximum pressure of 3.45 bar (50.0380 psi).
R              NOTE : You can see the pressure 3.45 bar on the toilet service panel.
               ____
R (4) Touch the drain hose and make sure that the fluid is fully drained.
R (6) Push the drain valve control-handle 3341M to the CLOSE position.
  
  EFF :
  
             ALL                                      12-16-38
                                                     
                                                                            Page 304
                                                                           Aug 01/10
                                                    
    UZB                                             
  Subtask 12-16-38-613-051
        WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
        _______
                  MATERIAL.
                  THIS MATERIAL IS DANGEROUS.
        (1) Use the toilet service vehicle and fill the waste tank with 10 l
            (2.64 USgal) of disinfectant solution.
        (4) Make sure there are no leaks from the waste drain connection, leaks
            are not permitted.
            NOTE : The inner flap (1) will close and lock automatically when you
            ____
                   close the drain cap (2).
        (6) Disconnect the fill and rinse hose and let the connection drain
            completely.
        (8) Clean and dry the service panel area with a lint free cloth
            MISCELLANEOUS (Material No. 19-003).
  
  EFF :
  
             ALL                                      12-16-38
                                                     
                                                                           Page 305
                                                                          Feb 01/10
                                                
 UZB                                            
  5. Close-up
     ________
Subtask 12-16-38-410-051
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-16-38-862-050
Subtask 12-16-38-942-051
        (2) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-16-38
                                                     
                                                                         Page 306
                                                                        Feb 01/10
                                                 
 UZB                                             
                   RAIN REPELLENT - DESCRIPTION AND OPERATION
                   __________________________________________
  1. _______
     General
     This section provides the procedures related to the Rain Repellent
     servicing.
  
  EFF :
  
             ALL                                      12-17-00
                                                     
                                                                             Page 1
                                                                          Feb 01/10
                                                
 UZB                                            
                          ICE AND RAIN PROTECTION - SERVICING
                          ___________________________________
TASK 12-17-30-200-001
  NOTE : If there is leakage of FORALKYL 2211, you can smell a pine odor.
  ____
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-17-30-010-050
A. Get Access
(1) In the cockpit open the access door to the rain repellent fluid can.
  4. Procedure
     _________
Subtask 12-17-30-210-050
            (a) On the pressure indicator, make sure that the pointer points to
                the green area (if the pointer points to the yellow area, replace
                the can) (Ref. TASK 30-45-00-600-001).
  
  EFF :
  
             ALL                                      12-17-30
                                                     
                                                                           Page 301
                                                                          Feb 01/10
                                                  
 UZB                                              
                           Rain-Repellent Fluid Gage
                       Figure 301/TASK 12-17-30-991-001
  
  EFF :
  
             ALL                                      12-17-30
                                                     
                                                                   Page 302
                                                                  Feb 01/10
                                              
 UZB                                          
            (b) On the quantity indicator, make sure that there is sufficient
                rain-repellent fluid (if you see the surface of the fluid,
                replace the can) (Ref. TASK 30-45-00-600-001).
  5. Close-up
     ________
Subtask 12-17-30-410-050
A. Close Access
(1) Close the access door to the rain repellent fluid can.
  
  EFF :
  
             ALL                                      12-17-30
                                                     
                                                                         Page 303
                                                                        Feb 01/10
                                                
 UZB                                            
                  SCHEDULED SERVICING - DESCRIPTION AND OPERATION
                  _______________________________________________
  1. _______
     General
     This section provides instructions related to the servicing operations, for
     which a frequency is specified.
     The different operations are classified as follows:
     - CLEANING (Ref. ATA 12-21),
     - LUBRICATION (Ref. ATA 12-22),
     - DRAINAGE (Ref. ATA 12-24),
     - USE OF MANUAL (MAGNETIC) FUEL QUANTITY INDICATORS (Ref. ATA 12-28).
  
  EFF :
  
             ALL                                      12-20-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                       CLEANING - DESCRIPTION AND OPERATION
                       ____________________________________
  1. _______
     General
     This section covers the procedures to be applied for the aircraft external
     and internal cleaning.
  
  EFF :
  
             ALL                                      12-21-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                              EXTERNAL CLEANING - SERVICING
                              _____________________________
TASK 12-21-11-615-002
External Cleaning
R    WARNING : DO NOT GO ON WET AIRCRAFT. YOU CAN SLIP, WHICH CAN CAUSE YOU INJURY.
     _______
R    WARNING : BEFORE YOU START WORK, YOU MUST PUT ON A SAFETY HARNESS AND ATTACH IT
     _______
R              TO THE ACCESS PLATFORM. WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS
R              CAN KILL YOU OR CAUSE YOU INJURY.
R    WARNING : BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL
     _______
R              MANUFACTURERS INSTRUCTIONS AND THE LOCAL REGULATIONS. MAKE SURE THAT
R              THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. DO NOT BREATHE THE
R              FUMES. DO NOT USE THESE MATERIALS NEAR A FLAME, SPARKS OR SOURCES OF
R              HEAT. USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES. IF YOU GET ONE OF
R              THESE MATERIALS:
R              - ON YOUR SKIN OR IN YOUR EYES, FLUSH IT AWAY WITH A FLOW OF CLEAN
R              WATER.
R              - IN YOUR MOUTH, GET IMMEDIATE MEDICAL AID.
R              IN GENERAL, THESE MATERIALS ARE FLAMMABLE, POISONOUS AND SKIN
R              IRRITANTS.
     1. __________________
        Reason for the Job
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 301
                                                                           Nov 01/10
                                                   
    UZB                                            
R         NOTE : This task can contribute to fuel savings.
          ____
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                                 Page 302
                                                                                Nov 01/10
                                                       
    UZB                                                
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 303
                                                                           Feb 01/11
                                                   
    UZB                                            
R    3. __________
        Job Set-up
R Subtask 12-21-11-941-058
R          (1) If you can see snow or signs of ice on the aircraft, do the de-icing
R              of the aircraft (Ref. TASK 12-31-12-660-002).
R              Washing is not permitted at temperatures lower than or equal to 3
R              deg.C (37.40 deg.F).
R              If possible, do not wash the aircraft in direct sunlight and/or wind
R              because the cleaning agent will dry too quickly and leave marks.
R              At temperatures above 25 deg.C (77.00 deg.F):
R              - First, spray water on the surface to be cleaned, to decrease the
R                temperature of the aircraft skin before you apply the cleaning
R                agent,
R              - Wash small areas at a time so that the cleaning agent does not dry
R                before rinsing.
R Subtask 12-21-11-941-059
R B. General
R              (a) We recommend that you use water that has these qualities:
R                  - pH between 5 and 8.5,
R                  - Chloride level less than 100 ppm.
R          (2) The persons that do the cleaning must put on BOOT - RUBBER, GLOVES -
R              RUBBER, GOGGLES - PROTECTIVE and OVERALL WITH HOOD - WATERPROOF.
R Subtask 12-21-11-860-057
R          WARNING : MAKE SURE THE SAFETY DEVICES AND WARNING NOTICES ARE IN
           _______
R                    POSITION BEFORE YOU START THE TASK. MOVEMENT OF FLIGHT CONTROL
R                    SURFACES AND THE RELATED CONTROL LEVERS CAN:
R                    - KILL OR CAUSE INJURY TO PERSONS
R                    - CAUSE DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                              Page 304
                                                                             Nov 01/10
                                                     
    UZB                                              
           (1) Tow the aircraft to the cleaning area (Ref. TASK 09-10-00-584-002) or
               (Ref. TASK 09-10-00-584-006).
           (4) Make sure that the safety devices and warning notices are in position
               before you start the task.
           (6) Make sure that the slats, flaps, spoilers, ailerons and thrust
               reversers are retracted.
           (7) On the panel 25VU, push the DITCHING pushbutton switch (the ON legend
               comes on).
R                  1
                   _   Use TAPE - ADHESIVE only in the specified areas.
R                  2
                   _   Use TAPE - ADHESIVE that:
                       - is water resistant,
                       - does not leave adhesive marks on the aircraft skin,
                       - has a color that is different to the color of the area on
                         the aircraft (easy to see).
(b) Make sure that the engines, the APU and the probes are cool.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                             Page 305
                                                                            Feb 01/11
                                                    
    UZB                                             
           (c) Protection equipment
               1
               _   Install the aircraft protection equipment (Ref. TASK 10-11-00-
                   555-013).
               2
               _   AOA sensors
                   (Ref. Fig. 301/TASK 12-21-11-991-002)
                   After the installation of the protective equipment on the 3
                   AOA sensors:
                   - put a FILM - POLYETHYLENE (dimensions: 300 mm (11.8110 in.)
                     x 300 mm (11.8110 in.)) on each AOA area,
R                  - seal it at the top and on the sides with TAPE - ADHESIVE.
R                    Do not seal the FILM - POLYETHYLENE at the bottom edge
                     (water drain).
                   - Record the locations where you put the adhesive tape.
               3
               _   Engine air intakes and APU
R                  You can use TAPE - ADHESIVE to get better sealing on the
                   engine air intakes and on the APU.
                   - Record the locations where you put the adhesive tape.
           (d) Install protection on all the wheel tires and brake assemblies
R              with FILM - POLYETHYLENE.
R              You can use TAPE - ADHESIVE to get better sealing.
               - Record the locations where you put the adhesive tape.
R          (e) Close these openings with FILM - POLYETHYLENE sealed with TAPE -
               ADHESIVE:
               - Air inlets and outlets,
               - Wing NACA intakes 550AB and 650AB,
R              - Wing fuel tank overpressure protectors on access panels 550CB
R                and 650CB.
                 Record the locations where you put the adhesive tape.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                         Page 306
                                                                        Feb 01/11
                                                
    UZB                                         
R                               AOA Protection
                       Figure 301/TASK 12-21-11-991-002
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                   Page 307
                                                                  Feb 01/11
                                              
    UZB                                       
R          (10) Make sure that all the aircraft openings are closed:
R               - sliding windows,
R               - passenger/crew doors,
R               - landing gear doors,
R               - cargo compartment doors,
R               - service panels.
R Subtask 12-21-11-941-060
R D. Job Set-up
R          (2) Prepare the CLEANING EQUIPMENT HEIGHT 12M (40FT) - MOBILE and the
R              cleaning solution with CLEANING AGENTS (Material No. 11-001).
R              Mix the cleaning agent with water as recommended in the material
R              manufacturers instructions.
R              For the cleaning of very dirty areas, increase the concentration but
R              obey the manufacturers instructions.
R              The cleaning solution concentration must not be more than the maximum
R              concentration specified in the manufacturers instructions.
R          (3) Set the temperature of the cleaning solution and the rinsing water to
R              not more than 50 deg.C (122.00 deg.F).
R    4. Procedure
        _________
R Subtask 12-21-11-615-071
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 308
                                                                           Nov 01/10
                                                    
    UZB                                             
               - Apply the cleaning solution with a sponge or spray equipment and
                 rub at the same time.
               - Let the cleaning solution soak but do not let it dry.
               - Rinse the zones with water in the sequence that you applied the
                 cleaning solution.
                 Never let the cleaning solution dry on the surface of the aircraft
R                before rinsing.
               NOTE : If the weather is very hot, clean small areas so that the
               ____
                      cleaning solution does not become dry on the external skin.
               (a) Windows
                   Never rub the fuselage windows, cockpit windows or windshield
                   with a SPONGE. Refer to the procedure given in the paragraph:
                   Cleaning of the Windows.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 309
                                                                           Feb 01/11
                                                   
    UZB                                            
           (b) Hold the spray gun at approximately 1 m (3.28 ft.) maximum from
               the surface and at angle of 45 degrees to the surface (never at
               90 degrees).
           (c) Move the spray head above the surface at maximum speed of
               approximately 100 mm/second but do not stay at one spot for more
               than 5 seconds.
               1
               _   Do not use high pressure to clean:
                   - mechanical parts that move: swivel bearings, bearings,
                     hinges, actuators and related seals, etc.,
                   - seals: seals of doors, cabin windows, panels, mechanical
                     items, etc.,
                   - electrical items such as harnesses, sensors, connectors,
                     etc...,
                   - antennas,
                   - air inlets,
                   - PR sealant and other sealing products,
                   - windows,
                   - landing gear bays,
                   - all the items with protection (air intake, engine exhaust
                     nozzles, APU assembly, static ports, pitot probes, AOA
                     sensors, probes).
               2
               _   Limits
                   (Ref. Fig. 302/TASK 12-21-11-991-003, 303/TASK 12-21-11-991-
                   004, 304/TASK 12-21-11-991-006, 305/TASK 12-21-11-991-005)
                   To prevent damage to the aircraft surface, obey these
                   operating conditions:
                   - Maximum impact pressure 1.5 psi (0.1034 bar) on radome,
                     belly fairing, rudder and elevators.
                   - Maximum impact pressure 10 psi (0.6894 bar) on all other
                     surfaces.
                     Example of SPRAYING EQUIPMENT settings for an impact
                     pressure of 1.5 psi (0.1034 bar):
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                         Page 310
                                                                        Feb 01/11
                                                 
    UZB                                          
R                        Gun Direction and Spray Shape
R                      Figure 302/TASK 12-21-11-991-003
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                   Page 311
                                                                  Nov 01/10
                                              
    UZB                                       
R                              Cleaning Methods
                       Figure 303/TASK 12-21-11-991-004
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                   Page 312
                                                                  Feb 01/11
                                              
    UZB                                       
                                INTENTIONALLY BLANK
  
  
  
                                                      12-21-11
                                                     
                                                                   Page 313
                                                                  Nov 01/10
                                             
 UZB                                         
R                           Specific Composite Parts
R                 Figure 304/TASK 12-21-11-991-006- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                    Page 314
                                                                   Nov 01/10
                                               
    UZB                                        
R                           Specific Composite Parts
R                 Figure 304/TASK 12-21-11-991-006- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                    Page 315
                                                                   Nov 01/10
                                               
    UZB                                        
R                    FWD Section Sensitive Parts (Typical)
                       Figure 305/TASK 12-21-11-991-005
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                   Page 316
                                                                  Feb 01/11
                                              
    UZB                                       
R    -------------------------------------------------------------------------------
R    |                                    |              |     Nozzle/Aircraft     |
R    |        Nozzle Pressure             | Maximum Flow |     minimum distance    |
R    -------------------------------------------------------------------------------
R    | For 100 bar (1450 psi) pressure    | 900 l/h      |   1000 mm (40 in.)      |
R    | For 50 bar (725 psi) pressure      | 900 l/h      |    500 mm (20 in.)      |
R    -------------------------------------------------------------------------------
R    -------------------------------------------------------------------------------
R    |                                    |              |     Nozzle/Aircraft     |
R    |        Nozzle Pressure             | Maximum Flow |     minimum distance    |
R    -------------------------------------------------------------------------------
R    | For 100 bar (1450 psi) pressure    | 900 l/h      |     250 mm (10 in.)     |
R    | For 50 bar (725 psi) pressure      | 900 l/h      |     50 mm (2 in.)       |
R    -------------------------------------------------------------------------------
R Subtask 12-21-11-615-072
R          CAUTION : DURING THE DE-ICING AND CLEANING PROCEDURES, MAKE SURE THAT THE
           _______
R                    HOT WATER OR HOT WATER/FLUID MIXTURES DO NOT CAUSE THE
R                    TEMPERATURE OF THE AIRCRAFT SKIN TO INCREASE TO MORE THAN
R                    +70⁰C.
R                    DO NOT USE STEAM. IF YOU DO NOT OBEY THESE PRECAUTIONS, YOU CAN
R                    CAUSE DAMAGE TO THE SURFACE OR TO PARTS.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 317
                                                                           Nov 01/10
                                                   
    UZB                                            
           CAUTION : USE HIGH-PRESSURE SPRAYING EQUIPMENT FOR SPECIFIED AREAS ONLY.
           _______
                     DO NOT USE HIGH-PRESSURE SPRAYING EQUIPMENT TO CLEAN THE AREAS
                     AROUND SENSORS, PROBES, ANTENNAS, ETC.
                     YOU MUST CLEAN THESE AREAS BY HAND.
                     MAKE SURE THAT YOU ADJUST THE HIGH-PRESSURE SPRAYING EQUIPMENT
                     TO, AND USE IT AT, THE SPECIFIED VALUES.
                     IF YOU DO NOT OBEY THESE PRECAUTIONS, YOU CAN CAUSE DAMAGE TO
                     THE SURFACE OR TO PARTS. HIGH-PRESSURE SPRAYING EQUIPMENT CAN
                     PUSH LIQUIDS INTO BEARINGS, JOINTS, PROBES, BRAKES, ELECTRICAL
                     CONNECTORS AND OTHER SEALED COMPONENTS.
                     LIQUIDS THAT GO INTO THESE AREAS CAN FREEZE DURING AIRCRAFT
                     FLIGHT, REMOVE LUBRICANTS, CAUSE CORROSION AND ELECTRICAL
                     FAULTS.
(1) Washing
               (a) Adjust the cleaning solution and the temperature controls to the
                   required settings.
(b) Hold the spray gun at the required distance, angle and speed.
               (c) You must always point the spray from the front to the rear of the
                   aircraft.
               (d) Airbus recommends that you apply the cleaning solution from the
                   bottom to the top of the aircraft in the sequence that follows
                   (this prevents scratches and runs):
                   - Lower forward fuselage from the leading edge of the wing to the
                     nose of the aircraft
                   - Lower aft fuselage from the wings to the leading edge of the
                     horizontal stabilizer
R                  - Wing upper surface between the fuselage and the engine pylon
                   - Upper fuselage from the nose to the horizontal stabilizer
                   - Lower center fuselage, engine nacelles and wing bottom skin
                   - Tail cone, rudder, bottom and top skins of the horizontal
                     stabilizer.
R - Wing top skin between the engine pylon and the wing tips.
(e) Clean the areas around the sensors, probes and antennas by hand.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 318
                                                                           Feb 01/11
                                                   
    UZB                                            
R          (2) Rinsing
R              CAUTION : MAKE SURE THAT YOU RINSE THE SURFACE SUFFICIENTLY TO REMOVE
               _______
R                        ALL THE CLEANING SOLUTION. CLEANING SOLUTION THAT STAYS ON
R                        THE AIRCRAFT SURFACE CAN CAUSE CORROSION.
R (a) Let the cleaning solution soak but do not let it dry.
R (b) Rinse the areas around the sensors, probes and antennas by hand.
R              (c) Adjust the water pressure and water flow to the required
R                  settings.
R              (d) Hold the water gun at the required distance and angle.
R                  You must always point the spray from the front to the rear of the
R                  aircraft.
R              (e) Rinse the aircraft from the top to the bottom to remove all the
R                  cleaning solution.
R                  Never stop rinsing before the rinsing water becomes perfectly
R                  clear.
R              (f) When you rinse the wings and the horizontal stabilizer, always
R                  complete this step with the bottom skin.
R              (g) If there is ice after the rinsing operation, do the de-icing and
R                  anti-icing of the aircraft (Ref. TASK 12-31-12-660-002).
R Subtask 12-21-11-615-073
R          (1) Never rub the fuselage windows, cockpit windows or windshield with a
R              sponge.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 319
                                                                           Nov 01/10
                                                   
    UZB                                            
R    Subtask 12-21-11-615-074
R          NOTE : There are many components in the landing gear bays that can easily
           ____
R                 become damaged. Thus Airbus recommends that you clean the landing
R                 gear bays only when you do heavy maintenance checks.
R          (2) Make sure that the access door openings in the landing gear bays are
R              correctly closed.
R (a) Make sure that each landing gear wheel/brake has protection.
R              (b) Use FILM - POLYETHYLENE and TAPE - ADHESIVE for protection of all
R                  rubber items, hinges and sliding assemblies.
R                  - Record the locations where you put the adhesive tape.
R                  WARNING : BE CAREFUL WHEN YOU USE MATERIAL NO. 11-001. OBEY THE
                   _______
R                            MATERIAL MANUFACTURERS INSTRUCTIONS.
R              (d) Apply CLEANING AGENTS (Material No. 11-001) with a SPONGE only on
R                  the applicable parts of the landing gear bays, and on the
R                  internal surfaces of the landing gear doors.
R              (e) In the zones where access is not easy, apply CLEANING AGENTS
R                  (Material No. 11-001) with a BRUSH - BRISTLED, SOFT, to remove
R                  all signs of grease and oil.
R              (f) Manually rinse the applicable parts of the landing gear bays to
R                  remove all the cleaning solution.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 320
                                                                           Nov 01/10
                                                   
    UZB                                            
R              (g) In the zones where access is not easy, use clean dry AIR SOURCE
R                  FILTERED, DRY that does not contain oil, to remove the remaining
R                  moisture.
R              WARNING : BE CAREFUL WHEN YOU USE THESE MATERIALS. OBEY THE MATERIAL
               _______
R                        MANUFACTURERS INSTRUCTIONS.
R              (a) In the landing gears bays, remove SPECIAL MATERIALS (Material No.
R                  05-005) from all:
R                  - threads of studs on clamp blocks,
R                  - washers,
R                  - nuts.
R              (c) In the landing gears bays, apply SPECIAL MATERIALS (Material No.
R                  05-005) on all:
R                  - threads of studs on clamp blocks,
R                  - washers,
R                  - nuts.
R (6) General Visual Inspection of the Landing gear and Landing gear Bays
R              (a) Do a general visual inspection of the MLG (legs and doors) zones
R                  730 and 740 and MLG bay zones 147 and 148.
R              (b) Do a general visual inspection of the NLG (leg and doors) zone
R                  710 and NLG bay zones 123 and 124.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 321
                                                                           Nov 01/10
                                                   
    UZB                                            
     Subtask 12-21-11-615-075
R (1) All the aircraft surfaces must be clean and without dirty runs.
               (b) Make a clean and dry MISCELLANEOUS (Material No. 19-003) moist
                   with CLEANING AGENTS (Material No. 11-026) or CLEANING AGENTS
                   (Material No. 11-002).
(c) Directly rub the dirty area with the moist cloth.
               (d) Let the cleaning agent soak but do not let it dry.
                   Rinse several times with water.
               (e) Wipe the area with a clean and dry MISCELLANEOUS (Material No.
                   19-003).
     5. Close-up
        ________
Subtask 12-21-11-860-058
           (2) Refer to the record of application of the adhesive tape to remove all
               FILM - POLYETHYLENE and TAPE - ADHESIVE.
           (4) Remove all signs of adhesive tape with a MISCELLANEOUS (Material No.
               19-003) soaked in CLEANING AGENTS (Material No. 11-002).
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                            Page 322
                                                                           Feb 01/11
                                                   
    UZB                                            
R          (5) Energize the aircraft electrical circuits
R              (Ref. TASK 24-41-00-861-002).
R                  1
                   _   On the DITCHING pushbutton switch, the white ON legend goes
R                      off.
R                  2
                   _   On the PRESS page of the lower ECAM DU:
R                      - the skin air-outlet valve (EXTRACT) is open
R                      - the skin air-inlet (INLET) valve is open
R                      - the outflow valve is fully open.
R Subtask 12-21-11-410-053
R          (1) Remove the tag from the Captains side stick or write in the log book
R              that the protection covers/devices are not installed.
R (2) Close the nose landing gear doors (Ref. TASK 32-22-00-410-001).
R (3) Close the main landing gear doors (Ref. TASK 32-12-00-410-001).
R          (4) Remove the ground support and the maintenance equipment, the special
R              and standard tools and all other items.
  
  EFF :
  
             ALL                                      12-21-11
                                                     
                                                                             Page 323
                                                                            Nov 01/10
                                                    
    UZB                                             
                             INTERNAL CLEANING - SERVICING
                             _____________________________
TASK 12-21-12-100-001
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-21-12-861-051
  4. Procedure
     _________
Subtask 12-21-12-160-062
        (1) Clean the instrument panel Display Unit (DU) (Ref. TASK 31-63-22-100-
            001).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 301
                                                                          Feb 01/10
                                                  
 UZB                                              
                             Cockpit Display Units
                       Figure 301/TASK 12-21-12-991-004
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 302
                                                                  Feb 01/10
                                              
 UZB                                          
                                ISIS Indicator
                       Figure 302/TASK 12-21-12-991-009
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
        (2) Clean the multipurpose control Display Unit(s) (MCDU) (Ref. TASK 22-
            82-12-100-001).
        (4) Make sure that the work area is clean and clear of tool(s) and other
            items.
  5. Close-up
     ________
Subtask 12-21-12-862-051
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 304
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-21-12-100-002
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                              Page 305
                                                                             May 01/11
                                                     
    UZB                                              
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-21-12-861-055
   4. Procedure
      _________
Subtask 12-21-12-160-071
         WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
         _______
                   AREA WHEN YOU USE SPECIAL MATERIALS.
                   IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH
                   OR IN YOUR EYES :
                   -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
                   MINUTES.
                   -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
                   DO NOT BREATHE THE FUMES FROM THE MATERIAL.
                   DO NOT SMOKE WHEN YOU USE THE MATERIAL.
                   DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF
                   HEAT.
                   THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE
                   AND SKIN IRRITANTS.
         (2) Clean the foam plastic (polyurethane) parts (Ref. TASK 25-13-00-100-
             001).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 306
                                                                         May 01/11
R                                                  
  UZB                                              
                       Linings and Furnishings - Cockpit
                       Figure 303/TASK 12-21-12-991-007
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 307
                                                                  Feb 01/10
                                              
 UZB                                          
           (3) Clean the overhead panel, the glareshild, the main instrument panel,
               the lateral consoles and the center pedestal:
               (b) Remove the loose dirt from the surface with a BRUSH - BRISTLED,
                   FIBER, SOFT and a VACUUM CLEANER.
                   (Ref. Fig. 304/TASK 12-21-12-991-001)
                   NOTE : Always make the cloth moist, not the part you will clean.
                   ____
               (e) Dry the surface with a clean lint-free cotton cloth MISCELLANEOUS
                   (Material No. 19-003).
               (a) Clean the seats as given in the of the seat manufacturer (Ref.
                   CMM 25-11-XX).
R
R          (6) Make sure that the work area is clean and clear of tool(s) and other
               items.
     5. Close-up
        ________
Subtask 12-21-12-862-055
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 308
                                                                           May 01/11
                                                   
    UZB                                            
                            Vacuum Cleaner Sockets
                       Figure 304/TASK 12-21-12-991-001
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 309
                                                                  Feb 01/10
                                              
 UZB                                          
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-21-12
                                                     
                                                                   Page 310
                                                                  May 01/11
                                             
 UZB                                         
  TASK 12-21-12-100-003
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 311
                                                                          Feb 01/10
                                                  
 UZB                                              
  3. __________
     Job Set-up
Subtask 12-21-12-861-056
  4. Procedure
     _________
     WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA
     _______
               WHEN YOU USE SPECIAL MATERIALS.
               IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR
               IN YOUR EYES :
               -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
               MINUTES.
               -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
               DO NOT BREATHE THE FUMES FROM THE MATERIAL.
               DO NOT SMOKE WHEN YOU USE THE MATERIAL.
               DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
               THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
               SKIN IRRITANTS.
     CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
     _______
               THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE
               PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
Subtask 12-21-12-160-072
(a) Soak the area of the stain with warm clean water.
            (b) Dry the area of the stain with a lint-free cotton cloth
                MISCELLANEOUS (Material No. 19-003).
            (c) Carefully apply CLEANING AGENTS (Material No. 11-018) to the area
                of the stain with a BRUSH - BRISTLED, FIBER, MEDIUM.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 312
                                                                          Feb 01/10
                                                
 UZB                                            
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-21-12
                                                     
                                                                   Page 313
                                                                  May 01/10
                                             
 UZB                                         
R               Component Location/Surface Finish Identification
                  Figure 305/TASK 12-21-12-991-005- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                    Page 314
                                                                   May 01/11
                                               
    UZB                                        
R               Component Location/Surface Finish Identification
                  Figure 305/TASK 12-21-12-991-005- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                    Page 315
                                                                   May 01/11
                                               
    UZB                                        
             (e) Use a BRUSH - BRISTLED, FIBER, MEDIUM to lift the carpet pile.
(b) Use a BRUSH - BRISTLED, FIBER, MEDIUM to lift the carpet pile.
Subtask 12-21-12-160-080
         (1) Remove the loose dirt from surface with a VACUUM CLEANER.
             (Ref. Fig. 304/TASK 12-21-12-991-001)
         (2) Apply CLEANING AGENTS (Material No. 11-017) to the surface with a
             BRUSH - BRISTLED, FIBER, STIFF.
         (4) Dry the surface with a lint-free cotton cloth MISCELLANEOUS (Material
             No. 19-003).
   5. Close-up
      ________
Subtask 12-21-12-862-056
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 316
                                                                         May 01/10
R                                                
  UZB                                            
   TASK 12-21-12-100-004
   1. __________________
      Reason for the Job
Self Explanatory
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 317
                                                                           May 01/10
R                                                  
  UZB                                              
      C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-21-12-861-057
   4. Procedure
      _________
Subtask 12-21-12-160-073
         WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
         _______
                   AREA WHEN YOU USE SPECIAL MATERIALS.
                   IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH
                   OR IN YOUR EYES :
                   -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
                   MINUTES.
                   -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
                   DO NOT BREATHE THE FUMES FROM THE MATERIAL.
                   DO NOT SMOKE WHEN YOU USE THE MATERIAL.
                   DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF
                   HEAT.
                   THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE
                   AND SKIN IRRITANTS.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 318
                                                                          May 01/10
R                                                 
  UZB                                             
                      Linings and Furnishings - Lavatory
                       Figure 306/TASK 12-21-12-991-006
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 319
                                                                  May 01/10
R                                             
  UZB                                         
         CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
         _______
                   THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE
                   SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
         NOTE : The water and equipment that you use for these procedures must be
         ____
                clean and contain no particles that could damage the surfaces.
             (b) Remove the loose dirt from the surface with a BRUSH - BRISTLED,
                 FIBER, SOFT.
             (c) Apply CLEANING AGENTS (Material No. 11-017) to the dirty surface
                 with a lint-free cotton cloth MISCELLANEOUS (Material No. 19-
                 003).
             (c) Apply CLEANING AGENTS (Material No. 11-017) to the surface with a
                 lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
             (d) Clean the surface with warm clean water and dry it with a CHAMOIS
                 LEATHER.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 320
                                                                           May 01/10
R                                                
  UZB                                            
             (e) If there is a stain:
                 1
                 _   Apply SPECIAL MATERIALS (Material No. 05-010) to the surface
                     with a cloth.
                 2
                 _   Clean the surface with warm clean water and dry it with a
                     CHAMOIS LEATHER.
             (b) Apply CLEANING AGENTS (Material No. 11-019) to the surface with a
                 lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
             (c) Clean the surface with warm clean water and dry it with a CHAMOIS
                 LEATHER.
   5. Close-up
      ________
Subtask 12-21-12-862-057
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 321
                                                                           May 01/10
R                                                 
  UZB                                             
   TASK 12-21-12-100-005
   1. __________________
      Reason for the Job
Self Explanatory
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                             Page 322
                                                                            May 01/10
R                                                  
  UZB                                              
   3. __________
      Job Set-up
Subtask 12-21-12-861-058
   4. Procedure
      _________
      WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA
      _______
                WHEN YOU USE SPECIAL MATERIALS.
                IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR
                IN YOUR EYES :
                -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
                MINUTES.
                -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
                DO NOT BREATHE THE FUMES FROM THE MATERIAL.
                DO NOT SMOKE WHEN YOU USE THE MATERIAL.
                DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
                THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
                SKIN IRRITANTS.
      CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
      _______
                THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE
                PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
Subtask 12-21-12-110-050
             (a) Soak the area of the stain with CLEANING AGENTS (Material No. 11-
                 018).
             (b) Dry the wet area with a lint-free cotton cloth MISCELLANEOUS
                 (Material No. 19-003).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 323
                                                                         May 01/10
R                                                
  UZB                                            
             (c) Dry clean the area of the stain with a solution of CLEANING
                 AGENTS (Material No. 11-018) and CLEANING AGENTS (Material No.
                 11-002) and a lint-free cotton cloth MISCELLANEOUS (Material No.
                 19-003).
             CAUTION : DO NOT USE SADDLE SOAP OR WAX POLISHES. LDO NOT USE
             _______
                       CLEANING FLUIDS WHICH ARE NOT SPECIFIED FOR LEATHER. LDO
                       NOT USE SPRAY POLISHES THAT CONTAIN SILICONE. LIF YOU DO
                       NOT OBEY THESE INSTRUCTIONS, YOU CAN CAUSE DAMAGE TO THE
                       LEATHER SURFACE.
             (b) Clean the leather surfaces of the seat with Pelle Leather Care
                 Products and a lint-free cotton cloth MISCELLANEOUS (Material No.
                 19-003).
Subtask 12-21-12-110-051
             (a) Soak the area of the stain with CLEANING AGENTS (Material No. 11-
                 018).
             (b) Dry the wet area with a lint-free cotton cloth MISCELLANEOUS
                 (Material No. 19-003).
             (c) Dry clean the area of the stain with a solution of CLEANING
                 AGENTS (Material No. 11-018) and CLEANING AGENTS (Material No.
                 11-002) and a lint-free cotton cloth MISCELLANEOUS (Material No.
                 19-003).
   5. Close-up
      ________
Subtask 12-21-12-862-058
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 324
                                                                         May 01/10
R                                                  
  UZB                                              
   TASK 12-21-12-100-006
   1. __________________
      Reason for the Job
Self Explanatory
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-21-12-861-059
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 325
                                                                           May 01/10
R                                                  
  UZB                                              
   4. Procedure
      _________
Subtask 12-21-12-160-074
         (1) Put CAP - PROTECTION on the electrical outlets so that they do not
             get wet.
             (a) Apply CLEANING AGENTS (Material No. 11-016) to the surface with a
                 lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
Subtask 12-21-12-160-081
         CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
         _______
                   THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE
                   SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
         (1) Apply SPECIAL MATERIALS (Material No. 05-025) to the area you will
             clean and wipe it with a lint-free cotton cloth MISCELLANEOUS
             (Material No. 19-003).
   5. Close-up
      ________
Subtask 12-21-12-862-059
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 326
                                                                           May 01/10
R                                                
  UZB                                            
  TASK 12-21-12-100-007
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                             Page 327
                                                                            Feb 01/10
                                                    
 UZB                                                
     C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-21-12-010-054
A. Get Access
        (1) Open the FWD and/or aft cargo-compartment door as required (Ref. TASK
            52-30-00-860-001).
Subtask 12-21-12-861-060
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 328
                                                                         Feb 01/10
                                                 
 UZB                                             
  4. Procedure
     _________
Subtask 12-21-12-160-075
        WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
        _______
                  AREA WHEN YOU USE SPECIAL MATERIALS.
                  IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH
                  OR IN YOUR EYES :
                  -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
                  MINUTES.
                  -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
                  DO NOT BREATHE THE FUMES FROM THE MATERIAL.
                  DO NOT SMOKE WHEN YOU USE THE MATERIAL.
                  DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF
                  HEAT.
                  THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE
                  AND SKIN IRRITANTS.
        (1) Remove loose materials with a SCRAPER - NON METALLIC or a BRUSH - NON
            METALLIC and a VACUUM CLEANER.
            (Ref. Fig. 304/TASK 12-21-12-991-001)
(2) Clean the area with CLEANING AGENTS (Material No. 11-001C).
            (b) Clean the area with the cleaning solution and a lint-free cotton
                cloth MISCELLANEOUS (Material No. 19-003).
            (c) Dry the area with a HOT AIR BLOWER OPERATING 40 DEG C (100 DEG
                F).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 329
                                                                          Feb 01/10
                                                 
 UZB                                             
  5. Close-up
     ________
Subtask 12-21-12-862-060
Subtask 12-21-12-410-054
B. Close Access
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 330
                                                                        Feb 01/10
                                                
 UZB                                            
  TASK 12-21-12-100-008
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-21-12-861-061
  4. Procedure
     _________
Subtask 12-21-12-160-076
        (1) Clean the cabin monitors and the display screens (Ref. TASK 23-36-00-
            100-001).
  5. Close-up
     ________
Subtask 12-21-12-862-061
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 331
                                                                          Feb 01/10
                                                  
 UZB                                              
  TASK 12-21-12-100-009
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 332
                                                                          Feb 01/10
                                                  
 UZB                                              
     C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-21-12-861-063
  4. Procedure
     _________
Subtask 12-21-12-160-077
A. General Cleaning
        NOTE : The water and equipment that you use for these procedures must be
        ____
               clean and contain no particles that could damage the surfaces.
        (1) Remove the loose dirt from the surface with a BRUSH - BRISTLED,
            FIBER, SOFT.
        (2) Apply a mild soap solution to the dirty surface with a lint-free
            cotton cloth MISCELLANEOUS (Material No. 19-003).
        (4) Wipe the surface dry with a lint-free cotton cloth MISCELLANEOUS
            (Material No. 19-003).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 333
                                                                          Feb 01/10
                                                 
 UZB                                             
        (5) If necessary, do Para B. steps (1) thru (3).
Subtask 12-21-12-160-078
B. Special Cleaning
        CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
        _______
                  THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE
                  SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
        (1) Apply an abrasive general household cleaning agent to the area of the
            stain(s) and wipe it with a moist lint-free cotton cloth
            MISCELLANEOUS (Material No. 19-003).
        (3) Wipe the surface dry with a lint-free cotton cloth MISCELLANEOUS
            (Material No. 19-003)
Subtask 12-21-12-160-079
        CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
        _______
                  THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE
                  SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 334
                                                                        Feb 01/10
                                                
 UZB                                            
                -   a felt pen,
                -   a lipstick,
                -   hair dye,
                -   hairspray,
                -   mascara,
                -   nail varnish,
                -   shoe polish.
        (1) Apply SPECIAL MATERIALS (Material No. 05-008) to the area of the
            stain(s) and wipe it with a lint-free cotton cloth MISCELLANEOUS
            (Material No. 19-003).
        (2) Apply SPECIAL MATERIALS (Material No. 05-009) to the area of the
            stain(s) and wipe it with a lint-free cotton cloth MISCELLANEOUS
            (Material No. 19-003).
  5. Close-up
     ________
Subtask 12-21-12-862-063
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 335
                                                                        Feb 01/10
                                                
 UZB                                            
  TASK 12-21-12-100-010
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 336
                                                                          Feb 01/10
                                                  
 UZB                                              
  3. __________
     Job Set-up
Subtask 12-21-12-860-051
  4. Procedure
     _________
Subtask 12-21-12-100-050
        WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK
        _______
                  AREA WHEN YOU USE SPECIAL MATERIALS.
                  IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH
                  OR IN YOUR EYES :
                  -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
                  MINUTES.
                  -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
                  DO NOT BREATHE THE FUMES FROM THE MATERIAL.
                  DO NOT SMOKE WHEN YOU USE THE MATERIAL.
                  DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF
                  HEAT.
                  THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE
                  AND SKIN IRRITANTS.
        CAUTION : USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM
        _______
                  THE MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE
                  SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
        NOTE : The water and equipment that you use for these procedures must be
        ____
               clean and contain no particles that could damage the surfaces.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 337
                                                                        Feb 01/10
                                                 
 UZB                                             
            (b) Remove the loose dirt from the surface with a BRUSH - BRISTLED,
                FIBER, SOFT and a VACUUM CLEANER.
            (d) Apply the solution to the dirty area or surface with a lint-free
                cotton cloth MISCELLANEOUS (Material No. 19-003).
            (f) Wipe the surface dry with a lint-free cotton cloth MISCELLANEOUS
                (Material No. 19-003).
Subtask 12-21-12-100-051
  5. Close-up
     ________
Subtask 12-21-12-860-052
A. Close Access
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 338
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-21-12-670-001
     WARNING : ONLY PERSONS NECESSARY FOR THIS PROCEDURE ARE PERMITTED IN THE
     _______
               AIRCRAFT DURING THE TASK.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                              Page 339
                                                                             Nov 01/10
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-21-12-861-052
Subtask 12-21-12-865-052
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      122VU ELEC/GALLEY/CNTOR                                         7MC      S28
      122VU ELEC/GALY & CAB/CTL                                       1XA      S26
Subtask 12-21-12-010-051
C. Get Access
R          (1) Put the WARNING NOTICE(S) in position to tell persons that the
               aircraft will be disinfected.
           (3) Open the FWD and aft cargo-compartment doors (Ref. TASK 52-30-00-860-
               003).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                             Page 340
                                                                            Nov 01/10
                                                    
    UZB                                             
     4. Procedure
        _________
        WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
        _______
                  MATERIAL.
                  THIS MATERIAL IS DANGEROUS.
Subtask 12-21-12-615-050
               (b) Clean and dry the cockpit equipment and furnishings with and a
                   lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
(2) Galleys:
               (b) Clean and dry the galleys and the galley equipment with clean
                   water and a lint-free cotton cloth MISCELLANEOUS (Material No.
                   19-003).
(3) Lavatories:
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 341
                                                                           May 01/10
                                                   
    UZB                                            
               (b) Clean and dry the toilet seats and the lavatory equipment with
                   clean water and a lint-free cotton cloth MISCELLANEOUS (Material
                   No. 19-003).
               (b) Clean and dry the cabin equipment with clean water and a
                   lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
               (b) Clean and dry the cargo compartments with clean water and a
                   lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
     5. Close-up
        ________
Subtask 12-21-12-865-053
        A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
           1XA, 7MC.
Subtask 12-21-12-410-051
B. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
           (2) Close the FWD and aft cargo-compartment doors (Ref. TASK 52-30-00-
               860-004).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 342
                                                                           May 01/10
                                                   
    UZB                                            
        (5) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
Subtask 12-21-12-862-052
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 343
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-21-12-670-002
     WARNING : ONLY PERSONS NECESSARY FOR THIS PROCEDURE ARE PERMITTED IN THE
     _______
               AIRCRAFT DURING THE TASK.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                              Page 344
                                                                             Nov 01/10
                                                     
    UZB                                              
     C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-21-12-861-053
Subtask 12-21-12-865-054
  -------------------------------------------------------------------------------
  PANEL DESIGNATION                                               IDENT. LOCATION
  -------------------------------------------------------------------------------
   122VU ELEC/GALLEY/CNTOR                                         7MC      S28
   122VU ELEC/GALY & CAB/CTL                                       1XA      S26
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 345
                                                                         Feb 01/10
                                                 
 UZB                                             
     Subtask 12-21-12-010-052
C. Get Access
R          (1) Put the WARNING NOTICE(S) in position to tell your personnel about
               the aircraft disinsectization.
     ------------------------------------------------------------------------------
     |                |                  Aircraft Model                           |
     | Compartment    |-----------------------------------------------------------|
     |                |      A318     |      A319    |      A320    |    A321     |
R    ------------------------------------------------------------------------------
     | Cockpit        | 9 m3          | 9 m3         | 9 m3         | 9 m3        |
     |                | (318 ft.3)    | (318 ft.3)   | (318 ft.3)   | (318 ft.3) |
     |----------------|---------------|--------------|--------------|-------------|
     | Cabin          | 80 m3         | 95 m3        | 110 m3       | 137 m3      |
     | (SEE NOTE)     | (3178 ft.3)   | (3355 ft.3) | (3885 ft.3) | (4838 ft.3) |
     |----------------|---------------|--------------|--------------|-------------|
     | Forward Cargo | 6.5 m3         | 10.7 m3      | 15.5 m3      | 25.4 m3     |
     |                | (230 ft.3)    | (378 ft.3)   | (547 ft.3)   | (897 ft.3) |
     |----------------|---------------|--------------|--------------|-------------|
     | Aft and Bulk   | 14.7 m3       | 21.2 m3      | 28 m3        | 32.6 m3     |
     | Cargo          | (519 ft.3)    | (749 ft.3)   | (989 ft.3)   | (1151 ft.3) |
     ------------------------------------------------------------------------------
           (4) If necessary remove the cushions and backrests of the cabin seats,
               the cockpit seats and the cabin attendants seats.
(5) Open all the stowages, the lavatory doors and the cockpit door.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                              Page 346
                                                                             Nov 01/10
                                                   
    UZB                                            
           (6) If the trap-door 231AF is installed:
                    WARNING : MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING
                    _______
                              NOTICES ARE IN POSITION WHEN THE TRAP DOOR (231AF) IS
                              OPEN.
                              INJURY CAN OCCUR IF PERSONS FALL THROUGH THE OPENING.
           (9) Open the forward and aft cargo-compartment doors (Ref. TASK 52-30-00-
               860-001).
     4. Procedure
        _________
Subtask 12-21-12-615-051
           WARNING : ONLY PERSONS NECESSARY FOR THIS PROCEDURE ARE PERMITTED IN THE
           _______
                     AIRCRAFT DURING THE TASK.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                             Page 347
                                                                            Nov 01/10
                                                     
    UZB                                              
        (1) Disinsect the cockpit and cabin area:
            (a) Apply
                - DISINFECTANTS (Material No. 14-004) or equivalent
                  or
                - DISINFECTANTS (Material No. 14-010) to the:
                - Floor area of the cockpit
                - Floor of the galleys and the lavatories
                - Floor adjacent to the galleys and lavatories
                - Cabin area.
            (b) Dry all wet surfaces and covers immediately with a lint-free
                cotton cloth MISCELLANEOUS (Material No. 19-003).
            (b) Close the forward and aft cargo-compartment doors (Ref. TASK 52-
                30-00-860-002).
        (6) Clean all the surfaces of the cockpit and the cabin:
            - The cockpit display units
              (Ref. TASK 12-21-12-100-001)
            - The cockpit equipment and furnishings
              (Ref. TASK 12-21-12-100-002)
            - The plastic surfaces and mirrors
              (Ref. TASK 12-21-12-100-004)
            - The light alloy and steel components
              (Ref. TASK 12-21-12-100-006)
            - The monitors and display screens in the cabin
              (Ref. TASK 12-21-12-100-008).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 348
                                                                        Feb 01/10
                                                
 UZB                                            
  5. Close-up
     ________
Subtask 12-21-12-865-055
     A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        1XA, 7MC.
Subtask 12-21-12-410-052
B. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
(2) Close the cockpit door (and the trapdoor 231AF if installed).
        (4) If removed, install the cushions and the backrests of the cabin
            seats, the cockpit seats and the cabin attendants seats.
        (8) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
Subtask 12-21-12-862-053
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 349
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-21-12-670-004
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 350
                                                                           Nov 01/10
                                                     
    UZB                                              
     C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 351
                                                                           Feb 01/10
                                                   
 UZB                                               
     3. __________
        Job Set-up
Subtask 12-21-12-941-051
A. Safety Precautions
           WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
           _______
                     MATERIAL.
                     THIS MATERIAL IS DANGEROUS.
(1) Make sure that there is sufficient airflow around the aircraft.
               (b) Put SAFETY BARRIER(S) in position to keep all persons out of the
                   work area.
               (d) If you do the task in a hangar which has under-floor areas, make
                   sure that they are sealed.
Subtask 12-21-12-010-056
B. Get Access
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                              Page 352
                                                                             Nov 01/10
                                                     
    UZB                                              
           (3) In the forward utility area of the cabin:
Subtask 12-21-12-480-050
R                  1
                   _   Put the LOCALLY MANUFACTURED - ADAPTER (1) in position in the
R                      cockpit window frame and attach it with the screws and the
                       wing nuts.
R
R                  2
                   _   Put the HOSE - RUBBER, min. dia 150 mm (6.0 in.), (2) through
R                      the opening in the center service channel.
R
R                  3
                   _   Put the upper end of the hose (2) in the highest position in
R                      the fuselage and attach it with cable ties.
R
R                  4
                   _   Connect the lower end of the hose (2) to the window adapter
R                      (1).
R                  1
                   _   Put the LOCALLY MANUFACTURED - ADAPTER (1) in position on the
R                      outflow valve 10HL and attach it with the hooks and the wing
                       nuts.
R
R                  2
                   _   Connect the SUPPLY LINE - GAS, PRESSURIZED of the
R                      DISINFECTANTS (Material No. 14-009) CHARGING EQUIPMENT - GAS,
R                      STANDARD to the adapter (1).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                             Page 353
                                                                            May 01/10
                                                    
    UZB                                             
                        Adapter Cockpit Sliding Window
                       Figure 307/TASK 12-21-12-991-008
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 354
                                                                  Feb 01/10
                                              
 UZB                                          
                           Adapter Air-Outflow Valve
                       Figure 308/TASK 12-21-12-991-002
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 355
                                                                  Feb 01/10
                                              
 UZB                                          
  Subtask 12-21-12-869-050
        (1) Make sure that the attitude of the aircraft is level or nose-up:
            - (Ref. TASK 08-21-00-200-001),
              or
            - (Ref. TASK 08-21-00-200-001),
              or
            - (Ref. TASK 08-21-00-200-001).
        (3) Close the forward and aft cargo-compartment doors (Ref. TASK 52-30-
            00-860-002).
        (4) Make sure that the avionics compartment access doors are closed
            (Ref. TASK 52-41-00-410-002).
  4. Procedure
     _________
Subtask 12-21-12-614-050
(1) Preparation
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 356
                                                                        Feb 01/10
                                                
 UZB                                            
               WARNING : BEFORE YOU START THE FUMIGATION PROCEDURE, MAKE SURE THAT
               _______
                         NO PERSONS ARE IN THE AIRCRAFT.
                         THE FUMIGATION GAS CAN CAUSE DEATH.
           (2) Operate the gas charging equipment to fill the pressurized area of
               the fuselage with DISINFECTANTS (Material No. 14-009)
               (carbon-dioxide).
               (a) Refer to the following table for the required quantity of CO2
                   gas.
                   ----------------------------------------------------------------
                   |                      |            Aircraft Model             |
                   |                      |---------------------------------------|
                   |                      |   A318 |    A319 |    A320 |    A321 |
R                  ----------------------------------------------------------------
                   | Quantity of          |         |         |         |         |
                   | CO2 gas              | 550Kg | 600kg | 750kg | 900kg |
                   | (carbon-dioxide)     |         |         |         |         |
                   ----------------------------------------------------------------
           (3) Stop the gas charging equipment when the DETECTOR-COMBUSTIBLE GAS
               shows that CO2 (carbon-dioxide) flows out of the outlet hose (2).
Subtask 12-21-12-010-061
           WARNING : STOP THE OPENING PROCEDURE IF THE RED WARNING LIGHT FLASHES.
           _______
                     RESIDUAL PRESSURE COULD CAUSE THE DOOR TO OPEN WITH A SUDDEN
                     FORCE AND INJURE PERSONS AND/OR DAMAGE THE AIRCRAFT.
(1) Make sure that there is sufficient airflow around the aircraft.
           (2) Open the forward and aft cargo-compartment doors (Ref. TASK 52-30-00-
               860-001).
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 357
                                                                           Nov 01/10
                                                    
    UZB                                             
         (3) Open all avionics compartment access-doors (Ref. TASK 52-41-00-010-
             002).
Subtask 12-21-12-080-050
         (1) Disconnect the gas charging equipment from the air-outflow valve
             adapter (1).
(2) Remove the outlet tube (2) and the adapters (1).
         (3) Remove the masking tape (Mat. No. 08-074) from the outlet of the:
             - Waste-water drain masts (Ref. AMM 30-71-00 P.Block 001)
               and
             - All fuselage drain valves
Subtask 12-21-12-861-062
Subtask 12-21-12-618-050
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                            Page 358
                                                                           Nov 01/10
R                                                
  UZB                                            
        (2) Do a check of the CO2 concentration.
            (b) Make sure that there is less than 5% Vol. CO2 concentration 0.2 m
                (0.65 ft.) above the cabin floor level.
  5. Close-up
     ________
Subtask 12-21-12-410-055
A. Close Access
        (1) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
(4) Close the cockpit sliding window 8DG2 (Ref. TASK 56-12-11-410-001).
            (b) Close the forward and aft cargo compartment doors (Ref. TASK 52-
                30-00-860-002).
(6) If you did the task in a hangar with under floor areas:
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                           Page 359
                                                                          Feb 01/10
                                                  
