1. This quality assurance plan outlines inspection procedures for steel components being fabricated for a construction project of FOB platform shelters for RVNL. 2. Key materials like steel plates will be checked against mill test certificates and specifications in IS 2062:2011 with amendments. Visual and mechanical testing will be conducted by qualified agencies. 3. The frequency of inspections is defined for activities like material verification and testing. Record keeping and approval procedures are also specified.

Uploaded by

Prasanta Parida
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views32 pages

QAP of FOB AS PER PKG3

1. This quality assurance plan outlines inspection procedures for steel components being fabricated for a construction project of FOB platform shelters for RVNL. 2. Key materials like steel plates will be checked against mill test certificates and specifications in IS 2062:2011 with amendments. Visual and mechanical testing will be conducted by qualified agencies. 3. The frequency of inspections is defined for activities like material verification and testing. Record keeping and approval procedures are also specified.

Uploaded by

Prasanta Parida
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 32

Name of Contractor/Company: …………

Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

1. Steel Plates, (a) As per Mill Challan & Mill Verification PMC/QTL PMC Site Record As per Material
1 Structural Identification T.C. marking of materials supervisor maintained IS :2062:2011 clearance only
Section and correlation on the with 100% by With Amend 1 after verifying
with Mill Test components reference Fabricator Grade E 250 by PMC,
Certificate from documents RE:Random &verified by Quality ’A’ through
Supplier e.g., PMC challan,mill, TC
SAIL ,TATA,JIN PMC:PM/
DAL,RINL RVNL
Random
(b) Visual as per Challan & Mill Complete PMC/QTL PMC Site Record As per Material
Physical challan & T.C. visual supervisor maintained IS :2062:2011 clearance only
conditions :- Mill T.C. inspection 100% by With Amend 1 after verifying
Pitting, Fabricator Grade E 250 by PMC,
lamination, RE:Random &verified by Quality ’A’ through
rusting, PMC challan,mill, TC
straightness ,im PMC:PM/ & the lab test
perfect edges & RVNL results if any.
rolling defects Random
etc.

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Mechanical Test As per mill T.C & any Challan Verification PMC/QTL PMC Site Record As per Material
as per IS 2062- one sample each & Mill with reference supervisor maintained IS :2062:201 clearanc
2011 UTS, YS, % size thickness /heat T.C document & 100% by 1 With e only
Elongation reduction wise randomly testing Fabricator Amend 1 after
of area ,fracture and selected & tested by laboratory test RE:Random &verified by Grade E 250 verifying
Bend test etc any NABL approved reports PMC Quality ’A’ by PMC,
testing laboratory PMC:PM/ through
RVNL challan,m
Random ill, TC &
the lab
test
results if
any
Charpy test for . As per mill T.C & Challan Verification PMC/QTL PMC Site Record As per Material
quality A,BR,BO any one sample & Mill with reference supervisor maintained IS :2062:201 clearanc
and C each size T.C document & 100% by 1 With e only
A: Impact test thickness /heat wise testing Fabricator Amend 1 after
not required randomly selected & laboratory test RE:Random &verified by Grade E 250 verifying
semi tested by any NABL reports PMC Quality ’A’ by PMC,
killed/killed, approved testing PMC:PM/ through
BR: Impact test laboratory RVNL challan,m
optional Random ill, TC &
required at room the lab
temperature test
semi-killed results if
/killed any.

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

BO : Impact test
mandatory at 0’C
semi-
killed/Killed

C : Impact test
mandatory at
20’C
Chemical test As per mill T.C & Challan Verification PMC/QTL PMC Site Record As per Material
C,Mn,Si,S,&P etc any one sample & Mill with reference supervisor maintained IS :2062:201 clearanc
each size T.C document & 100% by 1 With e only
thickness /heat testing Fabricator Amend 1 after
wise randomly laboratory test RE: Random &verified by Grade E 250 verifying
selected & tested reports PMC Quality ’A’ by PMC,
by any NABL PMC:PM/ through
approved testing RVNL challan,m
laboratory Random ill, TC &
the lab
test
results if
any.
(f) As per mill Challan Verification PMC/QTL PMC Site Record As per Material
Ultrasonic testing of T.C.100% tested & Mill with reference supervisor maintained IS :2062:201 clearanc
Plates > 12 mm (in case by T.C document & 100% by 1 With e only
of UT test is not done ASNT,NDT,UTL II testing Fabricator Amend 1 after

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

by manufacturer.) by NABL laboratory test RE: Random &verified by Grade E 250 verifying
approved testing reports PMC Quality ’A’ by PMC,
laboratory under PMC:PM/ through
complete RVNL challan,m
supervision of Random ill, TC &
PMC the lab
test
results if
any.
(g) Measurement Challan Measurement PMC/QTL PMC Site Record IS :808 :198 Material
Dimension & Mill of dimension supervisor maintained 9 with clearanc
T.C check 100% by Amend .2 ,IS e only
Fabricator 1852, IS after
RE: Random &verified by 6649:1985 verifying
PMC with Amend by PMC,
PMC:PM/ 1, IS through
RVNL 3757:1985 challan,m
Random With amend ill, TC &
2,IS the lab
6623:2004, test
IS 1367 results if
Part-2:2002 any.
IS
4000:1992
and property
classes as

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

per relevant
Drg.

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(a) Visual & Challan & Verification with PMC /QTL PMC Site Record IS 6649:1985 Material
HTS Bolts Class Measurement As per Mill T.C reference supervisor maintained with Amend clearanc
8.8/10.9 Dimension mill T.C & any one document & 100% by 1 ,IS e only
3757:1985
Washers & Nuts sample each size measurement of Fabricator after
with Amend :2
randomly selected & bolts/nuts/washers RE: Random &verified by ,IS 6623:2004, verifying
tested by any NABL PMC IS :1367P- by PMC,
approved testing PMC:PM/ 2,:2002, IS through
laboratory RVNL 4000:1992 & challan,m
Random property ill, TC &
classes as per the lab
relevant Drg. test
results if
any.
(b) As per mill T.C & any Challan & Verification with PMC/QTL PMC Site Record IS 1367,P- Material
Mechanical & one sample each size Mill T.C reference supervisor maintained 6:1994, clearanc
Chemical as randomly selected & document 100% by e only
per tested by any NABL Fabricator IS 1586, after
Specification approved testing RE: Random &verified by IS1608:2005 verifying
laboratory PMC , IS 228 P- by PMC,
PMC:PM/ 1 :1987, through
RVNL challan,m
Random IS :228 P- ill, TC &
2:1987, the lab
test
IS 228P- results if
3:1987, any.

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

IS 228 P-
9:1989 ,
IS 1586 –

P2:1987,

IS1929:1982
With
Amend :4

IS1148:2009

IS1149:1982

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(e) Both quality 8S PMC/QTL PMC Site Record Clearance


Providing & nominal height of supervisor maintained only after
fixing nut 0.8 times the 100% by verifying
nominal dia Fabricator by PMC,
calibrated RE: Random &verified by
mechanical PMC
torque wrench for PMC:PM/
tightening of bolts RVNL
Random

(a) As per RDSO As per mill T C. & Challan & Verification with PMC/QTL PMC Site Record IRS M Electrodes
Welding Specification & any other test Mill T.C. Mill T.C. supervisor maintained 28:2012 ,AS should be
Consumables approved required by PMC 100% by ME Sec 2C of RDSO
(MWAW vendor by Fabricator & IS approved
electrode) RDSO RE: Random &verified by 814:2004 brand & as
PMC with per WPSS
PMC:PM/ Amend :2 approved
RVNL by PMC
Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(b) As per RDSO As per mill T C. & Challan & Verification with PMC/QTL PMC Site Record IRS M Consuma
Welding Specification & any other test Mill T.C. Mill T.C. supervisor maintained 46:2012,IRS bles
consumables approved required by PMC 100% by M 39:2012 should
(MAG wire, vendor by Fabricator be of
SAW Wire & RDSO RE: Random &verified by RDSO
flux PMC approved
PMC:PM/ brand
RVNL and as
Random per
WPSS
approved
by PMC
1 Paints & Seal of (Each batch). Challan & Verification of PMC PMC Site Record IS :5666:197 Paints to
. Primers drum ,brand Visual & As per mill Mill T.C. reference supervisor maintained 0With be
4 name ,IS mark T.C document 100% by Amend : 1, procured
pot life Fabricator IS :104 :201 from
approved RE: Random &verified by 7 approved
vendor PMC IS vendor
PMC:PM/ 2339:2013/
RVNL Contract
Random Aggrement

