Sub-Total B: Part B Other General Requirements

The approved budget contract includes costs for a project billboard, earthworks, and shade netting and UV plastic materials. The billboard will cost PHP13,662.63 to purchase and install. Excavation works are estimated at PHP42,641.82. Shade netting and UV plastic covering are the largest cost item at PHP90,390.59 to supply and install solar protection for the site. The total estimated direct cost for all contract items is PHP94,918.12.

Uploaded by

dieeegoix09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views7 pages

Sub-Total B: Part B Other General Requirements

The approved budget contract includes costs for a project billboard, earthworks, and shade netting and UV plastic materials. The billboard will cost PHP13,662.63 to purchase and install. Excavation works are estimated at PHP42,641.82. Shade netting and UV plastic covering are the largest cost item at PHP90,390.59 to supply and install solar protection for the site. The total estimated direct cost for all contract items is PHP94,918.12.

Uploaded by

dieeegoix09
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

APPROVED BUDGET FOR CONTRACT

MARK-UPS
DIRECT UNIT ESTIMATED (PERCENT) TOTAL MARK-UP
ITEM NO. DESCRIPTION QUANTITY UNIT COST DIRECT COST
OCM PROFIT % VALUE
1 2 3 4 5 6 7 8 9 10
PART B OTHER GENERAL REQUIREMENTS
B.5 Project Billboard/Signboard 1.00 ea. 11,829.12 11,829.12 0 10 10 1,182.91
#REF! #REF! #REF! #REF! #REF! #REF! 0 10 10 #REF!
#REF! #REF! 1.00 L.S. #REF! #REF! 0 0 0 #REF!
SUB-TOTAL B #REF!
PART C EARTHWORK
#REF! #REF! #REF! #REF! #REF! #REF! 15 10 25 #REF!
SPL Shade Net and UV Plastic 1.00 L.S 68,869.04 68,869.03 15 10 25 17,217.26
#REF!
TOTAL COST #REF! #REF!
UDGET FOR CONTRACT

ADJUSTED UNIT
VAT INDIRECT COST ITEM COST COST
5%(6+10) (10)+(11) (12)+(6) (13)/(3)
11 12 13 14

650.60 1,833.51 13,662.63 13,662.63


#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF!

#REF! #REF! #REF! #REF!


4,304.31 21,521.57 90,390.59 90,390.59
#REF!
#REF! #REF!
CHECKING
ESTIMATED
% LABOR EQUIPMENT MATERIALS SUM DIRECT COST

-
13,662.63 #REF! 2,455.56 245.56 9,128.00 11,829.12 11,829.12 -
5,607.59 #REF! 2,032.60 - 5,250.00 7,282.60 #REF! #REF!
36,885.45 #REF! 2,264.64 32,886.00 - 35,150.64 #REF! #REF!
#REF! -
-
42,641.82 #REF! 9,374.10 23,114.91 - 32,489.01 #REF! #REF!
305.90 #REF! 925.32 7,241.44 - 8,166.76 68,869.03 - 60,702.27

#REF! 17,052.22 63,487.90 14,378.01 94,918.12 #REF!


94,918.12
DETAILED UNIT PRICE ANALYSIS
Project Name:

Item No./ Description: B.5 Project Billboard/Signboard


Unit of Measurement: ea.
Quantity: 1.00
Designation No. of Person No. of Hours Hourly Rate Amount
A. Labor
a. Construction Foreman 1 12.00 96.79 1,161.48
b. Unskilled Labor 2 12.00 53.92 1,294.08

Sub-Total for A 2,455.56

N ame and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment
Minor Tools (10% of Labor) 245.56

Sub-Total for B 245.56


C. Total (A+B) 2,701.12
D. Quantity 1.00
E. Direct Unit Cost (C/D) 2,701.12
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
a. Tarpaulin (8' x 8') sq.ft 64.00 35.00 2,240.00
b. 1/2" x 4' x 8' Ordinary Plywood pcs. 2.00 750.00 1,500.00
c. 2"x 3" Cocolumber bd.ft 132.00 35.00 4,620.00
d. Common Wire Nail kgs. 8.00 96.00 768.00

Sub-Total for F 9,128.00


G. Direct Cost (E+F) 11,829.12
H. Overhead, Contingencies & Miscellaneous (OCM), per DO 197, 2016 0% of G -
I. Contractor's Profit (CP) 10% of G 1,182.91
J. Value Added Tax (VAT), per DO 197, 2016 5% of (G+H+I) 650.60
K. Total Item Cost (G+H+I+J) 13,662.63
ea.
1

2,455.56

245.56

9,128.00

1,182.91 697.54
650.60 383.65
DETAILED UNIT PRICE ANALYSIS
Project Name:

Item No./ Description: SPL Shade Net and UV Plastic


Unit of Measurement: L.S
Quantity: 1.00
Designation No. of Person No. of Hours Hourly Rate Amount
A. Labor
a. Construction Foreman 1 23.00 96.79 2,226.17
b. Skilled Labor 1 23.00 69.93 1,608.39
b. Unskilled Labor 3 23.00 53.92 3,720.48

Sub-Total for A 7,555.04

Name and Capacity No. of Units No. of Hours Hourly Rate Amount
B. Equipment

Sub-Total for B -
C. Total (A+B) 7,555.04
D. Quantity 1.00
E. Direct Unit Cost (C/D) 7,555.04
Name and Specification Unit Quantity Unit Cost Amount
F. Materials
a. Shade Net 30m x 2.5m (70% shade) rolls 6.00 7,579.00 45,474.00
b. UV Plastic 2.8 m x 50 m( 150 microns ) rolls 2.00 7,920.00 15,840.00

Sub-Total for F 61,314.00


G. Direct Cost (E+F) 68,869.04
H. Overhead, Contingencies & Miscellaneous (OCM), per DO 197, 2016 0% of G -
I. Contractor's Profit (CP) 10% of G 6,886.90
J. Value Added Tax (VAT), per DO 197, 2016 5% of (G+H+I) 3,787.80
K. Total Item Cost (G+H+I+J) 79,543.74
1,030,588.07

months
1.5

12%

11,332.56

UV PLASTIC 140
Shade net 75

408.88
5.45173333333

91,971.00

6,886.90 485.51
3,787.80 267.03