E. BOUCHANNA ocz
License No. G1/Lic-Syr/15/MBNR/2018
Municipal Licensed Surveyor
Municipality, Mahabubnagar.
Address : Shop No. 1-5-13/1
Opp. HUDA High School,
New Town, Mahabubnagar.
Cell : 9440239169, 9000862869
‘email : eddabuchanna@gmail.com
Name of the Work :
DETAILED ABSTRACT ESTIMATE
DRL BDO Coon baa 2024
Proposed Home Improvement of Residential building, House No.1-8-93/G/2, Stilt Floor,
First Floor, & Second Floor, Stuated at Vinayaka Nagar, TD Gutta, Near; Shivalayam
Temple, Mahabubnagar Town.
‘belongs to Smt.K.KALYANI W/o Sri.K.VEERU.
a
Municipal Licensed si
lcensed for Technal Su
SNe. GilticiSuriannanrsysseLer
= z Sages z 2
Earth work in excavation in B.C Red
learth soils including lead & lit etc,
complete for foundation
For Column its} 1|x|12} 5.00] 5.00| 6.00] 1800.00]
Long walls} 1 |x] 3] 65.00) 3.00] 3.00] 1755.00
Short walls| 1] x} 3| 12.50] 3.00] 3.00] _ 337.50]
3892.50|crt.
110.24 | 98.71 1082.00
cum | icum
2 |P.C.C cement concrete (1:2:4) prop
including cost conveniyence of all
materials including lead & lift labour
Jcharaes ete. comolete,
For Column Pits| 1] x] 12| 5.00] 5.00] 1.00] 300.00
Long waits] 1] x] 3| 65.00] 3.00] 0.60} 351.00
Short walls] 1x] 3] 12.50] 3.00] 0.60] _ 67.50]
718.50
20.35 | 1473.00 | 29973.00
cum | 1¢um
3 construction of CRS Masonry in em
6) including cost conveniyence of
al materials including lead & lift labour
charges ete., complete.
Long waits} 1| x] 3| 65.00) 2.00] 5.60] 2184.00
short walls] 1 |x| 3} 12.50] 2.00] 5.60] _ 420.00]
2604.00|crt.
54.6 | 1673.00 | 91781.00
cum | icum
4 earth fing with excavated earth in B.C
Red earth soll including lead & lit etc,
lcomolete for foundation
Haut] 1]x} 1] 15.90] 14.00| 4.00] 890.40]
zep room| 1|x| 1] 7.90] 9.00) 4.00] 284.40]
BED ROOM| 1 |x| 1] 7:60] 8.00] 4.00] 273.60
xr] 1 |x| 2] 5.60) 4.90] 4.00] 109.76
pura} 1]x| 1] 6.00) 4.00] 4.00] 96.00
Toi 1]x| 1 5.60] 4:90] 4.00] 109.76
1763.92|Cft.
SL.
. CTIONS Page No. 422:4) PROP : using 20 mm’
lsize H.B.G metal including and
lconveyance of all material labour
Ja) Columns.
b) Footings
c) Plinth beams
Jd) Slab level beams
Je) Roof Slab
F) Lintets
19) Sunshades
Long walls|
Short walls|
Long walls|
‘Short walls|
On Doors|
(On Window|
(On Doors|
(on window
impervious coat in em (1:3) prop:
20mm thick using 2 kg of acco powder
Including cost and conveyance of all
materials and labour charges etc.,
Jcomplete.
Roof Slab]
22
2
24.00| 0.90| 1.00] 259.20]
259.20|
7.34
cum
ls.0x5.0+1.0%13)x2) 315.60]
315.60|
8.94
cum
65.00] 0.90] 1.00] 175.50]
12,50] 0.90] 1.00] _ 33.75]
209.25|
5.93
cum
50.00] 0.90] 1.00] 270.00}
22.00] 0.90] 1.00] 118.80]
388.80]
11.01
‘cum
50.00] 23.00] 0.375] 862.50
862.50|
24.43
cum
5.00} 0.90 0.60] 21.60]
6.00] 0.90] 0.60] 25.92
5.00] 2.00
6.00] 2.00
36.00] 21.00] -
S.L.
