PEMBANGUNAN JALAN TOL SOLO-NGAWI-KERTOSONO RUAS : NGAWI - KERTOSONO
PAKET 2 : STA .110 +250 - STA.118+700
PERHITUNGAN LUAS AREA
BAB 4 PEKERJAAN TANAH RB WILANGAN
4.05.(1) GALIAN RETAINING WALL
Gambar Sket : STA. 0+200
94.000
5; 93.363
9; 92.972 8; 92.960 7; 92.820 6; 92.830
93.000
3; 91.730 4; 91.730 92.000
10;
1; 91.480
91.480 2; 91.480
91.000
90.000
-16.000 -15.500 -15.000 -14.500 -14.000 -13.500 -13.000 -12.500
Rencana Timbunan
No. Nilai Titik Koordinat Luas Penampang (m2) Keterangan
X (Jarak) Y (Elevasi) Xn * (Yn+1) Yn * (Xn+1) (Xn-Yn)/2
1 -15.526 91.480 - - -
2 -15.214 91.480 (1,420.318) (1,391.777) (14.270)
3 -14.964 91.730 (1,395.580) (1,368.907) (13.337)
4 -12.976 91.730 (1,372.648) (1,190.288) (91.180)
5 -12.976 93.363 (1,211.478) (1,190.288) (10.595)
6 -13.200 92.830 (1,204.562) (1,232.392) 13.915
7 -14.700 92.820 (1,225.224) (1,364.601) 69.689
8 -14.900 92.960 (1,366.512) (1,383.018) 8.253
9 -15.519 92.972 (1,385.283) (1,442.646) 28.682
10 -15.526 91.480 (1,419.678) (1,443.483) 11.902
Total Luas / Ʃ (m2) 3.059
Disetujui ; Diperiksa Disiapkan / diajukan
Konsultan Pengawas Kontraktor
PT. NGAWI KERTOSONO JAYA PT. BUANA ARCHICON PT . ADHI KARYA (Persero) Tbk.
at point X= -15.5259 Y= 1.4796 Z= 0
at point X= -15.2141 Y= 1.48 Z= 0
at point X= -14.9641 Y= 1.73 Z= 0
at point X= -12.9759 Y= 1.73 Z= 0
at point X= -12.9759 Y= 3.3627 Z= 0
at point X= -13.2 Y= 2.83 Z= 0
at point X= -14.7 Y= 2.82 Z= 0
at point X= -14.9 Y= 2.96 Z= 0
at point X= -15.5192 Y= 2.972 Z= 0
at point X= -15.5259 Y= 1.48 Z= 0
90
-15.526 91.48
-15.214 91.48
-14.964 91.73
-12.976 91.73
-12.976 93.363
-13.2 92.83
-14.7 92.82
-14.9 92.96
-15.519 92.972
-15.526 91.48