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Random As per mill T.C.& Challan & Verification of PMC PMC Site Record IS :5666:1970 With Paints to
test as per any other test Mill T.C. reference supervisor maintained Amend : 1 be
specification required by PMC at document 100% by IS :104:2017 procured
NABL approved Fabricator IS from
testing laboratory RE: Random &verified by :2339:2013/Contract approved
PMC Aggrement vendor
PMC:PM/
RVNL
Random
2.0 Fabrication process
2.1 Platform for Layout of component & joints
(a) Visual Measurement with Approved Measurement of PMC PMC Site Record Relevant IS /IRS Clearance
Nominal Dimension calibrated steel tape Drawing Dimensions supervisor maintained code & as per only after
and gauges 100% by approved drawing verifying
Fabricator by PMC
RE: Random &verified by
PMC
PMC:PM/
RVNL
Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(b) Visual Measurement with Approved Measurement of PMC PMC Site Record Relevant Clearance
Camber Dimension calibrated steel tape Drawing Dimensions supervisor maintained IS /IRS code only after
and gauges 100% by & as per verifying
Fabricator approved by PMC
RE: Random &verified by drawing
PMC
PMC:PM/
RVNL
Random
Master Visual Measurement with Approved Measurement of PMC PMC Site Record Relevant Clearance
(Replica of jigs) Dimension, calibrated steel tape Drawing Dimensions supervisor maintained IS /IRS code only after
Jigs for holes intersection and gauges 100% by & as per verifying
not required in lines pitch Fabricator approved by PMC
case of CNC gauge dia of RE: Random &verified by drawing
drilling facility holes & no. of PMC
holes PMC:PM/
RVNL
Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

2. Jigs,Templates & Visual Measurement with Approved Measurement of PMC PMC Site Record of IRS B1-2001 Clearanc
3 fixtures (Jigs for Dimension, calibrated steel tape Drawing Dimensions supervisor Jigs & /as per e only
holes not intersection and gauges 100% fixtures as approved after
required in case lines pitch per drawing verifying
of CNC Drilling gauge dia of RE: Random Performa by PMC
facility holes & no. of issued by
holes PMC:PM/ PMC
RVNL
Random

2. Cutting. Dimension & Visual & Relevant Visual inspection PMC/QTL Random Record IRS B1-2001 Clearanc
4 Straightening freedom from Measurement IS/IRS & measurement maintained IS :1852:198 e only
Edge defect code /under of dimensions by 5 after
Preparation etc supervision Fabricator With Amend verifying
of &verified by 2 by PMC
RVNL/PMC PMC
official &
fabricator’s
engg

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

3 Prior to welding
.
1
(a) Review of Verification of various IRS B1 - Verification of RVNL/ PMC Site WPSS & test IRS M:39- Internal
Submission of parameters for parameter mention in 2001,IS reference PMC supervisor records as 2001,IRS WPSS is to
WPSS MMAW/MAG&S WPSS in co relation 9595:1996 documents 100% per M:46- be
exercised
AW welding with welding WBC:2001 Performa 2012 ,IRS
by QTL
mentioned. equipments & IS /IRS RE: Random issued by B1 -2011 &PMC first
specification RDSO Appendix –V & then
PMC:PM/ & IRS M 28- should be
RVNL Random 2011 other sent to
IS/IRS PMC/RVNL
specification for approval

(b) Witness of Visual ,NDT,(DP Relevant Verification of RVNL/ PMC Site WPQR IS 7310(P- Clearance
WPQR /Witness established Macro etching) & DT IS/IRS reference PMC supervisor sheet to be 1)&IS 7307 only after
of welder test WPSS, Witness by NABL approved code documents & 100% recorded in (P-1):1974 verifying
of welder testing laboratory test reports presence of &IRS B1 by PMC
qualification test RE: Random PMC 2001 through
Appendix –V the lab
PMC:PM/ or any other test result
RVNL Random IS/IRS Spec.

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(c) All clean surface Visual (Wire brushing IS/IRS Visual checks & PMC/QTL PMC Site Record Relevant Clearance
Surface ,mild grinding/milling Specificati Measurement of supervisor maintained IRS Codes only after
preparation of &cleaning by blow air on dimension 100% by verifying
before welding on all edges of the Fabricator by PMC
job RE: Random &verified by
PMC
PMC:PM/
RVNL Random

Fit up of Visual/filler gauge Approved Visual checks & PMC/QTL PMC Site Record IRS B1 - Clearance
members drawings Measurement of supervisor maintained 2011 only after
dimension 100% by verifying
Fabricator by PMC
RE: Random &verified by
PMC
PMC:PM/
RVNL Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(d) To have Visual & As per Verification of PMC/QTL PMC Site Record Relevant Material
Baking of moisture –free Temp .indicator with manufactu reference supervisor maintained IS/IRS Clearance
electrodes /flux electrodes /flux sensor /touch feel re’s documents 100% by codes only after
recommen Fabricator verifying
dation RE: Random &verified by by PMC
PMC
PMC:PM/
RVNL Random

