Legislation Salah

The document outlines the roles and responsibilities of the owner, engineer, and contractor on an architecture and urban legislation project. The owner grants site access to the contractor and helps secure necessary permits. The engineer oversees the work and provides instructions to the contractor, and can delegate duties as needed. The contractor must cooperate with all parties, follow safety procedures, lay out the work accurately, and implement quality assurance measures.

Uploaded by

salahe90151
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

Legislation Salah

The document outlines the roles and responsibilities of the owner, engineer, and contractor on an architecture and urban legislation project. The owner grants site access to the contractor and helps secure necessary permits. The engineer oversees the work and provides instructions to the contractor, and can delegate duties as needed. The contractor must cooperate with all parties, follow safety procedures, lay out the work accurately, and implement quality assurance measures.

Uploaded by

salahe90151
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Architecture & Urban legislation

Submitted by: Menna Eid ID: 202000127 Submitted to: DR. Maram Adel
1- The role of the Owner 2- The role of the Engineer 3- The role of the Contractor
 Right of Access to the Site.  Engineer’s Duties and Authority.  Cooperation
The Employer grants the Contractor access to the The Employer appoints an Engineer and skilled According to the terms of the contract or the
entire site, however the Contractor may not have crew to perform the Contract's duties, but they engineer's instructions, the contractor must provide
sole ownership. Employer may keep access points, cannot alter the terms without employer consent, suitable possibilities for work to be completed by:
equipment, base, and building until they receive and any changes must be promptly shared. (a) the Employer's Personnel
Performance Security.  Delegation by the Engineer. (b) Members of any duly established public
 Permits, Licenses or Approvals. Engineers have the ability to delegate authority who may be engaged in the performance
When a contractor requests authorizations, licenses, responsibilities, withdraw power, or assign work to of any work not otherwise contained in the
or consents from authorities across the country, the others, such as resident engineers or independent Agreement.
employer will help the contractor secure those inspectors, provided that all parties are informed in  Safety Procedures
documents. writing of the assignments and revocations. The Contractor is responsible for adhering to safety
 Employer’s Personnel.  Instructions of the Engineer. standards, ensuring site safety, preventing
The employer makes sure that all of its workers and The contractor may request more or updated unnecessary obstructions, providing lighting,
contractors on the job site carry out the same duties drawings for job execution and flaws, and must fencing, security, and supervision, and constructing
as stipulated for the contractor. follow all directions about the contract from the temporary improvements for public use and safety,
 Employer’s Financial Arrangements. engineer or designated assistant. Within two as well as for nearby land owners and occupants
Within seven days of a bank loan suspension, the working days, written confirmation must be sent to  Setting Out
Employer is required to notify the Contractor, give both parties. The contractor must lay out the works according to
full facts, and show that the Contractor will have  Replacement of the Engineer. the contract's points, lines, and levels, and correct all
other sources of funding for payment after sixty Employers who intend to replace Engineers are components. They must fix errors in locations,
days. required to give Contractor at least 42 days' notice levels, and dimensions. If inaccuracies cause delays
 Employer’s Claims. of the name, address, and suitable experience of the or costs, the contractor will inform the Engineer.
If applicable, the Employer or Contractor will be replacement, should the need arise.  Quality Assurance
paid or the Defects Notification Period will be  Determinations. The contractor must implement a quality assurance
extended; however, they will not be paid for If an agreement cannot be reached, the Engineer system to ensure contract compliance, which can be
additional services. will make a just decision in line with the contract audited by the Engineer, but does not relieve them
and each party will have to carry out the resolution of their responsibilities.
after consulting with all parties.