 UZB                                              
            (a) Carefully open the sealed areas of the hangar and do a check for
                remaining CO2 concentration with a DETECTOR-COMBUSTIBLE GAS.
            (b) Make sure that there is less than 5% Vol. CO2 concentration 0.2 m
                (0.65 ft.) above the floor of the under-floor areas of the
                hangar.
Subtask 12-21-12-862-062
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                         Page 360
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-21-12-670-006
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-21-12-941-052
A. Preparation
R          (1) Put a WARNING NOTICE(S) in position in the cockpit to tell the flight
               crew that:
               - the procedure to apply insecticides in compartments that have smoke
                 detectors is in progress.
               - smoke warning(s) caused from the insecticide agent can occur.
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                              Page 361
                                                                             Nov 01/10
                                                     
    UZB                                              
  4. Procedure
     _________
Subtask 12-21-12-670-051
Subtask 12-21-12-210-051
B. Visual Inspection
Subtask 12-21-12-860-053
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                          Page 362
                                                                         Feb 01/10
                                                
 UZB                                            
                - AIR COND/AFT CARGO/VENT/CTL & MONG (31HN)
Subtask 12-21-12-710-051
D. Test.
  5. Close-up
     ________
Subtask 12-21-12-942-054
A. Close Access
  
  EFF :
  
             ALL                                      12-21-12
                                                     
                                                                   Page 363
                                                                  Feb 01/10
                                                
 UZB                                            
                             DUST REMOVAL - CLEANING/PAINTING
                             ________________________________
TASK 12-21-13-100-001
     1. __________________
        Reason for the Job
        To remove the dust contamination from the avionics compartment and from the
        cockpit (panels 10VU and 13VU).
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 701
                                                                           Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
R
     21-26-34-000-001          Removal of the Avionics Equipment Ventilation
                               Computer (AEVC) (10HQ)
     21-26-34-400-001          Installation of the Avionics Equipment Ventilation
                               Computer (AEVC) (10HQ)
     21-31-34-000-001          Removal of the Cabin Pressure Controller (11HL,12HL)
     21-31-34-400-001          Installation of the Cabin Pressure Controller
                               (11HL,12HL)
     21-43-34-000-002          Removal of the AFT Cargo Heat Controller (10HC)
     21-43-34-400-002          Installation of the AFT Cargo Heat Controller (10HC)
     21-61-34-000-002          Removal of the Air-Conditioning System Controller
                               (47HH, 57HH)
     21-61-34-400-002          Installation of the Air-Conditioning System
                               Controller (47HH, 57HH)
     22-66-34-000-002          Removal of the FAC (1CC1,1CC2)
     22-66-34-400-002          Installation of the FAC (1CC1,1CC2)
     22-81-12-000-001          Removal of the FCU (2CA)
     22-81-12-400-001          Installation of the FCU (2CA)
     22-83-34-000-001          Removal of the FMGC (1CA1,1CA2)
     22-83-34-400-001          Installation of the FMGC (1CA1,1CA2)
     23-11-33-000-001          Removal of the HF Transceiver (3RE1, 3RE2)
     23-11-33-400-001          Installation of the HF Transceiver (3RE1, 3RE2)
     23-12-33-000-001          Removal of the VHF Transceiver (1RC1, 1RC2, 1RC3)
     23-12-33-400-001          Installation of the VHF Transceiver (1RC1, 1RC2,
                               1RC3)
     23-24-34-000-001          Removal of the ACARS Management Unit (MU) (1RB)
     23-24-34-400-001          Installation of the ACARS Management Unit (MU) (1RB)
     23-32-34-000-001          Removal of the Announcement/Music Tape Reproducer
                               (10RX)
     23-32-34-400-001          Installation of the Announcement/Music Tape
                               Reproducer (10RX)
     23-33-31-000-001          Removal of the Passenger Entertainment System Main
                               Multiplexer (8MK)
     23-33-31-400-001          Installation of the Passenger Entertainment System
                               Main Multiplexer (8MK)
     23-34-34-000-001          Removal of the Digital Interface Unit (DIU) (190MH)
     23-34-34-400-001          Installation of the Digital Interface Unit (DIU)
                               (190MH)
     23-51-34-000-001          Removal of the Audio Management Unit (AMU) (1RN)
     23-51-34-400-001          Installation of the Audio Management Unit (AMU) (1RN)
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 702
                                                                           Feb 01/11
                                                   
    UZB                                            
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 703
                                                                           May 01/11
                                                   
    UZB                                            
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                         Page 704
                                                                        Feb 01/10
                                                
 UZB                                            
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-21-13-861-050
Subtask 12-21-13-941-050
B. Get Access
Subtask 12-21-13-020-051
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                             Page 705
                                                                            Nov 01/10
                                                    
    UZB                                             
             Location of Units in the Cockpit (Panels 10VU and 13VU)
                        Figure 701/TASK 12-21-13-991-001
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                        Page 706
                                                                       Nov 01/10
R                                              
  UZB                                          
           (2) On the glareshield 13VU:
               - Remove the FCU (2CA) (Ref. TASK 22-81-12-000-001).
Subtask 12-21-13-020-052
           (5) Remove the VHF transceivers 3 and 1 (1RC3, 1RC1) (Ref. TASK 23-12-33-
               000-001).
Subtask 12-21-13-020-053
           (7) Remove the ACARS Management Unit (MU) (1RB) (Ref. TASK 23-24-34-000-
               001), if installed.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 707
                                                                           Feb 01/11
                                                   
    UZB                                            
          Location of Shelves and Computers in the Avionics Compartment
                        Figure 702/TASK 12-21-13-991-002
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                        Page 708
                                                                       Feb 01/11
R                                              
  UZB                                          
     Subtask 12-21-13-020-054
Subtask 12-21-13-020-055
Subtask 12-21-13-020-056
           (3) Remove the DMC 1 and the DMC 3 (1WT1, 1WT3) (Ref. TASK 31-63-34-000-
               001).
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 709
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-21-13-020-057
Subtask 12-21-13-020-058
Subtask 12-21-13-020-059-A
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 710
                                                                           Feb 01/11
                                                   
    UZB                                            
           (3) Remove the Announce/Music reproducer (10RX) (Ref. TASK 23-32-34-000-
               001), if installed.
Subtask 12-21-13-020-060
           (1) Remove the ADIRU 1, the ADIRU 2 and the ADIRU 3 (1FP1, 1FP2, 1FP3)
               (Ref. TASK 34-12-34-000-001).
Subtask 12-21-13-020-061
           (1) Remove the GCU1 and the GCU2 (1XU1, 1XU2) (Ref. TASK 24-22-34-000-
               001).
(2) Remove the APU GCU (1XS) (Ref. TASK 24-23-34-000-001), if installed.
Subtask 12-21-13-020-062
           (1) Remove the FLSCU 1 and the FLSCU 2 (7QJ, 9QJ) (Ref. TASK 28-46-34-
               000-001).
Subtask 12-21-13-020-063
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 711
                                                                           Feb 01/11
                                                    
    UZB                                             
     Subtask 12-21-13-020-064
           (4) Remove the TIPS detection unit (2GV) (Ref. TASK 32-49-34-000-001), if
               installed.
R Subtask 12-21-13-020-065-A
R          (3) Remove the cabin pressure controller 1 (11HL) (Ref. TASK 21-31-34-
R              000-001).
R          (4) Remove the pack 1 temperature controller (47HH) (Ref. TASK 21-61-34-
R              000-002), if installed.
R Subtask 12-21-13-020-066-A
R          (1) Remove the pack 2 temperature controller (57HH) (Ref. TASK 21-61-34-
R              000-002), if installed.
R          (2) Remove the cabin pressure controller 2 (12HL) (Ref. TASK 21-31-34-
R              000-001).
R          (4) Remove the AFT cargo heat controller (10HC) (Ref. TASK 21-43-34-000-
R              002), if installed.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                            Page 712
                                                                           May 01/11
                                                   
    UZB                                            
R          (5) Remove the ILS Receiver 2 (2RT2) (Ref. TASK 34-36-31-000-001),
R              (Ref. TASK 34-36-31-000-001) or the Multi Mode Receiver 2 (40RT2)
R              (Ref. TASK 34-36-31-000-001), (Ref. TASK 34-36-31-000-001).
Subtask 12-21-13-020-067
           (1) Remove the Weather Radar transceivers 1 and 2 (1SQ1, 1SQ2) (Ref. TASK
               34-41-33-000-004), if installed.
Subtask 12-21-13-020-068
           (1) On the shelves 81VU, 82VU, 83VU, 84VU, 85VU, 86VU, 87VU, 88VU, 109VU,
               91VU, 92VU, 93VU, 94VU, 95VU, 96VU:
     4. Procedure
        _________
Subtask 12-21-13-160-050
        A. Cleaning of the Avionics Compartment and the Cockpit (Panels 10VU and
           13VU)
(a) the area where the units and computers were installed
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                             Page 713
                                                                            May 01/11
                                                    
    UZB                                             
   5. Close-up
      ________
Subtask 12-21-13-420-051
             (a) Install the display units (2WT1, 2WT2, 3WT1, 3WT2, 4WT1, 4WT2)
                 (Ref. TASK 31-63-22-400-001).
             (a) On the shelves 81VU, 82VU, 83VU, 84VU, 85VU, 86VU, 87VU, 88VU,
                 109VU, 91VU, 92VU, 93VU, 94VU, 95VU, 96VU:
                 - Install the rack assy.
Subtask 12-21-13-420-052
         (5) Install the VHF transceivers 3 and 1 (1RC3, 1RC1) (Ref. TASK 23-12-
             33-400-001).
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                           Page 714
                                                                          May 01/11
R                                                  
  UZB                                              
         (7) Install the ADF receiver 1 (2RP1) (Ref. TASK 34-53-31-400-002).
Subtask 12-21-13-420-053
         (7) Install the ACARS Management Unit (MU) (1RB) (Ref. TASK 23-24-34-400-
             001), if removed.
Subtask 12-21-13-420-054
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                           Page 715
                                                                          May 01/11
R                                                
  UZB                                            
   Subtask 12-21-13-420-055
Subtask 12-21-13-420-056
         (3) Install the DMC 1 and the DMC 3 (1WT1, 1WT3) (Ref. TASK 31-63-34-400-
             001).
Subtask 12-21-13-420-057
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                           Page 716
                                                                          May 01/11
R                                                
  UZB                                            
         (2) Install the FWC 2 (1WW2) (Ref. TASK 31-53-34-400-001).
Subtask 12-21-13-420-058
Subtask 12-21-13-420-059-A
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                           Page 717
                                                                          May 01/11
R                                                
  UZB                                            
         (3) Install the Announce/Music reproducer (10RX) (Ref. TASK 23-32-34-400-
             001), if removed.
Subtask 12-21-13-420-060
         (1) Install the ADIRU 1, the ADIRU 2 and the ADIRU 3 (1FP1, 1FP2, 1FP3)
             (Ref. TASK 34-12-34-400-001).
Subtask 12-21-13-420-061
         (1) Install the GCU1 and the GCU2 (1XU1, 1XU2) (Ref. TASK 24-22-34-400-
             001).
(2) Install the APU GCU (1XS) (Ref. TASK 24-23-34-400-001), if removed.
Subtask 12-21-13-420-062
         (1) Install the FLSCU 1 and the FLSCU 2 (7QJ, 9QJ) (Ref. TASK 28-46-34-
             400-001).
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                           Page 718
                                                                          May 01/11
R                                                
  UZB                                            
     Subtask 12-21-13-420-063
Subtask 12-21-13-420-064
           (4) Install the TIPS detection unit (2GV) (Ref. TASK 32-49-34-400-001),
               if removed.
R Subtask 12-21-13-420-065-A
R          (1) Install the ILS Receiver 1 (2RT1) (Ref. TASK 34-36-31-400-001) or the
R              Multi Mode Receiver 1 (40RT1) (Ref. TASK 34-36-31-400-001).
R          (3) Install the cabin pressure controller 1 (11HL) (Ref. TASK 21-31-34-
R              400-001).
R          (4) Install the pack 1 temperature controller (47HH) (Ref. TASK 21-61-34-
R              400-002), if removed.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                             Page 719
                                                                            May 01/11
                                                   
    UZB                                            
R    Subtask 12-21-13-420-066-A
R          (1) Install the pack 2 temperature controller (57HH) (Ref. TASK 21-61-34-
R              400-002), if removed.
R          (2) Install the cabin pressure controller 2 (12HL) (Ref. TASK 21-31-34-
R              400-001).
R          (4) Install the AFT cargo heat controller (10HC) (Ref. TASK 21-43-34-400-
R              002), if removed.
R          (5) Install the ILS Receiver 2 (2RT2) (Ref. TASK 34-36-31-400-001) or the
R              Multi Mode Receiver 2 (40RT2) (Ref. TASK 34-36-31-400-001).
Subtask 12-21-13-420-067
Subtask 12-21-13-942-050
T. Close Access
           (2) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                              Page 720
                                                                             May 01/11
                                                   
    UZB                                            
   Subtask 12-21-13-862-050
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                   Page 721
                                                                  May 01/11
R                                                
  UZB                                            
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-21-13
                                                     
                                                                   Page 722
                                                                  Nov 01/10
                                             
 UZB                                         
  TASK 12-21-13-100-002
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-21-13-010-051
A. Get Access
(1) Put an access platform in position at the access doors 812 and 822.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                         Page 723
                                                                        Feb 01/10
                                                  
 UZB                                              
  4. Procedure
     _________
Subtask 12-21-13-140-050
        NOTE : In the avionics compartment, use a vacuum cleaner and a soft brush
        ____
               to clean the equipments.
               Keep the vacuum cleaner out of the avionics compartment to prevent
               dust contamination.
Subtask 12-21-13-140-051
        NOTE : In the avionics compartment, use a vacuum cleaner and a soft brush
        ____
               to clean the equipments.
               Keep the vacuum cleaner out of the avionics compartment to prevent
               dust contamination.
(1) Clean the left and right external grids of the relay box 103VU.
Subtask 12-21-13-140-052
        NOTE : In the avionics compartment, use a vacuum cleaner and a soft brush
        ____
               to clean the equipments.
               Keep the vacuum cleaner out of the avionics compartment to prevent
               dust contamination.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                          Page 724
                                                                         Feb 01/10
                                                
 UZB                                            
                    Location of Units in Avionics Compartment
                        Figure 703/TASK 12-21-13-991-003
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                   Page 725
                                                                  Feb 01/10
                                               
 UZB                                           
  Subtask 12-21-13-140-053
        NOTE : In the avionics compartment, use a vacuum cleaner and a soft brush
        ____
               to clean the equipments.
               Keep the vacuum cleaner out of the avionics compartment to prevent
               dust contamination.
  5. Close-up
     ________
Subtask 12-21-13-410-051
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-21-13
                                                     
                                                                         Page 726
                                                                        Feb 01/10
                                                 
 UZB                                             
                      LUBRICATION - DESCRIPTION AND OPERATION
                      _______________________________________
  1. _______
     General
     The lubrication instructions define:
     - the specification of the lubricant to be used
     - the points to be lubricated
     - the special precautions to be observed.
        (1) The references of lubricants and greases are given in the list of
            materials required for aircraft servicing and maintenance (Ref. ATA
            20-31).
  
  EFF :
  
             ALL                                      12-22-00
                                                     
                                                                            Page 1
                                                                         Feb 01/10
                                                
 UZB                                            
     C. General Requirements
(1) Use only clean lubricants and tools for lubrication operations.
        (2) Before you start a lubrication operation, carefully clean the grease
            nipples lubricating-holes.
            You must do the lubrication immediately.
            Make sure that the grease nipples have balls and springs.
        (3) Make sure that the old grease comes out of the pressure relief valves
            and on each side of the spherical bearings (unless there is an
            indication of the quantity of grease to be used).
        (4) After lubrication, remove all unwanted grease. Wipe the grease nipple
            with a clean, lint-free cloth.
            Make sure that the balls and springs are in position.
     D. Lubrication Symbols
        (Ref. Fig. 001)
        The symbols used show the recommended lubrication method.
        Below each symbol, an index shows:
        - first term: the location of the lubrication point
        - second term : the lubricant to be used.
  
  EFF :
  
             ALL                                      12-22-00
                                                     
                                                                           Page 2
                                                                        Feb 01/10
                                                
 UZB                                            
                             Lubrication Symbols
                                 Figure 001
  
  EFF :
  
             ALL                                      12-22-00
                                                     
                                                                     Page 3
                                                                  Feb 01/10
                                             
 UZB                                         
                                   FLIGHT CONTROLS - SERVICING
                                   ___________________________
TASK 12-22-27-640-003
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
     _______
               GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
               BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
               HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
               MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
               USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
               AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
               AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
               DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
               YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
               YOUR AIRCRAFT).
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                             Page 301
                                                                            Nov 01/10
                                                       
    UZB                                                
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 302
                                                                           May 01/11
                                                   
    UZB                                            
     3. __________
        Job Set-up
Subtask 12-22-27-941-053
A. Safety Precautions
R          (2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to start
               the Auxiliary Power Unit (APU).
R          (3) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
               the Trimmable Horizontal Stabilizer (THS).
Subtask 12-22-27-865-054
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
      121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
      121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
Subtask 12-22-27-010-053
C. Get Access
           (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE below the access door
               312AR.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 303
                                                                           Nov 01/10
                                                     
    UZB                                              
R                Trimmable Horizontal Stabilizer (THS) Actuator.
                        Figure 301/TASK 12-22-27-991-003
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                    Page 304
                                                                   May 01/11
                                              
    UZB                                       
     4. Procedure
        _________
Subtask 12-22-27-640-052
R          WARNING : WHEN YOU DO A MAINTENANCE TASK THAT USES A GREASE GUN, OBEY THE
           _______
R                    MANUFACTURERS SAFETY AND HEALTH RECOMMENDATIONS.
R                    GREASE GUNS USE HIGH PRESSURE IN OPERATION. THIS CAN CAUSE
R                    INJURIES TO PERSONNEL OR DAMAGE TO EQUIPMENT.
           NOTE : When you do a maintenance task that uses common grease, refer to
           ____
                  the SIL (Ref. SIL 12-008).
R          (1) Clean the greaser and the THS actuator ball-screw nut with a clean
R              lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
           (2) Use a PIN - NON METALLIC and make sure that the vent hole of the
               ball-screw nut is clear.
R          (3) Use a GUN - GREASE and apply the new COMMON GREASE (Material No. 04-
R              004) or COMMON GREASE (Material No. 04-037) through the greaser of
R              the ball-screw nut. Apply the grease until it comes out through the
R              vent hole.
               NOTE : It is normal that some grease also comes out through the
               ____
                      top/bottom nut seals.
(4) Put a CONTAINER 1 L (1/4 USGAL) in position below the vent hole.
R          (5) Use a GUN - GREASE and apply more new COMMON GREASE (Material No. 04-
R              004) or COMMON GREASE (Material No. 04-037) through the greaser of
R              the ball-screw nut. Continue to apply grease until approximately 50
R              cm3 (3.05 in.3) of the grease comes out through the vent hole.
               NOTE : Grease can come out from the ball-screw nut vent hole or the
               ____
                      top/bottom nut seals. If grease leaks from a different
                      position, you must replace the THS Actuator (Ref. TASK 27-44-
                      51-000-001) (Ref. TASK 27-44-51-400-001).
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 305
                                                                           May 01/11
                                                   
    UZB                                            
           (6) Remove the GUN - GREASE and make sure that the ball in the greaser
               closes correctly after lubrication.
           (7) Clean the unwanted grease from the greaser and the ball-screw nut
R              with a lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
           (8) Make sure the travel range of the THS actuator ball-screw nut is
               clear.
Subtask 12-22-27-865-066
        B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
R    -------------------------------------------------------------------------------
R    PANEL DESIGNATION                                               IDENT. LOCATION
R    -------------------------------------------------------------------------------
R
R      49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2       B09
R     121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3       Q17
R     121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1       Q16
Subtask 12-22-27-865-067
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      121VU FLIGHT CONTROLS/ELAC2/NORM/SPLY                          15CE2     R20
Subtask 12-22-27-860-053
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                              Page 306
                                                                             May 01/11
                                                   
    UZB                                            
         (4) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
         (6) Pressurize the Green and the Yellow hydraulic systems (Ref. TASK 29-
             23-00-863-001) (Ref. TASK 29-24-00-863-001).
         (7) On the center pedestal, use the pitch-trim control wheel to operate
             the THS through one full cycle as follows:
             - slowly move the THS to the 13.5 degree UP stop
             - slowly move the THS to the 4 degree DN stop
             - slowly move the THS back to the 0 position.
         (8) Depressurize the Green and Yellow hydraulic systems (Ref. TASK 29-23-
             00-864-001) and (Ref. TASK 29-24-00-864-001).
         (9) Do the Electronic Instrument System (EIS) stop procedure (Ref. TASK
             31-60-00-860-002).
Subtask 12-22-27-865-068
   -------------------------------------------------------------------------------
   PANEL DESIGNATION                                               IDENT. LOCATION
   -------------------------------------------------------------------------------
     49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
    121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
    121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
Subtask 12-22-27-640-058
         (1) Lubricate the THS actuator ball-screw nut again as given in Paragraph
             4A.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 307
                                                                         May 01/11
R                                                 
  UZB                                             
     5. Close-up
        ________
Subtask 12-22-27-410-053
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-22-27-865-055
        B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
R
R    -------------------------------------------------------------------------------
R    PANEL DESIGNATION                                               IDENT. LOCATION
R    -------------------------------------------------------------------------------
R      49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
R     121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
R     121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
Subtask 12-22-27-942-053
C. Removal of Equipment
           (4) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 308
                                                                           May 01/11
                                                   
    UZB                                            
  TASK 12-22-27-640-004
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  _______
            - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
            - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
            - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
            INCORRECT INSTALLATION CAN CAUSE DAMAGE.
  CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
  _______
            GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
            BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
            HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
            MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
            USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
            AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
            AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
            DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
            YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
            YOUR AIRCRAFT).
  1. __________________
     Reason for the Job
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                         Page 309
                                                                        Feb 01/10
                                                
 UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                              Page 310
                                                                             May 01/11
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-22-27-941-054
A. Safety Precautions
Subtask 12-22-27-866-052
           (2) On panel 114VU, make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT.
               POSITION is installed on the flap/slat control lever.
           (3) Put a WARNING NOTICE(S) on the slat/flap control lever (panel 114VU)
               to tell persons not to operate the flap system.
           (4) Put the ACCESS PLATFORM 4M (13 FT) in position under the applicable
               flap track.
Subtask 12-22-27-865-056
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1                     6CV      B07
      121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2                     8CV      Q21
     4. Procedure
        _________
Subtask 12-22-27-640-053
A. Lubricate the Flap Track Carriage-Rollers and No.1 Track Lever Arm
R          WARNING : WHEN YOU DO A MAINTENANCE TASK THAT USES A GREASE GUN, OBEY THE
           _______
R                    MANUFACTURERS SAFETY AND HEALTH RECOMMENDATIONS.
R                    GREASE GUNS USE HIGH PRESSURE IN OPERATION. THIS CAN CAUSE
R                    INJURIES TO PERSONNEL OR DAMAGE TO EQUIPMENT.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 311
                                                                           May 01/11
                                                     
    UZB                                              
R          Flap Track Carriage Rollers and Drive Lever Arm - Lubrication Points
                       Figure 302/TASK 12-22-27-991-006- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                             Page 312
                                                                            May 01/11
                                                    
    UZB                                             
R          Flap Track Carriage Rollers and Drive Lever Arm - Lubrication Points
                       Figure 302/TASK 12-22-27-991-006- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                             Page 313
                                                                            May 01/11
                                                    
    UZB                                             
           CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING
           _______
                     EDGE:
                     - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
                     - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
                     - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
                     INCORRECT INSTALLATION CAN CAUSE DAMAGE.
           NOTE : When you do a maintenance task that uses grease, refer to the SIL
           ____
                  (Ref. SIL 12-008).
           NOTE : Make sure that the greaser ball of each greaser has sealed
           ____
                  correctly after lubrication.
R          (1) Clean the greasers of the flap track carriage-rollers with a clean
R              lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
R          (2) Use a GUN - GREASE filled with COMMON GREASE (Material No. 04-024) or
R              COMMON GREASE (Material No. 04-004) or COMMON GREASE (Material No.
R              04-037) to lubricate the flap track carriage-rollers. Lubricate all
               greasers until new grease comes out of the applicable roller.
R          (3) Remove the unwanted grease from around the greasers with a clean
R              lint-free cotton cloth MISCELLANEOUS (Material No. 19-003).
R          (4) Clean the greasers of the No.1 track lever arm with a clean lint-free
R              cotton cloth MISCELLANEOUS (Material No. 19-003).
R          (5) Use a GUN - GREASE filled with COMMON GREASE (Material No. 04-024) or
R              COMMON GREASE (Material No. 04-004) or COMMON GREASE (Material No.
R              04-037) to lubricate the No.1 track lever arm. Lubricate all greasers
R              until new grease comes out of the lever arm pivot.
           (6) Remove the unwanted grease from around the greasers of the No.1 track
R              lever arm with a clean lint-free cotton cloth MISCELLANEOUS (Material
               No. 19-003).
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 314
                                                                           May 01/11
                                                   
    UZB                                            
     5. Close-up
        ________
Subtask 12-22-27-865-057
        A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
R
R    -------------------------------------------------------------------------------
R    PANEL DESIGNATION                                               IDENT. LOCATION
R    -------------------------------------------------------------------------------
R      49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1                     6CV      B07
R     121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2                     8CV      Q21
Subtask 12-22-27-866-053
B. Aircraft Configuration
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-22-27-942-054
           (4) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 315
                                                                           May 01/11
                                                   
    UZB                                            
  TASK 12-22-27-640-005
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  CAUTION : BE CAREFUL WHEN YOU DO MAINTENANCE TASKS ON THE WING TRAILING EDGE:
  _______
            - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE RACEWAYS.
            - DO NOT CAUSE DAMAGE TO THE ELECTRICAL CABLE INSTALLATIONS.
            - MAKE SURE THAT THE ELECTRICAL CABLES ARE INSTALLED CORRECTLY.
            INCORRECT INSTALLATION CAN CAUSE DAMAGE.
  CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
  _______
            GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
            BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
            HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
            MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
            USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
            AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
            AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
            DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
            YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
            YOUR AIRCRAFT).
  1. __________________
     Reason for the Job
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                         Page 316
                                                                        Feb 01/10
                                                
 UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                              Page 317
                                                                             May 01/11
                                                     
    UZB                                              
   3. __________
      Job Set-up
Subtask 12-22-27-941-055
A. Safety Precautions
Subtask 12-22-27-866-054
         (2) On panel 114VU, make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT.
             POSITION is installed on the flap/slat control lever.
         (3) Put a WARNING NOTICE(S) on the flap/slat control lever (panel 114VU)
             to tell persons not to operate the flap system.
         (4) Put the ACCESS PLATFORM 4M (13 FT) in position under the applicable
             spoiler.
Subtask 12-22-27-865-058
   -------------------------------------------------------------------------------
   PANEL DESIGNATION                                               IDENT. LOCATION
   -------------------------------------------------------------------------------
     49VU FLIGHT CONTROLS/SEC1/NORM/SPLY                           21CE1     B08
     49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1                     6CV      B07
    105VU FLT CTL/SEC1/STBY SPLY                                   22CE      B01
    121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2                     8CV      Q21
    121VU FLIGHT CONTROLS/SEC3/SPLY                                21CE3     Q19
    121VU FLIGHT CONTROLS/SEC2/SPLY                                21CE2     Q18
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 318
                                                                         May 01/11
R                                                  
  UZB                                              
     4. Procedure
        _________
Subtask 12-22-27-640-054
           NOTE : When you do a maintenance task that uses common grease, refer to
           ____
                  the SIL (Ref. SIL 12-008).
R          (1) Clean the greasers with a clean lint-free cotton cloth MISCELLANEOUS
               (Material No. 19-003).
           (3) Remove the unwanted grease from the greasers and the spoiler
R              servo-control bearings with a clean lint-free cotton cloth
R              MISCELLANEOUS (Material No. 19-003).
           (4) Make sure that the greaser ball has seated correctly after
               lubrication.
     5. Close-up
        ________
Subtask 12-22-27-865-059
        A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
R
R    -------------------------------------------------------------------------------
R    PANEL DESIGNATION                                               IDENT. LOCATION
R    -------------------------------------------------------------------------------
R      49VU FLIGHT CONTROLS/SEC1/NORM/SPLY                           21CE1     B08
R      49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1                     6CV      B07
R     105VU FLT CTL/SEC1/STBY SPLY                                   22CE      B01
R     121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2                     8CV      Q21
R     121VU FLIGHT CONTROLS/SEC3/SPLY                                21CE3     Q19
R     121VU FLIGHT CONTROLS/SEC2/SPLY                                21CE2     Q18
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                             Page 319
                                                                            May 01/11
                                                   
    UZB                                            
R               Spoiler Servo Control Bearing - Lubrication Point
                        Figure 303/TASK 12-22-27-991-007
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                     Page 320
                                                                    May 01/11
                                              
    UZB                                       
   Subtask 12-22-27-866-055
B. Aircraft Configuration
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-22-27-942-055
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 321
                                                                         May 01/11
R                                                
  UZB                                            
   TASK 12-22-27-640-006
Lubrication of all Slat Track Rollers, Pinion Bearings, Pinions and Rack Teeth
   WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
   _______
             START A TASK ON OR NEAR:
             - THE FLIGHT CONTROLS
             - THE FLIGHT CONTROL SURFACES
             - THE LANDING GEAR AND THE RELATED DOORS
             - COMPONENTS THAT MOVE.
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
   _______
             GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
             BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
             HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
             MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
             USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
             AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
             AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
             DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
             YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
             YOUR AIRCRAFT).
   1. __________________
      Reason for the Job
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 322
                                                                         May 01/11
R                                                  
  UZB                                              
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 323
                                                                           May 01/11
                                                   
    UZB                                            
   3. __________
      Job Set-up
Subtask 12-22-27-941-056
A. Safety Precautions
Subtask 12-22-27-866-056
         (2) On panel 114VU, make sure that the LOCKING TOOL-FLAP SLAT LEVER,INT.
             POSITION (98D27803000000) is installed on the flap/slat control
             lever.
         (4) Put the ACCESS PLATFORM 4M (13 FT) in position under the applicable
             slat track.
Subtask 12-22-27-865-060
   -------------------------------------------------------------------------------
   PANEL DESIGNATION                                               IDENT. LOCATION
   -------------------------------------------------------------------------------
     49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1                     5CV      B06
    121VU FLIGHT CONTROLS/SLT/CTL/SYS2                              7CV      R21
Subtask 12-22-27-010-054
D. Get Access
         (1) Remove the applicable access panels, (Ref. TASK 57-41-37-000-004) and
             (Ref. TASK 57-41-37-000-006):
             - for the left wing remove 521AB, 521CB, 521EB, 522AB, 522CB, 522FB,
               522KB, 522LB, 522NB, 522QB, 522SB, 522UB
             - for the right wing remove 621AB, 621CB, 621EB, 622AB, 622CB, 622FB,
               622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 324
                                                                         May 01/11
R                                                  
  UZB                                              
R                         Slats - Lubrication Points
                       Figure 304/TASK 12-22-27-991-002
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                   Page 325
                                                                  May 01/11
                                              
    UZB                                       
     4. Procedure
        _________
Subtask 12-22-27-640-055
        A. Lubricate the Slat Track Pinion Bearings, the Slat Track Rollers, the
           Pinions and the Rack Teeth
           NOTE : When you do a maintenance task that uses common grease, refer to
           ____
                  the SIL (Ref. SIL 12-008).
R          (1) Lubricate the pinion bearings with COMMON GREASE (Material No. 04-
R              024) or COMMON GREASE (Material No. 04-004) or COMMON GREASE
R              (Material No. 04-037) as follows:
                    1
                    _   Lubricate through the pinion bearing greasers at a maximum
                        pressure of 3 bar (43.5 psi).
                    2
                    _   Lubricate through the greasers until new grease comes out.
                    1
                    _   Lubricate through the pinion bearing greasers.
                    2
                    _   Lubricate through the greasers until new grease comes out.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                              Page 326
                                                                             May 01/11
                                                     
    UZB                                              
R          (2) Lubricate the slat track rollers with COMMON GREASE (Material No. 04-
R              024) or COMMON GREASE (Material No. 04-004) or COMMON GREASE
R              (Material No. 04-037) as follows:
               (b) Lubricate the slat track rollers through the greasers until new
                   grease comes out.
           (3) Remove the unwanted grease from the greasers and the slat track
R              rollers and pinion bearings with a clean lint-free cotton cloth
R              MISCELLANEOUS (Material No. 19-003).
           (4) Make sure that the greaser ball has seated correctly after
               lubrication.
     5. Close-up
        ________
Subtask 12-22-27-410-054
A. Close Access
               - for the right wing install 621AB, 621CB, 621EB, 622AB, 622CB,
                 622FB, 622KB, 622LB, 622NB, 622QB, 622SB, 622UB.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                             Page 327
                                                                            May 01/11
                                                   
    UZB                                            
     Subtask 12-22-27-865-061
        B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
R
R    -------------------------------------------------------------------------------
R    PANEL DESIGNATION                                               IDENT. LOCATION
R    -------------------------------------------------------------------------------
R      49VU FLIGHT CONTROLS/SLT/CTL AND MONG/SYS1                     5CV      B06
R     121VU FLIGHT CONTROLS/SLT/CTL/SYS2                              7CV      R21
Subtask 12-22-27-866-057
C. Aircraft Configuration
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-22-27-942-056
D. Removal of Equipment
           (4) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 328
                                                                           May 01/11
                                                   
    UZB                                            
   TASK 12-22-27-640-007
   WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
   _______
             START A TASK ON OR NEAR:
             - THE FLIGHT CONTROLS
             - THE FLIGHT CONTROL SURFACES
             - THE LANDING GEAR AND THE RELATED DOORS
             - COMPONENTS THAT MOVE.
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
   _______
             GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
             BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
             HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
             MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
             USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
             AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
             AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
             DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
             YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
             YOUR AIRCRAFT).
   1. __________________
      Reason for the Job
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 329
                                                                         May 01/11
R                                                 
  UZB                                             
      B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-22-27-010-055
A. Get Access
         (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
             121.
         (2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone
             312.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 330
                                                                           May 01/11
R                                                 
  UZB                                             
   Subtask 12-22-27-860-050
         (1) On the center pedestal, make sure that the pitch-trim control-wheels
             are set to zero.
         (2) Install the PITCH TRIM CONTROL LOCKING (98D27403500000) to lock the
             pitch control wheels.
Subtask 12-22-27-865-062
   -------------------------------------------------------------------------------
   PANEL DESIGNATION                                               IDENT. LOCATION
   -------------------------------------------------------------------------------
     49VU FLIGHT CONTROLS/ELAC1/NORM/SPLY                          15CE1     B11
     49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
    105VU FLT CTL/ELAC1/STBY SPLY                                  16CE1     A01
    121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
    121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
Subtask 12-22-27-020-050
         (2) Release the fasteners (1) and remove the protective covers (2) and
             (5).
   4. Procedure
      _________
Subtask 12-22-27-640-056
         NOTE : When you do a maintenance task that uses common grease, refer to
         ____
                the SIL (Ref. SIL 12-008).
         (1) Clean the forward chains (6) and (7) and the aft chain (8) with
             CLEANING AGENTS (Material No. 11-002) and a fine brush.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 331
                                                                         May 01/11
R                                                
  UZB                                            
                  Removal/Installation of the Protective Covers
                        Figure 305/TASK 12-22-27-991-004
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                   Page 332
                                                                  May 01/11
R                                              
  UZB                                          
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-22-27
                                                     
                                                                   Page 333
                                                                  May 01/11
                                             
 UZB                                         
                                 Control Chains
                  Figure 306/TASK 12-22-27-991-005- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                    Page 334
                                                                   May 01/11
R                                              
  UZB                                          
                                 Control Chains
                  Figure 306/TASK 12-22-27-991-005- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                    Page 335
                                                                   May 01/11
R                                              
  UZB                                          
         (2) Use a BRUSH - BRISTLED to apply COMMON GREASE (Material No. 04-004)
             to the forward chains (6) and (7) and the aft chain (8).
   5. Close-up
      ________
Subtask 12-22-27-420-050
Subtask 12-22-27-865-063
      B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
         breaker(s):
         15CE1, 16CE1, 19CE1, 19CE2, 19CE3.
Subtask 12-22-27-942-057
(1) On the center pedestal, remove the PITCH TRIM CONTROL LOCKING.
Subtask 12-22-27-410-055
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                          Page 336
                                                                         May 01/11
R                                                
  UZB                                            
     TASK 12-22-27-640-009
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
     _______
               GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
               BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
               HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
               MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
               USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
               AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
               AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
               DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
               YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
               YOUR AIRCRAFT).
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 337
                                                                           May 01/11
                                                     
    UZB                                              
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-27-941-061
A. Safety Precautions
           (2) Put a WARNING NOTICE(S) in the cockpit to tell persons not to start
               the Auxiliary Power Unit (APU).
           (3) Put a WARNING NOTICE(S) in the cockpit to tell persons not to operate
               the Trimmable Horizontal Stabilizer (THS).
Subtask 12-22-27-865-074
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
      121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
      121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 338
                                                                           May 01/11
                                                     
    UZB                                              
     Subtask 12-22-27-010-057
C. Get Access
           (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
               zone 312.
     4. Procedure
        _________
Subtask 12-22-27-020-052
           (2) Release the fasteners (1) and remove the protective covers (2) and
               (5).
Subtask 12-22-27-640-061
           (1) Make sure that the cables (6) and (7) are not damaged (Ref. TASK 20-
               24-12-200-001).
           (2) Clean the control cables (6) and (7) in this area, with a
R              MISCELLANEOUS (Material No. 19-003).
           (3) Make sure that there is no corrosion on the cables (6) and (7)
               (Ref. TASK 20-24-11-100-001).
           (4) Lubricate the control cables (6) and (7) with COMMON GREASE (Material
               No. 04-004).
               NOTE : Refer to the SIL (Ref. SIL 12-008) about the mixing of lithium
               ____
                      and clay based greases.
Subtask 12-22-27-420-052
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                            Page 339
                                                                           May 01/11
                                                   
    UZB                                            
                 Removal/Installation of the Protective Covers.
                        Figure 307/TASK 12-22-27-991-008
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                   Page 340
                                                                  May 01/11
                                               
 UZB                                           
        (3) Install the washers (3) and the screws (4).
  5. Close-up
     ________
Subtask 12-22-27-410-057
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-22-27
                                                     
                                                                         Page 341
                                                                        May 01/11
                                                
 UZB                                            
                              HYDRAULIC POWER - SERVICING
                              ___________________________
TASK 12-22-29-600-001
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
A. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-22-29-860-050
(2) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-001).
  
  EFF :
  
             ALL                                      12-22-29
                                                     
                                                                           Page 301
                                                                          Feb 01/10
                                                  
 UZB                                              
  4. Procedure
     _________
Subtask 12-22-29-600-050
        (1) Lubricate the RAT door hinges with the OILS (Material No. 03-001) or
            the STORAGE PRESERVATION (Material No. 15-004).
  5. Close-up
     ________
Subtask 12-22-29-010-051
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-22-29-860-051
  
  EFF :
  
             ALL                                      12-22-29
                                                     
                                                                         Page 302
                                                                        Feb 01/10
                                                
 UZB                                            
              Lubrication of the Ram Air Turbine (RAT) Door Hinges
                        Figure 301/TASK 12-22-29-991-001
  
  EFF :
  
             ALL                                      12-22-29
                                                     
                                                                      Page 303
                                                                     Feb 01/10
                                               
 UZB                                           
                                LANDING GEAR - SERVICING
                                ________________________
TASK 12-22-32-640-001
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
     _______
               GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
               BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
               HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
               MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
               USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
               AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
               AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
               DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
               YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
               YOUR AIRCRAFT).
     1. __________________
        Reason for the Job
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 301
                                                                           Aug 01/10
                                                   
    UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                              Page 302
                                                                             May 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-32-941-050
A. Safety Precautions
           (2) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
Subtask 12-22-32-010-050
B. Get Access
           (1) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position adjacent
               to the applicable Main Landing Gear (MLG).
           (3) Make sure that a SLEEVE - GROUND LOCK (460005835) is installed on the
               applicable MLG door actuating cylinder.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                             Page 303
                                                                            Feb 01/11
                                                     
    UZB                                              
     Subtask 12-22-32-640-055
           (1) Make sure that the LUBRICATING EQUIPMENT is in the correct condition
               before you fill it.
           (2) Operate the lubricating equipment to make sure that the lines and
               adaptor are full of new lubricant.
           (3) Clean the greasers with a clean MISCELLANEOUS (Material No. 19-003)
               and CLEANING AGENTS (Material No. 11-026).
     4. Procedure
        _________
Subtask 12-22-32-640-051
           NOTE : Use the Figures together with the tables that follow, to find the
           ____
                  greasers.
R          NOTE : In the steps that follow, make sure that the materials COMMON
           ____
R                 GREASE (Material No. 04-004), COMMON GREASE (Material No. 04-022)
R                 or COMMON GREASE (Material No. 04-037) are not mixed together. Do
R                 not use them at the same time (Ref. SIL 12-008).
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 304
                                                                           May 01/11
                                                   
    UZB                                            
           (1) Lubricate the greasers of the MLG as follows:
R             (a) Lubricate all of the greasers in the MLG Table with COMMON GREASE
R                 (Material No. 04-004), COMMON GREASE (Material No. 04-022) or
R                 COMMON GREASE (Material No. 04-037). Do this until new grease
                  comes out.
R             (b) Lubricate the greasers Items 2 thru 4 in the MLG DOOR AND UPLOCKS
R                 Table with COMMON GREASE (Material No. 04-004), COMMON GREASE
R                 (Material No. 04-022) or COMMON GREASE (Material No. 04-037). Do
R                 this until new grease comes out.
R             (c) Lubricate the greasers Items 1 and 5 in the MLG DOOR AND UPLOCKS
R                 Table with COMMON GREASE (Material No. 04-004), COMMON GREASE
R                 (Material No. 04-022) or COMMON GREASE (Material No. 04-037) as
R                 follows:
                  - use the hand-operated lubrication equipment to lubricate the
                    uplock with a maximum of two full strokes.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                           Page 305
                                                                          May 01/11
                                                   
    UZB                                            
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 18 (SHEET 1)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 306
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 28 (SHEET 2)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 307
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 38 (SHEET 3)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 308
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 48 (SHEET 4)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 309
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 58 (SHEET 5)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 310
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 68 (SHEET 6)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 311
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 78 (SHEET 7)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 312
                                                                   Feb 01/10
                                               
 UZB                                           
                            MLG - Lubrication Points
                  Figure 301/TASK 12-22-32-991-001- 88 (SHEET 8)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 313
                                                                   Feb 01/10
                                               
 UZB                                           
R                  MLG Door and Uplocks - Lubrication Points
                       Figure 302/TASK 12-22-32-991-002
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                   Page 314
                                                                  Nov 01/10
                                              
    UZB                                       
         ----------------------------------------------------------------------
         | No.| Component/Location |Total| Position of Greasers               |
         ----------------------------------------------------------------------
         | 1 | Retraction          | 6 | 1 on the piston rod                  |
         |    | Actuating Cylinder |     | 2 on the piston rod attachment     |
         |    |                    |     |   pin                              |
         |    |                    |     | 3 on the structure attachment pin |
         |----|--------------------|-----|------------------------------------|
         | 2 | Upper Leg           | 9 | 1 on the forward pintle housing      |
         |    |                    |     | 1 on the aft pintle housing        |
         |    |                    |     | 3 on the aft pintle pin            |
         |    |                    |     | 4 on the aircraft structure at the |
         |    |                    |     |   forward pintle bearing (it is    |
         |    |                    |     |   permitted to lubricate only 2    |
         |    |                    |     |   greasers when the MLG is         |
         |    |                    |     |   installed)                       |
         |----|--------------------|-----|------------------------------------|
         | 3 | Gland Housing       | 3 | 3 on the bottom bearing              |
         |----|--------------------|-----|------------------------------------|
         | 4 | Torque Link         | 8 | 3 on the top torque link             |
         |    |                    |     | 2 on the top torque link           |
         |    |                    |     |   attachment pin                   |
         |    |                    |     | 3 on the bottom torque link        |
         |----|--------------------|-----|------------------------------------|
         | 5 | Lower Leg Lugs      | 2 | 1 on each lug                        |
         |----|--------------------|-----|------------------------------------|
         | 6 | Leg Side-Stay       | 2 | 2 on the leg attachment bracket      |
         |    | Attachment         |     |                                    |
         |----|--------------------|-----|------------------------------------|
         | 7 | Side-Stay           | 15 | 5 at the top cardan joint           |
         |    |                    |     | 7 at the middle joint              |
         |    |                    |     | 3 at the bottom cardan joint       |
         |----|--------------------|-----|------------------------------------|
         | 8 | Lockstay            | 13 | 2 at the side-stay attachment       |
         |    |                    |     | 3 at the middle joint              |
         |    |                    |     | 1 on the lockstay attachment lug   |
         |    |                    |     |   of the upper leg                 |
         |    |                    |     | 3 on the lockstay cardan joint     |
         |    |                    |     | 2 on the top of the lockstay       |
         |    |                    |     | 2 at the actuator attachment       |
         |----|--------------------|-----|------------------------------------|
         | 9 | Lockstay Actuating | 2 | 1 at each end of the actuating        |
         |    | Cylinder           |     |   cylinder                         |
         |----|--------------------|-----|------------------------------------|
         | 10 | Side-Stay Bracket, | 4 | 2 at each bush                       |
         |    | at A/C structure   |     |                                    |
         ----------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 315
                                                                           May 01/11
R                                                  
  UZB                                              
R          (e) MLG DOOR AND UPLOCKS Table:
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                   Page 316
                                                                  May 01/11
                                            
    UZB                                     
           ----------------------------------------------------------------------
           | No.| Component/Location |Total| Position of Greasers               |
           ----------------------------------------------------------------------
           | 1 | MLG Door Uplock     | 4 | 2 on each side                       |
           |----|--------------------|-----|------------------------------------|
           | 2 | MLG Door            | 1 | 1 on the aft hinge                   |
           |----|--------------------|-----|------------------------------------|
           | 3 | MLG Door            | 1 | 1 on the roller                      |
           |    | Uplock-Roller      |     |                                    |
           |----|--------------------|-----|------------------------------------|
           | 4 | MLG Door Actuating | 2 | 1 at each end of the actuating        |
           |    | Cylinder           |     |   cylinder                         |
           |----|--------------------|-----|------------------------------------|
           | 5 | MLG Uplock          | 4 | 2 on each side                       |
           ----------------------------------------------------------------------
(b) Make sure that the greaser ball has seated correctly.
R            (4) If grease is found, clean the chrome surfaces with a clean lint-free
R                cloth MISCELLANEOUS (Material No. 19-003) made moist with CLEANING
R                AGENTS (Material No. 11-002).
R            (5) Apply a thin layer of HYDRAULIC FLUIDS (Material No. 02-001) with a
R                clean lint-free cloth MISCELLANEOUS (Material No. 19-003) on the
R                chrome surfaces of the actuator piston rods.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                              Page 317
                                                                             May 01/11
                                                     
    UZB                                              
     5. Close-up
        ________
Subtask 12-22-32-410-050
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-22-32-942-050
B. Removal of Equipment
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                              Page 318
                                                                             Nov 01/10
                                                   
    UZB                                            
     TASK 12-22-32-640-002
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     CAUTION : WHEN YOU DO A MAINTENANCE TASK THAT USES COMMON GREASE, USE ONLY
     _______
               GREASES OF THE SAME SPECIFICATION (IT IS PERMITTED TO USE DIFFERENT
               BRANDS IF THEIR SPECIFICATIONS ARE THE SAME). DO NOT MIX GREASES THAT
               HAVE CLAY THICKENERS WITH GREASES THAT HAVE LITHIUM THICKENERS. THIS
               MIXTURE CAN CHANGE THE LUBRICATION PROPERTIES OF THE GREASE. IF YOU
               USE GREASES OF DIFFERENT TYPES (SPECIALLY THOSE WITH CLAY THICKENERS
               AND LITHIUM THICKENERS), DECREASE THE SERVICE INTERVALS OF THE
               AIRCRAFT (BY HALF, FOR EXAMPLE) SPECIFIED IN THE MAINTENANCE PLANNING
               DOCUMENT. DO THIS FOR APPROXIMATELY THREE OR FOUR SERVICES (REFER TO
               YOUR IN-SERVICE DATA TO FIND THE NUMBER OF SERVICES BEST ADAPTED TO
               YOUR AIRCRAFT).
     1. __________________
        Reason for the Job
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 319
                                                                           Aug 01/10
                                                   
    UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                                Page 320
                                                                               May 01/11
                                                       
    UZB                                                
     3. __________
        Job Set-up
Subtask 12-22-32-941-051
A. Safety Precautions
           (2) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
Subtask 12-22-32-010-051
B. Get Access
           (1) Put the ACCESS PLATFORM 2M (6 FT) in position adjacent to the Nose
               Landing Gear (NLG).
           (3) Make sure that a SAFETY PIN - NLG DOOR is installed in each NLG door
               (Ref. TASK 32-00-00-481-002).
Subtask 12-22-32-640-056
           (2) Operate the lubrication equipment to make sure the lines and adaptor
               are full of new lubricant.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 321
                                                                           Nov 01/10
                                                   
    UZB                                            
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 18 (SHEET 1)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 322
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 28 (SHEET 2)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 323
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 38 (SHEET 3)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 324
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 48 (SHEET 4)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 325
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 58 (SHEET 5)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 326
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 68 (SHEET 6)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 327
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 78 (SHEET 7)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 328
                                                                   Feb 01/10
                                               
 UZB                                           
                            NLG - Lubrication Points
                  Figure 303/TASK 12-22-32-991-003- 88 (SHEET 8)
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                    Page 329
                                                                   Feb 01/10
                                               
 UZB                                           
                   NLG Door and Uplocks - Lubrication Points
                       Figure 304/TASK 12-22-32-991-004
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                   Page 330
                                                                  Feb 01/10
                                              
 UZB                                          
           (3) Clean the greasers:
               (a) Clean the greasers with a clean MISCELLANEOUS (Material No. 19-
                   003) and CLEANING AGENTS (Material No. 11-026).
     4. Procedure
        _________
Subtask 12-22-32-640-053
           NOTE : Use the Figures together with the Tables that follow to find the
           ____
                  greasers.
R          NOTE : In the steps that follow, make sure that the materials COMMON
           ____
R                 GREASE (Material No. 04-004), COMMON GREASE (Material No. 04-022)
R                 or COMMON GREASE (Material No. 04-037) are not mixed together. Do
R                 not use them at the same time (Ref. SIL 12-008).
R              (a) Lubricate the greasers Items 1 and 2 in the NLG DOOR AND UPLOCKS
R                  Table with COMMON GREASE (Material No. 04-004), COMMON GREASE
R                  (Material No. 04-022) or COMMON GREASE (Material No. 04-037) as
R                  follows:
                   - use hand-operated lubrication equipment to lubricate each
                     greaser with a maximum of two full strokes.
R              (b) Lubricate the greasers of all the other items given in the Table,
R                  with COMMON GREASE (Material No. 04-004), COMMON GREASE (Material
R                  No. 04-022) or COMMON GREASE (Material No. 04-037). Do this until
R                  new grease comes out.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 331
                                                                           May 01/11
                                                   
