The document provides building notes for a construction project, outlining several requirements. It states that all building, plumbing and drainage work must comply with national regulations. It also notes that codes of practice and manufacturer specifications must be followed. Finally, it indicates that all work must be according to SABS O400 and 1200 standards, and that windows are to be made of aluminum.

Uploaded by

phosconprojects
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
159 views1 page

ZABAN

The document provides building notes for a construction project, outlining several requirements. It states that all building, plumbing and drainage work must comply with national regulations. It also notes that codes of practice and manufacturer specifications must be followed. Finally, it indicates that all work must be according to SABS O400 and 1200 standards, and that windows are to be made of aluminum.

Uploaded by

phosconprojects
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DO NOT RE-SALE IT PLEASE!!! DO NOT RE-SALE IT PLEASE!!!

B U I LD I NG N O T E S

B Y L A W R E Q U I RE M E N T S

IF NOT DETAILED OTHERWISE ON DRAWINGS;ALL BUILDING WORK


PLUMBING AND DRAINAGE INSTALLATIONS MUST BE CARRIED OUT
MV MOYANE HOUSE PLANS & DESIGNS 079 954 5535/ 063 959 3874 BUY THE CONTRACTOR IN ACORDANCE WITH THE NATIONAL BUILDING
REGULATION AND BUILDING STARDARDS ACT NO 103 OF 1977, AS
AMMENDED.THE CONTRACTOR MUST VERIFY ALL SURVEYORS PEGS,
SERVITUDES MARKS, LEVELS, HEIGHTS AND DIMENSIONS ON SITE
AND CHECK SOME AGAINST ALL SETS OF COUNCIL APROOVED
DRAWINGS.

CODES OF PRACTICE AND MANUFACTURES SPECIFICATIONS

ALL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH


SABS 0400 AND NATIONAL BUILDING REGULATIONS.
CODES OF PRACTICE OR MANUFACTURES SPECIFICATIONS
OR RECOMMENDATIONS IN SO FAR AS SUCH SPECIFICATIONS
ETC. IF DO NOT COMPLY WITH ANY BYLAWS.

ALL DRAWINGS AND DIMMENSIONS MUST BE CORRELATED


BEFORE ANY MATERIALS ARE ORDERED OR BUILDING

l
WORK COMMENCES.ALL DIMMENSIONS AND LEVELS TO BE CHECKED
BEFORE ANY BUILDING WORK START.ALL DISCREPANCIES MUST
BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

ia
ALL BUILDING WORK MUST BE IN ACCORDANCE TO THE SABS O400
AND 1200 STANDARDS. THIS DRAWING MAY NOT BE SCALED.

W I ND O W S C H E D U L E

NGL NGL NGL N O T E A L L W I ND O W S T O B E M A D E O F A L U M I NI UM

RIGHT ELEVATION 1:100


BACK ELEVATION 1:100

Tr
ROOFING

o
marley concrete tiles on prifabricated roof trusses secured to 38*38mm s.apine
battens @ max 300mm c/c on 114*38mms.a pine rafters @ max 900mmc/c ons.
a pine wall plate as per approved design specialist design complete with
NGL NGL NGL NGL ROOF TRUSSES ROOF TRUSSES
gauranteeroof trusses and rafters anchored to walls and columns withgalvanised
steel traps or wire built into brickwork min. depth of 800mm gutters,downpipes
and watertank provisional.
21450 LEFT ELEVATION 1:100 38X38MM PATTENS CELLING
4mm cladit a/c sheets fixed to underside oftrusses onto 38*38mm

SCULLERY
BEDROOM
ceramic/tiles

BATHROOM
3
Pr NO GUTTER AND DOWN

85MM
PIPE

Conc.Slab

SECTION A-A 1:100


branders at max.spacing of 300*300mm 75mm coved cornice.
S P E C I FI CA T I O N S
ALL WORKS TO COMPLY WITH THE LOCAL AUTHORITY RULEAND
CONFORM WITH THE SABS AND NHBRC REGULATIONS.ALL
STRUCURAL WORKS TO ENGINEEER,S
W A L L C O N S T R U C T I ON
DETAIL AND SPEC.

Unless otherwise specified, all walls shall be buil in stretcher


Bond with approved stork bricks to owner,s choice
internal &ext. walls shall receive cement sand plaster and two coats of
Acrylic pva paint and colour to owner's choice.Provide window cills.
Provide air bricks on outside walls above windows and doors.
All internal doors to be provided with fan-light above.
Provide brick force in every three courses. Walls shall not be built in
more that a meter at once.Provide brick pre cast columns as shown
Provide 75x25 meranti skirting and 25x25 quardrant finished with v/paintc
Clean all works and leave perfect.
F O U N D A T I ON S
Setting out to comply with the required building line.Unless
specified by structural engineer,external foundationshall be
TO

600x230 and 500x230 internal foundations.R.C. slabs, columns,


ceramic/tiles
F
ceramic/tiles and foundations to eng. details.Provide Dpc under all floors and
window cills. Floors to be finished as shown on plan,Provide 75mm
concrete surface bed at 1:3:5.Provide compected soil in 150mm
BEDROOM 2 layers and top layer.To be treated with termite poison on all works.
PORCH KITCHEN BATHROOM Plan shall not be scaled, all dimensions shall be read as on plan.
ceramic/tiles
16500

16500

DRAINAG E

ceramic/tiles ceramic/tiles ELECTRICAL KEYS


All electrical works to be done by the registered electrical engineer
with all light decorations.
DRESSING ROOM
PD

ceramic/tiles
DINING ROOM ARCHITECT DRAUGHTSMAN
ceramic/tiles
DOUBLE GARAGE
ceramic/tiles
LOUNGE
V E RA N D A H

MASTER BEDROOM
ceramic/tiles
PORCH ceramic/tiles
CELL NO 079 954 5535

PROPOSED NEW HOUSE ON STAND No

FOR MR :
21450 Cell :

GROUND FLOOR PLAN 1;100 DATE :


owner'signature.....................................