(e) Reference to Visual As per Verification of PMC/QTL PMC Site Record As per
Selection of WPSS /Relevant approved reference supervisor maintained approved Clearance
correct IS/IRS code WPSS documents 100% by WPSS/as only after
electrode Fabricator per list of verifying
/wire/flux RE: Random &verified by RDSO by PMC
PMC approved
PMC:PM/
RVNL Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(f) Measurement Visual with voltmeter As per Verification of PMC/QTL PMC Site Record As per Clearance
Current of Amp & ammeter approved reference supervisor maintained approved only after
condition &Voltage WPSS documents 100% by WPSS verifying
Fabricator by PMC
RE: Random &verified by
PMC
PMC:PM/
RVNL
Random
(g) To control Visual As per Verification of PMC/QTL PMC Site Record As per Clearance
Sequence of distortion approved reference supervisor maintained approved only after
welding WPSS documents 100% by WPSS/IRS verifying
Fabricator B1-2001 by PMC
RE: Random &verified by
PMC
PMC:PM/
RVNL
Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

(h) Measurement Temp. Indicator with As per Verification of PMC/QTL PMC Site Record IRS B 1 : More
Preheating & of Temp sensor/visual with approved reference supervisor maintained 2001 As per than 40
tack welding thermal temp stick WPSS documents 100% by approved mm
chalk Fabricator WPSS thickness
RE: Random &verified by plate
PMC
PMC:PM/
RVNL
Random
(i) To avoid crater Visual (should be As per IRS Verification of PMC/QTL PMC Site Record IRS B 1 : At least
Provision of run- defects provided in each B1 -2001 reference supervisor maintained 2001 150 mm
on & run –off SAW welding) documents 100% by size
plate Fabricator
RE: Random &verified by
PMC
PMC:PM/
RVNL
Random

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

3. During welding
2
Confirmation visual As per Continuous check PMC/QTL PMC Site Record Relevant Clearanc
to selected approved of approved supervisor maintained IS/IRS e only
parameter WPSS by parameters as per 100% by codes and after
PMC WPSS Fabricator approved verifying
RE: Random &verified by WPSS by PMC
PMC
PMC:PM/
RVNL
Random

4.0 Inspection of welding

After welding

Welding Welding profile 100 % visual As per Verification of PMC/QTL PMC Site Record As per Clearanc
,weld defect inspection for fillet relevant reference supervisor maintained relevant e only
for all fillet/butt size ,leg length,throat code, documents 100% by code. after
welds thickness DP macro standard / Fabricator standard verifying
etching test for at approved RE: Random &verified by /approved by PMC
least 100 m weld run Drg.& PMC Drg.&WBC-
at lab /site.100 % WPSS PMC:PM/ 2001
DPT test by qualified RVNL
ASNT NDT Level-2 Random
Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

operator for all welds


radiography /UT for
butt welds .All
gauges to be
approved and
calibrated weld
defects shall be
removed by
approved welder
only.
5. Assembly of Girders /Members /parts
0

) Dimension Visual & Dimension Approved Complete PMC One Record IRS B1 -
ii) Butting of Drg dimensional complete maintained 2001
compression check of span by
edges assembled girder Fabricator
iii) Fairness of with components &verified by
holes PMC

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

5.
6.
7.

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

1.0 Raw
Material
1.1 Steel Plates (a) As per MillT.C. Challan & Mill Verificationof materials with PMC/QTL PMC Site Record
&Structural Identification T.C. marking on reference documents Supervision maintained
Section the components 100% by Fabricator
and correlation
with Mill Test etc & verified by
Certificate RE: Random PMC
from Supplier
e.g., SAIL, PMC:PM
TISCO, IISCO /RVNL
JINDAL, RINL Random

Physical Visual - Complete 100% Fabricator’s


condition visual Record -
i.e., inspection
Pitting, PMC/RVN
rusting, L
straightness,
rolling

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)

Page 3 of 25
Name of Contractor/Company: …………
Name of work/Project: Construction of FOB Platform shelters Gauge beam Trusses, and other steel components for RVNL ……..
Drawing reference no………..
Place of Fabrication -
Client Name: RAIL VIKAS NIGAM LIMITED (RVNL) Chandigarh Contract agreement No…………..
Doc Name: Quality Assurance Plan Title : Construction of FOB Platform shelters.
Document no.:…….. Issue No. Issue Date: Copy No.
Issued by: ……… Amend No. Amend Date: Total Page No.
Prepared by:
Approved by: RVNL/PMC

SN Component/ Characteristic Frequency & type of Reference Fabricators Inspection details Type of Acceptance Remarks
Operations Check check Document Quality Control Record criteria
Inspecting Extent of
Agency Inspection
1 2 3 4 5 6 7 8 9 10 11

defect, 2062-2011,
e Gr. E 250 B0,
tc 12mm &
. Above thick.
Plates are
fully killed &
normalized or
Control
cooled.
Sections IS
2062-2006,

Signature QTL Signature of Contractor Signature of PMC (Review by) Signature of RVNL/PMC ( Approved by)