KHONAINI SAFET “ECURITY, HEALTH & ENVIRONMENT ‘SHEN-08.10K
» AGEMENT SYSTEM , Page 1 of2
JOB SAFETY ANALYSIS - WORKSHEET Dae eaneen2.
Wyss Rev:02
aed ke
SABIC
7 JOB DESCRIPTION JSA number: OCC
JOB SAFETY ANALYSIS Concrete Chipping Activity
wo | SEBUENCEOEBASICIO8 | porewmal HAZARDS Teo EAN RESPONSIBLITY ACCOUNTABLE
1.4.4 Obtain work permit before starting of job.
1. | Obtain work permit By ommeneenene or ‘Supervisor Foreman
wrong job 4.1.2 JSA shall be communicated with crew.
2.4 Incompetent workers | 2-1.1. Trained and physically fit employees shall only be allowed ‘Supervisor Foreman
to.use hand and power tools.
2.2 Injury & health | 2.2.1. Safety glasses / face shield / hearing protection / hand
problem to workers due | Sloves / dust mask shall be provided for personnel protection.
fo fying debris, silica | 2.2.2 All power tools to have protective guards and “dead man
Power Tools Operations | “ust, excessive noise. | switch type operation’.
Supervisor Foreman,
2 | for concrete chipping
aay 2.3.1,All power tools shall be double insulated and cones
Shall conform to the National Electrical Code.
2.3.2Foreman to ensure all tools are inspected by power tools
inspector
2.3.3.All equipment and tools to be registered in lst.
2.3.4 Electric cable to be arranged properly to avoid electrocution
or trip & fall hazard.
2.3.5 Ensure extension cords & cables are in good condition.
s
2.3 Electrocution Supervisor Foreman
3.4.1 All hand tools shall be inspected and color coded before
use.
3.1.2 Mushroomed tools shall not be used and returned to store
Using handtools for chipping | 3.1 Injury due to immediately
(cothaty damaged hand tools 3.1.3 Users should check the hammer prior to use to ensure
tightness of hammer head.
3.1.4 Pre-start briefing shall include hazards and risk controls of
hand tools
‘Supervisor Foremanse KHONAINISAFE SECURITY, HEALTH & ENVIRONMENT ‘SHENL08.10K
cK atte ._ «AGEMENT SYSTEM J Page 2 of 2
syed Anta gas Het
JOB SAFETY ANALYSIS ~ WORKSHEET pas wenaanie
Salta Rev:02
4.1.1 All fabricated mobile scaffold to have valid third-party
certificate.
Working on fabricated 4.1.2 Monthly inspection of fabricated mobile scaffold to be
mobile scaffold for conducted & tagged by scaffold inspector.
4, | chipping activity 41 Fal from heigh/Fall_| 4 1.3 Load should not exceed the safe working load of the mobile
(Height of scaffold platform scaffold.
is 1.2 Meter) 4.1.4 Caster wheel should be locked while working on a mobile
scaffold
4.1.5 Ensure the all tools and materials are secured propery.
5.1.1 Proper housekeeping shall be performed before, during and
5 | Housekeeping 5.1 Tripping Hazards | =r work ‘Supervisor Foreman
5.1.2. Material shall be properly segregated and arranged for
lear and easy access way.
ETY ANALYSI: A) TEAM,
Prepared by: KIC Construction Supervisor/Engineer
Name: MD spoig AAMEr
Reviewed & App
Name: jb
re ae Construction Supervisor/ Engineer
vate: 34/11/19
Signatur eae Date: 2.1 —\\—\q | Signature: fA
Reviewed \pproved by: KIC Construction Manager Reviewed & Ay by SABIC Construction Manager
Name: Sharyn Kaomav Or — Name: A. nee A\-herh?
Signature: Date: 2.) la liq | Signature: Se Date: 2 ¢/ 111 19
Reviewed & Approved by: KIC EHSS Manager
Name: Jiu Homes
Signature: Date: 2\-Ul~ |q
Reviewed & Approved by SABIC EHSS Lead
vom Boll cfrnsari
Signature: Sn date: 26/17/2014