Architecture & Urban legislation
Submitted by: Menna Eid                     ID: 202000127                                      Submitted to: DR. Maram Adel
1- The role of the Owner                               2- The role of the Engineer                             3- The role of the Contractor
   Right of Access to the Site.                          Engineer’s Duties and Authority.                       Cooperation
The Employer grants the Contractor access to the       The Employer appoints an Engineer and skilled           According to the terms of the contract or the
entire site, however the Contractor may not have       crew to perform the Contract's duties, but they         engineer's instructions, the contractor must provide
sole ownership. Employer may keep access points,       cannot alter the terms without employer consent,        suitable possibilities for work to be completed by:
equipment, base, and building until they receive       and any changes must be promptly shared.                (a) the Employer's Personnel
Performance Security.                                     Delegation by the Engineer.                         (b) Members of any duly established public
    Permits, Licenses or Approvals.                   Engineers have the ability to delegate                  authority who may be engaged in the performance
When a contractor requests authorizations, licenses,   responsibilities, withdraw power, or assign work to     of any work not otherwise contained in the
or consents from authorities across the country, the   others, such as resident engineers or independent       Agreement.
employer will help the contractor secure those         inspectors, provided that all parties are informed in      Safety Procedures
documents.                                             writing of the assignments and revocations.             The Contractor is responsible for adhering to safety
   Employer’s Personnel.                                 Instructions of the Engineer.                       standards, ensuring site safety, preventing
The employer makes sure that all of its workers and The contractor may request more or updated                 unnecessary obstructions, providing lighting,
contractors on the job site carry out the same duties drawings for job execution and flaws, and must           fencing, security, and supervision, and constructing
as stipulated for the contractor.                     follow all directions about the contract from the        temporary improvements for public use and safety,
    Employer’s Financial Arrangements.               engineer or designated assistant. Within two             as well as for nearby land owners and occupants
Within seven days of a bank loan suspension, the      working days, written confirmation must be sent to          Setting Out
Employer is required to notify the Contractor, give both parties.                                              The contractor must lay out the works according to
full facts, and show that the Contractor will have        Replacement of the Engineer.                        the contract's points, lines, and levels, and correct all
other sources of funding for payment after sixty      Employers who intend to replace Engineers are            components. They must fix errors in locations,
days.                                                 required to give Contractor at least 42 days' notice     levels, and dimensions. If inaccuracies cause delays
    Employer’s Claims.                               of the name, address, and suitable experience of the     or costs, the contractor will inform the Engineer.
If applicable, the Employer or Contractor will be     replacement, should the need arise.                         Quality Assurance
paid or the Defects Notification Period will be           Determinations.                                     The contractor must implement a quality assurance
extended; however, they will not be paid for          If an agreement cannot be reached, the Engineer          system to ensure contract compliance, which can be
additional services.                                  will make a just decision in line with the contract      audited by the Engineer, but does not relieve them
                                                      and each party will have to carry out the resolution     of their responsibilities.
                                                      after consulting with all parties.