Leg Profile-AP-64-AP-64

The document shows a line graph with two lines tracking values over time. Line 1 fluctuates between 96-104 over time while generally trending downward. Line 2 starts around 7.4 million and trends slightly upward, fluctuating between 7.3-7.4 million. The y-axis appears to measure values while the x-axis is a time scale ranging from -4.5 to +9.0 in increments of 1.5.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views1 page

Leg Profile-AP-64-AP-64

The document shows a line graph with two lines tracking values over time. Line 1 fluctuates between 96-104 over time while generally trending downward. Line 2 starts around 7.4 million and trends slightly upward, fluctuating between 7.3-7.4 million. The y-axis appears to measure values while the x-axis is a time scale ranging from -4.5 to +9.0 in increments of 1.5.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

98

100

96
10

92
10

2
3

95
99

93
-4.5m

97
10

91
1

98

96

94
-3.0m

100

93
95
4

-1.5m
10

103

101
0.0m

92
102

94
7M
81
+1.5m

8.
100
7.
39 +3.0m

94
8M
103
104

95
101

92
97
+4.5m

93
+6.0m

95
7.398M
10

98

94
99
8M
2

39
7.

96
+7.5m
104

101

93
97
100

9.
29
1M
+9.0m

92
94
103

102

99

+10.5m
98

90
93
+12.0m
4
10

8.818M
96
100

94

92
99

+13.5m
97
101

95

9.291M

91
99

6 +15.0m
92
93

9
98

94
102

+16.5m
0
103

95
10

+18.0m

Legends:

1. Major Contour
2. Minor Contour Rev. 00 03.10.21 Submission for Approval P. PANERU HBA -----
Rev. No. Date Description Prepared By Checked By Approved By
CLIENT: CONTRACTOR:
NEPAL ELECTRICITY AUTHORITY, NEPAL PINGGAO GROUP CO.,LTD

CONSULTANT: PROJECT:
POWER GRID CORPORATION OF INDIA LTD. 220 kV UDIPUR-BHARATPUR
TRANSMISSION LINE PROJECT
Notes:
SURVEYED BY:
1. The pit size has been considered for all pit as +9.0m approved foundation size which may vary with respect to the
SAHAN ENGINEERING CONCERN
approved foundation design of the raised chimney.
2. The lowering/raising of RL (CPG) is confirmed with profile and weight span and ground clearance is found O.K. PREPARED BY
3. The Leg combinations are selected as the best economical, as per the available ground profile. TITLE: LOCATION CONTOUR & LEG PROFILE REPORT
CHECKED BY
APPROVED BY SHEET NO :
DWG.NO.:PG/NEA/220KV/UDI-BHA/
Print Size: ISO A3 Scale: 1:200 (V:H)