    UZB                                            
           (2) Lubricate the NLG:
R              (a) Lubricate the greaser Item 1 and 7 in the NLG Table with COMMON
R                  GREASE (Material No. 04-004), COMMON GREASE (Material No. 04-022)
R                  or COMMON GREASE (Material No. 04-037) as follows:
                   - use hand-operated lubrication equipment to lubricate the
                     greaser with a maximum of three full strokes.
R              (b) Lubricate the greasers of all the other items given in the Table
R                  with COMMON GREASE (Material No. 04-004), COMMON GREASE (Material
R                  No. 04-022) or COMMON GREASE (Material No. 04-037). Do this until
R                  new grease comes out.
R
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 332
                                                                           May 01/11
                                                   
    UZB                                            
         ----------------------------------------------------------------------
         | No.| Component/Location |Total| Position of Greasers               |
         ----------------------------------------------------------------------
         | 1 | Upper Drag-Strut    | 4 | 2 on the drag-strut (one on each     |
         |    |                    |     |   side)                            |
         |    |                    |     | 1 on each attachment pin           |
         |----|--------------------|-----|------------------------------------|
         | 2 | Self-Aligning       | 2 | 2 on the aircraft structure (one     |
         |    | Bearings           |     |   on each side)                    |
         |----|--------------------|-----|------------------------------------|
         | 3 | Lockstay Middle     | 2 | 1 on the attachment pin              |
         |    | Axis               |     | 1 on the lockstay lower arm        |
         |----|--------------------|-----|------------------------------------|
         | 4 | Retraction Actuator| 4 | 1 at one end of the actuator          |
         |    |                    |     | 3 on the retraction actuator pin   |
         |----|--------------------|-----|------------------------------------|
         | 5 | Leg Upper           | 6 | 1 on each attachment pin             |
         |    | Attachments        |     | 2 on the adjacent aircraft         |
         |    |                    |     |   structure for the swivel         |
         |    |                    |     |   bearings (one on each side)      |
         |    |                    |     | 2 on the NLG leg (one on each      |
         |    |                    |     |   side)                            |
         |----|--------------------|-----|------------------------------------|
         | 6 | Lockstay to the     | 4 | 2 on the NLG leg                     |
         |    | NLG Leg Attachment |     | 2 on the lockstay upper arm        |
         |----|--------------------|-----|------------------------------------|
         | 7 | Nosewheel Steering | 1 | 1 on the actuator                     |
         |    | Actuator           |     |                                    |
         |----|--------------------|-----|------------------------------------|
         | 8 | Drag-Strut to the | 3 | 2 on the NLG leg                       |
         |    | Leg Attachment     |     | 1 on the bottom arm of the drag-   |
         |    |                    |     |   strut                            |
         |----|--------------------|-----|------------------------------------|
         | 9 | Drag-Strut to the | 10 | 2 on the drag-strut bottom arm        |
         |    | Lockstay Attachment|     | 1 on the bottom arm pin            |
         |    |                    |     | 2 on the drag-strut                |
         |    |                    |     | 2 on the ball joint                |
         |    |                    |     | 1 on the strut link-pin            |
         |    |                    |     | 1 on the uplock roller pin         |
         |    |                    |     | 1 on the lockstay lower arm        |
         |----|--------------------|-----|------------------------------------|
         | 10 | Torque Links       | 12 | 4 on the top torque link            |
         |    |                    |     | 2 on the turning tube (near the    |
         |    |                    |     |   upper torque link connector)     |
         |    |                    |     | 2 on the middle hinge pin          |
         |    |                    |     | 4 on the bottom torque link        |
         |----|--------------------|-----|------------------------------------|
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 333
                                                                           May 01/11
R                                                  
  UZB                                              
           ----------------------------------------------------------------------
           | No.| Component/Location |Total| Position of Greasers               |
           | 11 | Cam Pivot for NLG | 1 | 1 on the cam pivot pin                |
           |    | Weight-on-Wheels   |     |                                    |
           |    | Sensor             |     |                                    |
           |----|--------------------|-----|------------------------------------|
           | 12 | Downlock Release   | 2 | 1 on one end of the actuator         |
           |    | Actuator           |     | 1 on the attachment pin on the     |
           |    |                    |     |   NLG leg                          |
           |----|--------------------|-----|------------------------------------|
           | 13 | NLG Leg to the     | 2 | 2 on the NLG leg (one on each        |
           |    | Rotating Rod       |     |   side)                            |
           |    | Attachment         |     |                                    |
           |----|--------------------|-----|------------------------------------|
           | 14 | NLG Leg Barrel     | 2 | 2 on the NLG leg                     |
           |    | Lower Bearing      |     |                                    |
           ----------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                              Page 334
                                                                             May 01/11
                                                     
    UZB                                              
         ----------------------------------------------------------------------
         | No.| Component/Location |Total|      Position of Greasers          |
         ----------------------------------------------------------------------
         | 1 | NLG Door Uplock     | 4 | 3 on the aft side                    |
         |    |                    |     | 1 on the forward side              |
         |----|--------------------|-----|------------------------------------|
         | 2 | NLG Gear Uplock     | 3 | 2 on one side                        |
         |    |                    |     | 1 on the other side                |
         |----|--------------------|-----|------------------------------------|
         | 3 | Rotating Rod        | 8 | 2 on the lower attachment pins       |
         |    | Assembly           |     | 6 on the rotating rods             |
         |----|--------------------|-----|------------------------------------|
         | 4 | NLG Door Actuating | 2 | 1 on support bracket attachment pin|
         |    | Cylinder           |     | 1 on bellcrank lever attachment pin|
         ----------------------------------------------------------------------
(b) Make sure that the greaser ball has seated correctly.
   5. Close-up
      ________
Subtask 12-22-32-410-051
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-22-32-942-052
B. Removal of Equipment
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                            Page 335
                                                                           May 01/11
R                                                  
  UZB                                              
         (3) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-32
                                                     
                                                                          Page 336
                                                                         May 01/11
R                                                
  UZB                                            
                                    DOORS - SERVICING
                                    _________________
TASK 12-22-52-640-002
     WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
     _______
               YOU USE SPECIAL MATERIALS.
               IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN
               YOUR EYES :
               -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
               MINUTES.
               -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
               DO NOT BREATHE THE FUMES FROM THE MATERIAL.
               DO NOT SMOKE WHEN YOU USE THE MATERIAL.
               DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
               THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
               SKIN IRRITANTS.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 301
                                                                           Feb 01/11
                                                   
    UZB                                            
     B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                         Page 302
                                                                        Feb 01/10
                                                
 UZB                                            
     3. __________
        Job Set-up
Subtask 12-22-52-010-051
A. Get Access
           (1) Open the FWD and/or aft cargo-compartment door (referred to as cargo
               door) and safety it with the actuator safety locks (Ref. TASK 52-30-
               00-860-001).
R          (2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
R              opened cargo door.
           (3) Remove the access panels 825AR or 826AR from the applicable cargo
               door.
           (4) Remove the door lining to get access to the drift pins of the
               applicable cargo door (Ref. TASK 52-31-13-000-001) or (Ref. TASK 52-
               32-13-000-001).
Subtask 12-22-52-865-051
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      122VU DOORS/CARGO                                               1MJ      T12
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
     4. Procedure
        _________
Subtask 12-22-52-640-051
(1) Lubricate the piano hinges with OILS (Material No. 03-001).
               (a) Lubricate the bearings of the target lever with OILS (Material
                   No. 03-001).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                              Page 303
                                                                             Feb 01/11
                                                   
    UZB                                            
         Lubrication of the Switch Mechanism and the Piano Hinges at the FWD
                               Cargo-Compartment Door
                          Figure 301/TASK 12-22-52-991-002
  
  EFF :
  
            ALL                                   
                                                  
                                                       12-22-52           Page 304
                                                                         Feb 01/10
                                                 
  UZB                                            
         Lubrication of the Switch Mechanism and the Piano Hinges of the AFT
                               Cargo-Compartment Door
                          Figure 302/TASK 12-22-52-991-003
  
  EFF :
  
            ALL                                   
                                                  
                                                       12-22-52           Page 305
                                                                         Feb 01/10
                                                 
  UZB                                            
            (b) Lubricate the bearings of the link assy with OILS (Material No.
                03-001).
            (a) Lubricate the top and bottom vent door hinges with OILS (Material
                No. 03-001).
(b) Lubricate the bellcrank shafts with OILS (Material No. 03-001).
        (4) Lubricate the bearings of the locking shaft with OILS (Material No.
            03-001).
        (6) Lubricate the bearings of the latching shaft with OILS (Material No.
            03-001).
            (a) Lubricate the latching hooks with COMMON GREASE (Material No. 04-
                004).
            (b) Lubricate the bellcrank of each latching unit with COMMON GREASE
                (Material No. 04-004).
            (c) Lubricate the bearings of the bellcrank links with OILS (Material
                No. 03-001).
            (a) Lubricate the bearings of the interlock lever and the roller
                lever with OILS (Material No. 03-001).
            (b) Lubricate the bearings of the interlock link with OILS (Material
                No. 03-001).
            (c) Lubricate the mating surface of the spring sleeve with OILS
                (Material No. 03-001).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                         Page 306
                                                                        Feb 01/10
                                                
 UZB                                            
                    Lubrication of the Vent Door Mechanism
                       Figure 303/TASK 12-22-52-991-032
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 307
                                                                  Feb 01/10
                                              
 UZB                                          
                       Lubrication of the Latching Unit
                       Figure 304/TASK 12-22-52-991-030
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 308
                                                                  Feb 01/10
                                              
 UZB                                          
                    Lubrication of the Interlock Mechanism
                       Figure 305/TASK 12-22-52-991-031
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 309
                                                                  Feb 01/10
                                              
 UZB                                          
         (8) Lubricate the drift pin mechanism as follows:
             (Ref. Fig. 306/TASK 12-22-52-991-033)
             (a) Lubricate the drift pins with COMMON GREASE (Material No. 04-
                 004).
             (b) Lubricate bearing of the bellcrank lever with OILS (Material No.
                 03-001).
             (c) Lubricate bearing of the bellcrank shafts with OILS (Material No.
                 03-001).
             (b) Lubricate bearing of the sequence shaft with OILS (Material No.
                 03-001).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                          Page 310
                                                                         Feb 01/10
                                                 
 UZB                                             
                    Lubrication of the Drift Pin Mechanism
                       Figure 306/TASK 12-22-52-991-033
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 311
                                                                  Feb 01/10
                                              
 UZB                                          
                   Lubrication of the Sequence Shaft Assembly
                        Figure 307/TASK 12-22-52-991-034
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 312
                                                                  Feb 01/10
                                               
 UZB                                           
            (b) Apply STORAGE PRESERVATION (Material No. 15-006) to the inner
                face of the access panels and to the lower section of the dooe
                structure.
            (c) Make sure that you do not apply the STORAGE PRESERVATION
                (Material No. 15- 06) to the ball bearings of the door mechanism.
  5. Close-up
     ________
Subtask 12-22-52-865-050
     A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        1MJ, 3801GX, 3802GX, 3803GX
Subtask 12-22-52-410-051
B. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (2) Install the removed door linings on the applicable cargo door
            (Ref. TASK 52-31-13-400-001) or (Ref. TASK 52-32-13-400-001).
        (3) Remove the actuator safety locks and close the applicable cargo door
            (Ref. TASK 52-30-00-860-002).
        (4) Install the access panels 825AR or 826AR on the applicable cargo
            door.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                         Page 313
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-22-52-640-005
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                              Page 314
                                                                             Feb 01/11
                                                     
    UZB                                              
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-52-010-054
A. Get Access
           (1) Make sure that the control handle of the emergency-escape slide at
               the applicable passenger/crew door is safetied in the disarmed
               position (Ref. TASK 52-10-00-860-001).
           (2) Open the applicable passenger/crew door as required (Ref. TASK 52-10-
               00-010-001).
R          (3) Make sure that the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position
R              below the opened passenger/crew door.
           (4) Remove the door frame linings 221VW (Ref. TASK 25-23-45-000-005)
               222VW (Ref. TASK 25-23-45-000-002) 261UW (Ref. TASK 25-23-45-000-003)
               or 262UW (Ref. TASK 25-23-45-000-004) as required.
           (5) Remove the insulation blankets from the applicable door frame as
               required.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 315
                                                                            Feb 01/11
                                                    
    UZB                                             
     4. Procedure
        _________
Subtask 12-22-52-640-054
           (1) Apply OILS (Material No. 03-001) to the pivot points of the actuation
               lever (1).
           (2) Apply OILS (Material No. 03-001) to the pivot point of the target
               lever (2).
R (3) Remove the unwanted oil with a MISCELLANEOUS (Material No. 19-003).
     5. Close-up
        ________
Subtask 12-22-52-410-054
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
           (3) Install the applicable door frame linings 221VW (Ref. TASK 25-23-45-
               400-006) 222VW (Ref. TASK 25-23-45-400-007) 261UW (Ref. TASK 25-23-
               45-400-008) or 262UW (Ref. TASK 25-23-45-400-005).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                              Page 316
                                                                             Feb 01/11
                                                   
    UZB                                            
                   Actuating Mechanism of Proximity Switches
                       Figure 308/TASK 12-22-52-991-007
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 317
                                                                  Feb 01/10
                                              
 UZB                                          
     TASK 12-22-52-640-006
     Lubrication of the External Control Handles of the FWD and AFT Passenger/Crew
     Doors
     WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
     _______
               YOU USE SPECIAL MATERIALS.
               IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN
               YOUR EYES :
               -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
               MINUTES.
               -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
               DO NOT BREATHE THE FUMES FROM THE MATERIAL.
               DO NOT SMOKE WHEN YOU USE THE MATERIAL.
               DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
               THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
               SKIN IRRITANTS.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 318
                                                                           Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-52-010-056
A. Get Access
           (1) Open the applicable passenger/crew door as required (Ref. TASK 52-10-
               00-010-001).
           (2) Make sure that the control handle of the emergency-escape slide at
               the applicable passenger/crew door is safetied in the disarmed
               position (Ref. TASK 52-10-00-860-001).
     4. Procedure
        _________
Subtask 12-22-52-640-055
               (a) Make sure that the external control handle of the applicable
                   passenger/crew door is in the horizontal position.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 319
                                                                            Feb 01/11
                                                    
    UZB                                             
  Lubrication of the External Control Handles-FWD and AFT Passenger/Crew Doors
                         Figure 309/TASK 12-22-52-991-008
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                         Page 320
                                                                        Feb 01/10
                                                
 UZB                                            
            (b) Apply the COMMON GREASE (Material No. 04-017) to the control
                mechanism of the external control handle. the applicable external
                control handle.
        (2) Lubricate the telescopic arm of the door damper and emergency
            operation cylinder as follows:
            (Ref. Fig. 310/TASK 12-22-52-991-006)
            (a) Clean the lubrication fitting (1) with a lint-free cotton cloth,
                MISCELLANEOUS (Material No. 19-003).
            (b) Operate the GUN - GREASE until the new grease COMMON GREASE
                (Material No. 04-004) comes out to lubricate the telescopic arm.
  5. Close-up
     ________
Subtask 12-22-52-410-055
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                           Page 321
                                                                          Feb 01/10
                                                
 UZB                                            
                       Lubrication of the Telescopic Arm
                       Figure 310/TASK 12-22-52-991-006
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 322
                                                                  Feb 01/10
                                              
 UZB                                          
     TASK 12-22-52-640-007
     WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
     _______
               YOU USE SPECIAL MATERIALS.
               IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN
               YOUR EYES :
               -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
               MINUTES.
               -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
               DO NOT BREATHE THE FUMES FROM THE MATERIAL.
               DO NOT SMOKE WHEN YOU USE THE MATERIAL.
               DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
               THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
               SKIN IRRITANTS.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 323
                                                                           Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-52-010-057
A. Get Access
R              (a) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below
                   the closed BULK cargo-compartment door (refered to as Bulk door).
               (b) Push the button of the external door handle so that it moves from
                   its recess.
     4. Procedure
        _________
Subtask 12-22-52-640-056
A. Lubrication Procedure
               (a) Apply COMMON GREASE (Material No. 04-004) on the shaft of the
                   external door handle.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 324
                                                                            Feb 01/11
                                                     
    UZB                                              
               External Door Handle of Bulk Cargo-Compartment Door
                        Figure 311/TASK 12-22-52-991-015
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                      Page 325
                                                                     Feb 01/10
                                              
 UZB                                          
R              (b) Remove the unwanted grease with a MISCELLANEOUS (Material No. 19-
R                  003).
               (a) Apply OILS (Material No. 03-001) on the top bearing of the hinge
                   arms.
               (b) Apply OILS (Material No. 03-001) on the center bearing of the
                   hinge arms.
     5. Close-up
        ________
Subtask 12-22-52-410-056
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
           (2) Push the external door handle into its recess so that it is flush
               with the door contour.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 326
                                                                           Feb 01/11
                                                   
    UZB                                            
                    Lubrication of the Hinge Arms Bearings
                       Figure 312/TASK 12-22-52-991-037
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 327
                                                                  Feb 01/10
                                              
 UZB                                          
     TASK 12-22-52-640-008
     WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
     _______
               YOU USE SPECIAL MATERIALS.
               IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN
               YOUR EYES :
               -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
               MINUTES.
               -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
               DO NOT BREATHE THE FUMES FROM THE MATERIAL.
               DO NOT SMOKE WHEN YOU USE THE MATERIAL.
               DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
               THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
               SKIN IRRITANTS.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 328
                                                                            Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-52-010-064
A. Get Access
R          (1) Put the ACCESS PLATFORM 2M (6 FT) in position below the closed FWD,
               lateral left, lateral right or aft avionics compartment door as
               required.
           (2) Push the button of the external door handle at the applicable
               avionics compartment door so that it moves from its recess.
               NOTE : Do not move the external door handle in the UNLOCK position at
               ____
                      this time.
     4. Procedure
        _________
Subtask 12-22-52-640-057
           (1) Apply COMMON GREASE (Material No. 04-011) to the shaft of the
               external door handle at the FWD avionics compartment door.
           (2) Apply COMMON GREASE (Material No. 04-011) to the shaft of the
               external door handle at the lateral left avionics compartment door.
           (3) Apply COMMON GREASE (Material No. 04-011) to the shaft of the
               external door handle at the lateral right avionics compartment door.
           (4) Apply COMMON GREASE (Material No. 04-011) to the shaft of the
               external door handle at the aft avionics compartment door.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 329
                                                                           Feb 01/11
                                                    
    UZB                                             
               External Door Handle of Avionics Compartment Doors
                        Figure 313/TASK 12-22-52-991-010
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                     Page 330
                                                                    Feb 01/10
                                               
 UZB                                           
R          (5) Remove any unwanted lubricant with a clean MISCELLANEOUS (Material
R              No. 19-003).
           (6) Apply STORAGE PRESERVATION (Material No. 15-004) to the inner surface
               and the adjacent area of the applicable external door handle.
     5. Close-up
        ________
Subtask 12-22-52-410-057
A. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
           (2) Push the external door handle into its recess so that it is flush
               with the door contour.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 331
                                                                           Feb 01/11
                                                   
    UZB                                            
     TASK 12-22-52-640-009
     WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN
     _______
               YOU USE SPECIAL MATERIALS.
               IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN
               YOUR EYES :
               -FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 AND 15
               MINUTES.
               -GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS.
               DO NOT BREATHE THE FUMES FROM THE MATERIAL.
               DO NOT SMOKE WHEN YOU USE THE MATERIAL.
               DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT.
               THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND
               SKIN IRRITANTS.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 332
                                                                           Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-52-010-065
        A. Get Access
           (Ref. Fig. 314/TASK 12-22-52-991-014)
           (1) Open the FWD and/or aft cargo-compartment door (referred to as cargo
               door) and safety it with the actuator safety locks (Ref. TASK 52-30-
               00-860-001).
R          (2) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position below the
               opened cargo door.
           (3) Remove the door lining and insulation from the applicable cargo door
               to get access to inner skin (Ref. TASK 52-31-13-000-001) or
               (Ref. TASK 52-32-13-000-001).
           (4) Remove the screws and access cover from the inner skin of the cargo
               door.
Subtask 12-22-52-865-052
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      122VU DOORS/CARGO                                               1MJ      T12
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 333
                                                                            Feb 01/11
                                                    
    UZB                                             
          Lubrication of the FWD and AFT Cargo Compartment-Door Handle
                  Figure 314/TASK 12-22-52-991-014- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                          Page 334
                                                                         Feb 01/10
                                               
 UZB                                           
          Lubrication of the FWD and AFT Cargo Compartment-Door Handle
                  Figure 314/TASK 12-22-52-991-014- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                          Page 335
                                                                         Feb 01/10
                                               
 UZB                                           
     4. Procedure
        _________
Subtask 12-22-52-640-058
           (1) Apply COMMON GREASE (Material No. 04-004) or to the grease nipple of
               the door handle shaft.
           (2) Apply OILS (Material No. 03-001) to the pivot points of the door
               handle flap.
(3) Apply OILS (Material No. 03-001) to the handle flap spring.
           (4) Apply OILS (Material No. 03-001) to the bearings of the serrated
               shaft.
           (6) Apply COMMON GREASE (Material No. 04-017) to the mating surface of
               the Malteser-cross latch and the Malteser-cross lock.
           (7) Apply COMMON GREASE (Material No. 04-017) to the mating surface of
               the handle catch hook.
           (8) Apply COMMON GREASE (Material No. 04-017) to the mating surface of
               the roller lever.
R          (9) Remove the unwanted grease or oil with a MISCELLANEOUS (Material No.
R              19-003).
     5. Close-up
        ________
Subtask 12-22-52-865-053
        A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
           1MJ, 3801GX, 3802GX, 3803GX
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                              Page 336
                                                                             Feb 01/11
                                                   
    UZB                                            
  Subtask 12-22-52-410-058
     B. Close Access
        (Ref. Fig. 314/TASK 12-22-52-991-014)
        (1) Put the access cover on the inner skin of the cargo door and attach
            it with the screws.
        (2) Install the door lining and insulation on the cargo door (Ref. TASK
            52-31-13-000-001) or (Ref. TASK 52-32-13-000-001).
        (3) Remove the actuator safety locks and close the cargo door (Ref. TASK
            52-30-00-860-001).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                         Page 337
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-22-52-640-014
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                              Page 338
                                                                             Feb 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-52-010-066
A. Get Access
R          (1) Put the ACCESS PLATFORM 5M (16 FT)- ADJUSTABLE in position to the
               applicable passenger/crew door (referred to as door).
           (4) Remove the door lining (Ref. TASK 25-23-46-000-002) and (Ref. TASK
               25-23-46-000-001) and the door insulation as required.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 339
                                                                            Feb 01/11
                                                    
    UZB                                             
     4. Procedure
        _________
Subtask 12-22-52-640-063
A. Lubrication Procedure
R          (1) Apply COMMON GREASE (Material No. 04-004) with a GUN - GREASE to the
               grease fitting of the subsequent components:
               - the safety-pin guide fitting (1)
               - the spring rod of the slide control handle (2)
               - the telescopic rod of the slide arming mechanism (3)
               - the hook of the interlock mechanism (4)
               - the spring rod of the escape-slide control mechanism (5)
           (2) Make sure that the bushes of the safety-pin guide fitting (1) are in
               their correct position after the lubrication procedure.
(a) Loosen the lower seal nut (7) by three turns minimum.
               (b) Apply COMMON GREASE (Material No. 04-004) to the upper grease
                   fitting of the flexible control (6).
R                   NOTE : Operate the GUN - GREASE until the grease comes in view at
                    ____
                           the holes of the lower seal nut (7).
               (c) TORQUE the lower seal nut (7) to between 0.35 and 0.45 m.daN
                   (30.97 and 39.82 lbf.in).
(d) Loosen the upper seal nut (8) by three turns minimum.
               (e) Apply COMMON GREASE (Material No. 04-004) to the upper grease
                   fitting of the flexible control (6).
R                   NOTE : Operate the GUN - GREASE until the grease comes in view at
                    ____
                           the holes of the upper seal nut (8).
               (f) TORQUE the upper seal nut (8) to between 0.35 and 0.45 m.daN
                   (30.97 and 39.82 lbf.in).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                             Page 340
                                                                            Feb 01/11
                                                    
    UZB                                             
     Lubrication of the Safety Guide Fitting and Door Arming/Disarming Mechanism
                          Figure 315/TASK 12-22-52-991-022
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                          Page 341
                                                                         Feb 01/11
R                                                
  UZB                                            
                      Lubrication of the Girt Bar Spring
                       Figure 316/TASK 12-22-52-991-029
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                   Page 342
                                                                  Feb 01/11
R                                             
  UZB                                         
R          (4) Apply COMMON GREASE (Material No. 04-004) with a BRUSH - BRISTLED to
               the spring of girt bar trigger.
R          (5) Remove the unwanted grease with a MISCELLANEOUS (Material No. 19-
R              003).
     5. Close-up
        ________
Subtask 12-22-52-410-063
A. Close Access
           (1) Install the removed door insulation and door lining (Ref. TASK 25-23-
               46-400-001) and (Ref. TASK 25-23-46-400-002).
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 343
                                                                           Feb 01/11
                                                   
    UZB                                            
     TASK 12-22-52-640-016
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                              Page 344
                                                                             Feb 01/11
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-22-52-010-068
A. Get Access
Subtask 12-22-52-160-050
B. Cleaning Procedure
R          (1) Clean the bearing area of the opened door with a MISCELLANEOUS
R              (Material No. 19-003) and the CLEANING AGENTS (Material No. 11-016).
     4. Procedure
        _________
Subtask 12-22-52-640-065
           (1) Apply LUBRICANTS (Material No. 06-014) on all sliding parts of the
               bearings.
           (2) Release the door stay mechanism and move the applicable door in the
               close and open direction serveral times.
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                            Page 345
                                                                           Feb 01/11
                                                   
    UZB                                            
              Lubrication of the Hinge-Arm Support-Fitting Bearings
                        Figure 317/TASK 12-22-52-991-028
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                       Page 346
                                                                      Feb 01/10
                                               
 UZB                                           
  5. Close-up
     ________
Subtask 12-22-52-410-065
A. Close Access
  
  EFF :
  
             ALL                                      12-22-52
                                                     
                                                                         Page 347
                                                                        Feb 01/10
                                                
 UZB                                            
                                 FUSELAGE - SERVICING
                                 ____________________
TASK 12-22-53-640-001
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
  _______
            CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
  WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
  _______
            OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
  WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
  _______
            NOTICES ARE IN POSITION.
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                         Page 301
                                                                        Feb 01/10
                                                  
 UZB                                              
     B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-22-53-860-050
A. Aircraft Configuration
        (1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
            10-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00-
            864-003) and install the warning notices to prevent pressurization.
Subtask 12-22-53-941-050
B. Get Access
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                         Page 302
                                                                        Feb 01/10
                                                 
 UZB                                             
  Subtask 12-22-53-010-050
C. Open Access
        (1) Put the warning notices in position in the cockpit to prevent the
            operation of the flight controls.
  4. Procedure
     _________
Subtask 12-22-53-640-050
     A. Lubricate the attach and hinge fittings with COMMON GREASE (Material No.
        04-004).
        (Ref. Fig. 301/TASK 12-22-53-991-001)
  5. Close-up
     ________
Subtask 12-22-53-410-050
Subtask 12-22-53-942-050
B. Close Access
        (3) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                         Page 303
                                                                        Feb 01/10
                                                
 UZB                                            
         Lubrication Points of the Hinge and Attach Fittings of the Horizontal
                                      Stabilizer
                           Figure 301/TASK 12-22-53-991-001
  
  EFF :
  
             ALL                                   
                                                   
                                                       12-22-53            Page 304
                                                                          Feb 01/10
                                                  
  UZB                                             
  TASK 12-22-53-640-002
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
  _______
            CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
  WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
  _______
            OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
  WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING
  _______
            NOTICES ARE IN POSITION.
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                           Page 305
                                                                          Feb 01/10
                                                  
 UZB                                              
     C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-22-53-860-051
A. Aircraft Configuration
        (1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
            10-00-864-001), (Ref. TASK 29-10-00-864-002), (Ref. TASK 29-10-00-
            864-003) and install the warning notices to prevent pressurization.
Subtask 12-22-53-941-052
B. Get Access
Subtask 12-22-53-010-051
C. Open Access
        (1) Put the warning notices in position in the cockpit to prevent the
            operation of the flight controls.
  4. Procedure
     _________
Subtask 12-22-53-640-051
     A. Lubricate the attach and hinge fittings with COMMON GREASE (Material No.
        04-037).
        (Ref. Fig. 302/TASK 12-22-53-991-002)
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                         Page 306
                                                                        Feb 01/10
                                                 
 UZB                                             
     Lubrication of the Attach and Hinge fittings of the Horizontal Stabilizer
                         Figure 302/TASK 12-22-53-991-002
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                         Page 307
                                                                        Feb 01/10
                                                
 UZB                                            
  5. Close-up
     ________
Subtask 12-22-53-410-051
Subtask 12-22-53-942-051
B. Close Access
        (3) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-22-53
                                                     
                                                                         Page 308
                                                                        Feb 01/10
                                                
 UZB                                            
                                    STABILIZERS - SERVICING
                                    _______________________
TASK 12-22-55-640-001
Lubrication of Rudder Hinge Bearing No. 6 with Grease Mat. No. 04-004
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                              Page 301
                                                                             Nov 01/10
                                                      
    UZB                                               
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-55-010-051
A. Get Access
           (1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
               29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-
               864-003).
R          (2) Put the WARNING NOTICE(S) in the cockpit to tell persons not to
               operate the flight controls.
(3) Put the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position.
Subtask 12-22-55-865-050
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
       49VU AUTO FLT/FAC1/28VDC                                       5CC1     B04
       49VU AUTO FLT/FAC1/26VAC                                      14CC1     B03
      121VU AUTO FLT/RUDDER/TRIM/IND                                 15CC      M20
      121VU AUTO FLT/FAC2/28VDC                                       5CC2     M19
      121VU AUTO FLT/FAC2/26VAC                                      14CC2     M18
      121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
      121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                            Page 302
                                                                           Nov 01/10
                                                    
    UZB                                             
  4. Procedure
     _________
Subtask 12-22-55-640-050
        (1) Clean the grease nipple with a lint-free cotton cloth MISCELLANEOUS
            (Material No. 19-003)
        (2) Lubricate the bearing with COMMON GREASE (Material No. 04-004)
            through the grease nipple with a GUN - GREASE.
  5. Close-up
     ________
Subtask 12-22-55-410-051
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-22-55-865-051
     B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        19CE1, 19CE2, 19CE3, 15CC, 5CC1, 5CC2, 14CC1, 14CC2
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                           Page 303
                                                                          Feb 01/10
                                                
 UZB                                            
                          Rudder Hinge Bearing No. 6
                       Figure 301/TASK 12-22-55-991-001
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
     TASK 12-22-55-640-002
Lubrication of Rudder Hinge Bearing No. 6 with Grease MAT. No. 04-037
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                              Page 305
                                                                             Nov 01/10
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-55-010-052
A. Get Access
           (1) Depressurize the Green, Yellow and Blue hydraulic systems (Ref. TASK
               29-10-00-864-001) (Ref. TASK 29-10-00-864-002) (Ref. TASK 29-10-00-
               864-003).
R          (2) Put the WARNING NOTICE(S) in the cockpit to tell persons not to
               operate the flight controls.
(3) Put the ACCESS PLATFORM 10M (33 FT) - ADJUSTABLE in position.
Subtask 12-22-55-865-052
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU FLIGHT CONTROLS/THS/ACTR/MOT2                            19CE2     B09
       49VU AUTO FLT/FAC1/28VDC                                       5CC1     B04
       49VU AUTO FLT/FAC1/26VAC                                      14CC1     B03
      121VU AUTO FLT/RUDDER/TRIM/IND                                 15CC      M20
      121VU AUTO FLT/FAC2/28VDC                                       5CC2     M19
      121VU AUTO FLT/FAC2/26VAC                                      14CC2     M18
      121VU FLIGHT CONTROLS/THS ACTR/MOT3                            19CE3     Q17
      121VU FLIGHT CONTROLS/THS ACTR/MOT1                            19CE1     Q16
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                            Page 306
                                                                           Nov 01/10
                                                    
    UZB                                             
  4. Procedure
     _________
Subtask 12-22-55-640-051
        (1) Clean the grease nipple with a lint-free cotton cloth MISCELLANEOUS
            (Material No. 19-003).
        (2) Lubricate the bearing with COMMON GREASE (Material No. 04-037)
            through the grease nipple with a GUN - GREASE.
  5. Close-up
     ________
Subtask 12-22-55-410-052
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-22-55-865-053
     B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        19CE1, 19CE2, 19CE3, 15CC, 5CC1, 5CC2, 14CC1, 14CC2
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                           Page 307
                                                                          Feb 01/10
                                                
 UZB                                            
                          Rudder Hinge Bearing No. 6
                       Figure 302/TASK 12-22-55-991-002
  
  EFF :
  
             ALL                                      12-22-55
                                                     
                                                                   Page 308
                                                                  Feb 01/10
                                              
 UZB                                          
                                     WINDOWS - SERVICING
                                     ___________________
TASK 12-22-56-600-001
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
     No specific                 brush
R
     No specific                 access platform 3.45 m (11 ft. 4 in.)
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-22-56
                                                     
                                                                              Page 301
                                                                             May 01/11
                                                     
    UZB                                              
        C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-22-56-941-050
A. Get Access
     4. Procedure
        _________
Subtask 12-22-56-615-050
           (1) Clean the cockpit sliding window tracks with a brush soaked in
               CLEANING AGENTS (Material No. 11-003).
Subtask 12-22-56-640-050
           (1) Apply COMMON GREASE (Material No. 04-012) to the cockpit sliding
               window tracks. Move the sliding window back and forth if necessary.
  
  EFF :
  
             ALL                                      12-22-56
                                                     
                                                                            Page 302
                                                                           May 01/11
                                                   
    UZB                                            
                 Lubrication of Sliding Windows Mechanism Tracks
                        Figure 301/TASK 12-22-56-991-001
  
  EFF :
  
             ALL                                      12-22-56
                                                     
                                                                    Page 303
                                                                   Feb 01/10
                                              
 UZB                                          
     5. Close-up
        ________
Subtask 12-22-56-942-050
A. Close Access
           (2) Make sure that the work area is clean and clear of tool(s) and other
               items.
  
  EFF :
  
             ALL                                      12-22-56
                                                     
                                                                            Page 304
                                                                           May 01/10
                                                   
    UZB                                            
                       DRAINAGE - DESCRIPTION AND OPERATION
                       ____________________________________
  1. General
     _______
A. The drainage points and their locations are specified in 12-00-00 page 1.
  
  EFF :
  
             ALL                                      12-24-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                                 AIR DATA SYSTEM - SERVICING
                                 ___________________________
TASK 12-24-34-600-001
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
     No specific               container
R    No specific             1 ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-24-34-860-051
Subtask 12-24-34-010-050
  
  EFF :
  
             ALL                                      12-24-34
                                                     
                                                                            Page 301
                                                                           Feb 01/11
                                                     
    UZB                                              
  4. Procedure
     _________
Subtask 12-24-34-680-050
(1) Put the container in position under the water drain (1).
(2) Release the protection plug (2) from the water drain (1).
        (3) Turn the protection plug (2) 180 degrees and put it into the drain
            valve.
        (4) Push the drain valve until the water in the standby static pressure
            lines is removed.
(5) Install the protection plug (2) on the water drain (1) and lock it.
  5. Close-up
     ________
Subtask 12-24-34-860-050
        (2) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (3) Remove all the grounding connectors, the maintenance equipment, the
            special tools and the standard tools, the ground power units, the
            filling equipment and the other items of equipment.
Subtask 12-24-34-410-050
B. Close Access
  
  EFF :
  
             ALL                                      12-24-34
                                                     
                                                                         Page 302
                                                                        Feb 01/10
                                                
 UZB                                            
                      Standby Air Data System Water Drain
                       Figure 301/TASK 12-24-34-991-001
  
  EFF :
  
             ALL                                      12-24-34
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
                     POTABLE WATER SYSTEM - MAINTENANCE PRACTICES
                     ____________________________________________
TASK 12-24-38-680-001
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
     3. __________
        Job Set-up
Subtask 12-24-38-680-050
           CAUTION : MAKE SURE THAT THE DRAIN VALVES REMAIN OPEN AFTER YOU DRAIN THE
           _______
                     POTABLE WATER SYSTEM IF :
                     - THE BLEED AIR SYSTEM IS OFF AND
                     - THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
                     THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
           (1) You must drain the water system when the outside air temperature is
               as shown in the cold weather maintenance - procedure (Ref. TASK 12-
               31-38-660-001).
Subtask 12-24-38-861-051
Subtask 12-24-38-865-052
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
     2000VU WATER SYSTEM-QANT-IND                                     1MA      B01
     2001VU WATER-SYS-DRAIN                                           1MP      B05
Subtask 12-24-38-941-052
R       D. Put the ACCESS PLATFORM 2M (6 FT) in position below the 133AL, 192NB and
R          171AL.
Subtask 12-24-38-860-050
           (1) Make sure that the potable water shutoff-valve in each lavatory is
               open.
           (2) Make sure that the potable water shutoff-valve in each wet galley is
               open.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                            Page 202
                                                                           Feb 01/11
                                                   
    UZB                                            
           (3) Make sure that the potable water-mixing timer control-knob in each
               lavatory is set to the center position (between the RED and BLUE
               band).
           (4) Make sure that the potable water shutoff-valve in each galley is
               open.
Subtask 12-24-38-010-054
           (2) Remove the cap from the fill and drain port on the service panel
               2023VU.
     4. Procedure
        _________
Subtask 12-24-38-680-051
               (a) Turn the fill and drain control handle 3254MM to the PULL TO
                   DRAIN position. Then pull it out to the mechanical stop.
                    NOTE : These
                    ____           lights come on:
R                          - The   drain valve control light 2MP
R                          - The   drain valve control light 12MP
                           - The   overflow valve control light 6MP.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                             Page 203
                                                                            Aug 01/10
                                                      
    UZB                                               
                          Potable Water Service-Panel
                       Figure 201/TASK 12-24-38-991-004
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                   Page 204
                                                                  Feb 01/10
                                              
 UZB                                          
         (3) Operate the water faucet(s), the coffee makers and the water heater
             in the galley(s), if installed, to drain them.
(4) Step (3) must be repeated again if the aircraft has been moved.
         (5) When the system is drained, remove the drain hose from:
             - The fill and drain port at the service panel 2023VU
             - The drain port on the mid drain and overflow panel
             - The drain port on the forward drain panel.
         (6) Return the fill and drain control handle 3254MM to the NORMAL
             position.
   5. Close-up
      ________
Subtask 12-24-38-410-052
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (2) Clean and dry the panels with a lint free cloth MISCELLANEOUS
             (Material No. 19-003).
(3) Install the cap on the fill and drain port of the service panel.
             NOTE : If the draining is done in cold weather the caps and access
             ____
                    panels should be left open (Ref. TASK 12-31-38-660-001).
Subtask 12-24-38-862-051
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                          Page 205
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-24-38-942-055
      C. Remove the ground support and maintenance equipment, the special and
         standard tools and all other items.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                          Page 206
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-24-38-680-002
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-24-38-680-052
           CAUTION : MAKE SURE THAT THE DRAIN VALVES REMAIN OPEN AFTER YOU DRAIN THE
           _______
                     POTABLE WATER SYSTEM IF :
                     - THE BLEED AIR SYSTEM IS OFF AND
                     - THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
                     THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                            Page 207
                                                                           Feb 01/11
                                                     
    UZB                                              
           (1) You must drain the water system when the outside air temperature is
               as shown in the cold-weather maintenance-procedure (Ref. TASK 12-31-
               38-660-001).
Subtask 12-24-38-941-053
R       B. Put the ACCESS PLATFORM 2M (6 FT) in position below the 133AL, 192NB and
R          171AL.
Subtask 12-24-38-860-051
           (1) Make sure that the potable water shutoff valve in each lavatory is
               open.
           (2) Make sure that the potable water-mixing timer control-knob in each
               lavatory is set to the center position (between the RED and BLUE
               band).
           (3) Make sure that the potable water shutoff valve in each galley is
               open.
Subtask 12-24-38-010-055
           (2) Remove the cap from the fill and drain port on the service panel
               2023VU.
     4. Procedure
        _________
Subtask 12-24-38-680-053
           CAUTION : MAKE SURE THAT THE DRAIN VALVES ARE IN THE CLOSED POSITION IF
           _______
                     THE BLEED AIR SYSTEM IS ON.
                     YOU MUST DO THIS LESS THAN 10 MIN AFTER THE FLOW OF WATER FROM
                     THE DRAIN PORTS OF THE POTABLE WATER SYSTEM STOPS.
                     THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                            Page 208
                                                                           Feb 01/11
                                                   
    UZB                                            
         (1) Connect the drain hoses to:
             - the fill and drain port on the service panel
             - the drain port on the mid drain and overflow panel
             - the drain port on the forward drain panel.
             (a) Turn the fill and drain control handle 3254MM to the PULL TO
                 DRAIN position. Then pull it out to the mechanical stop.
             (a) Turn the drain control handle on the drain panel to the OPEN
                 position.
                 NOTE : Water
                 ____           will drain from:
                        - the   fill and drain port on the service panel 2023VU
                        - the   drain port on the mid drain panel
                        - the   drain port on the forward drain panel.
         (7) Clean and dry the panels with a lint-free cotton cloth MISCELLANEOUS
             (Material No. 19-003).
(8) Install the cap on the fill and drain port of the service panel.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                            Page 209
                                                                           Feb 01/11
R                                                  
  UZB                                              
  5. Close-up
     ________
Subtask 12-24-38-410-053
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (4) Remove all the ground support equipment, the maintenance equipment,
            the standard and special tools and all other items.
  
  EFF :
  
             ALL                                      12-24-38
                                                     
                                                                         Page 210
                                                                        Feb 01/11
                                                
 UZB                                            
   USE OF MANUAL (MAGNETIC) FUEL QUANTITY INDICATORS - DESCRIPTION AND OPERATION
   _____________________________________________________________________________
  1. _______
     General
     Manual Magnetic Indicators (MMIs) can be used to find the quantity of fuel
     in the tanks when the aircraft is on the ground. Electrical power is not
     required to operate the MMIs.
     Before the MMIs are used it is necessary to find the aircraft attitude
     value.
     The MMIs each contain a Magnetic Level Indicator (MLI) and its related
     Magnetic Level Indicator Housing (MLIH), these are fully described in (Ref.
     28-43-00) and for their use (Ref.12-11-28).
  
  EFF :
  
             ALL                                      12-28-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                 UNSCHEDULED SERVICING - DESCRIPTION AND OPERATION
                 _________________________________________________
  1. _______
     General
     This section provides instructions related to the servicing operations for
     which no frequency is specified.
     It is divided as follows:
     - AIRCRAFT PROTECTION (Ref. ATA 12-31),
     - SAMPLING FOR ANALYSIS (Ref. ATA 12-32),
     - PRE-CONDITIONING (Ref. ATA 12-33),
     - SYSTEM LINE FLUSHING (Ref. ATA 12-36).
  
  EFF :
  
             ALL                                      12-30-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                     AIRCRAFT PROTECTION - DESCRIPTION AND OPERATION
                     _______________________________________________
     1. _______
        General
        Safe operation of aircraft in cold weather conditions raises specific
        problems. Aircraft downtime and delays in flight schedules caused by cold
        weather problems can be minimized by a program of preventive cold weather
        servicing.
        Procedures for cold weather servicing during cold weather must be developed
        by the operator. This servicing must meet their specific requirements based
        on :
        - their cold weather experience
        - the available equipment and materials
        - the climatic conditions existing at their bases
        This topic contains information to assist the operator in defining
        developing, and implementing cold weather preventive maintenance procedures
        that will minimize aircraft downtime and improve the safe operating level of
        the aircraft in adverse climatic conditions .
        These procedures are:
        - 12-31-11,P. Block 201 ANTI-ICING PROTECTION
        - 12-31-12,P. Block 201 ICE AND SNOW REMOVAL.
        - 12-31-21,P. Block 201 AIR CONDITIONING.
        - 12-31-24,P. Block 201 ELECTRICAL POWER.
        - 12-31-25,P. Block 201 EQUIPMENT/FURNISHINGS.
        - 12-31-27,P. Block 201 FLIGHT CONTROLS.
        - 12-31-28,P. Block 201 FUEL.
        - 12-31-31,P. Block 201 INDICATING/RECORDING SYSTEMS AND NAVIGATION.
        - 12-31-32,P. Block 201 LANDING GEAR.
        - 12-31-35,P. Block 201 OXYGEN SYSTEM
        - 12-31-38,P. Block 201 WATER/WASTE.
        - 12-31-49,P. Block 201 AUXILIARY POWER UNIT.
        - 12-31-51,P. Block 201 STRUCTURE.
        - 12-31-52,P. Block 201 DOORS.
        - 12-31-71,P. Block 201 POWER PLANT.
        Cold Soak Definition
        The aircraft is in cold soak configuration when :
        - it is parked in cold weather (Outside Air Temperature (OAT) lower than 0
          deg.C (32.00 deg.F)) and
        - there is no supply of power to the aircraft (no air conditioning).
R
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                              Page 1
                                                                           May 01/10
                                                   
    UZB                                            
                       AIRCRAFT PROTECTION - MAINTENANCE PRACTICES
                       ___________________________________________
TASK 12-31-00-600-001
     1. __________________
        Reason for the Job
R       NOTE : All the data related to the fluids must come from the manufacturers
        ____
               recommendations for application and holdover times (supplied with the
               fluid). The Ice Protection Procedures and all the data related to
R              anti/de-icing fluids are shown in the Association of European
R              Airlines (AEA) recommendations available on the website www.aea.be:
               - Recommendations for De-Icing/Anti-Icing of Aircraft on the Ground
               - Training Recommendations and Background Information for
                 De-Icing/Anti-Icing of Aircraft on the Ground.
R                These procedures agree with and are related to SAE ARP 4737 (Ice
R                Protection Procedures) and are Airbus preferred for De-Icing and
                 Anti-Icing requirements.
     2. ______________________
        Job Set-up Information
A. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                              Page 201
                                                                             May 01/10
                                                     
    UZB                                              
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-31-00-941-050
A. Not Applicable
     4. Procedure
        _________
Subtask 12-31-00-860-050
A. General
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                             Page 202
                                                                            Nov 01/10
                                                    
    UZB                                             
           (2) Cold soak definition
               (a) The operators must prepare their own procedures for cold weather
                   servicing.
                   This servicing must be adapted to their special conditions:
                   - their cold weather experience,
                   - the available equipment and material,
                   - the climatic conditions at their bases.
Subtask 12-31-00-860-051
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                            Page 203
                                                                           Nov 01/10
                                                   
    UZB                                            
     Subtask 12-31-00-860-052
R          CAUTION : DO NOT MAKE THE ANTI-ICING/DE-ICING FLUID IN TANKS HOT TOO MANY
           _______
R                    TIMES OR FOR LONG PERIODS. IF YOU DO, THE QUANTITY OF WATER IN
R                    THE FLUID WILL DECREASE AND THERE WILL BE A POSSIBLE
R                    DEGRADATION OF THE FLUID PERFORMANCE.
               (a) De-icing is a procedure to remove frost, ice, snow and slush from
                   the aircraft surfaces.
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                            Page 204
                                                                           Nov 01/10
                                                   
    UZB                                            
R           (3) Anti-icing is a procedure wich gives protection from the formation of
R               frost or ice and snow accumulations on the treated surfaces of the
R               aircraft for a limited period of time (the holdover time).
R           (4) Anti-icing fluids are usually applied cold directly onto a clean
R               aircraft surface.
                Typical anti-icing fluids are:
                - Newtonian fluids (ISO or SAE or AEA type I ANTI-ICING AND DE-ICING
                  MATERIALS (Material No. 10-001)),
                - Mixtures of water and Type I fluid ANTI-ICING AND DE-ICING
                  MATERIALS (Material No. 10-001),
                - Non-Newtonian fluids (ISO or SAE or AEA Type II ANTI-ICING AND DE-
                  ICING MATERIALS (Material No. 10-003) or Type III ANTI-ICING AND
                  DE-ICING MATERIALS (Material No. 10-005) or Type IV ANTI-ICING AND
                  DE-ICING MATERIALS (Material No. 10-004)).
                - Mixtures of water and Type II ANTI-ICING AND DE-ICING MATERIALS
                  (Material No. 10-003) or Type III ANTI-ICING AND DE-ICING MATERIALS
                  (Material No. 10-005) or Type IV ANTI-ICING AND DE-ICING MATERIALS
                  (Material No. 10-004) fluids.
R           (6) Newtonian fluids (Type I) have a low viscosity that only changes with
                temperature.
            (7) Holdover time is the estimated time during which anti-icing fluids
R               will prevent the formation of frost or ice and snow accumulations on
R               the treated surfaces of the aircraft. The holdover time starts at the
                beginning of the anti-icing treatment.
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                             Page 205
                                                                            May 01/10
                                                    
    UZB                                             
R                     After long periods of de-icing/anti-icing, it is recommended
R                     to do a check of areas and cavities that are not in the
R                     aerodynamic airflows (such as balance bays and wing and
R                     stabilizer rear spars) for thickened fluid residues.
Subtask 12-31-00-860-053
R          (2) Ice, snow and frost or combinations of these will change the airflow,
R              and have an effect on lift and drag. They also increase the aircraft
R              weight.
R          (3) The aircraft, and especially its surfaces that give lift and
R              stability, must be aerodynamically clean. If they are not, safe
               operation is not possible.
R          (4) If the fuel temperature is lower than freezing point and the aircraft
R              is in precipitation, clear ice can form on the wings (wing tank
R              area), even if the outside temperature is as high as 15 deg.C (59.00
               deg.F).
R          (5) An aircraft that is ready for flight must not have ice, snow, slush
R              or frost on its critical flight surfaces (Wings, vertical and
R              horizontal stabilizers and rudder).
               Thin hoarfrost is permitted on the upper surface of the fuselage.
R              NOTE : A frost layer of less than 3 mm (0.1181 in.) on the wing lower
               ____
R                     surface (in the area of fuel tanks) is permitted without
R                     effect on take-off performance if it is caused by cold fuel
R                     (low fuel temperature, OAT higher than freezing point and high
R                     humidity).
R                     This is not applicable to THS.
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                            Page 206
                                                                           May 01/10
                                                    
    UZB                                             
           (6) A contamination check of the aircraft must include all parts of the
               aircraft. You must do this visual inspection from a position which
R              gives a clear view of all surfaces. Because you cannot always see
R              collected clear ice easily, we recommend that you do an inspection of
R              the critical surfaces (wings, vertical and horizontal stabilizers and
R              rudder) with your hands.
Subtask 12-31-00-860-054
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                            Page 207
                                                                           May 01/10
                                                   
    UZB                                            
R          (2) Type II ANTI-ICING AND DE-ICING MATERIALS (Material No. 10-003), or
R              Type III ANTI-ICING AND DE-ICING MATERIALS (Material No. 10-005), or
R              Type IV ANTI-ICING AND DE-ICING MATERIALS (Material No. 10-004)
R              fluids have a minimum of 50% by volume of either:
               - Monoethylene-glycol
               - Diethylene-glycol
               - Monopropylene-glycol
               - or a mixture of these glycols.
R                The other 50% is:
R              - Inhibitors,to prevent corrosion and increase the flash-point
R              - Water and wetting agents,to help the fluid form a uniform film over
R                the aircraft surfaces
R              - Thickening agents, to help the fluid to adhere to the aircraft
R                surfaces for longer periods.
R                The holdover time is longer for Type II or Type III or Type IV
R                fluids than for Type I fluids.
(4) Equipment
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                            Page 208
                                                                           May 01/10
                                                   
    UZB                                            
           (b) Static facilities
               Purpose-built de-icing/anti-icing facilities, available at some
R              airports, consist of spray nozzles installed on a gantry. The
R              gantry moves at a given speed above the aircraft or the aircraft
R              moves below the gantry. The rate of fluid application can be
R              computer-controlled to give regular and fast fluid application.
  
