LAMPIRAN 4D
(PWD 142B - Rev.`91)
JABATAN KERJA RAYA
AS TENDERED DETAILED ABSTRACT FOR Total Amount of Main Tender: RM
Contractor for Main Works Class
Head Sub/Head Year Total Prov. RM Closing Date of Tender Tender Valid Until
Prov. for Const. RM
Contract Period: COMPETITIVE TENDER LIST
Tender No. Tender Sum Tender No. Tender Sum
Type of Contract:
Form of Contract:
Basis of Tender:
No. of Tenders Received:
BRIEF DESCRIPTION OF BUILDINGS
BUILDING Frame Wall Roof Floor Ceiling Window Standard
b
c
d
e
f
PRIME COST AND PROVISIONAL SUMS
ITEM ALLOWED RM ACTUAL RM
a
b
c
d
e
f
g
h
BREAKDOWN OF COST COST RM
1 PRELIMINARIES Being % of Remainder of Main Tender
2 PILING/SPECIAL FOUNDATION Unit Quantity Unit Cost
Type and Size -
a M
b M
c
Floor 0
3 BUILDING - Drawing No. Area m2 Cost/m2 Vol.m3* Cost/m3*
a
b
c
d
e
f
g
SUBTOTAL
carried forward -
*Refer to Note 8.2 (b)
45
LAMPIRAN 4D (samb.)
BREAKDOWN OF COST (CONT'D) COST RM
SUBTOTAL brought forward -
4 INTERNAL SERVICES * Building Cost % of
Served /m2 Bldg.
Ref. No. Floor Area Served RM Cost
a Plumbing Installation
b Sanitary Appliances
c Electrical Installation
d Fire Protection Installation PLEASE REFER TO APPENDIX 'B'
e Air Conditioning Installation
f Lift & Conveyor Installation
5 EXTERNAL WORKS Appropriate Unit Quantity Unit Cost
a i) Site Preparation i) Hectares
ii) Earthwork (I.f. = %) ii) Cu. m moved (m3)
b Roads, Hardstanding, Surface Area (m2)
Footpaths & Paving
c Fencing & Gates PLEASE Perimeter (m)
d Turfing & Soft Landscaping REFER TO Turfed Area (m2)
(S.t. = %) APPENDIX 'C'
e Surface Drainage Tot. length of drn. & pipes (m)
f Sewerage No. of occupants served
g External Electrical Installation No. of KVA required
h External Water Supply Installation No. of occupants served
i External Telephone Installation No. of Tel. points served
6 VARIATION OF PRICES ALL IN UNIT RATE (of Total Items 1 to 9)
7 CONTRIBUTION FEE TO LOCAL Total Floor Area m2 : Cost/m2 :
AND UTILITY AUTHORITY Quantity Surveyor/
a TNB & JBA Superintending Officer's Representative
b Telekoms
8 MISCELLANEOUS
a Advertisement & Documentation
b Soil Investigation Date :
Superintending Officer/
9 CONTINGENCIES State Director of Works
TOTAL (Items 1 to 9)
10 SUPERVISION
11 PROFESSIONAL FEES
a Architect Date :
b Civil & Structural Engineer Portfolio Branch Director of Works
c Mechanical Engineer
d Electrical Engineer
e Quantity Surveyor
TOTAL COST OF PROJECT
Date :
* Refer to Note 9.2 (b) & 10.2
46