=
Municipal Licen
LC\No. Gt/Lies
New Town, wae
47.52,
1.35
cum
180.00}
96.00}
176.00)
16.35
Sq.Mt.
756.00
756.00)
70.23
Sq.Mt.
cre.
8500.00
1.cum
cfe.
8500.00
1cum
tt.
8500.00
1¢cum
cht.
8500.00
1cum
cre.
8500.00
1cum
crt.
8500.00
1¢cum
sft.
468.00
1.Sq. Mt.
sft.
468.00
1Sq. Mt.
for Technical Surv
62395.00
75972.00
50371.00
93592.00
207621.00
11440.00
7652.00
32869.00
Page No. 2Brick masonry in C.M (1:6)prop using
2" Class bricks for super structure
including cost & conveyance of all
Imaterials & labour charges etc.,
icomplete.
Long walls
‘Short walls}
Cross wall of toilet|
[Deductions
Doors|
windows|
Plastering in C.M (1:4) prop : with 20
Imm thick two coat including cost and
[conveyance of all materials and labour
[charges etc., complete.
ROOM|
Ceiling]
ROOM
Ceiling|
Kitchen]
Ceiling|
HALL
Ceiling
BED|
Ceiling]
Outside
Flooring with polishing stones like
lgranite variety including coast and
labour charges etc., complete.
ROOM|
ROOM
BED
Kitchen
Hall
«s.00] 0.90] 2.00] 1053.00
32'50| 0.50] 2.00] 337.59
30.60] 0.50] 2.00] 35.9
1485.00
2.00] 0.0) 6.00] 129.60
400] 00] 4.00] si2.00
© 641.60)
a4.s0|crt
23.01 | 1889.00
cum | i.cum
aaa0] = |11.00] 374.09
730] 9.0] - | 71d
2800] = [11.00] 363.0
7180] 90] - | 68.40
21.00] - |11.00] 231.00
so] 490] - | 52.3q
60.00] [11.00] 1320.00
15:50] 400] - | 445.29
é2.00] [11.00] 682.0
1830] 750] - | 267.5
gs.a0] | 11.00] 1089.0
521.235.
420.02 | 1300.00
‘Sq.Mt. | 10 Sq. Mt.
720] 9.00] - | 136.80
7.30] 9.00] > | 14220
x0.60|11.00] - } 233.29
So 490] = | 2744
ssiso| 4.00] - | 435.29
705.84| Sft.
65.57 | 9600.00
same. | 1059, mt.
a
S.L.V.CONSTRUCTIONS
E BUCHANNA, po
Municipal Licensed for Techncei Surv
HEN, Giitelsursnianrcoisse
ew Town, MAHABUENAGAR ps O67
Cell : 9000852889 Sagnzrataa
Page No. 3supply & z
lwindow with fully shutters including
cost & convayence ofall materials.
olos. 8000.00 0.00
Each
11 |White wash with different colours in
two coat including cost and
conveyance of all materials labour 200000.00
charges etc., complete.
12 [Provision for steel & its fabrication Ls| 200000.00
13 [Provision for internal electrification ts| 100000.00
14 [Provision for sanitary fitting & water ts| 100000.00
15 [Provision for unforeseen works Ls 2073.00
1300000.00
FIRST FLOOR
TWIRGC, (1i8:4) PROP : using 20 mm
size H.B.G metal including and
conveyance of all material labour
a) Columns 1] x]12] 24.00] 0.90} 1.00] 259.20]
259.20 crt.
7.34 | 8500.00 | — 62395.00
cum | 1cum
) Slab level beams
Long wails| 2] x 3] 32.00] 0.90] 1.00] 270.00]
Short walls] 2| x] 3| 12.50] 0.90] 1.00| 128.80]
388.80|crt.
11.01 | 8500.00 | — 93592.00
cum | cum
Jo) Roof Stab 2] x{ 1] 50.00] 22.00]0.375} 262.50]
862.50|crt.