  EFF :
  
             ALL                                      12-31-00
                                                     
                                                                        Page 209
                                                                       May 01/10
                                               
    UZB                                        
                    ANTI-ICING PROTECTION - MAINTENANCE PRACTICES
                    _____________________________________________
TASK 12-31-11-660-001
   WARNING : BE CAREFUL WHEN YOU USE ANTI-ICING AND DE-ICING MATERIALS. OBEY THE
   _______
             MATERIAL MANUFACTURERS INSTRUCTIONS AND THE LOCAL REGULATIONS. MAKE
             SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. DO NOT
             BREATHE THE FUMES. USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES. IF
             YOU GET ONE OF THESE MATERIALS:
             - ON YOUR SKIN OR IN YOUR EYES, FLUSH IT AWAY WITH A FLOW OF CLEAN
             WATER.
             - IN YOUR MOUTH, GET IMMEDIATE MEDICAL AID.
   CAUTION : DO NOT USE JET EXHAUST TO REMOVE SNOW OR ICE FROM THE AIRFRAME. THE
   _______
             HIGH PRESSURE AND HIGH TEMPERATURE OF JET EXHAUST CAN CAUSE DAMAGE TO
             THE AIRCRAFT.
   1. __________________
      Reason for the Job
      The procedures prevent the formation of ice in some zones (wings, vertical
      and horizontal stabilizers, rudder) and make the removal of snow from the
      aircraft easier.
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                          Page 201
                                                                         Feb 01/11
R                                                
  UZB                                            
        NOTE : All the data related to the fluids must be taken from the
        ____
               manufacturers recommendations for application and holdover times
               (supplied with the fluid).
R              The ice protection procedures and all the data related to
R              anti/de-icing fluids are given in the Association of European
               Airlines (AEA) recommendations available on the website www.aea.be:
R              - Recommendations for De-Icing/Anti-Icing of aircraft on the Ground
               - Training Recommendations and Background Information for
                 De-Icing/Anti-Icing of Aircraft on the Ground.
R       NOTE : The operators must use the procedures applicable to their specified
        ____
R              operating procedures and requirements.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                            Page 202
                                                                           Feb 01/11
                                                   
    UZB                                            
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-31-11-660-058
           (1) If the aircraft comes to the gate with the flaps/slats in a position
               other than fully retracted:
               - You must do an inspection of these flaps/slats.
               - You must remove the ice before retraction, if necessary.
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                             Page 203
                                                                            Feb 01/11
                                                    
    UZB                                             
     Subtask 12-31-11-860-053
R          (1) Park the aircraft on a flat surface. Make sure that the wheels of the
R              nose landing gear are on the aircraft axis and that the aircraft
R              points into the wind.
           (2) Install the safety devices on the landing gears (Ref. TASK 32-00-00-
               481-001).
           (6) Make sure that the flaps, the slats, the spoilers, the speed brakes
               and the thrust reversers are retracted.
           (7) Make sure that the Auxiliary Power Unit (APU) and the engine
               bleed-air systems are stopped.
               CAUTION : BEFORE YOU PUSH THE DITCHING PUSHBUTTON SWITCH, MAKE SURE
               _______
                         THAT THERE IS NO SUPPLY OF AIR TO THE AIRCRAFT THROUGH THE
                         LOW PRESSURE CONNECTION. IF THERE IS A SUPPLY OF AIR, YOU
                         CAN CAUSE UNWANTED PRESSURIZATION OF THE AIRCRAFT.
R              (a) Make sure that the MODE SEL pushbutton switch is in AUTO
R                  position.
R                  - The FAULT and MAN legends of the MODE SEL pushbutton switch are
R                    off.
R
R              (b) Lift the guard and push the DITCHING pushbutton switch (the ON
R                  legend comes on).
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                            Page 204
                                                                           Feb 01/11
                                                    
    UZB                                             
                    1
                    _   Put a WARNING NOTICE(S) in position to tell persons not to
                        operate this pushbutton switch.
            (9) Put a WARNING NOTICE(S) to tell persons to remove snow from their
                shoes and clothes before they go into the aircraft. This is very
                important in the cargo compartments. If there is ice or snow on the
                latches, this can cause defective operation of the cargo loading
                system.
           (11) To prevent contamination of the aircraft interior, make sure that all
                the doors and the sliding windows are closed.
Subtask 12-31-11-941-055
C. Preparation of Equipment
            CAUTION : BEFORE YOU APPLY ANTI-ICING/DE-ICING FLUIDS, MAKE SURE THAT THE
            _______
                      SUPPLY PRESSURE IS NOT MORE THAN THE SPECIFIED VALUES.
            CAUTION : DO NOT MAKE THE ANTI-ICING/DE-ICING FLUID IN TANKS HOT TOO MANY
            _______
                      TIMES OR FOR LONG PERIODS. IF YOU DO, THE QUANTITY OF WATER IN
                      THE FLUID WILL DECREASE AND THERE WILL BE A POSSIBLE
                      DEGRADATION OF THE FLUID PERFORMANCE.
            (1) Put the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT in
                position. Make sure that the safety zone of the aircraft is clear so
                that the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT moves
                easily.
R               NOTE : For the use on the ramp, the DE- ANTI-ICING EQUIPMENT - 12M
                ____
R                      (39 FT) SPRAYING HEIGHT has a storage tank for the
R                      anti/de-icing fluid. Do not mix other fluids with the
                       anti/de-icing fluid. Use the fluid at the recommended
                       concentration for the temperature to get a correct protection.
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                              Page 205
                                                                             Feb 01/11
                                                     
    UZB                                              
           (2) On the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT:
               (a) Set the supply pressure to less than 10 psi (0.6894 bar) impact
                   pressure.
                   - For fairings, the impact pressure must not be more than 1.5 psi
                     (0.1034 bar).
     4. Procedure
        _________
Subtask 12-31-11-660-059
A. Aircraft Anti-Icing
           (1) Apply the anti-icing fluid to all the external surfaces of the
               aircraft with the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING
               HEIGHT
               You must always point the spray from the front to the rear of the
               aircraft.
               Do no apply fluid directly on:
R              - the APU air intake and exhaust,
R              - the engine cowls, air intakes and exhausts
R              - the outflow valve air-outlet
R              - the outlet and inlet of the avionic compartment ventilation system
R              - the outlets and inlets of the air conditioning system
R              - the landing gear doors
R              - the brake systems and wheels of the landing gears
R              - the battery venturi
R              - the pitot probes
R              - the static probes
R              - the Angle-of-Attack (AOA) sensors
R              - the temperature sensor
R              - the ice detectors (If installed)
R              - the cabin windows and window seals.
           (2) Do not put too much anti-icing fluid in the areas of the rudder,
R              elevator and aileron servocontrols.
R              NOTE : If you point the spray in the other direction (rear to front),
               ____
R                     anti-icing fluid can go into the THS or into the rear fuselage
R                     non-pressurized compartment.
           (4) To prevent the flow of fluid on the cockpit windows, remove the
               remaining fluid from the forward areas. You can clean the surface
               with clear water and a soft cloth.
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                            Page 206
                                                                           Feb 01/11
                                                   
    UZB                                            
           (5) If you find fluid on the cockpit or cabin windows, clean the windows
               with clear water and a soft cloth.
               - Do not use the wipers to clean fluid from the windshield.
               - Be careful to remove all fluid from the windshield, specially in
                 the wiper area.
     5. Close-up
        ________
Subtask 12-31-11-942-053
(b) Release the DITCHING pushbutton switch (the ON legend goes off).
Subtask 12-31-11-865-050
        B. If the VENT AVNCS SYS FAULT message is shown on the upper ECAM DU, reset
           these AEVC C/Bs:
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU AIR COND/AVNCS VENT/CTL                                   6HQ      D06
       49VU AIR COND/AVNCS VENT/CTL                                   5HQ      D05
      122VU AIR COND/AVNCS/VENT/MONG                                  3HQ      Y17
Subtask 12-31-11-942-054
           (2) Remove the protections and clean the covers with water to remove all
               signs of anti-icing fluid.
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                            Page 207
                                                                           Feb 01/11
                                                   
    UZB                                            
         (3) Remove the ground support and maintenance equipment, the special and
             standard tools, materials used for protection and all other items.
  
  EFF :
  
             ALL                                      12-31-11
                                                     
                                                                          Page 208
                                                                         Feb 01/11
R                                                
  UZB                                            
                      ICE AND SNOW REMOVAL - MAINTENANCE PRACTICES
                      ____________________________________________
TASK 12-31-12-660-002
     WARNING : BE CAREFUL WHEN YOU USE ANTI-ICING AND DE-ICING MATERIALS. OBEY THE
     _______
               MATERIAL MANUFACTURERS INSTRUCTIONS AND THE LOCAL REGULATIONS. MAKE
               SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. DO NOT
               BREATHE THE FUMES. USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES. IF
               YOU GET ONE OF THESE MATERIALS:
               - ON YOUR SKIN OR IN YOUR EYES, FLUSH IT AWAY WITH A FLOW OF CLEAN
               WATER.
               - IN YOUR MOUTH, GET IMMEDIATE MEDICAL AID.
     CAUTION : DO NOT TRY TO OPERATE ANY OF THE FLIGHT CONTROL SURFACES IF THERE IS
     _______
               ICE ON THEM. IF YOU DO, YOU CAN CAUSE DAMAGE TO THE SYSTEM.
               SMALL SURFACE MOVEMENT IS PERMITTED AT HYDRAULIC POWER-UP OF
               AIRCRAFT.
     CAUTION : DO NOT USE JET EXHAUST TO REMOVE SNOW OR ICE FROM THE AIRFRAME. THE
     _______
               HIGH PRESSURE AND HIGH TEMPERATURE OF JET EXHAUST CAN CAUSE DAMAGE TO
               THE AIRCRAFT.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 201
                                                                           Feb 01/11
                                                   
    UZB                                            
     1. __________________
        Reason for the Job
R       This procedure gives guidelines for the removal of ice and snow on the
R       aircraft.
R       This applies to an aircraft parked in an applicable de-icing area with
R       engines or APU stopped, or no GPU, or no air conditioning cart connected.
        NOTE : All the data related to the fluids must be taken from the
        ____
               manufacturers recommendations for application and holdover times
R              (supplied with the fluid). The ice protection procedures and all the
R              data related to anti/de-icing fluids are given in the Association of
               European Airlines (AEA) recommendations available on the website
               www.aea.be:
R              - Recommendations for De-Icing/Anti-Icing of aircraft on the Ground
               - Training Recommendations and Background Information for
                 De-Icing/Anti-Icing of Aircraft on the Ground.
        NOTE : The operators must use the procedures applicable to their specified
        ____
               operating procedures and requirements.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 202
                                                                           Feb 01/11
                                                   
    UZB                                            
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
   No specific             1 BROOM
   No specific             1 BRUSH - BRISTLED, SOFT
   No specific             1 DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING
                             HEIGHT
   No specific            AR FILM - POLYETHYLENE
   No specific             1 WARNING NOTICE(S)
B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 203
                                                                           Feb 01/11
R                                                  
  UZB                                              
     3. __________
        Job Set-up
Subtask 12-31-12-860-052
R          (1) Park the aircraft on a flat surface. Make sure that the wheels of the
R              nose landing gear are on the aircraft axis and that the aircraft
R              points into the wind.
(2) Make sure that the APU and aircraft engines are stopped.
           (3) Install the safety devices on the landing gears (Ref. TASK 32-00-00-
               481-001).
           (7) Make sure that the slats, flaps, spoilers, ailerons and thrust
               reversers are retracted.
R              If they are not retracted:
               (a) Release the EXTRACT pushbutton switch (the OVRD legend comes on).
R
R              CAUTION : BEFORE YOU PUSH THE DITCHING PUSHBUTTON SWITCH, MAKE SURE
               _______
R                        THAT THERE IS NO SUPPLY OF AIR TO THE AIRCRAFT THROUGH THE
R                        LOW PRESSURE CONNECTION. IF THERE IS A SUPPLY OF AIR, YOU
R                        CAN CAUSE UNWANTED PRESSURIZATION OF THE AIRCRAFT.
R              (a) Make sure that the MODE SEL pushbutton switch is in AUTO
R                  position.
R                  - The FAULT and MAN legends of the MODE SEL pushbutton switch are
R                    off.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                              Page 204
                                                                             Feb 01/11
                                                   
    UZB                                            
R
R               (b) Lift the guard and push the DITCHING pushbutton switch (the ON
R                   legend comes on).
                    1
                    _   Put a WARNING NOTICE(S) in position to tell persons not to
                        operate this pushbutton switch.
           (10) Put a WARNING NOTICE(S) to tell persons to remove snow from their
                shoes and clothes before they go into the aircraft. This is very
                important in the cargo compartments. If there is ice or snow on the
                latches, this can cause defective operation of the cargo loading
                system.
           (12) Make sure that the landing gear doors, passenger/crew doors, cargo
                compartment doors, emergency exits, service doors and sliding windows
                are closed.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                              Page 205
                                                                             Feb 01/11
                                                     
    UZB                                              
     Subtask 12-31-12-860-058
B. Preparation of Equipment
           CAUTION : BEFORE YOU APPLY ANTI-ICING/DE-ICING FLUIDS, MAKE SURE THAT THE
           _______
                     SUPPLY PRESSURE IS NOT MORE THAN THE SPECIFIED VALUES.
           CAUTION : DO NOT MAKE THE ANTI-ICING/DE-ICING FLUID IN TANKS HOT TOO MANY
           _______
                     TIMES OR FOR LONG PERIODS. IF YOU DO, THE QUANTITY OF WATER IN
                     THE FLUID WILL DECREASE AND THERE WILL BE A POSSIBLE
                     DEGRADATION OF THE FLUID PERFORMANCE.
           (1) Put the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT in
               position. Make sure that the safety zone of the aircraft is clear so
               that the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT moves
               easily.
R              NOTE : For the use on the ramp, the DE- ANTI-ICING EQUIPMENT - 12M
               ____
R                     (39 FT) SPRAYING HEIGHT has a storage tank for the
R                     anti/de-icing fluid. Do not mix other fluids with the
                      anti/de-icing fluid. Use the fluid at the recommended
                      concentration for the temperature to get a correct protection.
(2) On the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT:
               (a) Set the supply pressure to less than 10 psi (0.6894 bar) impact
                   pressure.
                   - For fairings, the impact pressure must not be more than 1.5 psi
                     (0.1034 bar).
     4. Procedure
        _________
Subtask 12-31-12-660-067
A. De-icing
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 206
                                                                           Feb 01/11
                                                   
    UZB                                            
                  -   the   pitot probes,
                  -   the   static probes,
R                 -   the   Angle-of-Attack (AOA) sensors,
                  -   the   temperature sensor,
                  -   the   ice detectors (If installed).
              (b) If the layer of snow is too thick, use a BROOM to remove most of
                  the snow. Use a BROOM with soft bristles to prevent damage to the
                  aircraft skin.
              CAUTION : DURING THE DE-ICING AND CLEANING PROCEDURES, MAKE SURE THAT
              _______
                        THE HOT WATER OR HOT WATER/FLUID MIXTURES DO NOT CAUSE THE
                        TEMPERATURE OF THE AIRCRAFT SKIN TO INCREASE TO MORE THAN
                        +70⁰C.
                        DO NOT USE STEAM. IF YOU DO NOT OBEY THESE PRECAUTIONS, YOU
                        CAN CAUSE DAMAGE TO THE SURFACE OR TO PARTS.
              (b) Apply the fluid on the aircraft skin with the spray gun of the
                  equipment.
                  - The nozzle must be at a distance of between 0.5 m (1.64 ft.)
                    and 3 m (9.84 ft.) from the aircraft skin.
- You must apply the fluid directly from the front to the rear.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                           Page 207
                                                                          Feb 01/11
                                                      
    UZB                                               
                   -   the   Angle of Attack (AOA) sensors,
                   -   the   temperature sensor,
                   -   the   ice detectors (If installed),
                   -   the   cabin windows and window seals.
               (d) Do not use too much de-icing fluid on the rudder, elevator and
                   aileron servocontrol areas. Use sufficient fluid to remove the
                   contamination (snow, frost, ice or slush).
                   NOTE : In the THS apron area, de-icing fluid can go into the rear
                   ____
R                         fuselage non-pressurized compartment if you point the
R                         spray from the rear to the front.
Subtask 12-31-12-210-059
           (1) Make sure that there is no ice, frost, slush or snow on:
               - the fuselage,
               - the wings,
               - the fuel tank vents,
               - the flap and slat tracks,
               - the control surfaces,
               - the tail cone,
               - the vertical stabilizer,
               - the Trimmable Horizontal Stabilizer (THS),
               - the APU air intake and exhaust,
               - the engine intakes and exhausts,
               - the ice detectors (If installed),
               - the temperature sensor,
               - the pitot probes,
               - the static probes,
               - the AOA sensors,
R              - the outlet and inlet of the avionics compartment ventilation
R                system,
R              - the inlets and outlets of the air conditioning system,
               - the outflow valve,
               - the landing gears and landing gear doors.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 208
                                                                           Feb 01/11
                                                       
    UZB                                                
     Subtask 12-31-12-640-052
C. Lubrication
           (1) If the control handle of the cargo compartment doors stays blocked,
               lubricate the handle and the latch with OILS (Material No. 03-001).
     5. Close-up
        ________
Subtask 12-31-12-860-053
R (b) Release the DITCHING pushbutton switch (the ON legend goes off).
               (c) Visually make sure that the outflow valve 10HL is in the open
                   position.
Subtask 12-31-12-865-053
        B. If the VENT AVNCS SYS FAULT message is shown on the upper ECAM DU, reset
           these AEVC C/Bs:
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU AIR COND/AVNCS VENT/CTL                                   6HQ      D06
       49VU AIR COND/AVNCS VENT/CTL                                   5HQ      D05
      122VU AIR COND/AVNCS/VENT/MONG                                  3HQ      Y17
R Subtask 12-31-12-942-061
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 209
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-31-12-942-057
           (2) Remove the protections and clean the covers with water to remove all
               signs of de-icing fluid.
           (3) Remove the ground support and maintenance equipment, the special and
               standard tools, materials used for protection and all other items.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 210
                                                                           Feb 01/11
                                                   
    UZB                                            
     TASK 12-31-12-660-003
     WARNING : WEAR A SAFETY HARNESS WHEN YOU DE-ICE THE FORWARD FUSELAGE WITH THE
     _______
               ENGINES AT IDLE. THE SUCTION AND EXHAUST OF THE ENGINES CAN BE
               DANGEROUS.
     WARNING : BE CAREFUL WHEN YOU USE ANTI-ICING AND DE-ICING MATERIALS. OBEY THE
     _______
               MATERIAL MANUFACTURERS INSTRUCTIONS AND THE LOCAL REGULATIONS. MAKE
               SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. DO NOT
               BREATHE THE FUMES. USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES. IF
               YOU GET ONE OF THESE MATERIALS:
               - ON YOUR SKIN OR IN YOUR EYES, FLUSH IT AWAY WITH A FLOW OF CLEAN
               WATER.
               - IN YOUR MOUTH, GET IMMEDIATE MEDICAL AID.
     CAUTION : DO NOT TRY TO OPERATE ANY OF THE FLIGHT CONTROL SURFACES IF THERE IS
     _______
               ICE ON THEM. IF YOU DO, YOU CAN CAUSE DAMAGE TO THE SYSTEM.
               SMALL SURFACE MOVEMENT IS PERMITTED AT HYDRAULIC POWER-UP OF
               AIRCRAFT.
     CAUTION : DO NOT USE JET EXHAUST TO REMOVE SNOW OR ICE FROM THE AIRFRAME. THE
     _______
               HIGH PRESSURE AND HIGH TEMPERATURE OF JET EXHAUST CAN CAUSE DAMAGE TO
               THE AIRCRAFT.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 211
                                                                           Feb 01/11
                                                     
    UZB                                              
     1. __________________
        Reason for the Job
R       This procedure gives guidelines for the removal of ice and snow on the
R       aircraft.
R       This applies to an aircraft parked in an applicable de-icing area with
R       engines or APU in operation, or GPU or air conditioning cart connected.
R       NOTE : All the data related to the fluids must be taken from the
        ____
R              manufacturers recommendations for application and holdover times
R              (supplied with the fluid). The ice protection procedures and all the
R              data related to anti/de-icing fluids are given in the Association of
               European Airlines (AEA) recommendations available on the website
               www.aea.be:
               - Recommendations for De-Icing/Anti-Icing of aircraft on the Ground
               - Training Recommendations and Background Information for
                 De-Icing/Anti-Icing of Aircraft on the Ground.
        NOTE : The operators must use the procedures applicable to their specified
        ____
R              operating procedures and requirements.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
     No specific             1 BROOM
     No specific             1 BRUSH - BRISTLED, SOFT
     No specific             1 DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING
                               HEIGHT
     No specific             1 WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 212
                                                                           Feb 01/11
                                                   
    UZB                                            
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-31-12-860-054
R (1) Make sure that the throttle control levers are in the IDLE position.
           (2) Make sure that the slats, flaps, spoilers, ailerons and thrust
               reversers are retracted.
R              If they are not retracted:
(a) Make sure that the PARK BRK control handle is set to ON.
R (a) Release the EXTRACT pushbutton switch (the OVRD legend comes on).
R (a) Release the APU BLEED pushbutton switch (the ON legend goes off).
R              (b) Release the ENG 1 BLEED and ENG 2 BLEED pushbutton switches (the
R                  OFF legends come on).
R
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                              Page 213
                                                                             Feb 01/11
                                                     
    UZB                                              
R          (6) On panel 25VU:
R              CAUTION : BEFORE YOU PUSH THE DITCHING PUSHBUTTON SWITCH, MAKE SURE
               _______
R                        THAT THERE IS NO SUPPLY OF AIR TO THE AIRCRAFT THROUGH THE
R                        LOW PRESSURE CONNECTION. IF THERE IS A SUPPLY OF AIR, YOU
R                        CAN CAUSE UNWANTED PRESSURIZATION OF THE AIRCRAFT.
R              (a) Make sure that the MODE SEL pushbutton switch is in AUTO
R                  position.
R                  - The FAULT and MAN legends of the MODE SEL pushbutton switch are
R                    off.
R
R              (b) Lift the guard and push the DITCHING pushbutton switch (the ON
R                  legend comes on).
                   1
                   _   Put a WARNING NOTICE(S) in position to tell persons not to
                       operate this pushbutton switch.
           (7) Put a WARNING NOTICE(S) to tell persons to remove snow from their
               shoes and clothes before they go into the aircraft. This is very
               important in the cargo compartments. If there is ice or snow on the
               latches, this can cause defective operation of the cargo loading
               system.
           (8) Make sure that the landing gear doors, passenger/crew doors, cargo
               compartment doors, emergency exits, service doors and sliding windows
               are closed.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                             Page 214
                                                                            Feb 01/11
                                                    
    UZB                                             
     Subtask 12-31-12-660-070
B. Preparation of Equipment
           CAUTION : BEFORE YOU APPLY ANTI-ICING/DE-ICING FLUIDS, MAKE SURE THAT THE
           _______
                     SUPPLY PRESSURE IS NOT MORE THAN THE SPECIFIED VALUES.
           CAUTION : DO NOT MAKE THE ANTI-ICING/DE-ICING FLUID IN TANKS HOT TOO MANY
           _______
                     TIMES OR FOR LONG PERIODS. IF YOU DO, THE QUANTITY OF WATER IN
                     THE FLUID WILL DECREASE AND THERE WILL BE A POSSIBLE
                     DEGRADATION OF THE FLUID PERFORMANCE.
           (1) Put the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT in
               position. Make sure that the safety zone of the aircraft is clear so
               that the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT moves
               easily.
R              NOTE : For the use on the ramp, the DE- ANTI-ICING EQUIPMENT - 12M
               ____
R                     (39 FT) SPRAYING HEIGHT has a storage tank for the
R                     anti/de-icing fluid. Do not mix other fluids with the
                      anti/de-icing fluid. Use the fluid at the recommended
                      concentration for the temperature to get a correct protection.
(2) On the DE- ANTI-ICING EQUIPMENT - 12M (39 FT) SPRAYING HEIGHT:
               (a) Set the supply pressure to less than 10 psi (0.6894 bar) impact
                   pressure.
                   - For fairings, the impact pressure must not be more than 1.5 psi
                     (0.1034 bar).
     4. Procedure
        _________
Subtask 12-31-12-660-068
A. De-icing
           (1) If the layer of snow is too thick, use a BROOM to remove most of the
               snow.
               Use a BROOM with soft bristles to prevent damage to the aircraft
               skin.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 215
                                                                           Feb 01/11
                                                   
    UZB                                            
R          (2) De-icing fluid application
              CAUTION : DURING THE DE-ICING AND CLEANING PROCEDURES, MAKE SURE THAT
              _______
                        THE HOT WATER OR HOT WATER/FLUID MIXTURES DO NOT CAUSE THE
                        TEMPERATURE OF THE AIRCRAFT SKIN TO INCREASE TO MORE THAN
                        +70⁰C.
                        DO NOT USE STEAM. IF YOU DO NOT OBEY THESE PRECAUTIONS, YOU
                        CAN CAUSE DAMAGE TO THE SURFACE OR TO PARTS.
              (a) Apply the fluid on the aircraft skin with the spray gun of the
                  equipment.
                  - The nozzle must be at a distance of between 0.5 m (1.64 ft.)
                    and 3 m (9.84 ft.) from aircraft skin.
- You must apply the fluid directly from the front to the rear.
              (c) Do not use too much de-icing fluid on the rudder, elevator and
                  aileron servocontrol areas. Use sufficient fluid to remove the
                  contamination (snow, frost, ice or slush).
                  NOTE : In the THS apron area, de-icing fluid can go into the rear
                  ____
R                        fuselage non-pressurized compartment if you point the from
R                        the rear to the front.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                           Page 216
                                                                          Feb 01/11
                                                  
    UZB                                           
     Subtask 12-31-12-210-060
           (1) Make sure that there is no ice, frost, slush or snow on:
               - the fuselage,
               - the wings,
               - the fuel tank vents,
               - the flap and slat tracks,
               - the control surfaces,
               - the tail cone,
               - the vertical stabilizer,
               - the Trimmable Horizontal Stabilizer (THS),
               - the APU air intake and exhaust,
               - the engine intakes and exhausts,
               - the ice detectors (If installed),
               - the temperature sensor,
               - the pitot probes,
               - the static probes
               - the AOA sensors,
R              - the outlet and inlet of the avionics-compartment ventilation
R                system,
               - the air conditioning inlets and outlets,
               - the outflow valve,
               - the landing gears and landing gear doors.
Subtask 12-31-12-640-053
C. Lubrication
           (1) If the control handle of the cargo compartment doors stays blocked,
               lubricate the handle and the latch with OILS (Material No. 03-001).
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 217
                                                                           Feb 01/11
                                                   
    UZB                                            
     5. Close-up
        ________
Subtask 12-31-12-942-062
R       A. If the engine(s) and/or APU were in operation during the de-icing fluid
R          application:
R          - Operate the APU and/or the engine(s) that was in operation for a few
R            minutes,
R          - Wait 3 or 4 minutes before you open the engine and/or APU bleed
R            valve(s).
R Subtask 12-31-12-860-056
R (a) Release the DITCHING pushbutton switch (the ON legend goes off).
R              (b) Visually make sure that the outflow valve 10HL is in the open
R                  position.
R              (a) Push the ENG 1 BLEED and ENG 2 BLEED pushbutton switches (the OFF
R                  legends go off).
R (b) Push the APU BLEED pushbutton switch (the ON legend comes on).
R          (3) On panel 22VU, push the EXTRACT pushbutton switch (the OVRD legend
R              goes OFF).
R Subtask 12-31-12-865-054
R       C. If the VENT AVNCS SYS FAULT message is shown on the upper ECAM DU, reset
           these AEVC C/Bs:
R    -------------------------------------------------------------------------------
R    PANEL DESIGNATION                                               IDENT. LOCATION
R    -------------------------------------------------------------------------------
R      49VU AIR COND/AVNCS VENT/CTL                                   6HQ      D06
R      49VU AIR COND/AVNCS VENT/CTL                                   5HQ      D05
R     122VU AIR COND/AVNCS/VENT/MONG                                  3HQ      Y17
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 218
                                                                           May 01/11
                                                   
    UZB                                            
     Subtask 12-31-12-942-058
R       D. Remove all the fixtures, tools, test and support equipment used during
           this procedure.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 219
                                                                           Feb 01/11
                                                   
    UZB                                            
   TASK 12-31-12-660-006
   CAUTION : DO NOT TRY TO OPERATE ANY OF THE FLIGHT CONTROL SURFACES IF THERE IS
   _______
             ICE ON THEM. IF YOU DO, YOU CAN CAUSE DAMAGE TO THE SYSTEM.
             SMALL SURFACE MOVEMENT IS PERMITTED AT HYDRAULIC POWER-UP OF
             AIRCRAFT.
   1. __________________
      Reason for the Job
   2. ______________________
      Job Set-up Information
Not Applicable
   3. __________
      Job Set-up
Subtask 12-31-12-660-063
   4. Procedure
      _________
      CAUTION : DURING THE INFRARED DE-ICING PROCEDURE, MAKE SURE THAT THE
      _______
                TEMPERATURE OF THE AIRCRAFT SKIN DOES NOT INCREASE TO MORE THAN
                +70 DEG.C (158.0 DEG.F).
Subtask 12-31-12-660-064
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                          Page 220
                                                                         Feb 01/11
R                                                
  UZB                                            
   5. Close-up
      ________
Subtask 12-31-12-942-055
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                          Page 221
                                                                         Feb 01/11
R                                                
  UZB                                            
   TASK 12-31-12-660-008
   WARNING : WEAR A SAFETY HARNESS WHEN YOU DE-ICE THE FORWARD FUSELAGE WITH THE
   _______
             ENGINES AT IDLE. THE SUCTION AND EXHAUST OF THE ENGINES CAN BE
             DANGEROUS.
   WARNING : BE CAREFUL WHEN YOU USE ANTI-ICING AND DE-ICING MATERIALS. OBEY THE
   _______
             MATERIAL MANUFACTURERS INSTRUCTIONS AND THE LOCAL REGULATIONS. MAKE
             SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. DO NOT
             BREATHE THE FUMES. USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES. IF
             YOU GET ONE OF THESE MATERIALS:
             - ON YOUR SKIN OR IN YOUR EYES, FLUSH IT AWAY WITH A FLOW OF CLEAN
             WATER.
             - IN YOUR MOUTH, GET IMMEDIATE MEDICAL AID.
   CAUTION : DO NOT USE JET EXHAUST TO REMOVE SNOW OR ICE FROM THE AIRFRAME. THE
   _______
             HIGH PRESSURE AND HIGH TEMPERATURE OF JET EXHAUST CAN CAUSE DAMAGE TO
             THE AIRCRAFT.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                          Page 222
                                                                         Feb 01/11
R                                                
  UZB                                            
   1. __________________
      Reason for the Job
      To remove ice or frost or snow from the radome and forward fuselage area in
      front of the pitot and static probes immediately before departure of the
      aircraft (crew on board, doors closed, engines at idle, aircraft ready to
      taxi to take- off).
      It is not applicable for other areas of the aircraft.
      NOTE : All the data related to the fluids should be taken from the
      ____
             manufacturers recommendations for application and holdover times
             (supplied with the fluid).
             The Ice Protection Procedures and all the data related to
             anti/de-icing fluids are described in the Association of European
             Airlines (AEA) recommendations available on the website www.aea.be:
             - Recommendations for De-Icing/Anti-Icing of Aircraft on the Ground
             - Training Recommendations and Background Information for
               De-Icing/Anti-Icing of Aircraft on the Ground.
      NOTE : The time of protection against new snow/ice accretion will be shorter
      ____
             in very bad weather conditions. Thus it is important to do this
             procedure as near as possible to departure of the aircraft.
             If high wind or jet blast occurs, the time of protection will be much
             shorter.
             The time of protection can also be much shorter if the wind
             temperature is lower than the Outside Air Temperature (OAT).
   2. ______________________
      Job Set-up Information
   -------------------------------------------------------------------------------
   REFERENCE             QTY DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                          Page 223
                                                                         Feb 01/11
R                                                
  UZB                                            
      B. Consumable Materials
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-31-12-860-057
A. Aircraft Configuration
Subtask 12-31-12-941-061
         CAUTION : BEFORE YOU APPLY ANTI-ICING/DE-ICING FLUIDS, MAKE SURE THAT THE
         _______
                   SUPPLY PRESSURE IS NOT MORE THAN THE SPECIFIED VALUES.
         CAUTION : DO NOT MAKE THE ANTI-ICING/DE-ICING FLUID IN TANKS HOT TOO MANY
         _______
                   TIMES OR FOR LONG PERIODS. IF YOU DO, THE QUANTITY OF WATER IN
                   THE FLUID WILL DECREASE AND THERE WILL BE A POSSIBLE
                   DEGRADATION OF THE FLUID PERFORMANCE.
         (1) Prepare the SPRAYING EQUIPMENT and the de-icing solution with ANTI-
             ICING AND DE-ICING MATERIALS (Material No. 10-001).
             - Minimum dilution: 50%.
         (3) Set the pressure of the SPRAYING EQUIPMENT at low pressure, to less
             than 1.5 psi (0.1034 bar) impact pressure.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                          Page 224
                                                                         Feb 01/11
R                                                 
  UZB                                             
     4. Procedure
        _________
Subtask 12-31-12-660-069
           CAUTION : FOR THIS SPECIAL PROCEDURE, MAKE SURE THAT YOU POINT THE
           _______
                     SPRAYING EQUIPMENT NOZZLE FROM THE REAR TO THE FRONT OF THE
                     AIRCRAFT.
                     IF YOU DO NOT OBEY THIS PRECAUTION, THERE IS A RISK THAT THE
                     DE-ICING FLUID WILL GO INTO THE PITOT PROBES.
           CAUTION : DURING THE DE-ICING AND CLEANING PROCEDURES, MAKE SURE THAT THE
           _______
                     HOT WATER OR HOT WATER/FLUID MIXTURES DO NOT CAUSE THE
                     TEMPERATURE OF THE AIRCRAFT SKIN TO INCREASE TO MORE THAN
                     +70⁰C.
                     DO NOT USE STEAM. IF YOU DO NOT OBEY THESE PRECAUTIONS, YOU CAN
                     CAUSE DAMAGE TO THE SURFACE OR TO PARTS.
               NOTE : This is a special procedure to make sure that the fluid does
               ____
                      no go into the pitot and static probes.
Subtask 12-31-12-210-061
           (1) Make sure that there is no ice, frost, slush or snow on:
               - the radome and forward fuselage, specially in front of the pitot
                 and static probes,
               - the ice detectors (if installed),
               - the AOA sensors,
               - the pitot probes,
               - the static probes,
               - the temperature sensor,
               - the inlet and outlet of the avionics compartment ventilation.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                              Page 225
                                                                             Feb 01/11
                                                   
    UZB                                            
         (2) Make sure that there is no remaining de-icing solution on:
             - the ice detectors (if installed),
             - the AOA sensors,
             - the pitot probes,
             - the static probes,
             - the temperature sensor.
   5. Close-up
      ________
Subtask 12-31-12-942-059
A. Remove all the tools and equipment used during this procedure.
Subtask 12-31-12-942-060
      B. Tell the pilots that the de-icing procedure is complete (no ice, slush,
         or snow on the radome and forward fuselage in front of the pitot and
         static probes) and move away from the aircraft.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                           Page 226
                                                                          Feb 01/11
R                                                
  UZB                                            
     TASK 12-31-12-660-007
     WARNING : BE CAREFUL WHEN YOU USE ANTI-ICING AND DE-ICING MATERIALS. OBEY THE
     _______
               MATERIAL MANUFACTURERS INSTRUCTIONS AND THE LOCAL REGULATIONS. MAKE
               SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. DO NOT
               BREATHE THE FUMES. USE PROTECTIVE CLOTHING, GOGGLES AND GLOVES. IF
               YOU GET ONE OF THESE MATERIALS:
               - ON YOUR SKIN OR IN YOUR EYES, FLUSH IT AWAY WITH A FLOW OF CLEAN
               WATER.
               - IN YOUR MOUTH, GET IMMEDIATE MEDICAL AID.
     CAUTION : DO NOT TRY TO OPERATE ANY OF THE FLIGHT CONTROL SURFACES IF THERE IS
     _______
               ICE ON THEM. IF YOU DO, YOU CAN CAUSE DAMAGE TO THE SYSTEM.
               SMALL SURFACE MOVEMENT IS PERMITTED AT HYDRAULIC POWER-UP OF
               AIRCRAFT.
     CAUTION : DO NOT USE JET EXHAUST TO REMOVE SNOW OR ICE FROM THE AIRFRAME. THE
     _______
               HIGH PRESSURE AND HIGH TEMPERATURE OF JET EXHAUST CAN CAUSE DAMAGE TO
               THE AIRCRAFT.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 227
                                                                           Feb 01/11
                                                   
    UZB                                            
     1. __________________
        Reason for the Job
R       This procedure gives guidelines for the removal of snow and ice from some
R       areas of the aircraft.
        NOTE : All the data related to the fluids must be taken from the
        ____
               manufacturers recommendations for application and holdover times
R              (supplied with the fluid). The ice protection procedures and all the
R              data related to anti/de-icing fluids are given in the Association of
               European Airlines (AEA) recommendations available on the website
               www.aea.be:
R              - Recommendations for De-Icing/Anti-Icing of aircraft on the Ground
               - Training Recommendations and Background Information for
R                De-Icing/Anti-Icing of Aircraft on the Ground.
        NOTE : The operators must use the procedures applicable to their specified
        ____
               operating procedures and requirements.
     2. ______________________
        Job Set-up Information
A. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                              Page 228
                                                                             Feb 01/11
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-31-12-941-060
A. Safety Precautions
           (2) Install the safety devices on the landing gear (Ref. TASK 32-00-00-
               481-001).
     4. Procedure
        _________
Subtask 12-31-12-660-066
Subtask 12-31-12-210-058
B. If you think that snow will fall, put the aircraft in this configuration
           (3) Make sure that the flaps, slats, spoilers, speedbrakes and thrust
               reverser doors are retracted.
           (4) Make sure that the trimmable horizontal stabilizer is in the neutral
               position.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                            Page 229
                                                                           Feb 01/11
                                                   
    UZB                                            
  5. Close-up
     ________
Subtask 12-31-12-942-056
        (1) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-31-12
                                                     
                                                                         Page 230
                                                                        Feb 01/11
                                                
 UZB                                            
        COLD WEATHER MAINTENANCE - AIR CONDITIONING - MAINTENANCE PRACTICES
        ___________________________________________________________________
TASK 12-31-21-660-001
  1. __________________
     Reason for the Job
     This procedure gives the cold weather maintenance practices for the air
     conditioning.
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-21-660-050
A. General
  
  EFF :
  
             ALL                                      12-31-21
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
        (2) Avionics Bay Temperature
        (3) If the temperature in the aircraft avionics bay is between -40 deg.C
            (-40.00 deg.F) and -15 deg.C (+5.00 deg.F):
            - do not energize the aircraft electrical circuits before the related
              computer systems circuit breakers are open.
  4. Procedure
     _________
Subtask 12-31-21-660-051
A. Pre-conditioning Recommendations
        (1) If the avionics bay temperature is equal to or less than -40 deg.C (-
            40.00 deg.F) you must do the pre-conditioning through the Low
            Pressure (LP) ground connector (Ref. TASK 12-33-21-618-001).
        (2) If the avionics bay temperature is between -15 deg.C (+5.00 deg.F)
            and -40 deg.C (-40.00 deg.F) you must do the pre-conditioning
            through:
            - the LP ground connector (Ref. TASK 12-33-21-618-001) or,
            - the High Pressure (HP) ground connector (Ref. TASK 12-33-21-618-
              001).
  
  EFF :
  
             ALL                                      12-31-21
                                                     
                                                                         Page 202
                                                                        Feb 01/10
                                                
 UZB                                            
                   - this can be because of the temperature conditions and not
                     necessarily through a technical malfunction.
        (3) If the avionics bay temperature is above -15 deg.C (+5.00 deg.F)you
            must do the pre-conditioning:
            (c) With the APU (Ref. TASK 12-33-21-618-001) and (Ref. TASK 12-31-
                49-660-001).
  
  EFF :
  
             ALL                                      12-31-21
                                                     
                                                                         Page 203
                                                                        Feb 01/10
                                                
 UZB                                            
        COLD WEATHER MAINTENANCE - ELECTRICAL POWER - MAINTENANCE PRACTICES
        ___________________________________________________________________
TASK 12-31-24-660-001
  1. __________________
     Reason for the Job
     This procedures gives the cold weather maintenance practices for the
     batteries when the aircraft is in a cold soak configuration.
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-24-941-050
A. Not Applicable
  4. Procedure
     _________
Subtask 12-31-24-660-050
     A. General.
        In very low temperatures, the chemical reaction of the electrolyte is
        slower and the performance of the batteries decreases :
        - the quantity of high current that the batteries can supply, decreases,
        - the time necessary to charge the batteries, increases.
          This procedure gives you instructions that keep the batteries
          serviceable.
        NOTE : The values specified in this procedure are only applicable if the
        ____
               aircraft doors stay closed during the cold soak.
  
  EFF :
  
             ALL                                      12-31-24
                                                     
                                                                         Page 201
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-31-24-660-051
        (1) The batteries can stay on the aircraft during the cold soak if :
            - the Outside Air Temperature (OAT) stays higher than -15 deg.C
              (+5.00 deg.F),
        (2) Refer to the graph to know the battery cool-down time. You must
            remove the batteries before their internal temperature reaches -15
            DEG.C (+5.00 DEG.F).
            (Ref. Fig. 201/TASK 12-31-24-991-001)
            NOTE : We recommend that you use a ground power unit to start the
            ____
                   Auxiliary Power Unit (APU) if the OAT was lower than -15 deg.C
                   (+5.00 deg.F) during the cold soak.
  
  EFF :
  
             ALL                                      12-31-24
                                                     
                                                                         Page 202
                                                                        Feb 01/10
                                                
 UZB                                            
                         Batteries Cooling Down Curve
                       Figure 201/TASK 12-31-24-991-001
  
  EFF :
  
             ALL                                      12-31-24
                                                     
                                                                   Page 203
                                                                  Feb 01/10
                                              
 UZB                                          
     COLD WEATHER MAINTENANCE - EQUIPMENT/FURNISHINGS - MAINTENANCE PRACTICES
     ________________________________________________________________________
TASK 12-31-25-660-001
  1. __________________
     Reason for the Job
Self Explanatory
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-25
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
  3. __________
     Job Set-up
Subtask 12-31-25-010-050
A. Get Access
  4. Procedure
     _________
Subtask 12-31-25-660-050
            (a) Remove the ball strips adjacent to the door sill latches
                (Ref. TASK 25-52-22-000-001).
                  NOTE : Make sure that the door sill latches are clean and clear.
                  ____
                  1
                  _   If the aircraft is parked and not heated:
                      - Make sure that all snow and/or slush is removed from the
                        door exit area, before you close the doors of the aircraft.
                  2
                  _   Clean dirt from the floor fittings. Do a check every 350
                      flight hours, or more frequently as necessary.
  
  EFF :
  
             ALL                                      12-31-25
                                                     
                                                                            Page 202
                                                                           Feb 01/10
                                                   
 UZB                                               
            (b) Escape Slides
                1
                _   Low pressure (NO GO) indication:
            (a) You must drain all the galley equipment which contains water,
                such as coffee makers and water boilers (Ref. TASK 12-31-38-660-
                001).
                NOTE : You must operate the taps several times to make sure that
                ____
                       the supply lines are empty.
  
  EFF :
  
             ALL                                      12-31-25
                                                     
                                                                          Page 203
                                                                         Feb 01/10
                                                 
 UZB                                             
               (b) Pre-conditioning
R                  WARNING : MAKE SURE THAT THE FWD AVIONICS ACCESS DOOR 811 IS OPEN
                   _______
                             WITH A WARNING PLACARD ATTACHED TO IT.
                             THE WARNING NOTICE MUST TELL PERSONS NOT TO CLOSE THE
                             DOOR. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE
                             AIRCRAFT.
      ----------------------------------------------------------------------------
      | OUTSIDE AIR |EXTERNAL HEAT |      APU      | SUPERVISOR | DRAINING OF |
      | TEMPERATURE |     SOURCE    |              |              | WATER SYSTEM |
      |--------------|--------------|--------------|--------------|--------------|
      |    0 deg.C   |   1 HOUR     |              |              |              |
      | (32 deg.F) |                |              |              |              |
      |     to       |    EVERY     |      NO      |      NO      |      NO      |
      |   -5 deg.C   |              |              |              |              |
      | (23 deg.F) |     4 HOURS    |              |              |              |
      |--------------|--------------|--------------|--------------|--------------|
      |   -5 deg.C   |   2 HOURS    |              |              |              |
      | (23 deg.F) |                |              |              |              |
      |     to       |    EVERY     |      NO      |      NO      |      NO      |
      | -10 deg.C    |              |              |              |              |
      | (14 deg.F) |     4 HOURS    |              |              |              |
      |--------------|--------------|--------------|--------------|--------------|
      | -10 deg.C    |              |              |              |              |
      | (14 deg.F) |                |              |              |              |
      |     to       | CONTINUOUS |        NO      |      NO      |      NO      |
      | -15 deg.C    |              |              |              |              |
      | (-5 deg.F) |                |              |              |              |
      |--------------|--------------|--------------|--------------|--------------|
      |    BELOW     |              |      AS      |              |              |
      | -15 deg.C    | CONTINUOUS |     REQUIRED   |      YES     |     YES      |
      | (-5 deg.F) |                |              |              |              |
      ----------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-25
                                                     
                                                                            Page 204
                                                                           Aug 01/10
                                                   
    UZB                                            
  Subtask 12-31-25-620-050
        (1) Remove the first aid kits from the aircraft if the cabin temperature
            is below -10 deg.C (+14.00 deg.F).
            NOTE : To avoid damage to the kit equipment keep the kits in a place
            ____
                   with a temperature between min. 1 deg.C (33.80 deg.F) and 40
                   deg.C (104.00 deg.F) max.
        (2) Put a warning notice in position to tell personnel that the first aid
            kits are removed.
  5. Close-up
     ________
Subtask 12-31-25-410-050
A. Close Access
  
  EFF :
  
             ALL                                      12-31-25
                                                     
                                                                         Page 205
                                                                        Feb 01/10
                                                
 UZB                                            
        COLD WEATHER MAINTENANCE - FLIGHT CONTROLS - MAINTENANCE PRACTICES
        __________________________________________________________________
TASK 12-31-27-660-001
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  CAUTION : BEFORE YOU START THE ENGINE OR YOU PRESSURIZE THE HYDRAULIC SYSTEMS,
  _______
            MAKE SURE THAT THERE IS NO ICE OR SNOW ON THE FLIGHT CONTROLS AREA
            (ELEVATOR, RUDDER AND AILERON).
  1. __________________
     Reason for the Job
     This procedure gives the cold weather maintenance practices for the flight
     controls.
  2. ______________________
     Job Set-up Information
A. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-27
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-27-941-050
A. Not applicable
  4. Procedure
     _________
Subtask 12-31-27-660-050
        (2) You must retract the wing flaps and slats during periods of snowfall
            and icing conditions. If it is necessary to operate these controls,
            make sure that they are clear of accumulation before retraction.
        (3) If an aircraft arrives with the slats and flaps in a positon other
            than fully retracted during a period of ice or snow conditons, those
            slats and flaps which are extended must be inspected for ice and snow
            accumulation before retracting.
        (4) All control surfaces must have no ice, snow or frost. After the
            deicing operation, do a check of the associated hinges, tracks,
            actuators and servo controls for trapped moisture that can freeze.
            Apply anti-icing fluid for protection ANTI-ICING AND DE-ICING
            MATERIALS (Material No. 10-001), ANTI-ICING AND DE-ICING MATERIALS
            (Material No. 10-003), ANTI-ICING AND DE-ICING MATERIALS (Material
            No. 10-005) or ANTI-ICING AND DE-ICING MATERIALS (Material No. 10-
            004) (Ref. TASK 12-31-11-660-001)
  
  EFF :
  
             ALL                                      12-31-27
                                                     
                                                                          Page 202
                                                                         Feb 01/10
                                                 
 UZB                                             
        (5) Do a check of the leading edge area of the spoilers, the flaps for
            ice, snow and frost.
Subtask 12-31-27-660-051
        (2) The winter preparation program should include the flap and slat
            lubrication.
        (3) When you do the lubrication tasks take care to ensure that all the
            old grease is removed in order to reduce the risk of an increase in
            grease stiffness.
  
  EFF :
  
             ALL                                      12-31-27
                                                     
                                                                         Page 203
                                                                        Feb 01/10
                                                
 UZB                                            
                   COLD WEATHER MAINTENANCE - FUEL - MAINTENANCE PRACTICES
                   _______________________________________________________
TASK 12-31-28-660-001
     WARNING : MAKE SURE THE AREA AROUND THE AIRCRAFT IS SAFE BEFORE YOU START THE
     _______
               REFUEL/DEFUEL PROCEDURE. IN THE SAFETY AREA, DO NOT:
               - SMOKE
               - MAKE SPARKS OR FIRE
               - USE ANY EQUIPMENT WHICH IS NOT APPROVED FOR REFUEL/DEFUEL
               PROCEDURES.
               AIRCRAFT FUEL IS FLAMMABLE.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-28
                                                     
                                                                              Page 201
                                                                             Aug 01/10
                                                     
    UZB                                              
  3. __________
     Job Set-up
Subtask 12-31-28-869-050
A. General Information
        This procedure gives the cold weather maintenance practices for the fuel
        system when:
        - an aircraft is operated or stored in conditions with ground
          temperatures of between 0 deg.C (32 deg.F) and -54 deg.C (-67 deg.F)
          or
        - the fuel temperature in the tanks is less than -5 deg.C (23 deg.F).
        The fuel storage and handling conditions can have an important effect on
        the amount of water in solution with the fuel. In unsatisfactory
        conditions, each 3785 liters (1000 USgal) of fuel can contain up to 0.76
        l (0.2 USgal) of water. Water can get into the tanks in different ways:
        - the fuel supplied to the aircraft contains water
        - the air in the tank contains moisture (water)
        - during descent large quantities of moist air can enter the tank
        - fuel which is open to dampness or wet atmospheric conditions will
          contain larger quantities of water than fuel stored in sealed
          containers.
        In cold conditions, much of this water can come out of solution and fall
        to the bottom of the tank. It then collects at the lowest parts of the
        tank and can form ice. The formation of ice (and the presence of water)
        in the fuel tanks can have an effect on the accuracy and/or performance
        of the quantity indication system. It can also cause engine or corrosion
        related problems.
        NOTE : Ice can form on the inside of the fuel tank close to the water
        ____
               drain valve. When you drain fuel from the tank for a water
               analysis check, fuel flows over the ice and collects water. This
  
  EFF :
  
             ALL                                      12-31-28
                                                     
                                                                         Page 202
                                                                        Feb 01/10
                                                
 UZB                                            
                    can cause incorrect analysis results. The procedure that follows
                    should remove most of the water/ice from the fuel tank.
                    You must do the water drain procedure regularly to make sure that
                    all the water is drained from the tank low points.
Subtask 12-31-28-941-050
B. Safety Precautions
           (1) You must obey the fuel safety procedures (Ref. TASK 28-00-00-910-001)
               when you do work on the fuel system.
     4. Procedure
        _________
Subtask 12-31-28-660-050
           (1) If a water drain does not open with the usual pressure, find the
               cause. The valve could be frozen because of the low temperature.
               (c) If necessary, use an approved hot air blower to warm the bottom
                   skin of the tank to be drained. Make sure the temperature of the
                   bottom skin does not increase to more than 50 deg.C (122.00
                   deg.F).
  
  EFF :
  
             ALL                                      12-31-28
                                                     
                                                                              Page 203
                                                                             Aug 01/10
                                                     
    UZB                                              
               NOTE : When you do the water drain procedure, it can be necessary
               ____
                      to drain large quantities of fuel to get a satisfactory
                      HYDROKIT test result (Ref. TASK 12-32-28-281-001).
           CAUTION : MAKE SURE THAT THE TEMPERATURE OF THE AIR FROM THE HOT AIR
           _______
                     BLOWER IS NOT MORE THAN 50 DEG.C (122 DEG.F).
                     IF THE TEMPERATURE IS MORE THAN 50 DEG.C (122 DEG.F) YOU
                     CAN CAUSE DAMAGE TO THE AIRCRAFT.
           (c) Use an approved hot air blower to warm the bottom skin of the
               tank to be drained. Make sure the temperature of the bottom skin
               does not increase to more than 50 deg.C (122.00 deg.F).
               NOTE : The temperature of the bottom skin near to the drain valve
               ____
                      should be 1 deg.C (33.80 deg.F) or more measured one
                      minute after the removal of the hot air blower.
  
  EFF :
  
             ALL                                      12-31-28
                                                     
                                                                        Page 204
                                                                       Feb 01/10
                                               
 UZB                                           
  Subtask 12-31-28-660-051
B. Anti-Icing Additives
        (1) If you think that fuel temperatures will be less than 0 deg.C (32.00
            deg.F) (and if it is not possible to warm the aircraft in a hangar)
            it is necessary to put anti-icing additives in the fuel. This makes
            sure that the water in the fuel does not freeze.
            When you add anti-icing additives to the fuel, the concentration must
            not be more than 0.15 % by volume.
            You must also make sure that the additive is fully mixed with the
            fuel.
  5. Close-up
     ________
Subtask 12-31-28-942-050
A. Removal of Equipment
        (2) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-31-28
                                                     
                                                                         Page 205
                                                                        Feb 01/10
                                                
 UZB                                            
        ______________________________________________________________________
        COLD WEATHER MAINTENANCE - INDICATING/RECORDING SYSTEMS AND NAVIGATION
                                MAINTENANCE PRACTICES
                                _____________________
TASK 12-31-31-660-001
  1. __________________
     Reason for the Job
     This procedure gives the cold weather maintenance practices for the
     indicating/recording and navigation systems.
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-31-941-050
A. Not Applicable
  4. Procedure
     _________
Subtask 12-31-31-660-050
A. General.
          (1) When the Outside Air Temperature (OAT) is very low, cold (temperature
              lower than -15 deg.C (+5.00 deg.F)) in the avionics compartment can
              cause incorrect operation of the computers.
              NOTE : This is only due to the cold weather conditions and not to a
              ____
                     technical malfunction.
  
  EFF :
  
             ALL                                      12-31-31
                                                     
                                                                             Page 201
                                                                            Feb 01/10
                                                  
 UZB                                              
  Subtask 12-31-31-660-051
B. Recommendations.
        (1) Make sure that the computers are at a temperature equal to or higher
            than -15 deg.C (+5.00 deg.F) for correct operation.
            (a) Preconditioning
                It is recommended to use the pre-conditioning procedure to
                increase the temperature in the avionics compartment (Ref. TASK
                12-31-21-660-001).
  
  EFF :
  
             ALL                                      12-31-31
                                                     
                                                                         Page 202
                                                                        Feb 01/10
                                                
 UZB                                            
             COLD WEATHER MAINTENANCE - LANDING GEAR - MAINTENANCE PRACTICES
             _______________________________________________________________
TASK 12-31-32-660-001
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
        This procedure gives the cold weather maintenance practices for the landing
        gear.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-31-32-941-050
A. Safety Precautions
  
  EFF :
  
             ALL                                      12-31-32
                                                     
                                                                             Page 201
                                                                            Aug 01/10
                                                     
    UZB                                              
   4. Procedure
      _________
Subtask 12-31-32-660-050
A. General
         (1) When the ambient temperature decreases, the pressure in the tires
             also decreases.
             A 3 deg.C (5.4 deg.F) change in temperature causes a 1% change in
             tire pressure.
             NOTE : The tires wear faster if the pressure in the tires is low.
             ____
         (2) It is recommended that all ice and/or snow is removed from the
             landing gear before flight. Ice and/or snow contamination could cause
             a possible malfunction and/or damage the landing gear components on
             retraction.
Subtask 12-31-32-660-051
B. Recommendations
             NOTE : Do not use air to correct the tire pressure. If the ambient
             ____
                    temperature is below 0 deg.C (32.00 deg.F), moisture in the
                    air can change to ice in the valve and cause a permanent leak.
             NOTE : De-ice the landing gear no more than 1 hour before flight.
             ____
             Use a HOT AIR BLOWER OPERATING 40 DEG C (100 DEG F) to blow air at a
             maximum temperature of 40 deg.C (104.00 deg.F) at the landing gear
             assembly. Start at the top and work down the landing gear until all
             signs of ice and/or snow is removed. Make sure that no ice or snow
             stays on the components that follow:
             - the dynamic joints
             - the lock springs
             - the sliding tube of the shock absorber
             - the piston rod of the retraction actuator
             - the piston rod of the lockstay actuator
             - the proximity sensors and targets
  
  EFF :
  
             ALL                                      12-31-32
                                                     
                                                                          Page 202
                                                                         Aug 01/10
R                                                
  UZB                                            
               - the brakes and brake hoses.
           (3) Towing
               Be careful during aircraft towing operations in cold weather
               conditions. Do not make small-radius turns which can cause too much
               load on the sidewalls of the tires.
     5. Close-up
        ________
Subtask 12-31-32-942-050
A. Removal of Equipment
           (2) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-31-32
                                                     
                                                                            Page 203
                                                                           Aug 01/10
                                                   
    UZB                                            
             COLD WEATHER MAINTENANCE - OXYGEN - MAINTENANCE PRACTICES
             _________________________________________________________
TASK 12-31-35-660-001
  1. __________________
     Reason for the Job
     This procedure gives the cold weather maintenance practises for the oxygen
     system.
  2. ______________________
     Job Set-up Information
A. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-35-941-050
A. Not Applicable
  
  EFF :
  
             ALL                                      12-31-35
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
  4. Procedure
     _________
Subtask 12-31-35-660-050
        NOTE : When you replace oxygen cylinder(s), you must mandatorily obey the
        ____
               Removal/Installation procedure for oxygen cylinder(s).
        (1) If you replace the oxygen cylinder(s) of the crew oxygen system when
            the ambient temperature is -20 deg.C (-4.00 deg.F) or less :
            - make sure that the temperature in the oxygen cylinder compartment
              is more than -20 deg.C (-4.00 deg.F). If this temperature is -20
              deg.C (-4.00 deg.F) or less, the SPECIAL MATERIALS (Material No.
              05-004) used to do the leak test will freeze.
Subtask 12-31-35-660-051
        NOTE : When you fill oxygen cylinder(s), you must mandatorily obey the
        ____
               replenishment procedure for oxygen cylinder(s).
        (1) The maximum charging pressure of the cylinder changes with the
            ambient temperature. Be careful that the pressure at which you
            pressurize the cylinder is not more than the maximumn charging
            pressure.
  
  EFF :
  
             ALL                                      12-31-35
                                                     
                                                                         Page 202
                                                                        Feb 01/10
                                                
 UZB                                            
          COLD WEATHER MAINTENANCE - WATER/ WASTE - MAINTENANCE PRACTICES
          _______________________________________________________________
TASK 12-31-38-660-001
  CAUTION : MAKE SURE THAT THE DRAIN VALVES REMAIN OPEN AFTER YOU DRAIN THE
  _______
            POTABLE WATER SYSTEM IF :
            - THE BLEED AIR SYSTEM IS OFF AND
            - THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
            THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
  CAUTION : BEFORE YOU SUPPLY AIR FROM AN EXTERNAL SOURCE OR THE APU, MAKE
  _______
            CERTAIN THAT :
            -AT LEAST ONE COCKPIT WINDOW OR CABIN DOOR IS OPEN AND THAT IT
            REMAINS OPEN DURING SERVICING.
            -IF THE AIRCRAFT IS PARKED OUTSIDE AND IS NOT PROTECTED FROM THE RAIN
            ONE MAINTENANCE DOOR OR AVIONICS COMPARTMENT ACCESS DOOR IS OPEN AND
            THAT IT REMAINS OPEN DURING SERVICING.
  1. __________________
     Reason for the Job
     To prevent damage to the water/waste system by ice when the aircraft is not
     supplied with power or other sources of hot air.
     NOTE : If the service panels or caps are frozen closed, you must not use
     ____
            force to open or release them. You must apply hot air.
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                         Page 201
                                                                        Feb 01/10
                                                
 UZB                                            
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-38-941-050
  4. Procedure
     _________
Subtask 12-31-38-660-050
        (1) After draining due to low ambient temperatures you must obey the
            steps that follow.
            (a) Fill the potable water system with warm water of 30 deg.C (86.00
                deg.F) not earlier than 30 minutes before the engine start
                (Ref. TASK 12-15-38-613-001).
            (b) Pressurize the potable water system and examine the fill/drain
                valve for leaks.
            (c) Remove excessive quantity of water from around the service panel
                before you close it.
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                           Page 202
                                                                          Feb 01/10
                                                  
 UZB                                              
        (4) Waste system
            (a) Pre-charge the waste tanks not earlier than 30 minutes before the
                engine start (Ref. TASK 12-16-38-613-001).
                - Remove excessive liquid from around the waste service panel
                  before you close it.
Subtask 12-31-38-660-052
     B. Post Flight (Last Flight of the Day but not Transit Stops) (Ref. TASK 38-
        31-00-680-001) (Ref. TASK 12-24-38-680-001)
(1) General
            (a) Do the servicing of the potable water system and waste water
                tanks as soon as possible after a flight.
                NOTE : If you install the caps, the remaining fluids can freeze
                ____
                       immediately behind the fill/drain caps and will cause:
                       - Damage to the piping system
                       - The system to be unserviceable
                       - delays at the next servicing.
                       Potable water system
                       Table 1
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                         Page 203
                                                                        Feb 01/10
                                                
 UZB                                            
  ---------------------------------------------------------------------
  |OUTSIDE AIR | AIR   | CABIN     |DEPRES-    |EXPOSURE    |POTABLE |
  |TEMPERATURE |CONDIT-|TEMPERA-   |SURIZATION |TIME TO     |WATER    |
  |IN DEG.C    |IONING |TURE       |SYSTEM     |WEATHER     |SYSTEM   |
  |(DEG.F)     |       |IN DEG.C   |           |CONDITIONS |DRAINING |
  |            |       | (DEG.F)   |           |IN HOURS:MIN|REQUIRED |
  ---------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                           Page 204
                                                                          Feb 01/10
                                                
 UZB                                            
        (2) Potable water system
           CAUTION : MAKE SURE THAT THE TEMPERATURE OF THE AIR SUPPLIED BY THE
           _______
                     AIRCRAFT BLEEDAIR SYSTEM IS NOT HIGHER THAN 50 DEG.C (122
                     DEG.F).
                     IF THE AIR IS HOTTER THAN 50 DEG.C (122 DEG.F). IT CAN
                     CAUSE DAMAGE TO THE AIRCRAFT.
               1
               _   On the FAP 120RH push the membram switch WATER DEPR
                   - The light in the membram switch comes ON.
                   - Keep the aircraft power on to use the potable water heating
                     system.
               1
               _   Drain the potable water system (Ref. TASK 12-24-38-680-001).
               2
               _   Close all the lavatory and galley manual shutoff valves.
               3
               _   Close all the potable-water drain and fill valves.
               4
               _   Pressurize the potable water system (Ref. TASK 38-10-00-614-
                   001).
               5
               _   To remove the remaining water from the potable water system do
                   the procedure as follows:
                   a
                   _   Open one related manual shutoff valve of one lavatory or
                       galley.
                   b
                   _   Operate the faucet (HOT and COLD).
                   c
                   _   Make sure that air but no water comes out of the faucet.
                   d
                   _   Flush the toilet as often as necessary until you are sure
                       that only air comes out of the toilet rinse valve.
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                          Page 205
                                                                         Feb 01/10
                                                 
 UZB                                             
                      e
                      _   Close the related manual shutoff valve.
                      f
                      _   Do the whole procedure for all lavatories and galleys which
                          have potable-water supplied equipment.
                 6
                 _    Open the manual shutoff valves in all galleys and lavatories.
                 7
                 _    Open all drain valves of the potable water system and release
                      the pressure from the potable water system (Ref. TASK 38-10-
                      00-614-002).
             (c) If the potable water has frozen (or started to freeze) before you
                 can use the depressurization system or drain it,
                 - you must heat the aircraft with an external or internal source
                   as given in table 3
Subtask 12-31-38-660-053
  ---------------------------------------------------------------
  |OUTSIDE AIR |    AIR     | CABIN     |EXPOSURE     |WASTE    |
  |TEMPERATURE |CONDITIONING|TEMPERATURE|TIME TO      |SYSTEM   |
  |IN DEG.C    |            |IN DEG.C   |WEATHER      |DRAINING |
  |(DEG.F)     |            |(DEG.F)    |CONDITIONS   |REQUIRED |
  |            |            |           |IN HOURS:MIN |         |
  ---------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                             Page 206
                                                                            Feb 01/10
                                                    
 UZB                                                
  ---------------------------------------------------------------
  |OUTSIDE AIR |    AIR     | CABIN     |EXPOSURE     |WASTE    |
  |TEMPERATURE |CONDITIONING|TEMPERATURE|TIME TO      |SYSTEM   |
  |IN DEG.C     |           |IN DEG.C   |WEATHER      |DRAINING |
  |(DEG.F)      |           |(DEG.F)    |CONDITIONS   |REQUIRED |
  |             |           |           |IN HOURS:MIN |         |
  ---------------------------------------------------------------
    0 and -7
    (38 and 19)
Subtask 12-31-38-660-054
  -------------------------------------------------------------------
  |OUTSIDE AIR |EXTERNAL HEAT| APU    | SUPERVISOR | DRAINING OF |
  |TEMPERATURE |   SOURCE    |        |              | WATER SYSTEM |
  |IN DEG.C    |             |        |              |              |
  |(DEG.F)     |             |        |              |              |
  -------------------------------------------------------------------
   0 to -5      1 Hour       NO        NO            NO
   (32 to 23)   Every
                4 Hours
   -5 to -10    2 Hours      NO        NO            NO
   (23 to 14)   Every
                4 Hours
  
  EFF :
  
             ALL                                      12-31-38
                                                     
                                                                         Page 207
                                                                        Feb 01/10
                                                
 UZB                                            
    COLD WEATHER MAINTENANCE - AIRBORNE AUXILIARY POWER - MAINTENANCE PRACTICES
    ___________________________________________________________________________
TASK 12-31-49-660-001
  1. __________________
     Reason for the Job
     This procedure gives the cold weather maintenance practices for the
     Auxiliary Power Unit (APU) when the aircraft is in a cold soak condition.
  2. ______________________
     Job Set-up Information
A. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-49
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-49-860-050
A. Not Applicable
  4. Procedure
     _________
Subtask 12-31-49-660-055
        (1) If the Outside Air Temperature (OAT) is/will be lower than -40 deg.C
            (-40.00 deg.F) and the aircraft is not pre-conditioned (heated)
            alternatively:
            - through the Low Pressure (LP) ground connection (Ref. TASK 12-33-
              21-618-001),
            - the High Pressure (HP) ground connection (Ref. TASK 12-33-21-618-
              001), or
            - with the APU (Ref. TASK 12-33-21-618-001).
            (a) Remove the Electronic Control Box (ECB) 59KD from the aircraft
                - If a GTCP 36-300 APU is installed
                  (Ref. TASK 49-61-34-000-001)
                - If an APS 3200 APU is installed
                  (Ref. TASK 49-61-34-000-002)
                - If a 131-9(A) APU is installed
                  (Ref. TASK 49-61-34-000-003)
  
  EFF :
  
             ALL                                      12-31-49
                                                     
                                                                          Page 202
                                                                         Feb 01/10
                                                 
 UZB                                             
  Subtask 12-31-49-660-056
        NOTE : It is recommended to use type 1 OILS (Material No. 03-003) for APU
        ____
               operation in cold weather conditions.
            (a) It is recommended to start the APU every three hours and operate
                it for one hour if the Outside Air Temperature (OAT) is lower
                than -30 deg.C (-22.00 deg.F).
                NOTE : These values are only applicable if all the access doors
                ____
                       are closed.
Subtask 12-31-49-660-054
            NOTE : Do not operate the ECB 59KD for more than 30 minutes at -40
            ____
                   deg.C (-40.00 deg.F) or lower.
  
  EFF :
  
             ALL                                      12-31-49
                                                     
                                                                         Page 203
                                                                        Feb 01/10
                                                  
 UZB                                              
            (a) If the ECB was on the aircraft during the cold soak, make sure
                that the temperature of the ECB is higher than -40 deg.C (-40.00
                deg.F).
                If the temperature of the ECB is lower than -40 deg.C (-40.00
                deg.F), use a pre-conditioning procedure to increase the
                temperature of the ECB to a minimum of -40 deg.C (-40.00 deg.F)
                (Ref. TASK 12-33-21-618-001) or (Ref. TASK 12-33-21-618-001).
            (b) If the ECB was removed from the aircraft and kept at a
                temperature of between 15 deg.C (59.00 deg.F) and 35 deg.C (95.00
                deg.F), install the ECB
                - If a GTCP 36-300 APU is installed
                  (Ref. TASK 49-61-34-400-001)
                - If an APS 3200 APU is installed
                  (Ref. TASK 49-61-34-400-002)
                - If a 131-9(A) APU is installed
                  (Ref. TASK 49-61-34-400-003)
            (a) For the cold weather maintenance - electrical power (Ref. TASK
                12-31-24-660-001).
Subtask 12-31-49-660-053
     D. Turn-Around Time
        For turn-around in cold weather conditions, when it is not pratical to
        remove equipment, it is recommended to keep the APU in operation. In this
        configuration :
        - the temperature in the cabin will not decrease,
        - no specific cold weather maintenance practices are necessary for the
          APU system.
  
  EFF :
  
             ALL                                      12-31-49
                                                     
                                                                         Page 204
                                                                        Feb 01/10
                                                 
 UZB                                             
           COLD WEATHER MAINTENANCE - STRUCTURE - MAINTENANCE PRACTICES
           ____________________________________________________________
TASK 12-31-51-660-001
  1. __________________
     Reason for the Job
     This procedure gives the cold weather maintenance practices for the
     structure.
  2. ______________________
     Job Set-up Information
A. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-51-010-050
  4. Procedure
     _________
Subtask 12-31-51-660-050
A. General
        (1) At the start of each winter, make sure that the drain valves in the
            lower fuselage are clean and operate correctly. (Ref. TASK 53-00-00-
            210-001)
  
  EFF :
  
             ALL                                      12-31-51
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
        (2) Ice can collect in the lower fuselage areas especially when the
            aircraft flies from warm, humid climates to cold climates. In some
            conditions, the ice can collect during more than one flight.
            NOTE : Water/ice in the lower fuselage can cause failure of the radio
            ____
                   altimeter.
        (3) When you do a check for ice in the lower fuselage, look for ice in
            the aft area before you look in the forward area. Ice usually
            collects more easily in the aft area than in the forward area. Water
            evaporation is faster in the forward area because of the warm air
            from the avionics compartment.
Subtask 12-31-51-660-051
        (1) Remove a floor panel from the forward end of the aft cargo
            compartment. (Ref. TASK 53-42-14-000-001)
        (3) If you find ice below the aft cargo compartment, look for ice below
            the forward cargo compartment.
Subtask 12-31-51-660-052
C. Removal of Ice
  
  EFF :
  
             ALL                                      12-31-51
                                                     
                                                                          Page 202
                                                                         Feb 01/10
                                                 
 UZB                                             
        (2) Hot air blower
            CAUTION : MAKE SURE THAT THE TEMPERATURE OF THE AIR FROM THE HOT AIR
            _______
                      BLOWER IS NOT MORE THAN 50 DEG.C (122 DEG.F).
                      IF THE TEMPERATURE IS MORE THAN 50 DEG.C (122 DEG.F) YOU
                      CAN CAUSE DAMAGE TO THE AIRCRAFT.
            You can use a hot air blower if the aircraft is parked in an open
            area.
        (4) The procedure used to remove ice from the lower fuselage must be
            monitored to make sure that all water drains are working and that the
            all the ice is removed.
  
  EFF :
  
             ALL                                      12-31-51
                                                     
                                                                         Page 203
                                                                        Feb 01/10
                                                
 UZB                                            
             COLD WEATHER MAINTENANCE - DOORS - MAINTENANCE PRACTICES
             ________________________________________________________
TASK 12-31-52-660-001
  1. __________________
     Reason for the Job
This procedure gives the cold weather maintenance practices for the doors.
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-31-52-010-050
A. Get Access
           (1) Do not open the applicable passenger/crew door (Ref. TASK 52-10-00-
               010-001) until immediately before you start the winter preparation
               procedure in cold weather area.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                             Page 202
                                                                            May 01/11
                                                    
    UZB                                             
           (2) Do not remove the applicable emergency exit hatch (Ref. TASK 52-21-
               11-000-001) until immediately before you start the winter preparation
               procedure in cold weather areas.
           (3) Do not open the forward or aft cargo-compartment door (Ref. TASK 52-
               30-00-860-001) until immediately before you start the winter
               preparation procedure in cold weather areas.
           (4) Do not open the bulk cargo-compartment door (Ref. TASK 52-30-00-860-
               006) until immediately before you start the winter preparation
               procedure in cold weather areas.
     4. Procedure
        _________
Subtask 12-31-52-640-050
A. Winter Preparation on the Passenger Crew Doors and Emergency Exit Hatches
R          WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
           _______
R                    MATERIAL.
R                    THIS MATERIAL IS DANGEROUS.
               (a) Make sure that the inflation holes of the door seal are clear and
                   have no obstruction.
               (b) Clean the components of the passenger/crew door that follow with
                   the lint-free cotton cloth, MISCELLANEOUS (Material No. 19-
                   003),and CLEANING AGENTS (Material No. 11-004):
                   - The upper and lower door guide fittings
                   - The roller fittings
                   - The guide rollers.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                            Page 203
                                                                           Feb 01/11
                                                   
    UZB                                            
               (c) Apply the silicone grease, COMMON GREASE (Material No. 04-017),
                   to the upper and lower door guide fittings , the roller fittings
                   and guide rollers.
               (d) Clean the door seal and its mating surface on the fuselage with
                   lint-free cotton cloth, MISCELLANEOUS (Material No. 19-003), and
                   CLEANING AGENTS (Material No. 11-004).
R              (e) Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
R                  001) or COMMON GREASE (Material No. 04-011), to the door seal and
R                  its mating surface on the fuselage.
               (h) Make sure that the mechanism of the external control handle is
                   sufficently lubricated (Ref. TASK 12-22-52-640-006).
               (i) Make sure that the girt bar fittings in the entry area are clear
                   and have no obstruction.
               (a) Clean the components of the hatch that follow with the lint-free
                   cloth, MISCELLANEOUS (Material No. 19-003), and CLEANING AGENTS
                   (Material No. 11-004):
                   - The lower hook brackets
                   - The lateral guide fittings.
               (b) Apply the silicone grease, COMMON GREASE (Material No. 04-017),
                   to the lower hook brackets and the lateral guide fittings.
               (c) Clean the upper and lower pivot fittings of the hatch frame with
                   the lint-free cotton cloth, MISCELLANEOUS (Material No. 19-003),
                   and CLEANING AGENTS (Material No. 11-004).
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                            Page 204
                                                                           Feb 01/11
                                                   
    UZB                                            
               (d) Apply the silicone grease, COMMON GREASE (Material No. 04-017),
                   to the upper and lower pivot fittings.
               (e) Clean the hatch seal and its mating surface on the fuselage with
                   lint-free cotton cloth, MISCELLANEOUS (Material No. 19-003), and
                   CLEANING AGENTS (Material No. 11-004).
R              (f) Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
R                  001) or COMMON GREASE (Material No. 04-011), to the hatch seal
R                  and its mating surface on the fuselage.
           (4) Install the related emergency exit hatch (Ref. TASK 52-10-00-410-001)
               immediately after you completed the winter preparation.
Subtask 12-31-52-640-051
R          WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE SPECIAL
           _______
R                    MATERIAL.
R                    THIS MATERIAL IS DANGEROUS.
(a) Remove the access panels 825AR or 826AR from the cargo doors.
               (b) Make sure that the inflation holes of the door seal are clear and
                   have no obstruction.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                            Page 205
                                                                           Feb 01/11
                                                   
    UZB                                            
               (c) Clean the components of the doors that follow with lint-free
                   cotton cloth, MISCELLANEOUS (Material No. 19-003), and the
                   CLEANING AGENTS (Material No. 11-004):
                   - The pressure seals and their mating surfaces on the fuselage
                   - The vent door seals and their mating surfaces around the door
                     cut-out
                   - The external door handle mechanism
                   - The door hinges and the guide fittings of the fuselage
                   - The internal mechanism of the vent door, the locking mechanism
                     and the latching mechanism.
R              (d) Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
R                  001) or COMMON GREASE (Material No. 04-011), to the mating
R                  surface of the seals around the vent door and fuselage.
               (e) Apply the silicone grease, COMMON GREASE (Material No. 04-011),
                   or the pure mineral vaseline, COMMON GREASE (Material No. 04-
                   012), to the vent door seal and the cargo door seal.
               (f) Make sure that the related cargo door is sufficiently lubricated
                   (Ref. TASK 12-22-52-640-002) and (Ref. TASK 12-22-52-640-009).
           (2) Close the FWD or AFT cargo-compartment door (Ref. TASK 52-30-00-860-
               002) immediately after you completed the winter preparation.
(3) Install the access panels 825AR or 826AR on the cargo doors.
               (a) Make sure that the inflation holes of the door seal are clear and
                   have no obstruction.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                            Page 206
                                                                           Feb 01/11
                                                   
    UZB                                            
               (b) Clean the components of the Bulk cargo-compartment door that
                   follow with lint-free cotton cloth, MISCELLANEOUS (Material No.
                   19-003), and the CLEANING AGENTS (Material No. 11-004):
                   - The pressure seals and their mating surfaces on the fuselage
                   - The door handle mechanism
                   - The door suspension and the stop assemblies
                   - The door handle mechanism, locking mechanism and the balance
                     mechanism.
R              (c) Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
R                  001) or COMMON GREASE (Material No. 04-011), to the mating
R                  surface of the Bulk door seal.
               (d) Apply the silicone grease, COMMON GREASE (Material No. 04-011),
                   or the pure mineral vaseline, COMMON GREASE (Material No. 04-
                   012), to the Bulk door seal.
Subtask 12-31-52-660-051
               (a) Remove all the snow and slush from the areas that follow before
                   you close a passenger/crew door (Ref. TASK 52-10-00-410-001) or
                   install an emergency exit hatch (Ref. TASK 52-21-11-400-001):
                   - the door/hatch seal
                   - the seal contact area on the fuselage.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                            Page 207
                                                                           Feb 01/11
                                                   
    UZB                                            
         (2) On the FWD or AFT Cargo-Compartment Doors
            (a) Remove as much snow and/or water as possible from the cargo
                pallets before you install them in the aircraft.
                NOTE : Large quantities of melting snow and water can cause the
                ____
                       cargo-compartment doors to freeze in their closed
                       positions.
            (b) Do not open the FWD or AFT cargo-compartment doors (Ref. TASK 52-
                30-00-860-001) until immediately before you install the cargo
                pallets/containers.
            (c) Close the FWD or AFT cargo-compartment doors (Ref. TASK 52-30-00-
                860-002) immediately after the installation of the cargo
                pallets/containers is complete.
                NOTE : This procedure will help to remove the moisture from the
                ____
                       inner surfaces of the doors sill area.
            (e) Use a HOT AIR BLOWER OPERATING 40 DEG C (100 DEG F) to remove the
                ice from the doors or panels that are frozen in their closed
                positions. Do not use hard or sharp tools to remove the ice.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                         Page 208
                                                                        Feb 01/11
R                                                
  UZB                                            
            (a) Remove as much snow and/or water as possible from the bulk cargo
                before you install it in the aircraft.
                NOTE : Large quantities of melting snow and water can cause the
                ____
                       cargo-compartment doors to freeze in their closed
                       positions.
            (b) Do not open the Bulk cargo-compartment door (Ref. TASK 52-30-00-
                860-006) until immediately before you install the bulk cargo.
                NOTE : This procedure will help to remove the moisture from the
                ____
                       inner surfaces of the doors sill area.
            (e) Use a HOT AIR BLOWER OPERATING 40 DEG C (100 DEG F) to remove the
                ice from the door area that are frozen in their closed positions.
                Do not use hard or sharp tools to remove the ice.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                         Page 209
                                                                        Feb 01/11
R                                               
  UZB                                           
  Subtask 12-31-52-660-052
                1
                _   Remove the snow and/or slush from the areas that follow before
                    you close the passenger/crew doors (Ref. TASK 52-10-00-410-
                    001) or the emergency exit hatches (Ref. TASK 52-21-11-000-
                    001):
                    - the door/hatch seals
                    - the door/hatch contact areas on the fuselage.
                2
                _   Use a lint-free cotton cloth, MISCELLANEOUS (Material No. 19-
                    003), and the CLEANING AGENTS (Material No. 11-004) to clean
                    the pressure seals of the passenger/crew doors and the
                    emergency exit hatches.
                3
                _   Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
                    001), to the seals of the passenger/crew doors and the
                    emergency exit hatches.
                4
                _   Make sure that the infation holes of the door seal are clean
                    and have no obstructions.
                5
                _   Make sure that the drain holes of the passenger/crew doors are
                    clear and not blocked.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                          Page 210
                                                                         Feb 01/10
                                                 
 UZB                                             
              (b) For aircraft parked in a hangar:
R                 1
                  _   Open the passenger/crew doors (Ref. TASK 52-10-00-010-001) and
R                     the emergency exit hatches (Ref. TASK 52-21-11-000-001).
              (a) Remove the snow and/or slush from the areas that follow before
                  you close the FWD and AFT cargo-compartment doors (Ref. TASK 52-
                  30-00-860-002):
                  - the door seals
                  - the door contact areas on the fuselage.
                  1
                  _   Apply the temporary protective compound, STORAGE PRESERVATION
                      (Material No. 15-005A), as a spray to the subsequent areas of
                      the FWD and AFT cargo-compartment doors:
                      - the door mechanism
                      - the inner surfaces of the lower areas of the cargo doors.
              (a) Remove the snow and/or slush from the areas that follow before
                  you close the Bulk cargo-compartment door (Ref. TASK 52-30-00-
                  860-008):
                  - the door seals
                  - the door contact areas on the fuselage.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                            Page 211
                                                                           May 01/11
                                                    
    UZB                                             
               WARNING : OBEY THE MANUFACTURERS INSTRUCTIONS WHEN YOU USE THE
               _______
                         SPECIAL MATERIAL.
                         THIS MATERIAL IS DANGEROUS.
               1
               _   Apply the temporary protective compound, STORAGE PRESERVATION
                   (Material No. 15-005A), as a spray to the subsequent areas of
                   the Bulk cargo-compartment doors:
                   - the door handle mechanism
                   - the inner surfaces of the lower areas of the Bulk door.
           (a) Make sure that the inflation holes of the door seals are clear
               and not blocked.
           (c) Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
               001), to contact area of the seals around the vent door and the
               fuselage.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                          Page 212
                                                                         Feb 01/10
                                                 
 UZB                                             
            (d) Apply the silicone grease, COMMON GREASE (Material No. 04-011),
                or the pure mineral vaseline, COMMON GREASE (Material No. 04-
                012), to the vent door seal and the cargo door seal.
            (f) Lubricate the door hinges and the guide fittings. Apply the
                temporary protective compound, STORAGE PRESERVATION (Material No.
                15-005A), to the latch assemblies and the latch spools.
            (a) Make sure that the inflation holes of the door seal is clear and
                not blocked.
            (c) Apply the silicone grease, SPECIAL MATERIALS (Material No. 05-
                001), to contact area of the Bulk door seal.
            (d) Apply the silicone grease, COMMON GREASE (Material No. 04-011),
                or the pure mineral vaseline, COMMON GREASE (Material No. 04-
                012), to the Bulk door seal.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                           Page 213
                                                                          Feb 01/10
                                                  
 UZB                                              
           (e) Apply the temporary protective compound, STORAGE PRESERVATION
               (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-
               006), to the door handle mechanism.
  
  EFF :
  
             ALL                                      12-31-52
                                                     
                                                                        Page 214
                                                                       Feb 01/10
                                               
 UZB                                           
          COLD WEATHER MAINTENANCE - POWER PLANT - MAINTENANCE PRACTICES
          ______________________________________________________________
TASK 12-31-71-660-001
  CAUTION : BEFORE YOU START THE ENGINE OR YOU PRESSURIZE THE HYDRAULIC SYSTEMS,
  _______
            MAKE SURE THAT THERE IS NO ICE OR SNOW ON THE FLIGHT CONTROLS AREA
            (ELEVATOR, RUDDER AND AILERON).
  CAUTION : INSTALL ENGINE INLET AND EXHAUST PLUG COVERS WHEN AIRCRAFT IS STORED
  _______
            UNDER HEAVY SNOWSTORM CONDITIONS SINCE CONSEQUENTIAL ENGINE INTERNAL
            DAMAGES MAY OCCUR.
  1. __________________
     Reason for the Job
This procedure gives the cold weather maintenance practices for the engines.
  2. ______________________
     Job Set-up Information
A. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-31-71-941-050
A. Not applicable
  
  EFF :
  
             ALL                                      12-31-71
                                                     
                                                                         Page 201
                                                                        Feb 01/10
                                                  
 UZB                                              
  4. Procedure
     _________
Subtask 12-31-71-660-050
     A. Ice can form in the engine intakes and freeze the fan, therefore you must
        do a careful examination of the engine intake and fan before engine start
        up.
        Attention should be paid to the forward and rear sides of the fan blades
        in order to determine whether clear ice is present.
        Use hot air blower to remove all traces of ice and residual water before
        engine start up.
Subtask 12-31-71-660-051
B. Freezing Points
        (1) The oil temperature is also a limitation. For the approved oils and
            the oil limitation temperatures, you must refer to the engine
            manufacturers data.
Subtask 12-31-71-660-052
(a) Prepare the deicing/anti-icing fluid with the table given below :
  
  EFF :
  
             ALL                                      12-31-71
                                                     
                                                                         Page 202
                                                                        Feb 01/10
                                                 
 UZB                                             
  ------------------------------------------------------------------------------
  | OAT deg C (Deg F)    |       DEICING                  |     ANTI-ICING     |
  |----------------------|--------------------------------|--------------------|
  |                      | WATER HEATED TO 60 DEG C       |                    |
  | -3 (27) and above    | (140 deg F) MINIMUM OR HEATED | 50/50 WATER/DEICER |
  |                      | MIX OF DEICER WITH WATER       |                    |
  |----------------------|--------------------------------|--------------------|
  |                      |                                |                    |
  | -4 to -7 (19 to 26) |    50/50 HEATED WATER/DEICER    | 50/50 WATER/DEICER |
  |                      |                                |                    |
  |----------------------|--------------------------------|--------------------|
  |                      |                                |                    |
  | -8 to -14 (7 to 18) |    50/50 HEATED WATER/DEICER    | 25/75 WATER/DEICER |
  |                      |                                |                    |
  |----------------------|--------------------------------|--------------------|
  |                      |                                |                    |
  | -15 to -17 (1 to 6) |    50/50 HEATED WATER/DEICER    |    100% DEICER     |
  |                      |                                |                    |
  |----------------------|--------------------------------|--------------------|
  |                      |                                |                    |
  | -18 to -25 (-13 to 0)|   75/25 HEATED WATER/DEICER    |     100% DEICER    |
  |                      |                                |                    |
  |----------------------|-----------------------------------------------------|
  |                      | SAE TYPE II FLUIDS CAN BE USED AS                   |
  |                      | DEICING/ANTI-ICING AGENTS, IF A 7 DEG C (13 DEG F) |
  |                      | BUFFER IS MAINTAINED BETWEEN THE FREEZING POINT OF |
  | -26 (-14) and below | THE CONCENTRATED FLUID AND OAT.                      |
  |                      | IN ALL CONDITIONS THIS TEMPERATURE MUST NOT BE      |
  |                      | LOWER THAN THE LOWEST OPERATIONAL TEMPERATURE AS    |
  |                      | DEFINED BY THE AERODYNAMIC ACCEPTANCE TEST OF THE   |
  |                      | MANUFACTURER.                                       |
  ------------------------------------------------------------------------------
        (2) Look at the general condition of the fan spinner and fan blades, core
            exhaust nozzle, LPT and external surfaces of the cowls.
        (3) Make a check of the drain ports for fuel, oil and hydraulic leaks
            (Ref. TASK 71-00-00-790-002). Also make sure that fuel drained from
            the engine does not cause a fire.
            NOTE : In case of extreme cold weather condition (OAT < -20 deg.C),
            ____
                   fuel leaks from the drain may occur and should not be
  
  EFF :
  
             ALL                                      12-31-71
                                                     
                                                                         Page 203
                                                                        Feb 01/10
                                                
 UZB                                            
                  considered as abnormal. Therefore, check for fuel leaks at the
                  drain mast shall be performed with the engine fully stabilized
                  at idle.
  
  EFF :
  
             ALL                                      12-31-71
                                                     
                                                                        Page 204
                                                                       Feb 01/10
                                               
 UZB                                           
                 SAMPLING FOR ANALYSIS - DESCRIPTION AND OPERATION
                 _________________________________________________
  1. _______
     General
     This section defines the different fluid samplings which may be carried out
     for an analysis.
  
  EFF :
  
             ALL                                      12-32-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                         INTEGRATED DRIVE GENERATOR OIL - SERVICING
                         __________________________________________
TASK 12-32-24-281-001
     WARNING : BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER
     _______
               THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO
               ONE HOUR.
     1. __________________
        Reason for the Job
          To find the cause of the oil contamination (skydrol, fuel, water, chlorine,
          oil degradation, and other causes).
          NOTE : The best location and time to get an oil sample is at the case drain
          ____
                 after operation of the engine, when the IDG oil is at the operating
                 temperature (80 deg.C (176 deg.F)).
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                              Page 301
                                                                             Feb 01/11
                                                     
    UZB                                              
     B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-32-24-861-050
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                            Page 302
                                                                           Feb 01/10
                                                 
 UZB                                             
  Subtask 12-32-24-941-050
B. Safety Precautions
            (a) Put a warning notice in position to tell persons not to start the
                engine.
        (2) Make sure that the engine 1(2) shutdown occurred not less than 5
            minutes before you do this procedure.
            (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                pushbutton switch is off.
Subtask 12-32-24-010-050
Subtask 12-32-24-481-050
  4. Procedure
     _________
Subtask 12-32-24-864-050
        WARNING : POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT
        _______
                  THE HOSE TO THE OVERFLOW DRAIN VALVE. THIS WILL PREVENT BURNS
                  FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES AND
                  SKIN.
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                         Page 303
                                                                        Feb 01/10
                                                
 UZB                                            
                         IDG Oil Sampling for Analysis
                       Figure 301/TASK 12-32-24-991-001
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
           CAUTION : DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE
           _______
                     FITTING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE
                     DAMAGE TO THE OVERFLOW DRAIN-VALVE SEAT.
(2) Remove the dust cap (5) from the overflow drain valve (6).
R          (3) Put the end of the drain hose of the FILLING EQUIPMENT - TANK OIL,
R              DH13PM TYP in the container 5.7 l (1.5 USgal).
R              (a) Connect the overflow drain hose of the FILLING EQUIPMENT - TANK
R                  OIL, DH13PM TYP to the overflow drain valve (6).
                   NOTE : Some oil can come out of the overflow drain hose of the
                   ____
R                         FILLING EQUIPMENT - TANK OIL, DH13PM TYP when you connect
                          it.
Subtask 12-32-24-281-050
B. Oil Sampling
           WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
           _______
                     REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
                     LOCKWIRE CAN CUT OR BLIND YOU.
(1) Cut and remove the lockwire from the case drain plug (2).
           (3) Put a transparent bottle 1 l (0.26 USgal) below the case drain port
               (1).
           (4) Slowly remove the case drain plug (2) until oil flows out of the case
               drain port (1).
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                             Page 305
                                                                            Feb 01/11
                                                   
    UZB                                            
           (7) Remove the O-ring (3) from the case drain plug (2) and discard it.
Subtask 12-32-24-640-050
C. Lubricate the new O-ring (3) with OILS (Material No. 03-002).
Subtask 12-32-24-420-050
(1) Install the new O-ring (3) on the case drain plug (2).
(2) Install the case drain plug (2) in the case drain port (1).
           (3) TORQUE the case drain plug (2) to between 55 and 75 lbf.in (0.62 and
               0.84 m.daN).
           (4) Safety the case drain plug with the MISCELLANEOUS (Material No. 19-
               010).
Subtask 12-32-24-281-051
(1) Send the oil sample bottle to laboratory immediately with these data:
Subtask 12-32-24-080-050
R          (1) Disconnect the overflow drain hose of the FILLING EQUIPMENT - TANK
R              OIL, DH13PM TYP from the overflow drain valve (6).
(2) Install the dust cap (5) on the overflow drain valve (6).
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                              Page 306
                                                                             Feb 01/11
                                                   
    UZB                                            
  Subtask 12-32-24-612-050
     G. Fill the IDG with oil or add oil to the IDG after a level check
        (Ref. TASK 12-13-24-612-041).
  5. Close-up
     ________
Subtask 12-32-24-410-050
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-32-24-862-050
  
  EFF :
  
             ALL                                      12-32-24
                                                     
                                                                           Page 307
                                                                          Feb 01/10
                                                
 UZB                                            
                                 FUEL - SERVICING
                                 ________________
TASK 12-32-28-281-001
  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
  _______
            START A TASK ON OR NEAR:
            - THE FLIGHT CONTROLS
            - THE FLIGHT CONTROL SURFACES
            - THE LANDING GEAR AND THE RELATED DOORS
            - COMPONENTS THAT MOVE.
  WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
  _______
            GEAR.
  1. __________________
     Reason for the Job
     NOTE : For the gravity procedure AIRBUS recommends that there must be more
     ____
            than 10% content of fuel in each tank. If you have less than 10%
            content of fuel, then the indirect water drain valves will have a
            decreased flow. It is recommended that you use the suction procedure
            when you have less than 10% content of fuel.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                          Page 301
                                                                         Feb 01/10
                                                
 UZB                                            
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                 safety barriers
     No specific                 suction pump
     No specific                 warning notices
     No specific                 Miscellaneous - HYDROKIT
     No specific                 container 10 l (2.6416 USgal)
     No specific             1   CONTAINER-CLEAN, STERILIZED, TRANSPARENT GLASS
     97A28002117002          1   TOOL-PURGING
     98A28101000000          1   ADAPTING PIPE - WATER DRAINING FROM FUEL
     98A28104000000          1   PURGER - WATER DRAIN
     98A28104000002          1   TOOL - PURGING
     98D28104000000          1   PIPE ADAPTING-WATER DRAINING
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-32-28-941-054
A. Safety Precautions
           (1) You must obey the fuel safety procedures (Ref. TASK 28-00-00-910-001)
               when you do work on the fuel system.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                              Page 302
                                                                             May 01/11
                                                     
    UZB                                              
                          Fuel Sampling For Analysis
                       Figure 301/TASK 12-32-28-991-001
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
        (2) Put the safety barriers in position.
        (3) Make sure that the ground safety locks are installed on the landing
            gear (Ref. TASK 32-00-00-481-001).
        (5) Put warning notices in position to tell persons not to operate the
            landing gear doors.
        (6) If the fuel temperature is less than -5 DEG.C (+23.00 DEG.F) and/or
            the water drain valves are frozen, to keep the flight turnaround
            times, either:
            - do the cold weather maintenance procedure to warm the drain valve
              (Ref. TASK 12-31-28-660-001).
              or
            - remove the fuel samples 30 minutes after the refuel procedure.
            NOTE : Removal of the fuel samples after 30 minutes will not remove
            ____
                   the water content as satisfactorily as samples removed one
                   hour after the refuel procedure.
            NOTE : Do not apply unusually high force to open the water drain
            ____
                   valve.
Subtask 12-32-28-010-050
B. Get Access
        (1) For access to the center tank water drain valves, open the applicable
            access panels:
            - for water drain valve 94QM, open access panel 195BB
            - for water drain valve 95QM, open access panel 196BB.
Subtask 12-32-28-480-050
        (1) To get access to the high water drain valves from the ground, attach
            the:
            - ADAPTING PIPE - WATER DRAINING FROM FUEL (98A28101000000)
              or the
            - PIPE ADAPTING-WATER DRAINING (98D28104000000)
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                         Page 304
                                                                        Feb 01/10
                                                  
 UZB                                              
              to the bottle and funnel of the PURGER - WATER DRAIN
              (98A28104000000).
  4. Procedure
     _________
Subtask 12-32-28-281-050
            NOTE : Make sure that the fuel tanks are filled to a minimum of 10%
            ____
                   of capacity. This is necessary to cover the water drain valve
                   outlet, so that the water drain valves can operate
                   satisfactorily. Refer to SIL for data (Ref. SIL 28-079).
                 1
                 _   Push the center of the applicable water drain valve with the
                     PURGER - WATER DRAIN (98A28104000000). Drain approximately 1.0
                     l (0.2641 USgal) of fuel from the water drain valve.
                 2
                 _   Remove the PURGER - WATER DRAIN from the water drain valve.
                 3
                 _   Examine the water drain valve for leakage. If the valve does
                     leak, use the PURGER - WATER DRAIN to push (in) and release
                     (out) the center of the valve three or four times. No leaks
                     are permitted.
                 1
                 _   Push the center of the applicable water drain valve with the
                     TOOL - PURGING (98A28104000002). Drain approximately 1.0 l
                     (0.2641 USgal) of fuel from the water drain valve.
                 2
                 _   Remove the TOOL - PURGING from the water drain valve.
                 3
                 _   Examine the water drain valve for leakage. If the valve does
                     leak, use the PURGER - WATER DRAIN to push (in) and release
                     (out) the center of the valve three or four times. No leaks
                     are permitted.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                           Page 305
                                                                          Feb 01/10
                                                  
 UZB                                              
                      NOTE : This step is very important at the center tank water
                      ____
                             drain valves 94QM and 95QM, where access is not easy.
(d) Do the sample removal procedure at all of the water drain valves.
R              (b) Attach one end of the hose to the funnel. Attach the other end of
R                  the hose to the suction pump.
               (c) Put the outlet of the suction pump into the container and start
                   the suction pump.
               (d) Push the center of the applicable water drain valve with the
                   funnel. Drain approximately 1.0 l (0.2641 USgal) of fuel (as a
                   sample) from the drain valve
Subtask 12-32-28-750-050
               (a) If the sample moves into two layers it contains water. Continue
                   to drain from the water drain valve until it has no water.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                            Page 306
                                                                           May 01/11
                                                   
    UZB                                            
               (b) If the sample stays in one layer, it can be all fuel or all
                   water. To find if the sample is fuel or water, do the test that
                   follows:
     -------------------------------------------------------------------------------
R    |              ACTION                 |          RESULT                       |
     -------------------------------------------------------------------------------
or
      2. If you do not have a HYDROKIT      - If the sample moves into two layers,
         available, add water to the          then the sample is all fuel and the
         sample.                              test is complete.
or
        NOTE : You can use the same procedure to do an analysis on a sample from a
        ____
               fuel tanker. Remove the sample from the supply connector of the fuel
               tanker.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                            Page 307
                                                                           Feb 01/11
                                                   
    UZB                                            
   5. Close-up
      ________
Subtask 12-32-28-410-050
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-32-28-942-050
B. Removal of Equipment
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                          Page 308
                                                                         May 01/10
R                                                
  UZB                                            
     TASK 12-32-28-281-003
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     1. __________________
        Reason for the Job
        NOTE : Refer to Service Information Letter (SIL 28-079) for more data on
        ____
               microbiological contamination in fuel tanks
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                               Page 309
                                                                              Nov 01/10
                                                      
    UZB                                               
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-32-28-941-055
A. Safety Precautions
           (2) Make sure that the ground safety locks are installed on the landing
               gear (Ref. TASK 32-00-00-481-001).
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                             Page 310
                                                                            Feb 01/11
                                                     
    UZB                                              
           Maintenance Plan Flowchart - Microbiological Contamination
                        Figure 302/TASK 12-32-28-991-005
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                         Page 311
                                                                        Feb 01/11
R                                              
  UZB                                          
           Microbiological Contamination Test Kits - Comparison Table
                  Figure 303/TASK 12-32-28-991-006- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                         Page 312
                                                                        Feb 01/11
R                                              
  UZB                                          
           Microbiological Contamination Test Kits - Comparison Table
                  Figure 303/TASK 12-32-28-991-006- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                         Page 313
                                                                        Feb 01/11
R                                              
  UZB                                          
         (3) On the panel 400VU:
             - make sure that the landing-gear control-lever 6GA is in the DOWN
               position
             - put a warning notice in position to tell persons not to operate the
               landing gear.
         (4) Put WARNING NOTICE(S)S in position to tell persons not to operate the
             landing gear doors.
         (5) You must obey the fuel safety procedures (Ref. TASK 28-00-00-910-001)
             when you do work on the fuel system.
         (6) If the fuel temperature is less than -5 DEG.C (+23.00 DEG.F) and/or
             the water drain valves are frozen, either:
             - do the cold weather maintenance procedure to warm the drain valve
               (Ref. TASK 12-31-28-660-001)
               or
             - remove the fuel samples 30 minutes after the refuel procedure.
Subtask 12-32-28-010-054
B. Get Access
         (1) For access to the center tank water drain valves, open the applicable
             access panels:
             - for water drain valve 94QM, open 195BB
             - for water drain valve 95QM, open 196BB.
Subtask 12-32-28-480-051
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                          Page 314
                                                                         Feb 01/11
R                                                
  UZB                                            
     4. Procedure
        _________
Subtask 12-32-28-281-055
           NOTE : If you use a test kit, refer to the kit manufacturers instructions
           ____
                  on fuel sampling and storage. Carefully follow the manufacturers
                  instructions to make sure that the test results are accurate.
R (1) When you do this procedure, you can make one of these decisons:
R              (a) Decision A:
R                  - Use one of the procedures at paragraph 4.C. thru para 4.E. Each
R                    of these give the applicable procedure to use for the
R                    applicable test kit you have available.
R              (b) Decision B:
R                  - Send the samples for an IP385 test at an approved laboratory.
R                    Use the test results to do the procedure at para 4.F.
R              (c) Decision C:
R                  - Use an applicable test kit and also send samples for an IP385
R                    test.
               (a) Push the center of the applicable water drain valve with the
                   PURGER - WATER DRAIN (98A28104000000) and drain approximately 1.0
                   l (0.2641 USgal) of fuel from the water drain valve.
R
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                             Page 315
                                                                            Feb 01/11
                                                    
