HVA Report M75-L3: Device Under Test Is Cable

The report summarizes a VLF test on a 10m long, 15kV rated XLPE insulated cable. The test subjected the cable to voltages from 0.5kV to 24kVrms over periods from 1 to 15 minutes, measuring current, capacitance and resistance at each step. No breakdown or failure occurred and the cable passed the test according to IEC 60502-2 standards, allowing it to be energized.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views1 page

HVA Report M75-L3: Device Under Test Is Cable

The report summarizes a VLF test on a 10m long, 15kV rated XLPE insulated cable. The test subjected the cable to voltages from 0.5kV to 24kVrms over periods from 1 to 15 minutes, measuring current, capacitance and resistance at each step. No breakdown or failure occurred and the cable passed the test according to IEC 60502-2 standards, allowing it to be energized.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Page 1 of 1

HVA Report M75-L3


Company ABB Location Puerto Bolívar, Machala
Customer PO# YILPORT Owner IELMESA S.A.
Job # PBOJV-ADM-SCT-003 Owner Representative IELMESA S.A.
Date 1/21/2024 5:02:00 PM Temperature 32.4 °C
Tested by IELMESA S.A. Humidity 56.8%
Substation RSS RMU111-RSS TRX111Position RSS RMU111-RSS TRX111
Circuit ID M75-L3
________________________
________________________
________________________
________________________
Device Under Test is Cable
Rated Voltage 15.0 kV Operating Voltage 13.8 kV
Manufacturer VATAN KABLO Model NA2XS
Insulation Type XLPE Insulation Thickness 450 mm
Shield Type Cu Grounding YES
Conductor Size 3Cx95 sqmm Conductor Material Al
# of Conductors 1 Length 10 m
Installed in 2023 Age <1 year
Cable Test End 21/01/2024 Cable Far End SS-RR111 Trafo
Termination near SS-RR111 Termination far SS-RR111 Trafo
# of Splices 0 Splice Locations N/A
Jacket Yes Jacket Integrity OK
________________________
________________________
________________________
________________________
Equipment
Equipment Used GH5237 Serialnumber GH5237.23K004
________________________
________________________
________________________
________________________
Test Setup
Type of HV Test Diagnostic Test Test Voltage 0.5 / 5.0 / 15.0 / 24.0 kVrms
Waveform Sine Planned Test Duration 1 / 1 / 1 / 15 min
Frequency 0.1 Hz Current Limit Trip out on Arc
________________________
________________________
________________________
________________________
Measurements / Results
Breakdown No Breakdown Voltage
Time to Failure
M75 finished successfully
Step Voltage Current Capacitance Resistance Frequency
1 0.5 kVrms 2.2 uArms 7.01 nF >20 GOhm 0.1 Hz
2 5.0 kVrms 11 uArms 3.43 nF >20 GOhm 0.1 Hz
3 15.0 kVrms 30 uArms 3.21 nF >20 GOhm 0.1 Hz
4 24.0 kVrms 47 uArms 3.13 nF >20 GOhm 0.1 Hz

Test is X Acceptable Unacceptable

Comments The VLF electrical testing analysis on the cable M75 on phase L3 indicates
thatwith an injection voltage of 24 kVrms (34 kV peak) for 15 minutes,
according to the IEC 60502-2 (2014) standards, there was no arc discharge,
passing thetest. The cable can be energized.