24.43 | 8500.00 | 207621.00
cum | 1cum
a) Lintets
on doors} 1|x| 8} 5.00] 0.90] 0.60) 21.60
onwindow| 1]x{ 8] 6.00] 0.90] o.co] 25.92]
47.52\cKt.
1.35 | 2500.00 | 11440.00
cum | acum
Je) Sunshades :
on doors} 1 |x| 8} 5.00] 2.00]- 80.00}
on window| 1] x] 8] 6.00] 2.00|- 96.09}
176.00stt.
16.35 | 468.00 7652.00
samt. | 15q. Mt.
NETRUCTIONS
EBUCHANNA oc page No. 4[impervious coat in cm (1:3) prop’
!2omm thick using 2 kg of acco powder
including cost and conveyance of all
materials and labour charges etc.,
Jcomplete.
Roof Slab}
Brick masonry In C.M (1:6)prop using
12" Class bricks for super structure
including cost & conveyance of all
materials & labour charges etc.,
|complete.
Long walls
Short walls|
Cross wall of tollet|
Deductions
Doors
Windows|
Plastering in C.M (1:4) prop : with 20
Imm thick two coat including cost and
Jconveyance of all materials and labour
charges etc., complete.
ROON|
Ceiling}
ROOM
Celling
Kitchen
Ceiling
HaLL|
Ceiling
BED
Ceiling
Outside
Flooring with polishing stones like
loranite variety including coast and
labour charges etc., complete.
ROOM|
ROOM|
BED
Kitchen
Hall
36.00
65.00
12.50
10.60
3.00
4,00
34.00]
7.90
33.00
7.60
21.00
5.60|
60.00
15.90]
62.00]
15.30]
99.00
7.60]
7.90]
10.60]
5.60
15.90]
21.00] -
0.90] 9.00)
0.50] 9.00)
0.50] 9.00]
0.90] 6.00)
4,00] 4.00
oO
- | 11.00
co] -
+ | 11.00
9.00] -
= {11.00
aso| -
= {11.00
14.00] -
= |11.00
17.50]
11.00
9.00} -
9.00} -
11.00] -
4.90] -
14.00] -
758.00
756.00
70.23
Sq.Mt.
1053.00)
337.50|
95.40)
1485.90)
129.60)
512.00
641.60
844.30|
23.91
cum
374.00]
71.10}
363.00
68.40
231.00
54.88
1320.00)
445.20]
682.00|
267.75
1089.00]
4521.23|
420.02
SqMt.
sft.
468.00
1Sq. Mt.
cre.
468.00
1cum
sft.
1300.00
10 Sq. Mt.
sft.
9600.00
10 Sq. Mt.
ical Surveyor
L-C.No. Gi/LiciSu/15/MENRI2015-16
32869.00
11191.00
4603.00
62950.00
Page No. 5Supply & fixing of C.T wood Doors 2
window with fully shutters including
cost & convayence ofall materials.
6lnos. 8000.00] 4800.00
Each
7 {white wash with different colours in
ltwo coat including cost and ‘Si0000.001
conveyance ofall materials labour
charges etc., complete.
8 |Provision for steel & its fabrication Ls) 350000.00
9 |Provision for internal electrification Ls 100000.00
10 [Provision for sanitary fitting & water ls 100000.00
11 [Provision for unforeseen works 7687.00
Total -- 1500000.00
SECOND FLOOR
T VRC.C, (lida) PROP: using 20 mm
size H.B.G metal including and
[conveyance ofall material labour
2) Columns 1|x|8| 24.00] 0.90] 1.00] 172.80
172.80|crt.
aso | 8500.00 | 41597.00
cum | 1¢cum
») Slab level beams
Long waits} 2| x] 3| 31.00] 0.90) 1.00] 270.00
Short walls] 2 |x| 3] 15.25] 0.90] 1.00] 138.80]
388.80|Cft.
11.01 | 8500.00 | 93592.00
cum | acum
c) Roof Slab 2|x| 1| 0.00} 23.00] 0.375] 862.50
862.50|cft.
24.43 | 9500.00 | 207621.00
cum | 1cum
jd) Lintels
on doors} 1 |x| 8] 5.00] 0.90] 0.60] 21.60
onwindow| 1]x| 8] 6.00] 0.90] o.6o] 25.92
47.52|cfe.
1.35 | 8500.00 | 1140.00
cum | 1¢cum
|e) Sunshades:
ondoors| 1)x} @| 5.00] 2.00]- 80.00]
on window| 1}x} 8] 6.00] 2.00]- 96.00]
176.00] st.
16.35 | 468.00 7652.00
sqmt. | 1Sq.Mt.
s.L.V. TIONS
&. BUCHANNA, oce Praeass
Municipal Licensed for Techn] Surv
UCRo. Gtieisumewawrazors-ie
New Town, MAHABUBNAGAR
001impervious coat in cm (1:3) prop:
|20mm thick using 2 kg of acco powder
including cost and conveyance of all
materials and labour charges etc.,
lcomplete.
Roof Siab
Brick masonry in C.M (1:6)prop using
2" Class bricks for super structure
Including cost & conveyance of all
materials & labour charges etc.,
|complete.
Long walls
Short walls|
Cross wall of toilet|
Deductions
Doors|
Windows|
Plastering in C.M (1:4) prop : with 20
Imm thick two coat including cost and
Jconveyance of all materials and labour
Icharges etc., complete.
ROOM
Ceiling
ROOM|
Ceiling
Kitchen
Ceiling
HALL|
Ceiling}
BED
Ceiling
Outside
Flooring with polishing stones like
lgranite variety including coast and
labour charges etc., complete.
ROOM
ROOM
BED|
Kitchen
Hall
36.00] 21.001 - | 756.00
756.00|sft.
70.23 | 468.00
sqm. | 1Sq. Mt.
65.00| 0.90| 9.00] 1053.00
12.50] 0.50] 9.00] 337.50
10.60| 0.50] 9.00] 95.40
1485.90]
3.00| 0.90] 6.00] 129.60]
4.00] 4.00] 4.00] 512.00]
© | 641.60]
844.30]
23.91 | 468.00
cum | 4cum
34.00 - 11.00] 374.00
730| 9.00] = 71.10]
33.00 = |11.00] 363.00
7-60| 9.00] - 68.40
21.00 = |11.00] 231.00
5.60| 4.90] - 34.88
60.00] - 11.00] 1320.00
15,90] 14.00] > | 445.20
62.00] - |11.00] 682.00
15.30] 17.50] - | 267.75
99.00 - |13.00] 1089.00
4521.23|s.
420.02 | 1300.00
squMt, | 10 Sq. Mt.
7.60] 9.00} - | 136.80]
7:99] 9.00] - | 142.20]
10.60] 11.00 = | 233.20
5.60] 4.90] - 27.44
15,90] 14.00] - | 445.29
705.84|sft.
65.57 | 9600.00
Sq.Mt. | 10 Sq. Mt.
S.L.V. ‘CTIONS
Municipal Lice aN pee
ga Licensed for Techs] Surveyor
UG io. Gtitelsurtanianneiecg
New Town, MAHPBUBNARAR.a%9 an
32869.00
11191.00
$4603.00
62950,00
Page No.7[Supply & fixing of C.T wood Doors and
Iwindow with fully shutters including
cost & convayence of all materials.
8000.00] 4800.00
Each
White wash with different colours in
two coat Including cost and eae
|conveyance of all materials labour .
charges etc., complete.
Provision for steel & its fabrication 330000.00
Provision for internal electrification] 100000.00
Provision for sanitary fitting & water 100000.00
Provision for unforeseen works 8485.00
Total -->| 1450000.00
Grand Total -->| 4250000.00
E97. CONSTRUCTIONS
E-BUCHANNA, pee
sya iene fy Tees Surveyor
HEN. Ciiliisurnenuenszote-4
New Town, MAHABUBNAGAR-5
‘001
Gell: $000862869. 9440239769