    UZB                                             
R                         considered to have contamination and thus cannot be sent
R                         for the IP385 Test.
(b) Remove the PURGER - WATER DRAIN from the drain valve.
               (a) Push the center of the applicable water drain valve with the TOOL
                   - PURGING (98A28104000002) and drain approximately 1.0 l (0.2641
                   USgal) of fuel from the water drain valve.
R          (4) Examine the applicable water drain valve for leakage. Leaks are not
               permitted.
               NOTE : This step is very important at the center tank water drain
               ____
                      valves 94QM and 95QM, where access is not easy.
R          (5) Put the fuel sample for the microbiological test into a:
               - CONTAINER-CLEAN, STERILIZED, TRANSPARENT GLASS or CONTAINER-FUEL
                 RESISTANT, TRANSPARENT PLASTIC and seal the container.
R              - Make sure you can see a layer of water and a layer of fuel in each
R                sample.
               NOTE : Do not put additives into the sample to show the water
               ____
                      contents.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                              Page 316
                                                                             Feb 01/11
                                                   
    UZB                                            
               NOTE : Make a selection of one of
               ____                                the microbiological test kits for
                      the complete procedure. Do   not compare results between
                      microbiological test kits.   They use different methods to give
                      results. If you need help,   refer to the manufacturer of the
                      kit.
Subtask 12-32-28-281-060
           NOTE : This procedure is for use with the MICROBMONITOR2 test kit only.
           ____
                  Use only one sample analysis procedure and test kit to complete
                  the task. It is not necessary to do a sample analysis with all 3
                  test kits.
R
R          (1) Use the MICROBMONITOR2 TEST KIT ECHA MIC. UK(CAGE CODE OHZY6) (and
R              the manufacturers instructions) to make an analysis of each sample.
R
                   1
                   _   The contamination is negligible if:
                       - the WATER sample contents has 1000 CFU (Colony Forming
                         Units) per ml or less
                       - the FUEL sample contents has 4000 CFU per liter or less.
                   2
                   _   Continue to monitor the fuel tanks at the scheduled inspection
                       interval. No microbiological treatment is necessary.
                   1
                   _   The contamination is moderate if:
                       - the WATER sample contents has between 1000 and 10000 CFU per
                         ml
                       - the FUEL sample contents has between 4000 and 20000 CFU per
                         liter.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                              Page 317
                                                                             Feb 01/11
                                                     
    UZB                                              
                   2
                   _   Use the same method and do the sample test again in not more
                       than 10 days after the first test.
                   3
                   _   If the contamination has not changed from moderate:
                       - do the BIOBOR biocidal shock treatment (moderate
                         contamination procedure) to all fuel tanks (Ref. TASK 28-11-
                         00-600-008) or (Ref. TASK 28-11-00-600-008)
                         or
                       - do the KATHON biocidal shock treatment (moderate
                         contamination procedure) to all fuel tanks (Ref. TASK 28-11-
                         00-600-008) or (Ref. TASK 28-11-00-600-008).
                   1
                   _   The contamination is heavy if:
                       - the WATER sample contents has more than 10000 CFU per ml
                       - the FUEL sample contents has more than 20000 CFU per liter.
                   2
                   _   Use the same method and do the sample test again in not more
                       than 10 days after the first test.
                   3
                   _   If the contamination has not changed from heavy:
                       - do the BIOBOR biocidal shock treatment (heavy contamination
                         procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
                         (Ref. TASK 28-11-00-600-009)
                         or
                       - do the KATHON biocidal shock treatment (heavy contamination
                         procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
                         (Ref. TASK 28-11-00-600-009).
Subtask 12-32-28-281-061
           NOTE : This procedure is for use with the FUELSTAT RESINAE test kit only.
           ____
                  Use only one sample analysis procedure and test kit to complete
                  the task. It is not necessary to do a sample analysis with all 3
                  test kits.
           NOTE : The FUELSTAT RESINAE test kit shows the most frequent type of
           ____
                  contamination you can find in fuel tanks (Hormoconis Resinae).
                  Other types of contamination will not be shown.
R
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                             Page 318
                                                                            Feb 01/11
                                                    
    UZB                                             
R          (1) Use the FUELSTAT RESINAE TESTKIT CONIDIA BIO.(CAGECODE KE385) (and
R              the manufacturers instructions) to make an analysis of each sample.
R
                   1
                   _   The contamination is negligible if the indication lines (on
                       the test kit) show a negative result.
                   2
                   _   Continue to monitor the fuel tanks at the scheduled inspection
                       interval. No microbiological treatment is necessary.
                   1
                   _   The contamination is moderate if the indication lines (on the
                       test kit) show a low positive result.
                   2
                   _   Use the same method and do the sample test again in not more
                       than 10 days after the first test.
                   3
                   _   If the contamination has not changed from moderate:
                       - do the BIOBOR biocidal shock treatment (moderate
                         contamination procedure) to all fuel tanks (Ref. TASK 28-11-
                         00-600-008) or (Ref. TASK 28-11-00-600-008)
                         or
                       - do the KATHON biocidal shock treatment (moderate
                         contamination procedure) to all fuel tanks (Ref. TASK 28-11-
                         00-600-008) or (Ref. TASK 28-11-00-600-008).
                   1
                   _   The contamination is heavy if the indication lines (on the
                       test kit) show a high positive result.
                   2
                   _   Use the same method and do the sample test again in not more
                       than 10 days after the first test.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                             Page 319
                                                                            Feb 01/11
                                                    
    UZB                                             
                   3
                   _   If the contamination has not changed from heavy:
                       - do the BIOBOR biocidal shock treatment (heavy contamination
                         procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
                         (Ref. TASK 28-11-00-600-009)
                         or
                       - do the KATHON biocidal shock treatment (heavy contamination
                         procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
                         (Ref. TASK 28-11-00-600-009).
Subtask 12-32-28-281-062
           NOTE : This procedure is for use with the HY-LITE Jet A1 test kit only.
           ____
                  Use only one sample analysis procedure and test kit to complete
                  the task. It is not necessary to do a sample analysis with all 3
                  test kits.
R          (1) Use the FUEL CONTAMINATION TEST KIT - BIOCIDE (and the manufacturers
R              instructions) to make an analysis of each sample.
R
                   1
                   _   The contamination is negligible if the sample contents has
                       1000 RLU/litre (Relative Light Units) or less.
                   2
                   _   Continue to monitor the fuel tanks at the scheduled inspection
                       interval. No microbiological treatment is necessary.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                             Page 320
                                                                            Feb 01/11
                                                    
    UZB                                             
               (b) Moderate contamination:
                   1
                   _   The contamination is moderate if the sample contents has
                       between 1000 and 5000 RLU/litre.
                   2
                   _   Use the same method and do the sample test again in not more
                       than 10 days after the first test.
                   3
                   _   If the contamination has not changed from moderate:
                       - do the BIOBOR biocidal shock treatment (moderate
                         contamination procedure) to all fuel tanks (Ref. TASK 28-11-
                         00-600-008) or (Ref. TASK 28-11-00-600-008)
                         or
                       - do the KATHON biocidal shock treatment (moderate
                         contamination procedure) to all fuel tanks (Ref. TASK 28-11-
                         00-600-008) or (Ref. TASK 28-11-00-600-008).
                   1
                   _   The contamination is heavy if the sample contents has more
                       than 5000 RLU/litre.
                   2
                   _   Use the same method and do the sample test again in not more
                       than 10 days after the first test.
                   3
                   _   If the contamination has not changed from heavy:
                       - do the BIOBOR biocidal shock treatment (heavy contamination
                         procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
                         (Ref. TASK 28-11-00-600-009)
                         or
                       - do the KATHON biocidal shock treatment (heavy contamination
                         procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
                         (Ref. TASK 28-11-00-600-009).
R Subtask 12-32-28-281-063
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                             Page 321
                                                                            Feb 01/11
                                                    
    UZB                                             
R          (a) Negligible contamination:
R              1
               _   The contamination is negligible if:
R                  - the WATER sample contents has 1000 CFU (Colony Forming
R                    Units) per ml or less
R                  - the FUEL sample contents has 4000 CFU per liter or less.
R              2
               _   Continue to monitor the fuel tanks at the scheduled inspection
R                  interval. No microbiological treatment is necessary.
R              1
               _   The contamination is moderate if:
R                  - the WATER sample contents has between 1000 and 10000 CFU per
R                    ml
R                  - the FUEL sample contents has between 4000 and 20000 CFU per
R                    liter.
R              2
               _   Use the same method and do the sample test again in not more
R                  than 10 days after the first test.
R              3
               _   If the contamination has not changed from moderate:
R                  - do the BIOBOR biocidal shock treatment (moderate
R                    contamination procedure) to all fuel tanks (Ref. TASK 28-11-
R                    00-600-008) or (Ref. TASK 28-11-00-600-008)
R                    or
R                  - do the KATHON biocidal shock treatment (moderate
R                    contamination procedure) to all fuel tanks (Ref. TASK 28-11-
R                    00-600-008) or (Ref. TASK 28-11-00-600-008).
R              1
               _   The contamination is heavy if:
R                  - the WATER sample contents has more than 10000 CFU per ml
R                  - the FUEL sample contents has more than 20000 CFU per liter.
R              2
               _   Use the same method and do the sample test again in not more
R                  than 10 days after the first test.
R              3
               _   If the contamination has not changed from heavy:
R                  - do the BIOBOR biocidal shock treatment (heavy contamination
R                    procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
R                    (Ref. TASK 28-11-00-600-009)
R                    or
R                  - do the KATHON biocidal shock treatment (heavy contamination
R                    procedure) to all fuel tanks (Ref. TASK 28-11-00-600-009) or
R                    (Ref. TASK 28-11-00-600-009).
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                         Page 322
                                                                        Feb 01/11
                                                
    UZB                                         
  5. Close-up
     ________
Subtask 12-32-28-410-054
A. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
Subtask 12-32-28-942-054
B. Removal of Equipment
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (3) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                         Page 323
                                                                        Feb 01/10
                                                
 UZB                                            
                 Fuel Sampling For Analysis - Suction Procedure
                        Figure 304/TASK 12-32-28-991-007
  
  EFF :
  
             ALL                                      12-32-28
                                                     
                                                                   Page 324
                                                                  Feb 01/10
                                               
 UZB                                           
                                 HYDRAULIC FLUID - SERVICING
                                 ___________________________
TASK 12-32-29-281-001
Hydraulic Fluid Sample of Green, Blue and Yellow Systems for Analysis
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
     _______
               OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                              Page 301
                                                                             Feb 01/11
                                                     
    UZB                                              
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                            Page 302
                                                                           Feb 01/11
                                                   
    UZB                                            
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                          Page 303
                                                                         May 01/11
R                                                
  UZB                                            
     3. __________
        Job Set-up
Subtask 12-32-29-941-050
A. Safety Precautions
           (2) Put the WARNING NOTICE(S) in position to tell persons not to move:
               - the flight controls,
               - the lever of the landing gear selector.
Subtask 12-32-29-863-050
Subtask 12-32-29-010-050
R Subtask 12-32-29-866-050
R       D. If you operated the hydraulic systems more than one hour ago:
R          - Operate the flight controls for 5 minutes but not over the full travel.
     4. Procedure
        _________
Subtask 12-32-29-170-050
           WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
           _______
                     REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
                     LOCKWIRE CAN CUT OR BLIND YOU.
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                              Page 304
                                                                             May 01/11
                                                   
    UZB                                            
         (1) Remove and discard the lockwire from the applicable sampling valve:
             - For the Green hydraulic system, the sampling valve 1187GM
             - For the Yellow hydraulic system, the sampling valve 3187GM
             - For the Blue hydraulic system, the sampling valve 2187GM.
(3) Put the CONTAINER - CLEAN, APPLICABLE below the sampling valve.
         (4) Put the notch in the head of the cap below the head of the needle
             valve.
         (5) Move the cap to pull the needle valve down and drain 0.2 l (0.0528
             USgal) into the applicable container.
Subtask 12-32-29-281-050
(1) Flush the sampling valve before you take each sample.
         (2) Put the clean glass BOTTLE - SAMPLE or the plastic (non PVC) BOTTLE -
             SAMPLE below the sampling valve. Do not use a container/bottle made
             from polyvinyl chloride (PVC). This material will effect the results
             from the hydraulic fluid sample.
         (3) Put the notch in the head of the cap below the head of the needle
             valve.
         (4) Move the cap to pull the needle valve down and drain 0.2 l (0.0528
             USgal) into the sample bottle.
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                          Page 305
                                                                         May 01/11
R                                                    
  UZB                                                
                    Sampling Valves - Location and Operation
                  Figure 301/TASK 12-32-29-991-001- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                    Page 306
                                                                   Feb 01/10
                                               
 UZB                                           
                    Sampling Valves - Location and Operation
                  Figure 301/TASK 12-32-29-991-001- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                    Page 307
                                                                   Feb 01/10
                                               
 UZB                                           
     Subtask 12-32-29-281-052
R          (1) The maximum particle contamination must agree with or be better than
R              NSA307110 class 9.
R                            --------------------------------------------
R                            |   Particle size     |    Class 9         |
R                            --------------------------------------------
R                            | 5 to 15 micron      |    128000          |
R                            | 15 to 25 micron     |    22800           |
R                            | 25 to 50 micron     |    4050            |
R                            | 50 to 100 micron    |    720             |
R                            | > 100 micron        |    128             |
R                            --------------------------------------------
R          (2) If the contamination rate in the fluid sample is more than the values
               given in the table above (class 9):
Subtask 12-32-29-281-053
        D. Chemical Analysis
           Chemical analysis must be to NSA307110 Limit Characteristics of fluid in
           operation. The values below are the permitted limits for in-service
           fluid:
           - Acid number: 1.5mg KOH/g maximum
           - Density at 23 +/- 3 deg.C: 970 to 1066 kg/m3 (60.56 to 66.55 lb/ft3)
           - Water content: 0.50% recommended, 0.80% maximum.
           NOTE : The maximum water content is 0.80%. But to increase the hydraulic
           ____
                  fluid life, Airbus recommends to keep this value at less than
                  0.50%.
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                             Page 308
                                                                            May 01/11
                                                     
    UZB                                              
           - Electrical conductivity: 0.30 microSiemens.cm-1 minimum.
               (a) The table that follows gives you the approval for aircraft
                   dispatch if the result of the fluid chemical analysis is not in
                   the correct limits.
                    --------------------------------------------------------------
                    | Hydraulic Fluid |     New Values         | Allowed Time     |
                    | Parameters      |                        | Frames           |
                    --------------------------------------------------------------
                    | Acid number     |   1.5 to 2.5mg KOH/g   | 7 calendar days |
                    |-----------------|------------------------|-----------------|
                    | Density         |     not applicable     | less than        |
                    |                 |                        | 600FH or 750FC |
                    |                 |                        | which come first|
                    |-----------------|------------------------|-----------------|
                    | Water content   |      0.8 to 1.0%       | less than        |
                    |                 |                        | 600FH or 750FC |
                    |                 |                        | which come first|
                    |-----------------|------------------------|-----------------|
                    | Water content   |      1.0 to 1.5%       | 7 calendar days |
                    |-----------------|------------------------|-----------------|
                    | Viscosity       |      at 38 deg.C:      | 10 calendar days|
R                   |                 |    5.5 to 6.0 CST     | or 150 FH       |
                    |-----------------|------------------------|-----------------|
                    | Chlorine content|     200 to 300 ppm     | 10 calendar days|
                    |                 |                        | or 150 FH        |
                    |-----------------|------------------------|-----------------|
                    | Electrical      |      lower than        | less than        |
                    | conductivity    | 0.30 microSiemens.cm-1 | 600FH or 750FC |
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                            Page 309
                                                                           Feb 01/11
                                                     
    UZB                                              
                    --------------------------------------------------------------
                    | Hydraulic Fluid |     New Values         | Allowed Time    |
                    | Parameters      |                        | Frames          |
                    --------------------------------------------------------------
                    |                 |                        | which come first|
                    --------------------------------------------------------------
                   NOTE : The time frames show the service time for the aircraft.
                   ____
                          This is from the time you find the contamination until you
                          get the new results. This time includes corrective
                          procedures, for new samples and for new analysis.
Subtask 12-32-29-281-054
               (a) Clean the hydraulic fluid of the applicable hydraulic system with
                   the HYDRAULIC PURIFIER (HSPA181-380J)
                   (Ref. TASK 12-36-29-615-001)
                   (Ref. TASK 12-36-29-615-002)
                   (Ref. TASK 12-36-29-615-003).
                   Or change the hydraulic fluid of the applicable hydraulic system
R                  (Ref. TASK 12-36-29-600-001)
R                  (Ref. TASK 12-36-29-600-002)
R                  (Ref. TASK 12-36-29-600-003).
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                            Page 310
                                                                           Feb 01/11
                                                   
    UZB                                            
                     (Ref. TASK 29-13-45-610-001).
                 1
                 _   If you find no corroded particles:
                     a
                     _   Make sure that the filter elements are clean and in the
                         correct condition. If necessary, replace the applicable
                         filter element with a new one.
                     b
                     _   Install the LP/HP filter elements as given in the
                         subsequent procedures:
                         - For the Green hydraulic system
                           (Ref. TASK 29-11-44-610-001)
                           (Ref. TASK 29-11-45-610-001)
                         - For the Blue hydraulic system
                           (Ref. TASK 29-12-44-610-001)
                           (Ref. TASK 29-12-45-610-001)
                         - For the Yellow hydraulic system
                           (Ref. TASK 29-13-44-610-001)
                           (Ref. TASK 29-13-45-610-001).
                 2
                 _   If you find corroded particles:
                     a
                     _   Install new HP/LP filter elements as given in the
                         subsequent procedures:
                         - For the Green hydraulic system
                           (Ref. TASK 29-11-44-610-001)
                           (Ref. TASK 29-11-45-610-001)
                         - For the Blue hydraulic system
                           (Ref. TASK 29-12-44-610-001)
                           (Ref. TASK 29-12-45-610-001)
                         - For the Yellow hydraulic system
                           (Ref. TASK 29-13-44-610-001)
                           (Ref. TASK 29-13-45-610-001).
                     b
                     _   Continue with the procedures given in step (2) (b) to (2)
                         (h) and step (3) (b) to (3) (h).
(2) If the water contamination is more than 1.3% and less than 2.5%:
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                              Page 311
                                                                             Feb 01/11
R                                                   
  UZB                                               
               (Ref. TASK 29-00-00-280-003).
           (c) Do the operational test of the wing tip brake and the pressure
               off brake
               (Ref. TASK 27-51-00-710-003)
               (Ref. TASK 27-81-00-710-002).
               1
               _   If you find no corroded particles:
                   a
                   _   Make sure that the filter elements are clean and in the
                       correct condition. If necessary, replace the applicable
                       filter element with a new one.
                   b
                   _   Install the new LP filter element as given in the
                       subsequent procedures:
                       - For the Green hydraulic system
                         (Ref. TASK 29-11-44-610-001)
                       - For the Blue hydraulic system
                         (Ref. TASK 29-12-44-610-001)
                       - For the Yellow hydraulic system
                         (Ref. TASK 29-13-44-610-001).
               2
               _   If you find corroded particles:
                   a
                   _   Install a new LP filter element as given in the subsequent
                       procedures:
                       - For the Green hydraulic system
                         (Ref. TASK 29-11-44-610-001)
                       - For the Blue hydraulic system
                         (Ref. TASK 29-12-44-610-001)
                       - For the Yellow hydraulic system
                         (Ref. TASK 29-13-44-610-001).
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                            Page 312
                                                                           Feb 01/11
R                                                
  UZB                                            
            (f) Remove the   bobbins of the HP manifold of the applicable hydraulic
                system
                (Ref. TASK   29-11-14-400-001)
                (Ref. TASK   29-12-14-400-001)
                (Ref. TASK   29-13-14-400-001)
                (Ref. TASK   20-23-21-911-001).
                1
                _   If you find no signs of corrosion:
                    a
                    _   Install the bobbins.
                2
                _   If you find signs of corrosion:
                    a
                    _   Replace the bobbins and the applicable component.
                1
                _   Continue with the procedures given in step (3) (b) to (3) (h).
(a) Do the procedures given in step (1) and step (2) (b) to (2) (h).
                1
                _   Remove the check valve (2029GM) (Ref. TASK 29-00-00-910-003).
                2
                _   Examine the check valve (2029GM) for signs of corrosion.
                    a
                    _   If you find no signs of corrosion:
                        - Install the check valve (2029GM).
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                             Page 313
                                                                            Feb 01/11
R                                                 
  UZB                                             
                       b
                       _   If you find signs of corrosion:
                           - Replace the check valve (2029GM).
               (h) Examine the thrust reverser check valves (3010KM1), (3010KM2) for
                   signs of corrosion.
                   1
                   _   If you find no signs of corrosion:
                       a
                       _   Install the thrust reverser check valves (3010KM1) and
                           (3010KM2) (Ref. TASK 29-13-35-400-001).
                   2
                   _   If you find signs of corrosion:
                       a
                       _   Replace the thrust reverser check valves (3010KM1) and
                           (3010KM2) (Ref. TASK 29-13-35-400-001).
Subtask 12-32-29-860-050
R              WARNING : WEAR GOGGLES WHEN YOU REMOVE OR INSTALL THE LOCKWIRE. CUT,
               _______
R                        REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK. LOOSE
R                        LOCKWIRE CAN CUT OR BLIND YOU.
           (3) Safety the cap with corrosion-resistant steel lockwire 0.8 mm (0.032
               in.) dia.
     5. Close-up
        ________
Subtask 12-32-29-611-050
        A. Make sure that the fluid level in the hydraulic reservoirs is correct. If
           necessary, fill the reservoirs (Ref. TASK 12-12-29-611-001).
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                              Page 314
                                                                             Feb 01/11
                                                     
    UZB                                              
  Subtask 12-32-29-410-050
B. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
  
  EFF :
  
             ALL                                      12-32-29
                                                     
                                                                         Page 315
                                                                        Feb 01/10
                                                
 UZB                                            
                                       APU - SERVICING
                                       _______________
TASK 12-32-49-281-001
     WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
     _______
               WHEN YOU DO THE MAINTENANCE TASK(S).
     1. __________________
        Reason for the Job
        To find the cause of the oil contamination (fuel, oil degradation and other
        causes).
        NOTE : You must get the sample 15 to 30 minutes after APU shutdown and
        ____
               before you add oil to the tank.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R B. Consumable Materials
R    -------------------------------------------------------------------------------
R    REFERENCE                 DESIGNATION
R    -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-32-49
                                                     
                                                                            Page 301
                                                                           Nov 01/10
                                                     
    UZB                                              
R       C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-32-49-860-050
           (1) Put the warning notices on panel 25VU to tell persons not to start
               the APU.
Subtask 12-32-49-865-050
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      121VU APU/APU/CTL                                               2KD      L42
      121VU APU/ECB/SPLY                                              1KD      L41
  
  EFF :
  
             ALL                                      12-32-49
                                                     
                                                                             Page 302
                                                                            Nov 01/10
                                                    
    UZB                                             
     Subtask 12-32-49-010-050
C. Get Access
     4. Procedure
        _________
Subtask 12-32-49-281-050
A. Get a sample
           WARNING : DO NOT REMOVE THE FILLER CAP OF THE OIL TANK IMMEDIATELY AFTER
           _______
                     ENGINE OPERATION. LET THE OIL PRESSURE DECREASE FOR A MINIMUM
                     OF 5 MINUTES AFTER THE ENGINE SHUTDOWN.
                     IF YOU OPEN THE FILLER CAP WHEN THERE IS PRESSURE IN THE TANK
                     THE OIL CAN BURN YOU DANGEROUSLY.
           CAUTION : MAKE SURE THAT THE OIL TANK SCUPPER IS CLEAN TO PREVENT
           _______
                     CONTAMINATION OF THE TANK DURING THE SERVICING OPERATIONS.
               CAUTION : USE A NEW AND VERY CLEAN PLASTIC BOTTLE WITH A NEW SCREW
               _______
                         TOP AND A NEW PLASTIC TUBE. DO NOT USE THESE ITEMS AGAIN.
               (a) Squeeze the plastic bottle (2) and put the free end of the tube
                   into the oil through the filling port (3).
               (b) Release the pressure on the bottle to remove the oil sample by
                   suction.
  
  EFF :
  
             ALL                                      12-32-49
                                                     
                                                                             Page 303
                                                                            Nov 01/10
                                                   
    UZB                                            
                           Oil Sampling for Analysis
                       Figure 301/TASK 12-32-49-991-001
  
  EFF :
  
             ALL                                      12-32-49
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
         (3) Tag the oil sample with these data:
             - APU total operating time.
             - Operating time since the last oil sampling.
             - Date of sample.
             - Identification of the APU (Serial Number).
             - Type and brand of the oil used.
         (5) Do a check of the oil level and fill the oil tank if necessary
             - for GTCP 36-300 APU
               (Ref. TASK 49-90-00-600-001)
             - for APS 3200 APU
               (Ref. TASK 49-90-00-600-004)
             - for 131-9(A) APU
               (Ref. TASK 49-90-00-600-007)
   5. Close-up
      ________
Subtask 12-32-49-410-050
A. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-32-49-865-051
      B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
         breaker(s):
         1KD, 2KD.
  
  EFF :
  
             ALL                                      12-32-49
                                                     
                                                                          Page 305
                                                                         Nov 01/10
R                                                
  UZB                                            
  Subtask 12-32-49-860-051
  
  EFF :
  
             ALL                                      12-32-49
                                                     
                                                                   Page 306
                                                                  Nov 01/10
                                                
 UZB                                            
                                   ENGINE OIL - SERVICING
                                   ______________________
TASK 12-32-79-281-002
     WARNING : DO NOT REMOVE THE FILLER CAP OF THE OIL TANK IMMEDIATELY AFTER ENGINE
     _______
               OPERATION. LET THE OIL PRESSURE DECREASE FOR A MINIMUM OF 5 MINUTES
               AFTER THE ENGINE SHUTDOWN.
               IF YOU OPEN THE FILLER CAP WHEN THERE IS PRESSURE IN THE TANK THE OIL
               CAN BURN YOU DANGEROUSLY.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R B. Consumable Materials
R    -------------------------------------------------------------------------------
R    REFERENCE                 DESIGNATION
R    -------------------------------------------------------------------------------
R C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     12-13-79-610-002            Check oil level and replenish Check Pop Out Indicator
                                 of EMCD (Electrical Master Chip Detector)
     12-13-79-610-002            Check oil level and replenish (Pressure Filling)
     79-11-10-300-004            Replacement of the O-ring of the Oil Cap Assembly
     12-32-79-991-300            Fig. 301
     12-32-79-991-301            Fig. 302
  
  EFF :
  
             ALL                                      12-32-79
                                                     
                                                                              Page 301
                                                                             May 01/11
                                                     
    UZB                                              
     3. __________
        Job Set-up
Subtask 12-32-79-941-051
A. Safety Precautions
(a) Put a warning notice to tell persons not to start the engine.
           (2) Make sure that the engine 1(2) shutdown occurred not less than 5
               minutes before you do this procedure.
               (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2)
                   pushbutton switch is off.
               (b) Put a warning notice to tell persons not to energize the FADEC
                   1(2).
Subtask 12-32-79-010-052
     4. Procedure
        _________
Subtask 12-32-79-160-051
           CAUTION : MAKE SURE THAT THE OIL TANK SCUPPER IS CLEAN TO PREVENT
           _______
                     CONTAMINATION OF THE TANK DURING THE SERVICING OPERATIONS.
R          (1) Clean the oil tank scupper with a clean MISCELLANEOUS (Material No.
R              19-003) before you remove the oil tank filler cap.
  
  EFF :
  
             ALL                                      12-32-79
                                                     
                                                                            Page 302
                                                                           May 01/11
                                                   
    UZB                                            
                      Removal of the Oil Tank Filler Cap
                       Figure 301/TASK 12-32-79-991-300
  
  EFF :
  
             ALL                                      12-32-79
                                                     
                                                                   Page 303
                                                                  Feb 01/10
                                              
 UZB                                          
                           Oil Sampling for Analysis
                       Figure 302/TASK 12-32-79-991-301
  
  EFF :
  
             ALL                                      12-32-79
                                                     
                                                                   Page 304
                                                                  Feb 01/10
                                              
 UZB                                          
  Subtask 12-32-79-010-053
        (1) Raise oil tank filler cap handle to vertical (unlocked) position.
            (Ref. Fig. 301/TASK 12-32-79-991-300)
        (2) Firmly grip oil tank filler cap handle, push down and at the same
            time turn counter clockwise to disengage locking device and remove
            cap.
Subtask 12-32-79-281-051
        CAUTION : USE A NEW AND VERY CLEAN PLASTIC BOTTLE WITH A NEW SCREW TOP
        _______
                  AND A NEW PLASTIC TUBE. DO NOT USE THESE ITEMS AGAIN.
        (1) Take sample by squeezing a plastic bottle and then a dipping tube end
            into oil.
Subtask 12-32-79-612-050
  
  EFF :
  
             ALL                                      12-32-79
                                                     
                                                                         Page 305
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-32-79-410-052
        (1) Inspect the O-ring seal of the oil tank filler cap to make sure it is
            in good condition or does not show signs of leakage. If not, replace
            the seal (Ref. TASK 79-11-10-300-004).
        (2) Install oil tank filler cap with handle in vertical position, grip
            handle, push down on the cap and at the same time turn clockwise to
            engage the locking device.
        (3) Pull up on oil tank filler cap. If the locking device is properly
            engaged, the cap cannot be pulled from tank.
(4) Push hinged oil tank cap handle down flat into the locked position.
  5. Close-up
     ________
Subtask 12-32-79-410-053
     A. Close Access
        Make sure that the work area is clean and clear of tool(s) and other
        items.
            FOR 1000EM1
            437BL
            FOR 1000EM2
            447BL
            Remove the warning notice(s).
  
  EFF :
  
             ALL                                      12-32-79
                                                     
                                                                         Page 306
                                                                        Feb 01/10
                                                
 UZB                                            
                   PRE-CONDITIONING - DESCRIPTION AND OPERATION
                   ____________________________________________
  1. _______
     General
     The aircraft can be pre-conditioned on the ground with:
     - a ground air-supply unit through the LP ground connection (Ref. TASK
       12-33-21-618-00100).
     - a ground air-supply unit through the HP ground connection (Ref. TASK
       12-33-21-618-00101).
     - the APU (Ref. TASK 12-33-21-618-00102).
  
  EFF :
  
             ALL                                      12-33-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                   GROUND AIR PRE-CONDITIONING - MAINTENANCE PRACTICES
                   ___________________________________________________
TASK 12-33-21-618-001
     WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
     _______
               GEAR.
R    WARNING : MAKE SURE THAT DURING THIS PROCEDURE THE AIRCRAFT IS IN ONE OF THESE
     _______
R              THREE CONDITIONS:
R              - THE CABIN PRESSURE OUTFLOW VALVE IS OPEN.
R              - THE FWD AVIONICS COMPARTMENT ACCESS DOOR 811 IS OPEN.
R              - ONE OR MORE PASSENGER DOORS ARE OPEN.
R              YOU MUST ATTACH A WARNING NOTICE TO THE OPEN DOORS TO TELL PERSONS
R              NOT TO CLOSE THEM. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE
R              AIRCRAFT.
     CAUTION : DO NOT USE CONDITIONED AIR FROM THE PACKS AT THE SAME TIME AS AIR
     _______
               FROM THE LOW-PRESSURE GROUND UNITS. THIS CAN CAUSE DAMAGE TO THE
               CHECK VALVES.
     CAUTION : MAKE SURE THAT THE GROUND AIR-SUPPLY UNIT IS NOT TOO NEAR THE
     _______
               AIRCRAFT AND THAT THE ENGINE EXHAUST PIPE OF THE GROUND AIR- SUPPLY
               UNIT POINTS AWAY FROM THE AIRCRAFT. HEAT FROM THIS UNIT AND FROM THE
               EXHAUST CAN CAUSE DAMAGE TO THE AIRCRAFT STRUCTURE.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 201
                                                                           Aug 01/10
                                                     
    UZB                                              
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-33-21-010-050
        A. Get Access
R
     4. Procedure
        _________
Subtask 12-33-21-618-050
           NOTE : Obey the instructions given with the ground-air supply unit.
           ____
           (1) Start the ground air-supply unit and make sure that:
               - The airflow is between 54 kg.min (119.0495 lb.min) and 78 kg.min
                 (171.9605 lb.min),
               - The supplied air pressure is not more than 43 mbar (0.62 psi) at
                 the aircraft interface connector.
           (2) Set the necessary output air temperature on the ground air-supply
               unit and make sure that:
               - The supplied air temperature does not increase to more than 70
                 deg.C (158.00 deg.F).
               - The supplied air temperature does not decrease to less than 2 deg.C
                 (35.60 deg.F).
Subtask 12-33-21-618-056
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 202
                                                                           May 01/11
                                                   
    UZB                                            
                          LP and HP Ground Connectors
                       Figure 201/TASK 12-33-21-991-003
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                   Page 203
                                                                  Feb 01/10
                                              
 UZB                                          
     5. Close-up
        ________
Subtask 12-33-21-410-050
A. Close Access
           (1) Disconnect and remove the ground air-supply unit from the aircraft LP
               connector.
R (3) Close the FWD avionics compartment access door 811 if opened.
           (5) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 204
                                                                           May 01/11
                                                   
    UZB                                            
   TASK 12-33-21-618-001- 01
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   WARNING : MAKE SURE THAT DURING THIS PROCEDURE THE AIRCRAFT IS IN ONE OF THESE
   _______
             THREE CONDITIONS:
             - THE CABIN PRESSURE OUTFLOW VALVE IS OPEN.
             - THE FWD AVIONICS COMPARTMENT ACCESS DOOR 811 IS OPEN.
             - ONE OR MORE PASSENGER DOORS ARE OPEN.
             YOU MUST ATTACH A WARNING NOTICE TO THE OPEN DOORS TO TELL PERSONS
             NOT TO CLOSE THEM. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE
             AIRCRAFT.
   CAUTION : MAKE SURE THAT THE GROUND-AIR SUPPLY IS FREE FROM OIL CONTAMINATION.
   _______
             OIL CONTAMINATION CAN CAUSE THE SMELL OF OIL IN THE CABIN AND MAKE
             THE AIR-CONDITIONING PACKS UNSERVICEABLE.
   CAUTION : MAKE SURE THAT THE GROUND AIR-SUPPLY UNIT IS NOT TOO NEAR THE
   _______
             AIRCRAFT AND THAT THE ENGINE EXHAUST PIPE OF THE GROUND AIR- SUPPLY
             UNIT POINTS AWAY FROM THE AIRCRAFT. HEAT FROM THIS UNIT AND FROM THE
             EXHAUST CAN CAUSE DAMAGE TO THE AIRCRAFT STRUCTURE.
   NOTE : The ground air-supply unit supplies air to the air conditioning packs
   ____
          10HM/11HM.
   1. __________________
      Reason for the Job
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                          Page 205
                                                                         May 01/11
R                                                
  UZB                                            
     2. ______________________
        Job Set-up Information
A. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-33-21-865-053
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU AIR COND/AVNCS VENT/CTL                                   6HQ      D06
       49VU AIR COND/AVNCS VENT/CTL                                   5HQ      D05
      122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL              5HU      U21
      122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY             6HU      U19
      122VU AIR COND/RECIRC FAN/R/CTL                                11HG      W20
      122VU AIR COND/RECIRC FAN/R/SPLY                                3HG      W18
      122VU AIR COND/RECIRC FAN/L/CTL                                 2HG      X20
      122VU AIR COND/RECIRC FAN/L/SPLY                                1HG      X18
      122VU AIR COND/AVNCS/VENT/MONG                                  3HQ      Y17
      123VU AVNCS VENT/BLOWER/FAN                                     1HQ     AD10
      123VU AVNCS VENT/EXTC/FAN                                       2HQ     AE02
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                              Page 206
                                                                             May 01/11
                                                     
    UZB                                              
     Subtask 12-33-21-860-050
           (4) On the panel 22VU make sure that the CAB FANS pushbutton switch is in
               the on position (the OFF legend is off).
R Subtask 12-33-21-010-054
R C. Get Access
R          (2) Connect the GROUND AIR SUPPLY UNIT (HIGH PRESSURE) to the aircraft
R              High Pressure (HP) connector(s).
     4. Procedure
        _________
Subtask 12-33-21-618-054
           (1) Start the ground air-supply unit and make sure that:
               - the airflow is between 54 kg.min (119.0495 lb.min) and 78 kg.min
                 (171.9605 lb.min),
               - the supplied air pressure is not more than 3.5 bar (50.7631 psi),
               - the supplied air temperature does not go above 260 deg.C (500.00
                 deg.F).
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 207
                                                                           May 01/11
                                                   
    UZB                                            
                              Air Condition Panel
                       Figure 202/TASK 12-33-21-991-001
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                   Page 208
                                                                  Feb 01/10
                                              
 UZB                                          
                      On the PACK 1 and the PACK 2 pushbutton switches the FAULT
                      legends go off when the flow control valves open.
           (2) On the AIR BLEED page of the ECAM lower DU, make sure that the pack
               discharge-temperature indication is normal (i.e. green indication).
Subtask 12-33-21-618-057
     5. Close-up
        ________
Subtask 12-33-21-410-054
R A. Close Access
R          (1) Disconnect and remove the ground air-supply unit from the aircraft
R              High Pressure (HP) connector(s).
R (3) Close the FWD avionics compartment access door 811 if opened.
R          (5) Remove the ground support and maintenance equipment, the special and
R              standard tools and all other items.
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 209
                                                                           May 01/11
                                                   
    UZB                                            
R    Subtask 12-33-21-860-051
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 210
                                                                           May 01/11
                                                   
    UZB                                            
   TASK 12-33-21-618-001- 02
   WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
   _______
             GEAR.
   WARNING : MAKE SURE THAT DURING THIS PROCEDURE THE AIRCRAFT IS IN ONE OF THESE
   _______
             THREE CONDITIONS:
             - THE CABIN PRESSURE OUTFLOW VALVE IS OPEN.
             - THE FWD AVIONICS COMPARTMENT ACCESS DOOR 811 IS OPEN.
             - ONE OR MORE PASSENGER DOORS ARE OPEN.
             YOU MUST ATTACH A WARNING NOTICE TO THE OPEN DOORS TO TELL PERSONS
             NOT TO CLOSE THEM. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE
             AIRCRAFT.
   NOTE : The APU supplies air to the air conditioning packs 10HM/11HM.
   ____
   1. __________________
      Reason for the Job
   2. ______________________
      Job Set-up Information
A. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 211
                                                                           May 01/11
R                                                  
  UZB                                              
     3. __________
        Job Set-up
Subtask 12-33-21-865-054
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU AIR COND/AVNCS VENT/CTL                                   6HQ      D06
       49VU AIR COND/AVNCS VENT/CTL                                   5HQ      D05
      122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL              5HU      U21
      122VU AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY             6HU      U19
      122VU AIR COND/RECIRC FAN/R/CTL                                11HG      W20
      122VU AIR COND/RECIRC FAN/R/SPLY                                3HG      W18
      122VU AIR COND/RECIRC FAN/L/CTL                                 2HG      X20
      122VU AIR COND/RECIRC FAN/L/SPLY                                1HG      X18
      122VU AIR COND/AVNCS/VENT/MONG                                  3HQ      Y17
      123VU AVNCS VENT/BLOWER/FAN                                     1HQ     AD10
      123VU AVNCS VENT/EXTC/FAN                                       2HQ     AE02
Subtask 12-33-21-860-052
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 212
                                                                           May 01/11
                                                   
    UZB                                            
   4. Procedure
      _________
Subtask 12-33-21-618-055
         (4) On AIR BLEED page of the ECAM lower DU, make sure that the pack
             discharge temperature-indication is normal (green).
Subtask 12-33-21-618-058
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                          Page 213
                                                                         May 01/11
R                                                  
  UZB                                              
           (3) Do the procedure to stop the APU:
               - (Ref. TASK 49-00-00-860-004) or,
               - (Ref. TASK 49-00-00-860-006) or,
               - (Ref. TASK 49-00-00-860-009).
     5. Close-up
        ________
Subtask 12-33-21-860-053
R (3) Close the FWD avionics compartment access door 811 if opened.
R          (5) Remove the ground support and maintenance equipment, the special and
R              standard tools and all other items.
R
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 214
                                                                           May 01/11
                                                   
    UZB                                            
                           GROUND AIR PRE-CONDITIONING - SERVICING
                           _______________________________________
TASK 12-33-21-600-001
R    WARNING : MAKE SURE THAT DURING THIS PROCEDURE THE AIRCRAFT IS IN ONE OF THESE
     _______
R              THREE CONDITIONS:
R              - THE CABIN PRESSURE OUTFLOW VALVE IS OPEN.
R              - THE FWD AVIONICS COMPARTMENT ACCESS DOOR 811 IS OPEN.
R              - ONE OR MORE PASSENGER DOORS ARE OPEN.
R              YOU MUST ATTACH A WARNING NOTICE TO THE OPEN DOORS TO TELL PERSONS
R              NOT TO CLOSE THEM. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE
R              AIRCRAFT.
     CAUTION : DO NOT USE CONDITIONED AIR FROM THE PACKS AT THE SAME TIME AS AIR
     _______
               FROM THE LOW-PRESSURE GROUND UNITS. THIS CAN CAUSE DAMAGE TO THE
               CHECK VALVES.
     CAUTION : MAKE SURE THAT THE GROUND AIR-SUPPLY UNIT IS NOT TOO NEAR THE
     _______
               AIRCRAFT AND THAT THE ENGINE EXHAUST PIPE OF THE GROUND AIR- SUPPLY
               UNIT POINTS AWAY FROM THE AIRCRAFT. HEAT FROM THIS UNIT AND FROM THE
               EXHAUST CAN CAUSE DAMAGE TO THE AIRCRAFT STRUCTURE.
     1. __________________
        Reason for the Job
Self Explanatory
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                            Page 301
                                                                           Aug 01/10
                                                     
    UZB                                              
   3. __________
      Job Set-up
Subtask 12-33-21-010-056
A. Get Access
         (2) Put a warning notice in position to tell persons not to close the
             avionics-bay access door 811.
   4. Procedure
      _________
Subtask 12-33-21-618-060
         (1) Start the ground air-supply unit and make sure that:
             - the airflow is between 54 kg.min (119.0495 lb.min) and 78 kg.min
               (171.9605 lb.min),
             - the supplied air pressure is not more than 40 mbar (0.58 psi),
         (2) Set the necessary output air temperature on the ground air-supply
             unit.
             NOTE : Make sure that the supplied air temperature does not go above
             ____
                    70 deg.C (158.00 deg.F).
Subtask 12-33-21-618-061
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                          Page 302
                                                                         Aug 01/10
R                                                
  UZB                                            
  5. Close-up
     ________
Subtask 12-33-21-410-056
A. Close Access
        (1) Disconnect and remove the ground air-supply unit from the aircraft LP
            connector 4022HM.
        (5) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-33-21
                                                     
                                                                         Page 303
                                                                        Aug 01/10
                                                
 UZB                                            
                   GROUNDING POINTS - DESCRIPTION AND OPERATION
                   ____________________________________________
  1. _______
     General
     The grounding operation is for the electrical continuity between the
     aircraft and the earth.
     The bonding operation is for the electrical continuity between the aircraft
     and a ground equipment.
     You must electrically ground the aircraft:
     - when you do maintenance,
     - when in bad weather conditions.
       During refuel/defuel servicing operations:
     - bonding is mandatory
     - for grounding, you must obey the local area regulations.
     In other conditions, the aircraft is electrostatically discharged through
     the tires.
     Grounding points are:
     - on the nose landing gear,
     - on the main landing gear,
     - on the wing upper surface,
     - on the engine air intakes.
  
  EFF :
  
             ALL                                      12-34-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                     AIRCRAFT GROUNDING - MAINTENANCE PRACTICES
                     __________________________________________
TASK 12-34-24-869-001
  1. __________________
     Reason for the Job
     NOTE : The bonding operation is for the electrical continuity between the
     ____
            aircraft and the fuel tanker or the ground-filling equipment.
            The grounding operation is for the electrical continuity between the
            aircraft and the earth.
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                           Page 201
                                                                          Feb 01/10
                                                  
 UZB                                              
  3. __________
     Job Set-up
Subtask 12-34-24-210-054
A. Safety Precautions
        (1) Make sure that the fuel tanker or the oxygen ground filling
            equipement is grounded.
  4. Procedure
     _________
Subtask 12-34-24-869-053
        WARNING : ALWAYS CONNECT THE GROUND CABLE TO THE PARKING GROUND POINT
        _______
                  BEFORE YOU CONNECT IT TO THE AIRCRAFT. DO NOT ATTACH THE CABLE
                  TO THE AIRCRAFT FIRST (THERE IS A RISK OF ELECTRIC SHOCK).
        (1) Connect a ground cable to the aircraft grounding point on one of the
            MLG legs or the NLG leg,
            (Ref. Fig. 201/TASK 12-34-24-991-001, 202/TASK 12-34-24-991-002)
        (2) Connect a bonding cable between the fuel tanker or the oxygen ground
            filling equipement and a grounding point on one of the MLG Legs or
            the NLG Leg,
            (Ref. Fig. 201/TASK 12-34-24-991-001, 202/TASK 12-34-24-991-002)
            or connect a bonding cable between the fuel tanker and the grounding
            point on the upper wing surface.
            (Ref. Fig. 203/TASK 12-34-24-991-003)
            The aircraft wheels must be on ground.
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                           Page 202
                                                                          Feb 01/10
                                                
 UZB                                            
            Location of the Grounding Point on the Nose Landing Gear
                        Figure 201/TASK 12-34-24-991-001
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                        Page 203
                                                                       Feb 01/10
                                               
 UZB                                           
            Location of the Grounding Point on the Main Landing Gear
                        Figure 202/TASK 12-34-24-991-002
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                        Page 204
                                                                       Feb 01/10
                                               
 UZB                                           
                   Grounding Point on the Wing Upper Surface
                       Figure 203/TASK 12-34-24-991-003
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                   Page 205
                                                                  Feb 01/10
                                              
 UZB                                          
  5. Close-up
     ________
Subtask 12-34-24-080-051
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                         Page 206
                                                                        Feb 01/10
                                                
 UZB                                            
  TASK 12-34-24-869-002
  1. __________________
     Reason for the Job
  2. ______________________
     Job Set-up Information
  -------------------------------------------------------------------------------
  REFERENCE             QTY DESIGNATION
  -------------------------------------------------------------------------------
B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-34-24-210-051
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                         Page 207
                                                                        Feb 01/10
                                                
 UZB                                            
  4. Procedure
     _________
Subtask 12-34-24-869-051
        WARNING : ALWAYS CONNECT THE GROUND CABLE TO THE PARKING GROUND POINT
        _______
                  BEFORE YOU CONNECT IT TO THE AIRCRAFT. DO NOT ATTACH THE CABLE
                  TO THE AIRCRAFT FIRST (THERE IS A RISK OF ELECTRIC SHOCK).
        (1) We recommend to connect the parking or the hangar ground cable to the
            aircraft grounding point on the landing gears.
            (Ref. Fig. 201/TASK 12-34-24-991-001, 202/TASK 12-34-24-991-002)
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                         Page 208
                                                                        Feb 01/10
                                                
 UZB                                            
                   Grounding Point on the Engine Air Intake
                       Figure 204/TASK 12-34-24-991-005
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                   Page 209
                                                                  Feb 01/10
                                              
 UZB                                          
  5. Close-up
     ________
Subtask 12-34-24-942-051
(1) After the maintenance operation, disconnect all the grounding cables.
  
  EFF :
  
             ALL                                      12-34-24
                                                     
                                                                         Page 210
                                                                        Feb 01/10
                                                
 UZB                                            
                 SYSTEM LINE FLUSHING - DESCRIPTION AND OPERATION
                 ________________________________________________
  1. _______
     General
     Flushing of a system line consists in removing all foreign matters from that
     fluid and from the system line.
     The fluid involved may be used again only if its characteristics are in
     accordance with the specifications in force.
  
  EFF :
  
             ALL                                      12-36-00
                                                     
                                                                           Page 1
                                                                        Feb 01/10
                                                
 UZB                                            
                                   HYDRAULIC POWER - SERVICING
                                   ___________________________
TASK 12-36-29-170-001
Flushing of the Green Hydraulic System of the Engine Driven Pump (EDP) 1030GK
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Green hydraulic system after a failure in the engine driven
          pump 1030GK
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             2   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 301
                                                                             Feb 01/11
                                                       
    UZB                                                
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-36-29-860-050
        (3) Depressurize the reservoir of the Green hydraulic system (Ref. TASK
            29-14-00-614-001).
Subtask 12-36-29-010-084
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 302
                                                                         Feb 01/10
                                                 
 UZB                                             
          Green Hydraulic System of the EDP 1030GK - Flushing Schematic
                        Figure 301/TASK 12-36-29-991-001
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page 303
                                                                       Feb 01/10
                                               
 UZB                                           
     Subtask 12-36-29-860-051
R           (2) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the Zone
                147.
R           (4) Put the CONTAINER 5 L(1 1/2 USGAL) in postion to collect the
                hydraulic fluid below:
                - the engine driven pump 1030GK,
                - the case drain filter 1084GM,
                - the LP manifold 1003GM.
            (5) Disconnect the case-drain lower line from the engine driven pump
                1030GK.
(6) Disconnect the pressure line from the engine driven pump 1030GK.
            (7) Disconnect the case-drain upper and lower lines from the case drain
                filter 1084GM.
(8) Disconnect the case-drain upper line from the LP manifold 1003GM.
R           (9) Connect the pressure line and the case-drain lower line together with
R               a union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (11) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               filter end of the case-drain lower-line with an LOCALLY MANUFACTURED-
R               ADAPTER .
           (12) Connect the return hose of the hydraulic power cart to the delivery
R               connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 304
                                                                            Feb 01/11
                                                      
    UZB                                               
     4. Procedure
        _________
Subtask 12-36-29-170-050
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
           (3) Disconnect the pressure hose of the hydraulic power cart and the
               adaptor from the case-drain lower line.
           (4) Disconnect the return hose of the hydraulic power cart and the
               adaptor from the delivery connector 1008GM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
           (6) Connect the pressure hose of the hydraulic power cart to the filter
R              end of the case-drain upper-line with an LOCALLY MANUFACTURED -
R              ADAPTER.
           (7) Connect the return hose of the hydraulic power cart to the manifold
R              end of the case-drain upper-line with an LOCALLY MANUFACTURED -
R              ADAPTER.
(9) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-050
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 305
                                                                             Feb 01/11
                                                    
    UZB                                             
  5. Close-up
     ________
Subtask 12-36-29-860-052
        (1) Disconnect the pressure and return hoses of the hydraulic power cart
            and the adaptors from the case-drain upper line.
        (2) Disconnect and remove the union from the pressure line and the
            case-drain lower line.
        (5) Connect the case-drain upper line to the LP manifold 1003GM and the
            case drain filter 1084GM.
(6) Connect the case-drain lower line to the case drain filter 1084GM.
        (7) Connect the pressure line and the case-drain lower line to the engine
            driven pump 1030GK.
Subtask 12-36-29-790-050
Subtask 12-36-29-942-089
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 306
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-36-29-410-071
D. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (5) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 307
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-36-29-170-002
Flushing of the Yellow Hydraulic System of the Engine Driven Pump (EDP) 3030GD
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Yellow hydraulic system after a failure in the engine driven
          pump 3030GD.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             2   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 308
                                                                             Feb 01/11
                                                       
    UZB                                                
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-36-29-860-053
        (3) Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK
            29-14-00-614-001).
Subtask 12-36-29-010-085
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 309
                                                                         Feb 01/10
                                                 
 UZB                                             
         Yellow Hydraulic System of the EDP 3030GD - Flushing Schematic
                        Figure 302/TASK 12-36-29-991-002
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page 310
                                                                       Feb 01/10
                                               
 UZB                                           
            (3) Open the access door 198CB.
Subtask 12-36-29-860-054
R (3) Put the ACCESS PLATFORM 2M (6 FT) in position below the Zone 147.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   engine driven pump 3030GD,
                - the   case drain filter 3084GM,
                - the   LP manifold 3003GM.
            (5) Disconnect the case-drain lower line from the engine driven pump
                3030GD.
(6) Disconnect the pressure line from the engine driven pump 3030GD.
            (7) Disconnect the case-drain upper and lower lines from the case drain
                filter 3084GM.
(8) Disconnect the case-drain upper line from the LP manifold 3003GM.
R           (9) Connect the pressure line and the case-drain lower line together with
R               a union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (11) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               filter end of the case-drain lower-line with an LOCALLY MANUFACTURED-
R               ADAPTER.
           (12) Connect the return hose of the hydraulic power cart to the delivery
R               connector 3008GM with an LOCALLY MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 311
                                                                              Feb 01/11
                                                      
    UZB                                               
     4. Procedure
        _________
Subtask 12-36-29-170-051
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
           (3) Disconnect the pressure hose of the hydraulic power cart and the
               adaptor from the case-drain lower line.
           (4) Disconnect the return hose of the hydraulic power cart and the
               adaptor from the delivery connector 3008GM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
           (6) Connect the pressure hose of the hydraulic power cart to the filter
R              end of the case-drain upper-line with an LOCALLY MANUFACTURED -
R              ADAPTER.
           (7) Connect the return hose of the hydraulic power cart to the manifold
R              end of the case-drain upper-line with an LOCALLY MANUFACTURED -
R              ADAPTER.
(9) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-051
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 312
                                                                             Feb 01/11
                                                    
    UZB                                             
  5. Close-up
     ________
Subtask 12-36-29-860-055
        (1) Disconnect the pressure and return hoses of the hydraulic power cart
            and the adaptors from the case-drain upper line.
        (2) Disconnect and remove the union from the pressure line and the
            case-drain lower line.
        (5) Connect the case-drain upper line to the LP manifold 3003GM and the
            case drain filter 3084GM.
(6) Connect the case-drain lower line to the case drain filter 3084GM.
        (7) Connect the pressure line and the case-drain lower line to the engine
            driven pump 3030GD.
Subtask 12-36-29-790-051
Subtask 12-36-29-942-090
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 313
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-36-29-410-072
D. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (5) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 314
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-36-29-170-003
Flushing of the Blue Hydraulic System of the Electrically Driven Pump 2075GJ
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             2   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 315
                                                                             Feb 01/11
                                                       
    UZB                                                
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-36-29-860-056
        (3) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
            29-14-00-614-001).
Subtask 12-36-29-010-086
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 316
                                                                         Feb 01/10
                                                 
 UZB                                             
       Blue Hydraulic System of the Electrically Driven Pump 2075GJ - Flushing
                                      Schematic
                          Figure 303/TASK 12-36-29-991-003
  
  EFF :
  
            ALL                                   
                                                  
                                                       12-36-29           Page 317
                                                                         Feb 01/10
                                                 
  UZB                                            
     Subtask 12-36-29-860-057
R (3) Put the ACCESS PLATFORM 2M (6 FT) in position at the Zone 195.
R           (4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
                Zone 197.
R           (5) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   electrically driven pump 2075GJ,
                - the   case drain filter 2084GM,
                - the   LP filter 2002GM,
                - the   check valve 2041GM.
            (6) Disconnect the case-drain lower line from the electrically driven
                pump 2075GJ.
            (7) Disconnect the pressure line from the electrically driven pump
                2075GJ.
(8) Disconnect the case-drain lower line from the check valve 2041GM.
            (9) Disconnect the case-drain upper line from the case-drain filter
                2084GM.
(10) Disconnect the case-drain upper line from the LP filter 2002GM.
R          (11) Connect the pressure line and the case-drain lower line together with
R               a union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (13) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               check valve end of the case-drain lower line with an LOCALLY
R               MANUFACTURED - ADAPTER.
           (14) Connect the return hose of the hydraulic power cart to the delivery
R               connector 2008GM with an LOCALLY MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 318
                                                                              Feb 01/11
                                                      
    UZB                                               
           (15) Put blanking plugs on the disconnected line ends.
     4. Procedure
        _________
Subtask 12-36-29-170-052
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
            (3) Disconnect the pressure hose of the hydraulic power cart and the
                adaptor from the case-drain lower line.
            (4) Disconnect the return hose of the hydraulic power cart and the
                adaptor from the delivery connector 2008GM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
            (6) Connect the pressure hose (of the hydraulic power cart) to the
                case-drain filter 2084GM end of the case-drain upper line with an
R               LOCALLY MANUFACTURED - ADAPTER.
            (7) Connect the return hose (of the hydraulic power cart) to the LP
R               filter 2002GM end of the case-drain upper line with an LOCALLY
R               MANUFACTURED - ADAPTER.
(9) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-052
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 319
                                                                              Feb 01/11
                                                    
    UZB                                             
  5. Close-up
     ________
Subtask 12-36-29-860-058
        (1) Disconnect the pressure and return hoses of the hydraulic power cart
            and the adaptors from the case-drain upper line.
        (2) Disconnect and remove the union from the pressure line and the
            case-drain lower line.
(6) Connect the case-drain upper line to the case drain filter 2084GM.
(7) Connect the case-drain lower line to the check valve 2041GM.
        (8) Connect the pressure line and the case-drain lower line to the
            electrically driven pump 2075GJ.
Subtask 12-36-29-790-052
Subtask 12-36-29-942-091
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 320
                                                                         Feb 01/10
                                                
 UZB                                            
        (4) Remove the warning notice(s).
Subtask 12-36-29-410-073
D. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (4) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 321
                                                                        Feb 01/10
                                                  
 UZB                                              
     TASK 12-36-29-170-004
Flushing of the Green Hydraulic System of the Power Transfer Unit (PTU) 1088GM
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Green hydraulic system after a failure in the part of the PTU
          1088GM
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 322
                                                                             Feb 01/11
                                                       
    UZB                                                
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-36-29-860-059
        (3) Depressurize the reservoir of the Green hydraulic system (Ref. TASK
            29-14-00-614-001).
Subtask 12-36-29-010-087
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 323
                                                                         Feb 01/10
                                                 
 UZB                                             
          Green Hydraulic System of the PTU 1088GM - Flushing Schematic
                        Figure 304/TASK 12-36-29-991-004
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page 324
                                                                       Feb 01/10
                                               
 UZB                                           
     Subtask 12-36-29-860-060
R (3) Put the ACCESS PLATFORM 2M (6 FT) in position at the Zone 147.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   PTU 1088GM,
                - the   LP manifold 1003GM.
            (5) Disconnect the case drain line from the Green hydraulic system side
                of the PTU 1088GM.
(6) Disconnect the case drain line from the LP manifold 1003GM.
            (7) Disconnect the pressure line from Green hydraulic system side of the
                PTU 1088GM.
R           (8) Connect the pressure line and the case drain line together with a
R               union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (10) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
           (11) Connect the return hose of the hydraulic power cart to the manifold
R               end of the case drain line with an LOCALLY MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 325
                                                                              Feb 01/11
                                                      
    UZB                                               
  4. Procedure
     _________
Subtask 12-36-29-170-053
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-053
  5. Close-up
     ________
Subtask 12-36-29-860-061
        (1) Disconnect the return hose of the hydraulic power cart and the
            adaptor from the case drain line.
        (2) Disconnect the pressure hose of the hydraulic power cart and the
            adaptor from the delivery connector 1008GM.
        (3) Disconnect and remove the union from the pressure line and the case
            drain line.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 326
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-36-29-790-053
Subtask 12-36-29-942-092
Subtask 12-36-29-410-074
D. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (4) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 327
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-36-29-170-005
Flushing of the Yellow Hydraulic System of the Power Transfer Unit (PTU) 1088GM
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Yellow hydraulic system after a failure in that part of the PTU
          1088GM
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 328
                                                                             Feb 01/11
                                                       
    UZB                                                
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-36-29-860-062
        (3) Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK
            29-14-00-614-001).
Subtask 12-36-29-010-088
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 329
                                                                         Feb 01/10
                                                 
 UZB                                             
         Yellow Hydraulic System of the PTU 1088GM - Flushing Schematic
                        Figure 305/TASK 12-36-29-991-005
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page 330
                                                                       Feb 01/10
                                               
 UZB                                           
     Subtask 12-36-29-860-063
R           (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
                Zone 148.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   PTU 1088GM,
                - the   LP manifold 3003GM.
            (5) Disconnect the pressure line from the Yellow hydraulic system side of
                the PTU 1088GM.
            (6) Disconnect the case drain line from the Yellow hydraulic system side
                of the PTU 1088GM.
(7) Disconnect the case drain line from the LP manifold 3003GM.
R           (8) Connect the pressure line and the case drain line together with a
R               union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (10) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector of 3008GM with an LOCALLY MANUFACTURED - ADAPTER.
           (11) Connect the return hose of the hydraulic power cart to the manifold
R               end of the case-drain line with an LOCALLY MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 331
                                                                              Feb 01/11
                                                      
    UZB                                               
  4. Procedure
     _________
Subtask 12-36-29-170-054
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-054
  5. Close-up
     ________
Subtask 12-36-29-860-064
        (1) Disconnect the return hose of the hydraulic power cart and the
            adaptor from the case drain line.
        (2) Disconnect the pressure hose of the hydraulic power cart and the
            adaptor from the delivery connector 3008GM.
        (3) Disconnect and remove the union from the pressure line and the case
            drain line.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 332
                                                                        Feb 01/10
                                                
 UZB                                            
  Subtask 12-36-29-790-054
Subtask 12-36-29-942-093
Subtask 12-36-29-410-075
D. Close Access
        (1) Make sure that the work area is clean and clear of tool(s) and other
            items.
        (4) Remove the ground support and maintenance equipment, the special and
            standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 333
                                                                        Feb 01/10
                                                
 UZB                                            
     TASK 12-36-29-170-006
Flushing of the Yellow Hydraulic System of the Electrically Driven Pump 3075GX
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             2   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 334
                                                                             Feb 01/11
                                                       
    UZB                                                
     B. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  3. __________
     Job Set-up
Subtask 12-36-29-860-065
        (3) Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK
            29-14-00-614-001).
Subtask 12-36-29-010-089
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 335
                                                                         Feb 01/10
                                                 
 UZB                                             
       Yellow Hydraulic System of the Electrically Driven Pump 3075GX - Flushing
                                       Schematic
                           Figure 306/TASK 12-36-29-991-006
  
  EFF :
  
             ALL                                   
                                                   
                                                       12-36-29            Page 336
                                                                          Feb 01/10
                                                  
  UZB                                             
     Subtask 12-36-29-860-066
R (1) Put the ACCESS PLATFORM 2M (6 FT) in position at the Zone 148.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
R               - the   electrically driven pump 3075GX and
                - the   LP manifold 3003GM.
            (5) Disconnect the pressure line from the electrically driven pump
                3075GX.
            (6) Disconnect the case drain line from the electrically driven pump
                3075GX.
(7) Disconnect the case drain line from the LP manifold 3003GM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R           (9) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line at the electrically driven pump 3075GX with an
R               LOCALLY MANUFACTURED - ADAPTER.
R          (10) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line at the LP manifold 3003GM with an LOCALLY
R               MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 337
                                                                              Feb 01/11
                                                      
    UZB                                               
     4. Procedure
        _________
Subtask 12-36-29-170-055
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
           (3) Disconnect the pressure hose of the hydraulic power cart and the
               adaptor from the case drain line.
           (4) Disconnect the return hose of the hydraulic power cart and the
               adaptor from the case drain line.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
           (6) Connect the pressure hose of the hydraulic power cart to the pressure
R              line at the electrically driven pump 3075GX with an LOCALLY
R              MANUFACTURED - ADAPTER.
           (7) Connect the return hose of the hydraulic power cart to the delivery
R              connector 3008GM with an LOCALLY MANUFACTURED - ADAPTER.
(9) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-055
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 338
                                                                            Feb 01/11
                                                    
    UZB                                             
   5. Close-up
      ________
Subtask 12-36-29-860-067
         (1) Disconnect the return hose of the hydraulic power cart and the
             adaptor from the delivery connector 3008GM.
         (2) Disconnect the pressure hose of the hydraulic power cart and the
             adaptor from the pressure line.
(5) Connect the case drain line to the electrically driven pump 3075GX.
(6) Connect the pressure line to the electrically driven pump 3075GX.
Subtask 12-36-29-790-055
Subtask 12-36-29-942-094
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 339
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-410-076
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (5) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 340
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-170-007
     Flushing of the Green Hydraulic System of the Flap Power Control-Unit (PCU)
     6201CM
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Green hydraulic system after a failure in that part of the flap
          PCU 6201CM
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 341
                                                                             Feb 01/11
                                                       
    UZB                                                
      B. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-068
         (3) Depressurize the reservoir of the Green hydraulic system (Ref. TASK
             29-14-00-614-001).
Subtask 12-36-29-010-090
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 342
                                                                          Feb 01/11
R                                                 
  UZB                                             
         Green Hydraulic System of the Flap PCU 6201CM - Flushing Schematic
                          Figure 307/TASK 12-36-29-991-007
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 343
                                                                         Feb 01/11
R                                                
  UZB                                            
     Subtask 12-36-29-860-069
R           (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
                Zone 147.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   flap PCU 6201CM,
                - the   LP manifold 1003GM.
            (5) Disconnect the case drain line from the motor in the Green hydraulic
                system of the flap PCU 6201CM.
            (6) Disconnect the pressure line from the valve block 23CV in the Green
                hydraulic system of the flap PCU 6201CM.
(7) Disconnect the case drain line from the LP manifold 1003GM.
R           (9) Connect the pressure line to the case drain line with a union at the
R               flap PCU 6201CM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (10) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
R          (11) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line at the LP manifold 1003GM with an LOCALLY
R               MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 344
                                                                              Feb 01/11
                                                      
    UZB                                               
   4. Procedure
      _________
Subtask 12-36-29-170-056
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-056
   5. Close-up
      ________
Subtask 12-36-29-860-070
         (1) Disconnect the pressure hose of the hydraulic power cart and the
             adaptor from the delivery connector 1008GM.
         (2) Disconnect the return hose of the hydraulic power cart and the
             adaptor from the case drain line.
         (3) Disconnect and remove the union from the case drain line and the
             pressure line at the flap PCU 6201CM.
         (7) Connect the case drain line to the motor in the Green hydraulic
             system of the flap PCU 6201CM.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 345
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-790-056
Subtask 12-36-29-942-095
Subtask 12-36-29-410-077
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 346
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-170-008
     Flushing of the Yellow Hydraulic System of the Flap Power Control-Unit (PCU)
     6201CM
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Yellow hydraulic system after a failure in that part of the
          flap PCU 6201CM
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 347
                                                                             Feb 01/11
                                                       
    UZB                                                
      B. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-071
         (3) Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK
             29-14-00-614-001).
Subtask 12-36-29-010-091
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 348
                                                                          Feb 01/11
R                                                 
  UZB                                             
         Yellow Hydraulic System of the Flap PCU 6201CM - Flushing Schematic
                          Figure 308/TASK 12-36-29-991-008
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 349
                                                                         Feb 01/11
R                                                
  UZB                                            
     Subtask 12-36-29-860-072
R           (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
                Zone 148.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   flap PCU 6201CM,
                - the   LP manifold 3003GM.
            (5) Disconnect the case drain line from the motor in the Yellow hydraulic
                system of the flap PCU 6201CM.
            (6) Disconnect the pressure line from the valve block 24CV in the Yellow
                hydraulic system of the flap PCU 6201CM.
(7) Disconnect the case drain line from the LP manifold 3003GM.
R           (9) Connect the pressure line to the case drain line with a union at the
R               flap PCU 6201CM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (10) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 3008GM with an LOCALLY MANUFACTURED - ADAPTER.
R          (11) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line at the LP manifold 3003GM with an LOCALLY
R               MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 350
                                                                              Feb 01/11
                                                      
    UZB                                               
   4. Procedure
      _________
Subtask 12-36-29-170-057
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-057
   5. Close-up
      ________
Subtask 12-36-29-860-073
         (1) Disconnect the pressure hose of the hydraulic power cart and the
             adaptor from the delivery connector 3008GM.
         (2) Disconnect the return hose of the hydraulic power cart and the
             adaptor from the case drain line.
         (3) Disconnect and remove the union from the case drain line and the
             pressure line at the flap PCU 6201CM.
         (7) Connect the case drain line to the motor in the Yellow hydraulic
             system of the flap PCU 6201CM.
         (8) Connect the pressure line to the valve block 24CV in the Yellow
             hydraulic system of the flap PCU 6201CM.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 351
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-790-057
Subtask 12-36-29-942-096
Subtask 12-36-29-410-078
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (5) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 352
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-170-009
     Flushing of the Green Hydraulic System of the Slat Power Control-Unit (PCU)
     6001CM
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Green hydraulic system after a failure in that part of the slat
          PCU 6001CM.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 353
                                                                             Feb 01/11
                                                       
    UZB                                                
      B. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-074
         (3) Depressurize the reservoir of the Green hydraulic system (Ref. TASK
             29-14-00-614-001)
Subtask 12-36-29-010-092
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 354
                                                                          Feb 01/11
R                                                 
  UZB                                             
         Green Hydraulic System of the Slat PCU 6001CM - Flushing Schematic
                          Figure 309/TASK 12-36-29-991-009
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 355
                                                                         Feb 01/11
R                                                
  UZB                                            
     Subtask 12-36-29-860-075
R           (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the
                Zone 147.
R           (4) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   slat PCU 6001CM,
                - the   LP manifold 1003GM.
            (5) Disconnect the case drain line from the motor in the Green hydraulic
                system of the slat PCU 6001CM.
            (6) Disconnect the pressure line from the valve block 26CV in the Green
                hydraulic system of the slat PCU 6001CM.
(7) Disconnect the case drain line from the LP manifold 1003GM.
R           (8) Connect the pressure line to the case drain line with a union at the
R               slat PCU 6001CM.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (10) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
R          (11) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line at the LP manifold 1003GM with an LOCALLY
R               MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 356
                                                                              Feb 01/11
                                                      
    UZB                                               
   4. Procedure
      _________
Subtask 12-36-29-170-058
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-058
   5. Close-up
      ________
Subtask 12-36-29-860-076
         (1) Disconnect the pressure hose of the hydraulic power cart and the
             adaptor from the delivery connector 1008GM.
         (2) Disconnect the return hose of the hydraulic power cart and the
             adaptor from the case drain line.
         (3) Disconnect and remove the union from the case drain line and the
             pressure line at the slat PCU 6001CM.
         (7) Connect the case drain line to the motor in the Green hydraulic
             system of the slat PCU 6001CM.
         (8) Connect the pressure line to the valve block 26CV in the Green
             hydraulic system of the slat PCU 6001CM.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 357
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-790-058
Subtask 12-36-29-942-097
Subtask 12-36-29-410-079
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 358
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-170-010
     Flushing of the Blue Hydraulic System of the Slat Power Control-Unit (PCU)
     6001CM.
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Blue hydraulic system after a failure in that part of the slat
          PCU 6001CM.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 359
                                                                             Feb 01/11
                                                       
    UZB                                                
      B. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-077
         (3) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
             29-14-00-614-001).
Subtask 12-36-29-010-093
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 360
                                                                          Feb 01/11
R                                                 
  UZB                                             
         Blue Hydraulic System of the Slat PCU 6001CM - Flushing Schematic
                         Figure 310/TASK 12-36-29-991-010
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page 361
                                                                        Feb 01/11
R                                               
  UZB                                           
     Subtask 12-36-29-860-078
R (3) Put the ACCESS PLATFORM 2M (6 FT) in position at the Zone 147.
R (4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE at the Zone 197.
R           (5) Put a CONTAINER 5 L(1 1/2 USGAL) to collect the hydraulic fluid
                leakage below:
                - the slat PCU 6001CM,
                - the LP filter 2002GM.
            (6) Disconnect the case drain line from the motor in the Blue hydraulic
                system of the slat PCU 6001CM.
            (7) Disconnect the pressure line from the valve block 25CV in the Blue
                hydraulic system of the slat PCU 6001CM.
(8) Disconnect the case drain line from the LP filter 2002GM.
            (9) Connect the pressure line to the case drain line at the slat PCU
R               6001CM with an union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (11) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 2008GM with an LOCALLY MANUFACTURED - ADAPTER.
R          (12) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line with an LOCALLY MANUFACTURED - ADAPTER.
R
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 362
                                                                            Feb 01/11
                                                      
    UZB                                               
   4. Procedure
      _________
Subtask 12-36-29-170-059
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-059
   5. Close-up
      ________
Subtask 12-36-29-860-079
         (1) Disconnect the pressure hose and the adaptor from the delivery
             connector 2008GM.
(2) Disconnect the return hose and the adaptor from the case drain line.
         (3) Disconnect and remove the union from the case drain line and the
             pressure line at the slat PCU 6001CM.
         (7) Connect the case drain line to the motor in the Blue hydraulic system
             of the slat PCU 6001CM.
         (8) Connect the pressure line to the valve block 25CV in the Blue
             hydraulic system of the slat PCU 6001CM.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 363
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-790-059
         (1) Pressurize the Blue hydraulic system of the (Ref. TASK 29-10-00-863-
             003).
         (3) Depressurize the Blue hydraulic system of the (Ref. TASK 29-10-00-
             864-003).
Subtask 12-36-29-942-098
Subtask 12-36-29-410-080
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 364
                                                                         Feb 01/11
R                                                  
  UZB                                              
     TASK 12-36-29-170-011
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
To flush the Blue hydraulic System after a failure in the CSM/G 8XE.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 365
                                                                             Feb 01/11
                                                       
    UZB                                                
      B. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-080
         (3) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
             29-14-00-614-001).
Subtask 12-36-29-010-094
B. Get Access
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 366
                                                                          Feb 01/11
R                                                 
  UZB                                             
           Blue Hydraulic System of the CSM/G 8XE - Flushing Schematic
                        Figure 311/TASK 12-36-29-991-011
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 367
                                                                         Feb 01/11
R                                              
  UZB                                          
     Subtask 12-36-29-860-081
R           (4) Put an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the Zone
                197.
R           (5) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
                - the   CSM/G 8XE,
                - the   LP filter 2002GM.
(6) Disconnect the case drain line from the LP filter 2002GM.
(8) Disconnect the case drain line from the CSM/G 8XE.
R           (9) Connect the pressure line to the case drain line at the CSM/G 8XE
R               with a union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (11) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 2008GM with an LOCALLY MANUFACTURED - ADAPTER.
R          (12) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               case drain line at the LP filter 2002GM with an LOCALLY MANUFACTURED-
R               ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 368
                                                                              Feb 01/11
                                                      
    UZB                                               
   4. Procedure
      _________
Subtask 12-36-29-170-060
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-060
   5. Close-up
      ________
Subtask 12-36-29-860-082
         (1) Disconnect the pressure hose of the hydraulic power cart and the
             adaptor from the delivery connector 2008GM.
         (2) Disconnect the return hose of the hydraulic power cart and the
             adaptor from the case drain line.
         (3) Disconnect and remove the union from the case drain line and the
             pressure line at the CSM/G 8XE.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 369
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-790-060
Subtask 12-36-29-942-099
Subtask 12-36-29-410-081
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (4) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 370
                                                                         Feb 01/11
R                                                 
  UZB                                             
     TASK 12-36-29-170-012
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Green hydraulic system after a failure in that part of the THS
          actuator 9CE.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific             1   ACCESS PLATFORM 4M (13 FT)
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 371
                                                                             Feb 01/11
                                                       
    UZB                                                
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-36-29-860-083
           (3) Depressurize the reservoir of the Green hydraulic system (Ref. TASK
               29-14-00-614-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 372
                                                                            Feb 01/11
                                                     
    UZB                                              
         Green Hydraulic System of the THS Actuator 9CE - Flushing Schematic
                          Figure 312/TASK 12-36-29-991-012
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 373
                                                                         Feb 01/11
R                                                
  UZB                                            
R           (7) Put the ACCESS PLATFORM 4M (13 FT) in position at the Zone 310.
Subtask 12-36-29-010-095
B. Get Access
Subtask 12-36-29-860-084
R           (2) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R               fluid   below:
R               - the   THS actuator 9CE and
                - the   LP manifold 1003GM.
            (3) Remove and discard the lockwire from the hydraulic connections of the
                valve block (of the Green hydraulic system) at the THS actuator 9CE.
            (7) Connect the pressure line to the return line at the THS actuator 9CE
R               with an union.
                CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
                _______
                          GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R           (9) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R               delivery connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
R          (10) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               return line at the LP manifold 1003GM with an LOCALLY MANUFACTURED -
R               ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 374
                                                                              Feb 01/11
                                                      
    UZB                                               
         (11) Put blanking plugs on the disconnected line ends.
   4. Procedure
      _________
Subtask 12-36-29-170-061
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-061
   5. Close-up
      ________
Subtask 12-36-29-860-085
          (1) Disconnect the pressure hose of the hydraulic power cart and the
              adaptor from the delivery connector 1008GM.
          (2) Disconnect the return hose of the hydraulic power cart and the
              adaptor from the return line at the LP manifold 1003GM.
          (3) Disconnect and remove the union from the pressure and return lines at
              the THS actuator 9CE.
(7) Connect the pressure line to the valve block of the THS actuator 9CE.
(8) Connect the return line to the valve block of the THS actuator 9CE.
          (9) Safety the connections of the pressure and return lines with
              corrosion-resistant steel lockwire 0.8 mm (0.032 in) dia.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 375
                                                                          Feb 01/11
R                                                 
  UZB                                             
   Subtask 12-36-29-790-061
Subtask 12-36-29-942-100
Subtask 12-36-29-410-082
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (5) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 376
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-170-013
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
          To flush the Yellow hydraulic system after a failure in that part of the THS
          actuator 9CE
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
R
     No   specific                 safety barriers
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific             1   ACCESS PLATFORM 4M (13 FT)
R    No   specific            AR   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   LOCALLY MANUFACTURED - ADAPTER
R    No   specific             1   WARNING NOTICE(S)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 377
                                                                             Feb 01/11
                                                       
    UZB                                                
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-36-29-860-086
           (3) Depressurize the reservoir of the Yellow hydraulic system (Ref. TASK
               29-14-00-614-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 378
                                                                            Feb 01/11
                                                    
    UZB                                             
         Yellow Hydraulic System of the THS Actuator 9CE - Flushing Schematic
                           Figure 313/TASK 12-36-29-991-013
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 379
                                                                          Feb 01/11
R                                                 
  UZB                                             
           (6) Put the safety barriers in position.
R (7) Put the ACCESS PLATFORM 4M (13 FT) in position at the Zone 310.
Subtask 12-36-29-010-096
B. Get Access
Subtask 12-36-29-860-087
R          (2) Put a   CONTAINER 5 L(1 1/2 USGAL) in position to collect the hydraulic
R              fluid   below:
R              - the   THS actuator 9CE and
               - the   LP manifold 3003GM.
           (3) Remove and discard the lockwire from the hydraulic connections of the
               valve block (of the Yellow hydraulic system) at the THS actuator 9CE.
           (7) Connect the pressure line to the return line at the THS actuator 9CE
R              with a union.
               CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
               _______
                         GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (9) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R              delivery connector 3008GM with an LOCALLY MANUFACTURED - ADAPTER.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 380
                                                                             Feb 01/11
                                                     
    UZB                                              
R          (10) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R               return line at the LP manifold 3003GM with an LOCALLY MANUFACTURED -
R               ADAPTER.
     4. Procedure
        _________
Subtask 12-36-29-170-062
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
Subtask 12-36-29-960-062
     5. Close-up
        ________
Subtask 12-36-29-860-088
            (1) Disconnect the pressure hose of the hydraulic power cart and the
                adaptor from the delivery connector 3008GM.
            (2) Disconnect the return hose of the hydraulic power cart and the
                adaptor from the return line at the LP manifold 3003GM.
            (3) Disconnect and remove the union from the pressure and return lines at
                the THS actuator 9CE.
(7) Connect the pressure line to the valve block of the THS actuator 9CE.
(8) Connect the return line to the valve block of the THS actuator 9CE.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 381
                                                                            Feb 01/11
                                                    
    UZB                                             
         (9) Safety the connections of the pressure and supply lines with
             corrosion-resistant steel lockwire 0.8 mm (0.032 in) dia.
Subtask 12-36-29-790-062
Subtask 12-36-29-942-101
Subtask 12-36-29-410-083
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (5) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 382
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-600-001
R    Change of the Hydraulic Fluid in the Green Hydraulic System - with Ground Cart
R    Available
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
     No specific                   circuit breaker(s) safety clip(s)
R
     No   specific             1 ACCESS PLATFORM 2M (6 FT)
     No   specific             1 ACCESS PLATFORM 3M (10 FT)
     No   specific             1 CONTAINER 5 L(1 1/2 USGAL)
     No   specific             1 GROUND POWER CART-HYDRAULIC
R    No   specific             1 SAFETY BARRIER(S)
R    No   specific             1 WARNING NOTICE(S)
R    No   specific               Torque Wrench : range 0.67 to 13.50 m.daN
R                                                           (4.94 to 99.57 lbf.ft)
     D23080000                 1 PIN-GROUND LOCK,NLG
     460005833                 1 NOT PROCURABLE
     460007280                 1 SLEEVE-GROUND LOCK
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 383
                                                                             Feb 01/11
                                                       
    UZB                                                
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page 384
                                                                             Feb 01/11
                                                   
    UZB                                            
     3. __________
        Job Set-up
Subtask 12-36-29-860-096
A. Safety Precautions
Subtask 12-36-29-865-050
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU HYD/HYD PWR/B WARN/& CTL                               2702GJ      C12
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG                         3700GD      Q37
      121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL                          3701GD      Q36
      121VU HYDRAULIC/G HYD/PUMP ENG1/CTL                          1701GK      R35
      121VU HYDRAULIC/G HYD/PUMP ENG1/MONG                         1702GK      R34
      123VU B HYD/ELEC PUMP                                        2701GJ     AB09
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
Subtask 12-36-29-010-073
C. Get Access
(3) Open the left or the right MLG door (Ref. TASK 32-12-00-010-001).
(5) Put the ACCESS PLATFORM 3M (10 FT) in position at the MLG bay.
Subtask 12-36-29-680-050
        D. Drain the reservoir of the Green hydraulic system (Ref. TASK 29-10-00-
           680-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 385
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-36-29-860-095
           CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
           _______
                     GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
           (1) Put the CONTAINER 5 L(1 1/2 USGAL) below the fluid disconnect panel
               at the engine 1 to collect the unwanted hydraulic fluid.
           (2) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC (filled
               with new hydraulic fluid) to the delivery connector 1008GM at the
               ground service panel (Ref. detail A).
R          (3) Connect the return hose of the auxiliary hydraulic reservoir, with
R              capacity of 120 l (31.7 USgal) to the suction connector 1006GM at the
R              ground service panel.
     4. Procedure
        _________
Subtask 12-36-29-611-055
        A. Fluid Change Procedure without Hydraulic Lines of the Engine Driven Pump
           (EDP) (Ref. detail A)
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
           _______
                     CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                     AND/OR DAMAGE.
           CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
           _______
                     DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                     HYDRAULIC RESERVOIR BECOME TOO FULL.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 386
                                                                           Feb 01/11
                                                   
    UZB                                            
         Change of the Hydraulic Fluid in the Green Hydraulic System - Schematic
                            Figure 314/TASK 12-36-29-991-014
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 387
                                                                           Feb 01/11
R                                                  
  UZB                                              
         (3) In the cockpit, operate the flight controls.
             WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
             _______
                       CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
                       PERSONS AND/OR DAMAGE.
             (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                 position and then to the RET position. Do this step 3 times.
             (b) On the panel 18VU or 19VU, move the side stick fully to the left
                 and then fully to the right. Do this step 3 times.
             (c) On the panel 18VU or 19VU, move the side stick fully forward and
                 then fully rearward. Do this step 3 times.
             (d) At the captain or first officer position, push the LH pedal fully
                 forward and then the RH pedal fully forward. Do this step 3
                 times.
             (e) On the panel 114VU, move the flap/slat lever to the FULL position
                 and then to the 0 deg position. Do this step 2 times.
             (f) On the center pedestal, turn one of the pitch-trim control wheels
                 to the DN stop and then to the UP stop. Do this step 3 times.
                 Turn the pitch-trim control wheel to the 0 deg position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 388
                                                                         Feb 01/11
R                                                  
  UZB                                              
     Subtask 12-36-29-860-099
               (a) On the panel 50VU in the cockpit, lift the guard and push the
                   HYD/LEAK MEASUREMENT VALVES/G P/BSW (the OFF light comes on).
Subtask 12-36-29-611-056
        C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP
R          (Ref. detail A)
           WARNING : MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR
           _______
                     BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF NOT YOU CAN
                     CAUSE BAD INJURY TO PERSONNEL.
           CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
           _______
                     DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                     HYDRAULIC RESERVOIR BECOME TOO FULL.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 389
                                                                           Feb 01/11
                                                     
    UZB                                              
R          (10) Increase the rate of flow and pressure as necessary.
R          (11) On the panel 400VU, move the landing-gear control lever to the UP
                position and then to the DOWN position. Do this step 3 times.
                NOTE : The landing gear and the landing gear doors operate.
                ____
R          (12) Install the safety locks on the landing gear (Ref. TASK 32-00-00-481-
                001):
R               - For the NLG PIN-GROUND LOCK,NLG (D23080000)
R               - For the MLG NOT PROCURABLE (460005833) or the SLEEVE-GROUND LOCK
                  (460007280).
R          (16) Disconnect the pressure hose of the hydraulic power cart from the
                delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-054
            CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
            _______
                      GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
            CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
            _______
                      DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                      HYDRAULIC RESERVOIR BECOME TOO FULL.
            (1) Connect the hose of the auxiliary hydraulic reservoir to the suction
                connector 1006GM at the ground service panel.
            (2) Disconnect the suction line 1038GM at the fluid disconnect panel of
                the engine 1.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page 390
                                                                              Feb 01/11
                                                    
    UZB                                             
          (3) Connect the pressure hose of the hydraulic power cart to the coupling
              1700GM at the fluid disconnect panel of the engine 1.
          (7) Disonnect the pressure hose of the hydraulic power cart from the
              coupling 1700GM of the fluid disconnect panel at the engine 1.
          (8) Disconnect the hose of the auxiliary hydraulic reservoir from the
              suction connector 1006GM at the ground service panel.
         (10) Connect the suction line 1038GM at the fluid disconnect panel at the
              engine 1.
Subtask 12-36-29-611-053
          CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
          _______
                    GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
          CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
          _______
                    DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                    HYDRAULIC RESERVOIR BECOME TOO FULL.
          (1) Connect the pressure hose of the hydraulic power cart to the delivery
              connector 1008GM at the ground service panel.
          (2) Disconnect the pressure line 1673GM from the pressure coupling at the
              fluid disconnect panel of the engine 1.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page 391
                                                                          Feb 01/11
R                                                 
  UZB                                             
          (3) Remove the check valve 1050GM (Ref. TASK 29-11-36-000-001).
          (4) Connect the hose of the auxiliary hydraulic reservoir to the open
              pressure coupling in the fluid disconnect panel of the engine 1.
          (8) Disconnect the pressure hose of the hydraulic power cart from the
              delivery connector 1008GM at the ground service panel.
          (9) Disconnect the hose of the auxiliary hydraulic reservoir from the
              port of the fluid disconnect panel at the engine 1.
         (12) Connect the pressure line 1673GM to the pressure coupling of the
              fluid disconnect panel at the engine 1.
         (13) TORQUE the coupling nut of the pressure line 1673GM to between 9.66
              and 10.67 m.daN (71.23 and 78.68 lbf.ft).
   5. Close-up
      ________
Subtask 12-36-29-860-097
          (1) Fill the reservoir of the Green hydraulic system (Ref. TASK 12-12-29-
              611-001) or (Ref. TASK 12-12-29-611-002).
          (2) Pressurize the reservoir of the Green hydraulic system (Ref. TASK 29-
              14-00-614-002).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page 392
                                                                            Feb 01/11
R                                                 
  UZB                                             
         (3) Pressurize the Green Hydraulic system with the ground cart (Ref. TASK
             29-10-00-863-001).
         (4) On the panel 50VU in the cockpit, lift the guard and push the
             HYD/LEAK MEASUREMENT VALVES/G P/BSW (the OFF light goes off).
         (7) Make sure that the reservoir of the Green hydraulic system is
             correctly filled with new fluid (Ref. TASK 12-12-29-611-001).
Subtask 12-36-29-860-098
Subtask 12-36-29-410-062
C. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-36-29-865-051
      D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
         breaker(s):
         1701GK, 1702GK, 2701GJ, 2702GJ, 3700GD, 3701GD, 3801GX, 3802GX, 3803GX.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 393
                                                                           Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-860-100
         (2) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 394
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-600-002
R    Change of the Hydraulic Fluid in the Yellow Hydraulic System - with Ground Cart
R    Available
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                   blanking plugs
     No specific                   circuit breaker(s) safety clip(s)
R
     No   specific             1   ACCESS PLATFORM 2M (6 FT)
     No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
     No   specific             1   CONTAINER 5 L(1 1/2 USGAL)
     No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   SAFETY BARRIER(S)
R    No   specific             1   WARNING NOTICE(S)
R    No   specific                 Torque Wrench : range 0.67 to 13.50 m.daN
R                                                             (4.94 to 99.57 lbf.ft)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                                Page 395
                                                                               Feb 01/11
                                                       
    UZB                                                
      B. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 396
                                                                         Feb 01/11
R                                                
  UZB                                            
     3. __________
        Job Set-up
Subtask 12-36-29-860-103
A. Safety Precautions
Subtask 12-36-29-865-052
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU HYD/HYD PWR/B WARN/& CTL                               2702GJ      C12
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG                         3700GD      Q37
      121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL                          3701GD      Q36
      121VU HYDRAULIC/G HYD/PUMP ENG1/CTL                          1701GK      R35
      121VU HYDRAULIC/G HYD/PUMP ENG1/MONG                         1702GK      R34
      123VU B HYD/ELEC PUMP                                        2701GJ     AB09
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
Subtask 12-36-29-010-074
C. Get Access
(5) Open the left or right MLG door (Ref. TASK 32-12-00-010-001).
           (6) Put the locking handles of the FWD and AFT cargo-compartment doors in
               the UNLOCKED position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 397
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-36-29-680-051
        D. Drain the reservoir of the Yellow hydraulic system (Ref. TASK 29-10-00-
           680-002).
Subtask 12-36-29-860-101
           CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
           _______
                     GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (1) Put the NLG on to the turntable (to prevent damage to the tires when
R              the steering is operated).
           (3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the MLG
               bay.
           (4) Put the CONTAINER 5 L(1 1/2 USGAL) below the fluid disconnect panel
               at the engine 2 to collect the unwanted hydraulic fluid.
R          (6) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC (filled
R              with new hydraulic fluid) to the delivery connector 3008GM at the
R              ground service panel (Ref. detail A).
R          (7) Connect the return hose of the auxiliary hydraulic reservoir with a
R              capacity of 100 l (26.4 USgal) to the suction connector 3006GM at the
R              ground service panel.
     4. Procedure
        _________
        NOTE : The Green hydraulic system will be pressurized via the PTU for this
        ____
               procedure, the Green hydraulic reservoir must be pressurized.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page 398
                                                                           Feb 01/11
                                                   
    UZB                                            
      Change of the Hydraulic Fluid in the Yellow Hydraulic System - Schematic
                          Figure 315/TASK 12-36-29-991-015
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page 399
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-611-059
      A. Fluid Change without Hydraulic Lines of the Engine Driven Pump (EDP)
         (Ref. detail A)
         CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
         _______
                   DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                   HYDRAULIC RESERVOIR BECOME TOO FULL.
             WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
             _______
                       CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
                       PERSONS AND/OR DAMAGE.
             (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                 position and then to the RET position. Do this step 3 times.
             (b) On the panel 18VU or 19VU, move the side stick fully forward and
                 then fully rearward. Do this step 3 times.
             (c) At the captain or first officer position, push the LH pedal fully
                 forward (and release it) then the RH pedal fully forward (and
                 release it) . Do this step 3 times.
             (d) On the panel 114VU, move the flap/slat lever to the FULL position
                 and then to the 0 deg position. Do this step 2 times.
             (e) On the center pedestal, turn one of the pitch-trim control wheels
                 to the DN stop and then to the UP stop. Do this step 3 times.
                 Turn the pitch-trim control wheel to the 0 deg position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A300
                                                                         Feb 01/11
R                                                
  UZB                                            
                 NOTE : The THS operates.
                 ____
Subtask 12-36-29-869-059
         (1) On the panel 50VU in the cockpit, lift the guard and push the
             HYD/LEAK MEASUREMENT VALVES/Y P/BSW (the OFF light comes on).
Subtask 12-36-29-611-060
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP
         WARNING : MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR
         _______
                   BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF NOT YOU CAN
                   CAUSE BAD INJURY TO PERSONNEL.
         CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
         _______
                   DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                   HYDRAULIC RESERVOIR BECOME TOO FULL.
         (1) On the ground service panel, make sure that the selector valve 2500MJ
             is in the E PUMP position.
         (5) On the cargo-door control panels, put and hold the selectors in the
             OPEN position until the cargo doors are open. Put and hold the
             selectors in the CLOSE position until the cargo doors are closed. Do
             this step two times.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A301
                                                                           Feb 01/11
R                                                  
  UZB                                              
         (7) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the
             brake units of the alternate braking system (Ref. TASK 32-43-00-870-
             002).
Subtask 12-36-29-611-061
         CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
         _______
                   DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                   HYDRAULIC RESERVOIR BECOME TOO FULL.
         (2) On the brake manifold 3016GM (in the MLG bay), push the pressure
             relief valve 3067GM to drain the accumulator 2582GM of hydraulic
             fluid.
         (6) Disconnect the pressure hose of the hydraulic power cart from the
             delivery connector 3008GM at the ground service panel.
Subtask 12-36-29-611-057
         CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
         _______
                   GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
         CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
         _______
                   DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                   HYDRAULIC RESERVOIR BECOME TOO FULL.
         (1) Connect the hose of the auxiliary hydraulic reservoir to the suction
             connector 3006GM at the ground service panel.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A302
                                                                         Feb 01/11
R                                                
  UZB                                            
          (2) Disconnect the suction line 3038GM at the fluid disconnect panel of
              the engine 2.
          (3) Connect the pressure hose of the hydraulic power cart to the coupling
              3700GM at the fluid disconnect panel of the engine 2.
          (7) Disconnect the hose of the auxiliary hydraulic reservoir from the
              suction connector 3006GM at the ground service panel.
          (8) Disconnect the pressure hose of the hydraulic power cart from the
              coupling 3700GM at the fluid disconnect panel of the engine 2.
         (10) Connect the suction line 3038GM at the fluid disconnect panel of the
              engine 2.
Subtask 12-36-29-611-058
          CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
          _______
                    GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
          CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
          _______
                    DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                    HYDRAULIC RESERVOIR BECOME TOO FULL.
          (1) Connect the pressure hose of the hydraulic power cart to the delivery
              connector 3008GM
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A303
                                                                          Feb 01/11
R                                                 
  UZB                                             
          (2) Disconnect the pressure line 3673GM from the pressure coupling of the
              fluid disconnect panel at the engine 2.
          (4) Connect the hose of the auxiliary hydraulic reservoir to the open
              pressure coupling in the fluid disconnect panel of the engine 2.
          (8) Disconnect the pressure hose of the hydraulic power cart from the
              delivery connector 3008GM
          (9) Disconnect the hose of the auxiliary hydraulic reservoir from the
              pressure port at the fluid disconnect panel of the engine 2.
         (12) Connect the pressure line 3673GM to the pressure coupling of the
              fluid disconnect panel at the engine 2.
         (13) TORQUE the coupling nut of the pressure line 3673GM to between 9.66
              and 10.67 m.daN (71.23 and 78.68 lbf.ft)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A304
                                                                            Feb 01/11
R                                                 
  UZB                                             
   5. Close-up
      ________
Subtask 12-36-29-860-102
         (1) Fill the reservoir of the Yellow hydraulic system (Ref. TASK 12-12-
             29-611-001) or (Ref. TASK 12-12-29-611-002).
         (2) Pressurize the reservoir of the Yellow hydraulic system (Ref. TASK
             29-14-00-614-002).
         (3) Pressurize the Yellow hydraulic system with the ground cart
             (Ref. TASK 29-10-00-863-002).
         (4) On the panel 50VU in the cockpit, lift the guard and push the
             HYD/LEAK MEASUREMENT VALVES/Y P/BSW (the OFF light goes off).
         (7) Make sure that the reservoir of the Yellow hydraulic system is
             correctly filled with new fluid (Ref. TASK 12-12-29-611-001).
Subtask 12-36-29-410-063
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
         (2) Put the locking handles of the FWD and AFT cargo-compartment doors in
             the LOCKED position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A305
                                                                           Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-865-053
      C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
         breaker(s):
         1701GK, 1702GK, 2701GJ, 2702GJ, 3700GD, 3701GD, 3801GX, 3802GX, 3803GX
Subtask 12-36-29-860-104
         (2) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A306
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-600-003
R    Change of the Hydraulic Fluid in the Blue Hydraulic System - with Ground Cart
R    Available
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No   specific                 circuit breaker(s) safety clip(s)
R    No   specific             1   ACCESS PLATFORM 2M (6 FT)
R    No   specific             1   ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
R    No   specific             1   CAP - BLANKING
R    No   specific             1   CONTAINER 5 L(1 1/2 USGAL)
R    No   specific             1   GROUND POWER CART-HYDRAULIC
R    No   specific             1   SAFETY BARRIER(S)
R    No   specific             1   WARNING NOTICE(S)
     No   specific                 Torque Wrench : range 2.00 to 20.00 m.daN
                                                              (15.00 to 150.00 lbf.ft)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                               Page A307
                                                                               Feb 01/11
                                                       
    UZB                                                
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-36-29-860-107
A. Safety Precautions
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A308
                                                                            Feb 01/11
                                                    
    UZB                                             
     Subtask 12-36-29-865-054
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU HYD/HYD PWR/B WARN/& CTL                               2702GJ      C12
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG                         3700GD      Q37
      121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL                          3701GD      Q36
      121VU HYDRAULIC/G HYD/PUMP ENG1/CTL                          1701GK      R35
      121VU HYDRAULIC/G HYD/PUMP ENG1/MONG                         1702GK      R34
      123VU B HYD/ELEC PUMP                                        2701GJ     AB09
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
Subtask 12-36-29-010-075
C. Get Access
(3) Open the left or the right MLG door (Ref. TASK 32-12-00-010-001).
R (4) Put the ACCESS PLATFORM 2M (6 FT) below the Zone 195.
R (5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE below the MLG bay.
Subtask 12-36-29-680-052
        D. Drain the reservoir of the Blue hydraulic system (Ref. TASK 29-10-00-680-
           003).
Subtask 12-36-29-860-105
           CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
           _______
                     GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
R          (1) Put the CONTAINER 5 L(1 1/2 USGAL) below the electrically driven pump
               2075GJ.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A309
                                                                           Feb 01/11
                                                   
    UZB                                            
         Change of the Hydraulic Fluid in the Blue Hydraulic System - Schematic
                            Figure 316/TASK 12-36-29-991-016
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A310
                                                                           Feb 01/11
R                                                  
  UZB                                              
R          (2) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC (filled
R              with new hydraulic fluid) to the delivery connector 2008GM at the
R              ground service panel.
R          (3) Connect the return hose of the auxiliary hydraulic reservoir with a
R              capacity of 60 l (16 USgal) to the suction connector 2006GM at the
R              ground service panel.
     4. Procedure
        _________
Subtask 12-36-29-611-063
        A. Fluid Change Procedure without the Suction Line of the Blue Electric Pump
           (Ref. detail A)
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
           _______
                     CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                     AND/OR DAMAGE.
           CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
           _______
                     DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                     HYDRAULIC RESERVOIR BECOME TOO FULL.
               WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
               _______
                         CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
                         PERSONS AND/OR DAMAGE.
               (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                   position and then to the RET position. Do this step 3 times.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A311
                                                                           Feb 01/11
                                                    
    UZB                                             
               (b) On the panel 18VU or 19VU, move the side stick fully to the left
                   and then fully to the right. Do this step 3 times.
               (c) On the panel 18VU or 19VU, move the side stick fully forward and
                   then fully rearward. Do this step 3 times.
               (d) At the captain or first officer position, push the LH pedal fully
                   forward and then the RH pedal fully forward. Do this step 3
                   times.
               (e) On the panel 114VU, move the flap/slat lever to the FULL position
                   and then to the 0 deg position. Do this step 2 times.
           (6) On the panel 50VU in the cockpit, lift the guard and push the
               HYD/LEAK MEASUREMENT VALVES/B P/BSW (the OFF light comes on).
           (7) Disconnect the pressure hose of the hydraulic power cart from the
               delivery connector 2008GM at the ground service panel.
Subtask 12-36-29-611-062
        B. Fluid Change Procedure of the Suction Line of the Blue Electric Pump
R          (Ref. detail B)
           CAUTION : MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE
           _______
                     GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
           CAUTION : DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART
           _______
                     DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY
                     HYDRAULIC RESERVOIR BECOME TOO FULL.
           NOTE : Make sure that the supply pressure of the ground hydraulic cart
           ____
                  does not become more than 50 psi (3.4473 bar).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A312
                                                                           Feb 01/11
                                                   
    UZB                                            
            (1) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
                29-14-00-614-001).
            (4) Put the open line end in the auxiliary hydraulic reservoir.
R
R           (5) Connect the pressure hose of the hydraulic power cart to the suction
                connector (2006GM) at the ground service panel.
R           (6) Adjust the supply pressure on the hydraulic power cart slowly from 0
                to 50 psi (3.4473 bar) maximum.
R           (7) Stop the hydraulic power cart after a minimum of 20.0 l (5.2833
                USgal) hydraulic fluid has come out of the suction line (2457GM).
R (8) Remove the line end from the auxiliary hydraulic reservoir.
R           (9) Remove the blanking cap from the fitting and connect the suction line
                (2457GM).
R          (10) TORQUE the line end fitting to between 17.9 and 19.0 m.daN (132.00
                and 140.11 lbf.ft).
R
R          (11) Disconnect the pressure hose of the hydraulic power cart from the
                suction connector (2006GM) at the ground service panel.
     5. Close-up
        ________
Subtask 12-36-29-860-106
            (1) Fill the reservoir of the Blue hydraulic system (Ref. TASK 12-12-29-
                611-001) or (Ref. TASK 12-12-29-611-002).
            (2) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
                14-00-614-002).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                              Page A313
                                                                              Feb 01/11
                                                      
    UZB                                               
           (3) Pressurize the Blue Hydraulic system with the ground cart (Ref. TASK
               29-10-00-863-003).
           (4) On the panel 50VU in the cockpit, push the HYD/LEAK MEASUREMENT
               VALVES/B P/BSW (the OFF light goes off).
           (7) Make sure that the reservoir of the Blue hydraulic system is
               correctly filled with new fluid (Ref. TASK 12-12-29-611-001).
Subtask 12-36-29-410-064
B. Close Access
           (1) Make sure that the work area is clean and clear of tool(s) and other
               items.
Subtask 12-36-29-865-055
        C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
R          1701GK, 1702GK, 2701GJ, 2702GJ, 3700GD, 3701GD, 3801GX, 3802GX, 3803GX.
Subtask 12-36-29-860-108
           (2) Remove the ground support and maintenance equipment, the special and
               standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A314
                                                                             Feb 01/11
                                                   
    UZB                                            
         (3) After one week of aircraft operation, do a new sampling of the
             hydraulic fluid (Ref. TASK 12-32-29-281-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A315
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-600-004
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A316
                                                                           Feb 01/11
                                                     
    UZB                                              
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-36-29-860-110
A. Safety Precautions
Subtask 12-36-29-010-078
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A317
                                                                            Feb 01/11
                                                    
    UZB                                             
     Subtask 12-36-29-860-111
R          (2) Put the NLG on to the TURNTABLE - NLG STEERING OPERATION (to prevent
R              damage to the tires when the steering is operated).
R          (3) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R              delivery connector 1008GM.
R          (4) Connect the return hose of the GROUND POWER CART-HYDRAULIC to the
R              suction connector 1006GM.
R
     4. Procedure
        _________
Subtask 12-36-29-960-063
           (1) Replace the element in the LP filter 1002GM (Ref. TASK 29-11-44-610-
               001).
           (2) Replace the element in the HP filter 1048GM (Ref. TASK 29-11-45-610-
               001).
           (3) Replace the element in the brake filter 2584GM (Ref. TASK 32-42-12-
               610-001).
           (4) Replace the element in the case drain filter 1084GM (Ref. TASK 29-11-
               43-610-041).
Subtask 12-36-29-869-076
B. Reclamation Procedure
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
           _______
                     CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                     AND/OR DAMAGE.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A318
                                                                           Feb 01/11
                                                   
    UZB                                            
          (3) In the cockpit, operate the flight controls.
              (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                  position then to the RET position. Do this step 3 times.
              (b) On the panel 18VU or 19VU, move the side stick fully to the left
                  then fully to the right. Do this step 3 times.
              (c) On the panel 18VU or 19VU, move the side stick fully forward then
                  fully rearward. Do this step 3 times.
              (d) At the captain or first officer position, push the LH pedal fully
                  forward and the RH pedal fully forward. Do this step 3 times.
          (4) On the panel 114VU, move the flap/slat lever to the FULL position
              then to the 0 deg. position. Do this step 2 times.
          (5) On the center pedestal, turn one of the pitch-trim control wheels to
              the DN stop then to the UP stop. Do this step 3 times. Turn the
              pitch-trim control wheel to the 0 deg. position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A319
                                                                          Feb 01/11
R                                                   
  UZB                                               
         (12) On the panel 400VU, move the landing-gear control lever to the UP
              position then to the DOWN position. Do this step 3 times.
         (13) Install the safety locks on the landing gear (Ref. TASK 32-00-00-481-
              001):
              - for the NLG PIN-GROUND LOCK,NLG (D23080000)
              - for the MLG NOT PROCURABLE (460005833) or the SLEEVE-GROUND LOCK
                (460007280).
Subtask 12-36-29-281-050
C. Sampling Procedure
          (1) Take a sample from the Green hydraulic system and make an analysis
              (Ref. TASK 12-32-29-281-001).
Subtask 12-36-29-010-079
D. Get Access
(1) Open the left or the right MLG door (Ref. TASK 32-12-00-010-001).
Subtask 12-36-29-869-065
      E. Make sure that the clogging indicators on the filters 1002GM, 1048GM,
         1084GM and 2584GM are in (the filter is not clogged).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A320
                                                                          Feb 01/11
R                                                 
  UZB                                             
   5. Close-up
      ________
Subtask 12-36-29-860-109
         (1) Disconnect the pressure hose of the hydraulic power cart from the
             delivery connector 1008GM.
         (2) Disconnect the return hose of the hydraulic power cart from the
             suction connector 1006GM.
Subtask 12-36-29-410-067
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-36-29-860-112
         (2) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A321
                                                                           Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-600-005
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A322
                                                                           Feb 01/11
                                                   
    UZB                                            
        B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-36-29-860-114
A. Safety Precautions
Subtask 12-36-29-010-080
B. Get Access
           (2) Put the locking handles of the FWD and AFT cargo-compartment doors in
               the UNLOCKED position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A323
                                                                            May 01/11
                                                    
    UZB                                             
     Subtask 12-36-29-860-113
R          (2) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
R              delivery connector 3008GM.
           (3) Connect the return hose of the hydraulic power cart to the suction
               connector 3006GM.
     4. Procedure
        _________
Subtask 12-36-29-960-064
           (1) Replace the element in the LP filter 3002GM (Ref. TASK 29-13-44-610-
               001).
           (2) Replace the element in the HP filter 3048GM (Ref. TASK 29-13-45-610-
               001).
           (3) Replace the element in the case drain filter 3084GM (Ref. TASK 29-13-
               43-610-041).
Subtask 12-36-29-869-077
B. Reclamation Procedure
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
           _______
                     CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                     AND/OR DAMAGE.
               (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                   position then to the RET position. Do this step 3 times.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A324
                                                                           Feb 01/11
                                                    
    UZB                                             
R                  1
                   _   Align the ADIRS (Ref. TASK 34-10-00-860-004).
R                  2
                   _   For the spoiler 1,2,3 and 4:
R                      - On the center pedestal, set the SPEED BRAKE control lever to
R                        FULL.
R                      - On the lower ECAM display unit, the F/CTL page shows the
R                        related spoiler extended.
               (b) On the panel 18VU or 19VU, move the side stick fully forward and
                   fully rearward. Do this step 3 times.
               (c) At the captain or first officer position, push the LH pedal fully
                   forward (and release it) then the RH pedal fully forward (and
                   release it). Do this step 3 times.
               (d) On the panel 114VU, move the flap/slat lever to the FULL position
                   then to the 0 deg. position. Do this step 2 times.
               (e) On the center pedestal, turn one of the pitch-trim control wheels
                   to the DN stop then to the UP stop. Do this step 3 times. Turn
                   the pitch-trim control wheel to the 0 deg. position.
           (4) On the ground service panel, make sure that the selector valve 2500MJ
               is in the E PUMP position.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A325
                                                                            May 01/11
                                                     
    UZB                                              
   Subtask 12-36-29-281-051
C. Sampling Procedure
         (1) Take a sample from the Yellow hydraulic system and make an analysis
             (Ref. TASK 12-32-29-281-001).
Subtask 12-36-29-010-081
D. Get Access
Subtask 12-36-29-869-070
      E. Make sure that the clogging indicators on the filters 3002GM, 3048GM and
         3084GM are in (the filter is not clogged).
   5. Close-up
      ________
Subtask 12-36-29-860-115
         (2) Put the locking handles of the FWD and AFT cargo-compartment doors in
             the LOCKED position.
         (3) Disconnect the pressure hose of the hydraulic power cart from the
             delivery connector 3008GM.
         (4) Disconnect the return hose of the hydraulic power cart from the
             suction connector 3006GM.
Subtask 12-36-29-410-069
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A326
                                                                         May 01/11
R                                                  
  UZB                                              
   Subtask 12-36-29-860-116
         (1) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A327
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-600-006
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
     3. __________
        Job Set-up
Subtask 12-36-29-860-119
A. Safety Precautions
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A328
                                                                             Feb 01/11
                                                     
    UZB                                              
     Subtask 12-36-29-010-082
B. Get Access
Subtask 12-36-29-860-118
R          (1) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC to the
               delivery connector 2008GM.
           (2) Connect the return hose of the hydraulic power cart to the suction
               connector 2006GM.
     4. Procedure
        _________
Subtask 12-36-29-960-065
           (1) Replace the element in the LP filter 2002GM (Ref. TASK 29-12-44-610-
               001).
           (2) Replace the element in the HP filter 2048GM (Ref. TASK 29-12-45-610-
               001).
           (3) Replace the element in the case drain filter 2084GM (Ref. TASK 29-12-
               43-610-001).
Subtask 12-36-29-869-078
B. Reclamation Procedure
           WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
           _______
                     CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS
                     AND/OR DAMAGE.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A329
                                                                           Feb 01/11
                                                   
    UZB                                            
         (3) In the cockpit, operate the flight controls.
             (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                 position and then to the RET position. Do this step 3 times.
             (b) On the panel 18VU or 19VU, move the side stick fully to the left
                 and then fully to the right. Do this step 3 times.
             (c) On the panel 18VU or 19VU, move the side stick fully forward and
                 then fully rearward. Do this step 3 times.
             (d) At the captain or first officer position, push the LH pedal fully
                 forward and then the RH pedal fully forward. Do this step 3
                 times.
             (e) On the panel 114VU, move the flap/slat lever to the FULL position
                 and then to the 0 deg. position. Do this step 2 times.
Subtask 12-36-29-281-052
C. Sampling Procedure
         (1) Take a sample from the Blue hydraulic system and make an analysis
             (Ref. TASK 12-32-29-281-001).
Subtask 12-36-29-010-083
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A330
                                                                         Feb 01/11
R                                                
  UZB                                            
   Subtask 12-36-29-869-073
      E. Make sure that the clogging indicators on the filters 2002GM, 2048GM and
         2084GM are in (the filter is not clogged).
   5. Close-up
      ________
Subtask 12-36-29-860-117
         (1) Disconnect the pressure hose of the hydraulic power cart from the
             delivery connector 2008GM.
         (2) Disconnect the return hose of the hydraulic power cart from the
             suction connector 2006GM.
Subtask 12-36-29-410-070
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
Subtask 12-36-29-860-120
         (3) Remove the ground support and maintenance equipment, the special and
             standard tools and all other items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A331
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-615-001
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
        To remove water, chlorinated solvent and particles from the hydraulic fluid
        of the Green hydraulic system.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A332
                                                                           Feb 01/11
                                                     
    UZB                                              
      C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-089
         (4) Look at the quantity indicator on the hydraulic reservoir and make
             sure:
             - that the fluid level is correct, add fluid as necessary (Ref. TASK
               12-12-29-611-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A333
                                                                          Feb 01/11
R                                                 
  UZB                                             
         (5) Look at the air pressure gage on the hydraulic reservoir and make
             sure:
             - that the air pressure in the reservoir of the Green System is 50
               psi, pressurize the hydraulic reservoir as necessary (Ref. TASK 29-
               14-00-614-002).
Subtask 12-36-29-010-097
B. Get Access
(1) Open the left main landing gear door (Ref. TASK 32-12-00-010-001).
   4. Procedure
      _________
Subtask 12-36-29-615-050
         WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE
         _______
                   LANDING GEAR.
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
         _______
                   ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
                   SYSTEM.
             (a) Make sure that the hydraulic fluid content indicator (2) shows
                 the maximum fill level.
                 - If necessary fill the reservoir of the HYDRAULIC PURIFIER
                   (HSPA181-380J) with HYDRAULIC FLUIDS (Material No. 02-003)
                   through the fill connection (21).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A334
                                                                         Feb 01/11
R                                                
  UZB                                            
                              Hydraulic Purifier
                       Figure 317/TASK 12-36-29-991-017
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                  Page A335
                                                                  Feb 01/11
R                                             
  UZB                                         
               (d) Make sure that the red light (18) does not come on.
                   - If the red light (18) comes on, the rotary direction of the
                     internal electrical pump is not correct. Change two phases of
                     the electrical connection.
R (l) Put a CONTAINER 5 L(1 1/2 USGAL) below the valve (4).
               (a) Make sure that the hydraulic system of the HYDRAULIC PURIFIER
                   (HSPA181-380J) is depressurized. The low pressure indicator (10)
                   and the high pressure indicator (9) must show 0.
                   - If necessary depressurize the hydraulic system by opening the
                     drain valves (3).
(b) Make sure that the drain valves (3) are closed.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A336
                                                                           Feb 01/11
                                                   
    UZB                                            
           (c) Connect the hydraulic lines (1) of the HYDRAULIC PURIFIER
               (HSPA181-380J) to the aircraft connectors
               - 1006GM suction
               - 1008GM delivery.
           (j) Make sure that the low pressure indicator (10) shows the same
               pressure as shown on the gage of the Green hydraulic reservoir.
               If necessary, adjust the pressure with the pressure control valve
               (11).
           (k) Make sure that the value shown on the high pressure gage (9) is
               in the given limit.
           (l) Look at the water content indicator (22) to examine the water
               content of the hydraulic fluid.
           (m) Obey the fluid level of the Green hydraulic reservoir during the
               cleaning procedure. You can adjust the reservoir level with the
               pressure control valve (11).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                       Page A337
                                                                       Feb 01/11
R                                              
  UZB                                          
           (n) To make a fluid flow in the Green hydraulic system operate the
               subsequent hydraulic users 2 times minimum every 30 minutes:
               - the rudder,
               - the ailerons,
               - the elevators,
               - the flaps,
               - the slats,
               - the brakes,
               - the landing gear doors and
               - the trimmable horizontal stabilizer.
           (p) If the water content is still high, continue with the cleaning
               procedure.
           (q) Stop the cleaning procedure when the water content indicator
               (22), or the analysis of the hydraulic fluid sample gives a low
               water content.
           (r) Adjust the correct hydraulic fluid level in the Green hydraulic
               reservoir by operating the pressure control valve (11).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                       Page A338
                                                                       Feb 01/11
R                                                
  UZB                                            
   5. Close-up
      ________
Subtask 12-36-29-860-090
         (2) Look at the quantity indicator on the hydraulic reservoir and make
             sure:
             - that the fluid level is correct, add fluid as necessary (Ref. TASK
               12-12-29-611-001).
         (3) Look at the air pressure gage on the hydraulic reservoir and make
             sure:
             - that the air pressure in the reservoir of the Green System is 50
               psi, pressurize the hydraulic reservoir as necessary (Ref. TASK 29-
               14-00-614-002).
Subtask 12-36-29-410-084
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
(2) CLose the left main landing gear door (Ref. TASK 32-12-00-010-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A339
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-615-002
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
        To remove water, chlorinated solvent and particles from the hydraulic fluid
        of the Yellow hydraulic system.
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A340
                                                                           Feb 01/11
                                                     
    UZB                                              
      C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-091
         (4) Look at the quantity indicator on the hydraulic reservoir and make
             sure:
             - that the fluid level is correct, add fluid as necessary (Ref. TASK
               12-12-29-611-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A341
                                                                          Feb 01/11
R                                                 
  UZB                                             
         (5) Look at the air pressure gage on the hydraulic reservoir and make
             sure:
             - that the air pressure in the reservoir of the Yellow System is 50
               psi, pressurize the hydraulic reservoir as necessary (Ref. TASK 29-
               14-00-614-002).
Subtask 12-36-29-010-098
B. Get Access
   4. Procedure
      _________
Subtask 12-36-29-615-051
         WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE
         _______
                   LANDING GEAR.
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
         _______
                   ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
                   SYSTEM.
             (a) Make sure that the hydraulic fluid content indicator (2) shows
                 the maximum fill level.
                 - If necessary fill the reservoir of the HYDRAULIC PURIFIER
                   (HSPA181-380J) with HYDRAULIC FLUIDS (Material No. 02-003)
                   through the fill connection (21).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A342
                                                                         Feb 01/11
R                                                
  UZB                                            
               (d) Make sure that the red light (18) does not come on.
                   - If the red light (18) comes on, the rotary direction of the
                     internal electrical pump is not correct. Change two phases of
                     the electrical connection.
R (l) Put a CONTAINER 5 L(1 1/2 USGAL) below the valve (4).
               (a) Make sure that the hydraulic system of the HYDRAULIC PURIFIER
                   (HSPA181-380J) is depressurized. The low pressure indicator (10)
                   and the high pressure indicator (9) must show 0.
                   - If necessary depressurize the hydraulic system by opening the
                     drain valves (3).
(b) Make sure that the drain valves (3) are closed.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A343
                                                                           Feb 01/11
                                                   
    UZB                                            
           (c) Connect the hydraulic lines (1) of the HYDRAULIC PURIFIER
               (HSPA181-380J) to the aircraft connectors
               - 3006GM suction
               - 3008GM delivery.
           (j) Make sure that the low pressure indicator (10) shows the same
               pressure as shown on the gage of the Yellow hydraulic reservoir.
               If necessary, adjust the pressure with the pressure control valve
               (11).
           (k) Make sure that the value shown on the high pressure gage (9) is
               in the given limit.
           (l) Look at the water content indicator (22) to examine the water
               content of the hydraulic fluid.
           (m) Obey the fluid level of the Yellow hydraulic reservoir during the
               cleaning procedure. You can adjust the reservoir level with the
               pressure control valve (11).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                       Page A344
                                                                       Feb 01/11
R                                              
  UZB                                          
             (n) To make a fluid flow in the Yellow hydraulic system operate the
                 subsequent hydraulic users 2 times minimum every 30 minutes:
                 - the rudder,
                 - the spoilers,
                 - the elevators,
                 - the flaps,
                 - the parking brake,
                 - the cargo doors and
                 - the trimmable horizontal stabilizer.
             (p) If the water content is still high, continue with the cleaning
                 procedure.
             (q) Stop the cleaning procedure when the water content indicator
                 (22), or the analysis of the hydraulic fluid sample gives a low
                 water content.
             (r) Adjust the correct hydraulic fluid level in the Yellow hydraulic
                 reservoir by operating the pressure control valve (11).
   5. Close-up
      ________
Subtask 12-36-29-860-092
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A345
                                                                         Feb 01/11
R                                                  
  UZB                                              
         (2) Look at the quantity indicator on the hydraulic reservoir and make
             sure:
             - that the fluid level is correct, add fluid as necessary (Ref. TASK
               12-12-29-611-001).
         (3) Look at the air pressure gage on the hydraulic reservoir and make
             sure:
             - that the air pressure in the reservoir of the Green System is 50
               psi, pressurize the hydraulic reservoir as necessary (Ref. TASK 29-
               14-00-614-002).
Subtask 12-36-29-410-085
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A346
                                                                         Feb 01/11
R                                                
  UZB                                            
     TASK 12-36-29-615-003
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
        To remove water, chlorinated solvent and particles from the hydraulic fluid
        of the Blue hydraulic system
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A347
                                                                           Feb 01/11
                                                     
    UZB                                              
      C. Referenced Information
   -------------------------------------------------------------------------------
   REFERENCE                 DESIGNATION
   -------------------------------------------------------------------------------
   3. __________
      Job Set-up
Subtask 12-36-29-860-093
         (3) Look at the quantity indicator on the hydraulic reservoir and make
             sure:
             - that the fluid level is correct, add fluid as necessary (Ref. TASK
               12-12-29-611-001).
         (4) Look at the air pressure gage on the hydraulic reservoir and make
             sure:
             - that the air pressure in the reservoir of the Blue System is 50
               psi, pressurize the hydraulic reservoir as necessary (Ref. TASK 29-
               14-00-614-002).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A348
                                                                          Feb 01/11
R                                                 
  UZB                                             
   Subtask 12-36-29-010-099
B. Get Access
   4. Procedure
      _________
Subtask 12-36-29-615-052
         WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE
         _______
                   LANDING GEAR.
         WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES
         _______
                   ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC
                   SYSTEM.
             (a) Make sure that the hydraulic fluid content indicator (2) shows
                 the maximum fill level.
                 - If necessary fill the reservoir of the HYDRAULIC PURIFIER
                   (HSPA181-380J) with HYDRAULIC FLUIDS (Material No. 02-003)
                   through the fill connection (21).
             (d) Make sure that the red light (18) does not come on.
                 - If the red light (18) comes on, the rotary direction of the
                   internal electrical pump is not correct. Change two phases of
                   the electrical connection.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A349
                                                                         Feb 01/11
R                                                
  UZB                                            
               (g) Fill the reservoir of the HYDRAULIC PURIFIER (HSPA181-380J) with
                   HYDRAULIC FLUIDS (Material No. 02-003) through the fill
                   connection (21) until the hydraulic fluid quantity is in the
                   middle between the MIN and MAX mark of the hydraulic fluid
                   content indicator (2).
R (l) Put a CONTAINER 5 L(1 1/2 USGAL) below the valve (4).
               (a) Make sure that the hydraulic system of the HYDRAULIC PURIFIER
                   (HSPA181-380J) is depressurized. The low pressure indicator (10)
                   and the high pressure indicator (9) must show 0.
                   - If necessary depressurize the hydraulic system by opening the
                     drain valves (3).
(b) Make sure that the drain valves (3) are closed.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A350
                                                                           Feb 01/11
                                                   
    UZB                                            
           (g) Make sure that all values shown on the gages:
               - inlet oil temperature (5),
               - outlet pressure (6),
               - inlet pressure (7) and
               - chamber vacuum (8)
                 are in the given limits.
           (j) Make sure that the low pressure indicator (10) shows the same
               pressure as shown on the gage of the Blue hydraulic reservoir. If
               necessary, adjust the pressure with the pressure control valve
               (11).
           (k) Make sure that the value shown on the high pressure gage (9) is
               in the given limit.
           (l) Look at the water content indicator (22) to examine the water
               content of the hydraulic fluid.
           (m) Obey the fluid level of the Blue hydraulic reservoir during the
               cleaning procedure. You can adjust the reservoir level with the
               pressure control valve (11).
           (n) To make a fluid flow in the Blue hydraulic system operate the
               subsequent hydraulic users 2 times minimum every 30 minutes:
               - the rudder,
               - the ailerons,
               - the elevators,
               - the spoilers and
               - the slats.
           (p) If the water content is still high, continue with the cleaning
               procedure.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                       Page A351
                                                                       Feb 01/11
R                                              
  UZB                                          
             (q) Stop the cleaning procedure when the water content indicator
                 (22), or the analysis of the hydraulic fluid sample gives a low
                 water content.
             (r) Adjust the correct hydraulic fluid level in the Blue hydraulic
                 reservoir by operating the pressure control valve (11).
   5. Close-up
      ________
Subtask 12-36-29-860-094
         (1) Look at the quantity indicator on the hydraulic reservoir and make
             sure:
             - that the fluid level is correct, add fluid as necessary (Ref. TASK
               12-12-29-611-001).
         (2) Look at the air pressure gage on the hydraulic reservoir and make
             sure:
             - that the air pressure in the reservoir of the Green System is 50
               psi, pressurize the hydraulic reservoir as necessary (Ref. TASK 29-
               14-00-614-002).
Subtask 12-36-29-410-086
B. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A352
                                                                         Feb 01/11
R                                                  
  UZB                                              
         (3) Close the access door 197FB.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                  Page A353
                                                                  Feb 01/11
R                                           
  UZB                                       
     TASK 12-36-29-600-007
     Change of the Hydraulic Fluid of the Yellow Hydraulic System with the Tool -
     Hydraulic Fluid Change (DH0501)
     WARNING : DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER
     _______
               THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME
               AND CAN CAUSE INJURY.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A354
                                                                             Feb 01/11
                                                     
    UZB                                              
        B. Consumable Materials
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
C. Referenced Information
     -------------------------------------------------------------------------------
     REFERENCE                 DESIGNATION
     -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A355
                                                                           May 01/11
                                                   
    UZB                                            
     3. __________
        Job Set-up
R Subtask 12-36-29-860-121-A
R          (3) On the overhead maintenance panel 50VU, make sure that the LEAK
R              MEASUREMENT VALVES/Y pushbutton switch is released (the OFF legend is
R              on).
Subtask 12-36-29-865-056
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU HYD/HYD PWR/B WARN/& CTL                               2702GJ      C12
      123VU B HYD/ELEC PUMP                                        2701GJ     AB09
Subtask 12-36-29-010-100
C. Get Access
(3) Open the right main landing gear door (Ref. TASK 32-12-00-010-001).
(4) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the MLG bay.
Subtask 12-36-29-680-053
        D. Drain the reservoir of the Yellow hydraulic system (Ref. TASK 29-10-00-
           680-002).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A356
                                                                           May 01/11
                                                   
    UZB                                            
R    Subtask 12-36-29-860-122-A
R          (1) Set the GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L to the
R              correct configuration:
R              (a) Make sure that the hydraulic ground power supply reservoir is
R                  filled with new HYDRAULIC FLUIDS (Material No. 02-003).
R              (b) Make sure that no chlorinated solvent has been used to flush the
R                  tool lines.
R              (c) Set the hydraulic ground power supply to the cart reservoir
R                  configuration.
R                  WARNING : PROTECT YOUR HANDS AND FACE FROM THE GAS WHICH COMES
                   _______
R                            OUT WHEN YOU OPEN THE MANUAL DEPRESSURIZATION VALVE OF
R                            THE RESERVOIRS. IT IS POSSIBLE THAT THE GAS IS HOT AND
R                            CONTAINS HYDRAULIC FLUID.
R          (2) Set the TOOL - HYDRAULIC FLUID CHANGE (DH0501) to the correct
R              configuration.
R              (Ref. Fig. 318/TASK 12-36-29-991-018, 319/TASK 12-36-29-991-024-A,
               320/TASK 12-36-29-991-019-A)
R              (b) Put the selector valve 1134GQ in the position for the Yellow
R                  hydraulic reservoir. Make sure that the Yellow reservoir
R                  depressurization valve is open when you set the TOOL - HYDRAULIC
R                  FLUID CHANGE (DH0501) to the correct configuration.
R (c) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501) close the valve V1.
R              (d) Connect the connector LP1 of the TOOL - HYDRAULIC FLUID CHANGE
R                  (DH0501) to the LP connector of the hydraulic ground power
R                  supply.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A357
                                                                           May 01/11
                                                   
    UZB                                            
         Location of the Components in the Yellow Hydraulic System (Sheet 1)
                          Figure 318/TASK 12-36-29-991-018
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A358
                                                                         Feb 01/11
R                                                
  UZB                                            
R          Connection of the Tools in the Yellow Hydraulic System (Sheet 2)
R                        Figure 319/TASK 12-36-29-991-024-A
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A359
                                                                          May 01/11
                                                  
    UZB                                           
R                  Yellow Hydraulic System - Schematic Diagram
R                 Figure 320/TASK 12-36-29-991-019-A12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                   Page A360
                                                                   May 01/11
                                               
    UZB                                        
R                  Yellow Hydraulic System - Schematic Diagram
R                 Figure 320/TASK 12-36-29-991-019-A22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                   Page A361
                                                                   May 01/11
                                               
    UZB                                        
R          (e) Connect the HP1 connector of the TOOL - HYDRAULIC FLUID CHANGE
R              (DH0501) to the HP connector of the hydraulic ground power
R              supply.
R          (f) Connect the LP3 connector of the TOOL - HYDRAULIC FLUID CHANGE
R              (DH0501) to the suction connector of the ground service panel.
R              1
               _   Remove the Yellow HP filter (3048GM) (Ref. TASK 29-13-45-610-
R                  001).
R              2
               _   Install a dummy bowl of the TOOL - HYDRAULIC FLUID CHANGE
R                  (DH0501) in place of the Yellow HP filter (3048GM).
R              3
               _   Connect the HP2 line to the dummy bowl and to the valve V2.
R              1
               _   Put a CONTAINER 3 L(3/4 USGAL) below the LP filter (3002GM).
R              2
               _   Cut, remove and discard the lockwire between the filter bowl
R                  and the filter head.
R              3
               _   Remove the filter bowl.
R              1
               _   Put a CONTAINER 3 L(3/4 USGAL) below the Yellow LP manifold
R                  (3003GM).
R              2
               _   Disconnect the hydraulic line from the check valve (3017GM).
R              3
               _   Remove the check valve (3017GM) with its O-ring from the
R                  manifold.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page A362
                                                                        May 01/11
                                                
    UZB                                         
R                  4
                   _   Install the T-fitting in the open port of the manifold.
R                  5
                   _   Install the check valve with its O-ring in the open port of
R                      the T-fitting.
R                  6
                   _   Connect the hydraulic line with the check valve.
R                  7
                   _   Connect the LP2 line of the TOOL - HYDRAULIC FLUID CHANGE
R                      (DH0501) with the T-fitting. Use the HOSES FOR FLUID CHANGE,
R                      LP (98D12308351000) for the connection.
R          (3) Start the hydraulic ground power supply and make sure that the
R              pressure read on the gage of the TOOL - HYDRAULIC FLUID CHANGE
R              (DH0501) is 4.0 bar (58.0150 psi).
Subtask 12-36-29-611-064
           (2) Open the valve V1 of the TOOL - HYDRAULIC FLUID CHANGE (DH0501) and
               start the hydraulic ground power supply.
           (3) Fill the Yellow reservoir until the fluid is at the upper limit on
               the visual indicator.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A363
                                                                            May 01/11
                                                    
    UZB                                             
   4. Procedure
      _________
Subtask 12-36-29-611-065
         NOTE : Obey the fluid level of the Yellow reservoir during the procedure.
         ____
                Adjust the fluid level with the valve V1 when it decreases.
         (1) Change the fluid in the suction, pressure and case drain lines of the
             Yellow Engine Driven Pump (3030GD):
             (c) Do the dry motoring of the engine No.2 (Ref. TASK 71-00-00-710-
                 001).
             (f) Stop the dry motoring of the engine No.2 (Ref. TASK 71-00-00-710-
                 001).
         (2) Change the fluid in the suction, pressure and case drain lines of the
             Yellow Electric Pump (3075GX):
             (b) Pressurize the Yellow hydraulic system with the E-pump (Ref. TASK
                 29-24-00-863-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                          Page A364
                                                                          Feb 01/11
R                                                 
  UZB                                             
             (e) Depressurize the Yellow hydraulic system (Ref. TASK 29-24-00-864-
                 001).
         (3) Change the fluid in the supply and return lines of the primary
             servocontrols and the cargo door system:
             WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
             _______
                       CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
                       PERSONS AND/OR DAMAGE.
             (b) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501) open the valve V1
                 and keep it open during the full procedure.
             (c) Pressurize the Yellow hydraulic system with the E-pump (Ref. TASK
                 29-24-00-863-001). Make sure that the system pressure shown on
                 the ECAM SD and on the pressure gauge of the system accumulator
                 is correct.
             (e) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                 position and then to the RET position. Do this step 3 times.
             (f) On the panel 18VU or 19VU, move the side stick fully to the left
                 and then fully to the right. Do this step 3 times.
             (g) On the panel 18VU or 19VU, move the side stick fully forward and
                 then fully rearward. Do this step 3 times.
             (h) At the captain or first officer position, push the LH pedal fully
                 forward and then the RH pedal fully forward. Do this step 3
                 times.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A365
                                                                         Feb 01/11
R                                                
  UZB                                            
               (i) On the panel 114VU, move the flap/slat lever to the FULL position
                   and then to the 0 deg position. Do this step 2 times.
               (j) Open and close the FWD and AFT cargo doors (Ref. TASK 52-30-00-
                   860-001) and (Ref. TASK 52-30-00-860-002). Do this step 5 times.
     5. Close-up
        ________
Subtask 12-36-29-610-069
        A. Replace the filter element of the LP filter (3002GM) (Ref. TASK 29-13-44-
           610-001).
R Subtask 12-36-29-860-123-A
R          (1) On the overhead maintenance panel 50VU, make sure that the LEAK
R              MEASUREMENT VALVES/Y pushbutton switch is set to off (the OFF legend
R              is on).
R          (3) Close the valves V1 and V2 on the TOOL - HYDRAULIC FLUID CHANGE
R              (DH0501).
R (5) Remove the hydraulic line from the check valve (3017GM).
R (8) Install the check valve with a new O-ring in the manifold.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A366
                                                                            May 01/11
                                                   
    UZB                                            
R           (9) TORQUE the check valve to between 3.0 and 3.3 m.daN (22.12 and 24.33
R               lbf.ft).
R          (11) TORQUE the hydraulic line to between 2.9 and 3.2 m.daN (21.38 and
R               23.59 lbf.ft).
R          (12) Disconnect the HP1 and HP2 lines between the aircraft and the TOOL -
R               HYDRAULIC FLUID CHANGE (DH0501).
R          (13) Disconnect all the lines between the TOOL - HYDRAULIC FLUID CHANGE
R               (DH0501) and the hydraulic power cart.
R          (14) Remove the dummy bowl of the HP hydraulic filter (3048GM) and replace
R               the filter element (Ref. TASK 29-13-45-610-001).
R          (16) Operate the flight controls and monitor the reservoir level. If
R               necessary fill the Yellow hydraulic reservoir (Ref. TASK 12-12-29-
R               611-002).
Subtask 12-36-29-865-057
        C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
           breaker(s):
           2701GJ, 2702GJ.
Subtask 12-36-29-410-087
D. Close Access
            (1) Make sure that the work area is clean and clear of tool(s) and other
                items.
(4) Close the right main landing gear door (Ref. TASK 32-12-00-410-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A367
                                                                            May 01/11
                                                    
    UZB                                             
                                INTENTIONALLY BLANK
R
  
  
  
                                                      12-36-29
                                                     
                                                                  Page A368
                                                                  May 01/11
                                             
 UZB                                         
     TASK 12-36-29-600-008
     Change of the Hydraulic Fluid of the Green Hydraulic System with the Tool -
     Hydraulic Fluid Change (DH0501)
     WARNING : DO NOT TOUCH THE HYDRAULIC SYSTEM COMPONENTS FOR A SHORT TIME AFTER
     _______
               THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS STAY HOT FOR SOME TIME
               AND CAN CAUSE INJURY.
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                 circuit breaker(s) safety clip(s)
R    No specific             1   ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
R    No specific             1   GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L
R    No specific             1   PLUG - BLANKING
R    No specific             1   PLUG - BLANKING (E0052R8B3APNE TYPE)
     DH0501                  1   TOOL - HYDRAULIC FLUID CHANGE
     98D12308351000          1   HOSES FOR FLUID CHANGE, LP
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A369
                                                                             Feb 01/11
                                                     
    UZB                                              
     B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page A370
                                                                        Feb 01/10
                                                
 UZB                                            
     3. __________
        Job Set-up
Subtask 12-36-29-860-124
           (3) On the overhead maintenance panel 50VU, make sure that the LEAK
               MEASUREMENT VALVES/G pushbutton switch is released (the OFF legend is
               on).
Subtask 12-36-29-865-058
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
       49VU HYD/HYD PWR/B WARN/& CTL                               2702GJ      C12
      123VU B HYD/ELEC PUMP                                        2701GJ     AB09
Subtask 12-36-29-010-101
C. Get Access
(1) Open the left main landing gear door (Ref. TASK 32-12-00-010-001).
R (3) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the MLG bay.
Subtask 12-36-29-680-054
        D. Drain the reservoir of the Green hydraulic system (Ref. TASK 29-10-00-
           680-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A371
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-36-29-860-125
R          (1) Set the GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L to the
               correct configuration:
               (a) Make sure that the hydraulic ground power supply reservoir is
                   filled with new HYDRAULIC FLUIDS (Material No. 02-003).
               (b) Make sure that no chlorinated solvent has been used to flush the
                   tool lines.
               (c) Set the hydraulic ground power supply to the cart reservoir
                   configuration.
                   WARNING : PROTECT YOUR HANDS AND FACE FROM THE GAS WHICH COMES
                   _______
                             OUT WHEN YOU OPEN THE MANUAL DEPRESSURIZATION VALVE OF
                             THE RESERVOIRS. IT IS POSSIBLE THAT THE GAS IS HOT AND
                             CONTAINS HYDRAULIC FLUID.
           (2) Set the TOOL - HYDRAULIC FLUID CHANGE (DH0501) to the correct
               configuration.
               (Ref. Fig. 321/TASK 12-36-29-991-020, 322/TASK 12-36-29-991-021)
               (b) Put the selector valve 1134GQ in the position for the Green
                   hydraulic reservoir.
(c) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501) close the valve V1.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A372
                                                                           Feb 01/11
                                                   
    UZB                                            
               (d) Connect the connector LP1 of the TOOL - HYDRAULIC FLUID CHANGE
                   (DH0501) to the LP connector of the hydraulic ground power
                   supply.
               (e) Connect the HP1 connector of the TOOL - HYDRAULIC FLUID CHANGE
                   (DH0501) to the HP connector of the hydraulic ground power
                   supply.
               (f) Connect the LP3 connector of the TOOL - HYDRAULIC FLUID CHANGE
                   (DH0501) to the suction connector of the ground service panel.
                   1
                   _   Remove the Green HP filter (1048GM) (Ref. TASK 29-11-45-610-
                       001).
                   2
                   _   Install a dummy bowl of the TOOL - HYDRAULIC FLUID CHANGE
                       (DH0501) in place of the Green HP filter (1048GM).
                   3
                   _   Connect the HP2 line to the dummy bowl and to the valve V2.
                   1
                   _   Disconnect the tube from the outlet side of the LP filter
                       (1002GM).
R                  2
                   _   Put a PLUG - BLANKING in the open port of the tube.
                   3
                   _   Connect the LP filter (1002GM) with the LP2 line. Use the
                       HOSES FOR FLUID CHANGE, LP (98D12308351000) for the
                       connection.
           (3) Start the hydraulic ground power supply and make sure that the
               pressure read on the gage of the TOOL - HYDRAULIC FLUID CHANGE
               (DH0501) is 4.0 bar (58.0150 psi).
Subtask 12-36-29-611-067
           (2) Open the valve V1 of the TOOL - HYDRAULIC FLUID CHANGE (DH0501) and
               start the hydraulic ground power supply.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A373
                                                                             Feb 01/11
                                                    
    UZB                                             
              Connection of the Tools to the Green Hydraulic System
                  Figure 321/TASK 12-36-29-991-020- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                      Page A374
                                                                      Feb 01/10
                                               
 UZB                                           
              Connection of the Tools to the Green Hydraulic System
                  Figure 321/TASK 12-36-29-991-020- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                      Page A375
                                                                      Feb 01/10
                                               
 UZB                                           
                   Green Hydraulic System - Schematic Diagram
                  Figure 322/TASK 12-36-29-991-021- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                   Page A376
                                                                   Feb 01/10
                                               
 UZB                                           
                   Green Hydraulic System - Schematic Diagram
                  Figure 322/TASK 12-36-29-991-021- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                   Page A377
                                                                   Feb 01/10
                                               
 UZB                                           
           (3) Fill the Green reservoir until the fluid is at the upper limit on the
               visual indicator.
     4. Procedure
        _________
Subtask 12-36-29-611-068
           NOTE : Obey the fluid level of the Green reservoir during the procedure.
           ____
                  Adjust the fluid level with the valve V1 when it decreases.
R          (1) Change the fluid in the suction, pressure and case drain lines of the
R              Green Engine Driven Pump (1030GK):
               (c) Do the dry motoring of the engine No.2 (Ref. TASK 71-00-00-710-
                   001).
               (f) Stop the dry motoring of the engine No.2 (Ref. TASK 71-00-00-710-
                   001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                            Page A378
                                                                            Nov 01/10
                                                    
    UZB                                             
         (2) Change the fluid in the supply and return lines of the primary
             servocontrols:
             WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
             _______
                       CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
                       PERSONS AND/OR DAMAGE.
             (a) On the overhead maintenance panel 50VU, push the LEAK MEASUREMENT
                 VALVES/G P/BSW (the OFF legend is off).
             (b) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501) open the valve V1
                 and keep it open during the full procedure.
             (c) Pressurize the Green hydraulic system with the Power Transfer
                 Unit (PTU) (Ref. TASK 29-10-00-863-001). Make sure that the
                 pressure shown on the ECAM SD and on the gauge of the system
                 accumulator is correct.
             (e) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                 position and then to the RET position. Do this step 3 times.
             (f) On the panel 18VU or 19VU, move the side stick fully to the left
                 and then fully to the right. Do this step 3 times.
             (g) On the panel 18VU or 19VU, move the side stick fully forward and
                 then fully rearward. Do this step 3 times.
             (h) At the captain or first officer position, push the LH pedal fully
                 forward and then the RH pedal fully forward. Do this step 3
                 times.
             (i) On the panel 114VU, move the flap/slat lever to the FULL position
                 and then to the 0 deg position. Do this step 2 times.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A379
                                                                         Feb 01/11
R                                                
  UZB                                            
           (3) Change the fluid in the supply and return lines of the landing gear
               system with the PTU:
               (b) Make sure that the LP2 and HP2 lines are not in the area of the
                   landing gear to prevent damage during the retraction and
                   extension of the landing gear.
               (c) Make sure that the safety devices are correctly installed on the
                   landing gear doors (Ref. TASK 32-00-00-481-002). The main landing
                   gear doors must stay open during the retraction and extension of
                   the landing gear.
                   WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR
                   _______
                             ARE CLEAR.
               (d) Retract and extend the landing gear (Ref. TASK 32-30-00-867-001)
                   and (Ref. TASK 32-30-00-867-002). Do this step 3 times.
     5. Close-up
        ________
Subtask 12-36-29-610-070
        A. Replace the filter element of the LP filter (1002GM) (Ref. TASK 29-11-44-
           610-001).
Subtask 12-36-29-860-126
           (1) On the overhead maintenance panel 50VU, make sure that the LEAK
               MEASUREMENT VALVES/G pushbutton switch is set to off (the OFF legend
               is on).
           (3) Close the valves V1 and V2 on the TOOL - HYDRAULIC FLUID CHANGE
               (DH0501).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A380
                                                                           Feb 01/11
                                                   
    UZB                                            
         (4) Disconnect the LP2 line from the LP filter (1002GM). Remove the
             blanking plug from the tube and connect the tube to the outlet side
             of the LP filter (1002GM).
         (5) Disconnect the HP1 and HP2 lines between the aircraft and the TOOL -
             HYDRAULIC FLUID CHANGE (DH0501).
         (6) Disconnect all the lines between the TOOL - HYDRAULIC FLUID CHANGE
             (DH0501) and the hydraulic power cart.
         (7) Remove the dummy bowl of the HP hydraulic filter (1048GM) and replace
             the filter element (Ref. TASK 29-11-45-610-001).
         (9) Operate the flight controls and monitor the reservoir level. If
             necessary fill the Green hydraulic reservoir (Ref. TASK 12-12-29-611-
             002).
Subtask 12-36-29-865-059
     C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        2701GJ, 2702GJ.
Subtask 12-36-29-410-088
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
(4) Close the left main landing gear door (Ref. TASK 32-12-00-410-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A381
                                                                         Feb 01/10
                                                 
 UZB                                             
     TASK 12-36-29-600-009
     Change of the Hydraulic Fluid of the Blue Hydraulic System with the Tool -
     Hydraulic Fluid Change (DH0501)
     WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
     _______
               CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
     WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
     _______
               START A TASK ON OR NEAR:
               - THE FLIGHT CONTROLS
               - THE FLIGHT CONTROL SURFACES
               - THE LANDING GEAR AND THE RELATED DOORS
               - COMPONENTS THAT MOVE.
     WARNING : DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
     _______
               - FLUSH IT AWAY WITH CLEAN WATER
               - GET MEDICAL AID.
     1. __________________
        Reason for the Job
     2. ______________________
        Job Set-up Information
     -------------------------------------------------------------------------------
     REFERENCE             QTY DESIGNATION
     -------------------------------------------------------------------------------
R
     No specific                 circuit breaker(s) safety clip(s)
R    No specific             1   ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
R    No specific             1   GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L
R    No specific             1   PLUG - BLANKING
R    No specific             1   PLUG - BLANKING (E0052R8B3APNE TYPE)
     DH0501                  1   TOOL - HYDRAULIC FLUID CHANGE
     98D12308351000          1   HOSES FOR FLUID CHANGE, LP
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A382
                                                                             Feb 01/11
                                                     
    UZB                                              
     B. Consumable Materials
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
C. Referenced Information
  -------------------------------------------------------------------------------
  REFERENCE                 DESIGNATION
  -------------------------------------------------------------------------------
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                        Page A383
                                                                        Feb 01/10
                                                
 UZB                                            
     3. __________
        Job Set-up
Subtask 12-36-29-860-127
           (3) On the overhead maintenance panel 50VU, make sure that the LEAK
               MEASUREMENT VALVES/B pushbutton switch is released (the OFF legend is
               on).
Subtask 12-36-29-865-060
     -------------------------------------------------------------------------------
     PANEL DESIGNATION                                               IDENT. LOCATION
     -------------------------------------------------------------------------------
      121VU HYDRAULIC/HYD POWER/Y                                  3803GX      N30
      121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG                         3700GD      Q37
      121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL                          3701GD      Q36
      121VU HYDRAULIC/G HYD/PUMP ENG1/CTL                          1701GK      R35
      121VU HYDRAULIC/G HYD/PUMP ENG1/MONG                         1702GK      R34
      123VU Y HYD/ELEC/PUMP                                        3802GX     AB06
      123VU Y HYD/ELEC/ELEC PUMP/NORM                              3801GX     AB03
Subtask 12-36-29-010-102
C. Get Access
           (3) Open the left or right main landing gear door (Ref. TASK 32-12-00-
               010-001).
R (4) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE below the MLG bay.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A384
                                                                           Feb 01/11
                                                   
    UZB                                            
     Subtask 12-36-29-680-055
        D. Drain the reservoir of the Blue hydraulic system (Ref. TASK 29-10-00-680-
           003).
Subtask 12-36-29-860-128
R          (1) Set the GROUND POWER CART - HYDRAULIC, RESERVOIR MIN. 150 L to the
               correct configuration:
               (a) Make sure that the hydraulic ground power supply reservoir is
                   filled with new HYDRAULIC FLUIDS (Material No. 02-003).
               (b) Make sure that no chlorinated solvent has been used to flush the
                   tool lines.
               (c) Set the hydraulic ground power supply to the cart reservoir
                   configuration.
                   WARNING : PROTECT YOUR HANDS AND FACE FROM THE GAS WHICH COMES
                   _______
                             OUT WHEN YOU OPEN THE MANUAL DEPRESSURIZATION VALVE OF
                             THE RESERVOIRS. IT IS POSSIBLE THAT THE GAS IS HOT AND
                             CONTAINS HYDRAULIC FLUID.
           (2) Set the TOOL - HYDRAULIC FLUID CHANGE (DH0501) to the correct
               configuration.
               (Ref. Fig. 323/TASK 12-36-29-991-022, 324/TASK 12-36-29-991-023)
               (b) Put the selector valve 1134GQ in the position for the Blue
                   hydraulic reservoir.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A385
                                                                           Feb 01/11
                                                   
    UZB                                            
              Connection of the Tools to the Blue Hydraulic System
                  Figure 323/TASK 12-36-29-991-022- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                     Page A386
                                                                     Feb 01/10
                                               
 UZB                                           
              Connection of the Tools to the Blue Hydraulic System
                  Figure 323/TASK 12-36-29-991-022- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                     Page A387
                                                                     Feb 01/10
                                               
 UZB                                           
                    Blue Hydraulic System - Schematic Diagram
                  Figure 324/TASK 12-36-29-991-023- 12 (SHEET 1)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                   Page A388
                                                                   Feb 01/10
                                               
 UZB                                           
                    Blue Hydraulic System - Schematic Diagram
                  Figure 324/TASK 12-36-29-991-023- 22 (SHEET 2)
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                   Page A389
                                                                   Feb 01/10
                                               
 UZB                                           
               (c) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501) close the valve V1.
               (d) Connect the connector LP1 of the TOOL - HYDRAULIC FLUID CHANGE
                   (DH0501) to the LP connector of the hydraulic ground power
                   supply.
               (e) Connect the HP1 connector of the TOOL - HYDRAULIC FLUID CHANGE
                   (DH0501) to the HP connector of the hydraulic ground power
                   supply.
               (f) Connect the LP3 connector of the TOOL - HYDRAULIC FLUID CHANGE
                   (DH0501) to the suction connector of the ground service panel.
                   1
                   _   Remove the Blue HP filter (2048GM) (Ref. TASK 29-12-45-610-
                       001).
                   2
                   _   Install a dummy bowl of the TOOL - HYDRAULIC FLUID CHANGE
                       (DH0501) in place of the Blue HP filter (2048GM).
                   3
                   _   Connect the HP2 line to the dummy bowl and to the valve V2.
                   1
                   _   Disconnect the tube from the outlet side of the LP filter
                       (2002GM).
R                  2
                   _   Put a PLUG - BLANKING in the open port of the tube.
                   3
                   _   Connect the LP filter (2002GM) with the LP2 line. Use the
                       HOSES FOR FLUID CHANGE, LP (98D12308351000) for the
                       connection.
           (3) Start the hydraulic ground power supply and make sure that the
               pressure read on the gage of the TOOL - HYDRAULIC FLUID CHANGE
               (DH0501) is 4.0 bar (58.0150 psi).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                             Page A390
                                                                             Feb 01/11
                                                    
    UZB                                             
     Subtask 12-36-29-611-069
           (2) Open the valve V1 of the TOOL - HYDRAULIC FLUID CHANGE (DH0501) and
               start the hydraulic ground power supply.
           (3) Fill the Blue reservoir until the fluid is at the upper limit on the
               visual indicator.
     4. Procedure
        _________
Subtask 12-36-29-611-070
           NOTE : Obey the fluid level of the Blue reservoir during the procedure.
           ____
                  Adjust the fluid level with the valve V1 when it decreases.
R          (1) Change the Fluid in the Suction, Pressure and Case Drain Lines of the
R              Blue Electric Pump (2075GJ):
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A391
                                                                           Nov 01/10
                                                     
    UZB                                              
               (e) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501):
R                  - Open the valve V2 until you collect 4 liters of fluid.
R          (2) Change the fluid in the supply and return lines of the primary
R              servocontrols:
R
               WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE
               _______
                         CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO
                         PERSONS AND/OR DAMAGE.
               (b) On the overhead maintenance panel 50VU, push the LEAK MEASUREMENT
R                  VALVES/B P/BSW (the OFF legend is off).
               (c) On the TOOL - HYDRAULIC FLUID CHANGE (DH0501) open the valve V1
                   and keep it open during the full procedure.
               (d) Pressurize the Blue hydraulic system with the E-pump (Ref. TASK
                   29-10-00-863-003). Make sure that the system pressure shown on
                   the ECAM SD and the pressure gauge of the system accumulator is
                   correct.
               (f) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL
                   position and then to the RET position. Do this step 3 times.
               (g) On the panel 18VU or 19VU, move the side stick fully to the left
                   and then fully to the right. Do this step 3 times.
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A392
                                                                           Nov 01/10
                                                   
    UZB                                            
               (h) On the panel 18VU or 19VU, move the side stick fully forward and
                   then fully rearward. Do this step 3 times.
               (i) At the captain or first officer position, push the LH pedal fully
                   forward and then the RH pedal fully forward. Do this step 3
                   times.
               (j) On the panel 114VU, move the flap/slat lever to the FULL position
                   and then to the 0 deg position. Do this step 2 times.
     5. Close-up
        ________
Subtask 12-36-29-610-071
Subtask 12-36-29-860-129
           (1) On the overhead maintenance panel 50VU, make sure that the LEAK
               MEASUREMENT VALVES/B pushbutton switch is set to off (the OFF legend
               is on).
           (3) Close the valves V1 and V2 on the TOOL - HYDRAULIC FLUID CHANGE
               (DH0501).
           (4) Disconnect the LP2 line from the LP filter (2002GM). Remove the
               blanking plug from the tube and connect the tube to the outlet side
               of the LP filter (2002GM).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                           Page A393
                                                                           Feb 01/11
                                                   
    UZB                                            
         (5) Disconnect the HP1 and HP2 lines between the aircraft and the TOOL -
             HYDRAULIC FLUID CHANGE (DH0501).
         (6) Disconnect all the lines between the TOOL - HYDRAULIC FLUID CHANGE
             (DH0501) and the hydraulic power cart.
         (7) Remove the dummy bowl of the HP hydraulic filter (2048GM) and replace
             the filter element (Ref. TASK 29-12-45-610-001).
         (9) Operate the flight controls and monitor the reservoir level. If
             necessary fill the Blue hydraulic reservoir (Ref. TASK 12-12-29-611-
             002).
Subtask 12-36-29-865-061
     C. Remove the safety clip(s) and the tag(s) and close this(these) circuit
        breaker(s):
        1701GK, 1702GK, 3700GD, 3701GD, 3801GX, 3802GX, 3803GX
Subtask 12-36-29-410-089
D. Close Access
         (1) Make sure that the work area is clean and clear of tool(s) and other
             items.
(4) Close the main landing gear door (Ref. TASK 32-12-00-410-001).
  
  EFF :
  
             ALL                                      12-36-29
                                                     
                                                                         Page A394
                                                                         Feb 01/10
                                                 
 UZB