10mm Ø BARS,SP. @ 0.
15m
0.04
0.40
10mm Ø BARS,SP. @ 0.15m 0.09 0.10
0.13
0.09
10mm Ø BARS,SP. @ 0.15m HORIZONTAL TOP OF PARAPET
0.08
10mmØLATERALTIESSPACED
2@0.05,3@0.10,REST@0.175
10mm Ø BARS,SP. @ 0.15m
0.14
3 INCHES CONCRETE NAILS SPACE @ 0.10 BOTH 10mm Ø HORIZONTAL
HORIZONTAL AND VERTICAL DIRECTION BARS,SP. @ 0.60m OC, &
0.65 " NO. 16 G.I WIRE TIE TO THE CONCRETE NAIL 10mm Ø VERTICAL BARS, SP.
1.00
4-16MM DEFORM BARS
0.05
@ EVERY 3-LAYERS OF CHB.
0.06
TOP OF CONCRETE GUTTER STIFFENER VERTICAL
0.30
10mm Ø BARS,SP. @ 0.15m VERTICAL BARS
4"x 8" CHB WALL
0.40
NO. 16 G.I WIRE TIE TO THE CONCRETE NAIL PAVER BLOCKS 2 X 6
TOP OF CONCRETE GUTTER FLOORING 10mm Ø HORIZONTAL
0.09
BARS,SP. @ 0.60m OC, &
BOTTOM BEAM /CONCRETE GUTTER 10mm Ø VERTICAL BARS, SP.
@ EVERY 3-LAYERS OF CHB.
0.11
0.06
4"x 8" CHB WALL
10mm Ø HORIZONTAL
0.40
3 INCHES CONCRETE NAILS SPACE @ 0.10 BOTH BARS,SP. @ 0.60m OC, &
4 " PVC PIPE HORIZONTAL AND VERTICAL DIRECTION 10mm Ø VERTICAL BARS, SP.
@ EVERY 3-LAYERS OF CHB.
0.10
0.30
1.10m THK. FINE SAND BASE
COURSE COMPACTED TO 98% MDD
BASE ON ASTM D-698
0.10m THK. GRAVEL/BOULDERS BASE
COURSE COMPACTED TO 98% MDD
0.10
BASE ON ASTM D-698
A CONCRETE GUTTER (GUTTER TO COLUMN) .
1.25
1 1 SCALE: 1: 100 MTS.
10mm Ø BARS,SP. @ 0.15m 0.04
0.40
10mm Ø BARS,SP. @ 0.15m 0.09 0.10
0.13
0.09
10mm Ø BARS,SP. @ 0.15m HORIZONTAL TOP OF PARAPET
0.25
0.08
10mm Ø BARS,SP. @ 0.15m
0.14
3 INCHES CONCRETE NAILS SPACE @ 0.10 BOTH
0.10
HORIZONTAL AND VERTICAL DIRECTION
0.65 " NO. 16 G.I WIRE TIE TO THE CONCRETE NAIL
1.00
0.05
0.06
TOP OF CONCRETE GUTTER STIFFENER 0.10m THK. GRAVEL/BOULDERS BASE
COURSE COMPACTED TO 98% MDD
0.30
10mm Ø BARS,SP. @ 0.15m VERTICAL BARS BASE ON ASTM D-698
0.40
NO. 16 G.I WIRE TIE TO THE CONCRETE NAIL .
TOP OF CONCRETE GUTTER FLOORING
BOTTOM BEAM /CONCRETE GUTTER
10mm Ø BARS,SP. @ 0.15m HORIZONTAL BARS COLUMN ELEVATION DETAIL
0.11
A
0.06
1 1 SCALE: 1: 100 MTS.
3 INCHES CONCRETE NAILS SPACE @ 0.10 BOTH
4 " PVC PIPE HORIZONTAL AND VERTICAL DIRECTION
A CONCRETE GUTTER (GUTTER TO BEAM)
SCALE: 1: 100 MTS.
1 1
PREPARED BY: CHECKED BY: APPROVED BY: PROJECT TITLE:
AS-BUILT PLAN PHASE 4 PLAZA
ENGR.LACORTE, JUFREY ALDALLASA MA. VICTORIA L. ONTANILLAS-PIZARRO, CPA
MUNICIPAL ENGINEER MUNICIPAL MAYOR LOCATION: