Perspective Model

The document describes three prescriptive process models: the waterfall model, incremental process model, and RAD (Rapid Application Development) model. The waterfall model involves completing each phase fully before beginning the next in a linear sequence, while the incremental process model applies waterfall phases iteratively and the RAD model emphasizes rapid initial development and iterative user testing.

Uploaded by

Sujithkumar S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
218 views8 pages

Perspective Model

The document describes three prescriptive process models: the waterfall model, incremental process model, and RAD (Rapid Application Development) model. The waterfall model involves completing each phase fully before beginning the next in a linear sequence, while the incremental process model applies waterfall phases iteratively and the RAD model emphasizes rapid initial development and iterative user testing.

Uploaded by

Sujithkumar S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Prescriptive Process Model

name 'prescriptive' is given because the model prescribes a set of activities,


actions, tasks, quality assurance and change the mechanism for every project.

There are three types of prescriptive process models. They are:

1. The Waterfall Model


2. Incremental Process model
3. RAD model

1. The Waterfall Model

 The waterfall model is also called as 'Linear sequential


model' or 'Classic life cycle model'.
 In this model, each phase is fully completed before the beginning of the
next phase.
 This model is used for the small projects.
 In this model, feedback is taken after each phase to ensure that the
project is on the right path.
 Testing part starts only after the development is complete.
NOTE: The description of the phases of the waterfall model is same as that of
the process model.

An alternative design for 'linear sequential model' is as follows:

Advantages of waterfall model

 The waterfall model is simple and easy to understand, implement, and


use.
 All the requirements are known at the beginning of the project, hence it
is easy to manage.
 It avoids overlapping of phases because each phase is completed at once.
 This model works for small projects because the requirements are
understood very well.
 This model is preferred for those projects where the quality is more
important as compared to the cost of the project.
Disadvantages of the waterfall model

 This model is not good for complex and object oriented projects.
 It is a poor model for long projects.
 The problems with this model are uncovered, until the software testing.
 The amount of risk is high.

Prescriptive Process Models


 Home > Software Quality > Software Engineering

 « Previous
 Next »
Tutorial

 Software Engineering Home


 Software Process Models
 Agile Process
 Cleanroom Software Engineering
 Requirements Engineering
 Requirement Modeling
 Process designing concepts
 Software Architecture design
 Component & Interface design
 Strategies of Software Testing
 Approaches of Software Testing
 Project Management Concepts
 Advanced Software Engineering

The following framework activities are carried out irrespective of the process
model chosen by the organization.
1. Communication
2. Planning
3. Modeling
4. Construction
5. Deployment

The name 'prescriptive' is given because the model prescribes a set of activities,
actions, tasks, quality assurance and change the mechanism for every project.

There are three types of prescriptive process models. They are:

1. The Waterfall Model


2. Incremental Process model
3. RAD model

1. The Waterfall Model

 The waterfall model is also called as 'Linear sequential


model' or 'Classic life cycle model'.
 In this model, each phase is fully completed before the beginning of the
next phase.
 This model is used for the small projects.
 In this model, feedback is taken after each phase to ensure that the
project is on the right path.
 Testing part starts only after the development is complete.
NOTE: The description of the phases of the waterfall model is same as that of
the process model.

An alternative design for 'linear sequential model' is as follows:

Advantages of waterfall model

 The waterfall model is simple and easy to understand, implement, and


use.
 All the requirements are known at the beginning of the project, hence it
is easy to manage.
 It avoids overlapping of phases because each phase is completed at once.
 This model works for small projects because the requirements are
understood very well.
 This model is preferred for those projects where the quality is more
important as compared to the cost of the project.
Disadvantages of the waterfall model

 This model is not good for complex and object oriented projects.
 It is a poor model for long projects.
 The problems with this model are uncovered, until the software testing.
 The amount of risk is high.

2. Incremental Process model

 The incremental model combines the elements of waterfall model and


they are applied in an iterative fashion.
 The first increment in this model is generally a core product.
 Each increment builds the product and submits it to the customer for any
suggested modifications.
 The next increment implements on the customer's suggestions and add
additional requirements in the previous increment.
 This process is repeated until the product is finished.
For example, the word-processing software is developed using the
incremental model.

Advantages of incremental model


 This model is flexible because the cost of development is low and initial
product delivery is faster.
 It is easier to test and debug during the smaller iteration.
 The working software generates quickly and early during the software life
cycle.
 The customers can respond to its functionalities after every increment.
Disadvantages of the incremental model

 The cost of the final product may cross the cost estimated initially.
 This model requires a very clear and complete planning.
 The planning of design is required before the whole system is broken into
small increments.
 The demands of customer for the additional functionalities after every
increment causes problem during the system architecture.

3. RAD model

 RAD is a Rapid Application Development model.


 Using the RAD model, software product is developed in a short period of
time.
 The initial activity starts with the communication between customer and
developer.
 Planning depends upon the initial requirements and then the
requirements are divided into groups.
 Planning is more important to work together on different modules.
The RAD model consist of following phases:

1. Business Modeling

 Business modeling consist of the flow of information between various


functions in the project.
 For example what type of information is produced by every function and
which are the functions to handle that information.
 A complete business analysis should be performed to get the essential
business information.
2. Data modeling

 The information in the business modeling phase is refined into the set of
objects and it is essential for the business.
 The attributes of each object are identified and define the relationship
between objects.
3. Process modeling

 The data objects defined in the data modeling phase are changed to fulfil
the information flow to implement the business model.
 The process description is created for adding, modifying, deleting or
retrieving a data object.
4. Application generation

 In the application generation phase, the actual system is built.


 To construct the software the automated tools are used.
5. Testing and turnover

 The prototypes are independently tested after each iteration so that the
overall testing time is reduced.
 The data flow and the interfaces between all the components are are fully
tested. Hence, most of the programming components are already tested.