0% found this document useful (0 votes)
97 views2 pages

Atda KSG

This document is a tender abstract for a construction project. It includes: 1) A breakdown of construction costs for items like preliminaries, piling, building construction, internal services, external works, contingencies, supervision and professional fees. 2) Details of the tender like the number received, contract period, type and basis of tender. 3) Descriptions of the proposed buildings and notes referring to appendices for more information on internal services, external works and unit rates. The document provides an overview of the tender and cost breakdown for a construction project in a standardized format for procurement purposes.

Uploaded by

Iqbal Saleh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views2 pages

Atda KSG

This document is a tender abstract for a construction project. It includes: 1) A breakdown of construction costs for items like preliminaries, piling, building construction, internal services, external works, contingencies, supervision and professional fees. 2) Details of the tender like the number received, contract period, type and basis of tender. 3) Descriptions of the proposed buildings and notes referring to appendices for more information on internal services, external works and unit rates. The document provides an overview of the tender and cost breakdown for a construction project in a standardized format for procurement purposes.

Uploaded by

Iqbal Saleh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

LAMPIRAN 4D

(PWD 142B - Rev.`91)

JABATAN KERJA RAYA


AS TENDERED DETAILED ABSTRACT FOR Total Amount of Main Tender: RM
Contractor for Main Works Class

Head Sub/Head Year Total Prov. RM Closing Date of Tender Tender Valid Until
Prov. for Const. RM
Contract Period: COMPETITIVE TENDER LIST

Tender No. Tender Sum Tender No. Tender Sum


Type of Contract:
Form of Contract:
Basis of Tender:
No. of Tenders Received:

BRIEF DESCRIPTION OF BUILDINGS

BUILDING Frame Wall Roof Floor Ceiling Window Standard

b
c
d
e
f

PRIME COST AND PROVISIONAL SUMS

ITEM ALLOWED RM ACTUAL RM


a
b
c
d
e
f
g
h

BREAKDOWN OF COST COST RM

1 PRELIMINARIES Being % of Remainder of Main Tender


2 PILING/SPECIAL FOUNDATION Unit Quantity Unit Cost
Type and Size -
a M
b M
c
Floor 0
3 BUILDING - Drawing No. Area m2 Cost/m2 Vol.m3* Cost/m3*
a
b
c
d
e
f
g
SUBTOTAL
carried forward -
*Refer to Note 8.2 (b)

45
LAMPIRAN 4D (samb.)

BREAKDOWN OF COST (CONT'D) COST RM

SUBTOTAL brought forward -


4 INTERNAL SERVICES * Building Cost % of
Served /m2 Bldg.
Ref. No. Floor Area Served RM Cost
a Plumbing Installation
b Sanitary Appliances
c Electrical Installation
d Fire Protection Installation PLEASE REFER TO APPENDIX 'B'
e Air Conditioning Installation
f Lift & Conveyor Installation
5 EXTERNAL WORKS Appropriate Unit Quantity Unit Cost
a i) Site Preparation i) Hectares
ii) Earthwork (I.f. = %) ii) Cu. m moved (m3)
b Roads, Hardstanding, Surface Area (m2)
Footpaths & Paving
c Fencing & Gates PLEASE Perimeter (m)
d Turfing & Soft Landscaping REFER TO Turfed Area (m2)
(S.t. = %) APPENDIX 'C'
e Surface Drainage Tot. length of drn. & pipes (m)
f Sewerage No. of occupants served
g External Electrical Installation No. of KVA required
h External Water Supply Installation No. of occupants served
i External Telephone Installation No. of Tel. points served

6 VARIATION OF PRICES ALL IN UNIT RATE (of Total Items 1 to 9)


7 CONTRIBUTION FEE TO LOCAL Total Floor Area m2 : Cost/m2 :
AND UTILITY AUTHORITY Quantity Surveyor/
a TNB & JBA Superintending Officer's Representative
b Telekoms
8 MISCELLANEOUS
a Advertisement & Documentation
b Soil Investigation Date :
Superintending Officer/
9 CONTINGENCIES State Director of Works
TOTAL (Items 1 to 9)
10 SUPERVISION
11 PROFESSIONAL FEES
a Architect Date :
b Civil & Structural Engineer Portfolio Branch Director of Works
c Mechanical Engineer
d Electrical Engineer
e Quantity Surveyor

TOTAL COST OF PROJECT