A Project Report
On
<PROJECT TITLE>
Submitted in partial fulfillment of the requirement for the award of the degree of
BACHELOR OF TECHNOLOGY
In
BRANCH NAME
By:
STUDENT NAME ( Roll no.)
STUDENT NAME ( Roll no.)
STUDENT NAME ( Roll no.)
UNDER THE GUIDANCE OF
MR/MS. <GUIDE NAME>
(<Designation, Name of the Department>)
DEPARTMENT OF …………………………………………..
SIR CHHOTU RAM INSTITUTE OF ENGINEERING & TECHNOLOGY
CHAUDHARY CHARAN SINGH UNIVERSITY, MEERUT
(Year)
SIR CHHOTU RAM INSTITUTE OF ENGINEERING & TECHNOLOGY
CHAUDHARY CHARAN SINGH UNIVERSITY MEERUT
Approved by A.I.C.T.E., New Delhi
Student Declaration/Certificate
I ……………………………… hereby declare that the work, which is being presented
in the project entitled “…………………………………... “in partial fulfillment of the
requirement for the award of BACHELOR OF TECHNOLOGY (B.TECH.) degree,
is an authentic record of my own work carried out under the supervision
of……………………………..
The matter embodied in this project has not been submitted by us for the award of any
other degree.
Date:
------------------------------
(Full Signature of the students)
This is to certify that the above statements made by the candidate are correct to the
best of my knowledge.
(………………………..) (…………………….)
(Co-Ordinator, …….. Deptt) (Project Supervisor)
( ……………………… )
(Director, SCRIET)
ACKNOWLEDGEMENT
We extend our thanks to ………………………Director and Co-ordinator
…………………………., for giving us the motivation and guidance to complete this project.
We are deeply indebted to our project guide ……………………………., for the initial idea
of the project and for all the guidance and encouragement he gave in the subsequent months.
His supervision and co-operation at every stage helped us in successfully completing the
project. Whatever intellectual effort may be reflected from this project is the direct result of
the informative and stimulating discussions and suggestions he has given during the course
of the project.
Lastly, we would like to thank the entire staff of the …………… Department and our college
for their support and co-operation in the completion of this project.
(Students Signature)
Student Name (Roll No.) (email.Id)
Imp. Points to Prepare Proje ct Report
1. Cover of the Project Report.
Colour- Dark /Blue (B.Tech).
Colour –Brown/Red (MCA/MBA).
Matter Written By Golden Colour.
Hard Binding.
2. Each Project Report must be prepared in A4 size paper.
3. First Page of the Project Report same as Cover Matter.
4. Acknowledgement.
5. Company Certificate properly signed on letter head.
6. Candidate Declaration / Certificate.
7. Table of contents with heading number and page number.
8. Soft copy of project report with Code and EXE. files in CD only.
9. Soft copy of project presentation on power point slides in CD only.
10.Project report should not be more than 150 page in all respects.
11.On the date of Internal and External project presentation. the candidate should be in
formal Attire.
12.Two copies of project report are to be prepared for University, and College Library.
Note: Give Hardware Software Requirement for complete examination of project on
external project presentation day.