0% found this document useful (0 votes)
59 views3 pages

P6F - Case Study - 1

The document provides background information and objectives for creating a new project in Primavera P6 Professional for renovating an apartment building. It includes tables with details on: 1) Creating the project with the given Project ID, Name, Start Date, and Manager. 2) Adding a notebook topic indicating the $190,000 budget was approved on Dec 3, 2018. 3) Creating the Work Breakdown Structure (WBS) with the provided parent elements, codes, and names. 4) Adding initial activities to the project with the given WBS elements, activity IDs, names, types, and durations.

Uploaded by

Dario Fernando
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views3 pages

P6F - Case Study - 1

The document provides background information and objectives for creating a new project in Primavera P6 Professional for renovating an apartment building. It includes tables with details on: 1) Creating the project with the given Project ID, Name, Start Date, and Manager. 2) Adding a notebook topic indicating the $190,000 budget was approved on Dec 3, 2018. 3) Creating the Work Breakdown Structure (WBS) with the provided parent elements, codes, and names. 4) Adding initial activities to the project with the given WBS elements, activity IDs, names, types, and durations.

Uploaded by

Dario Fernando
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Primavera P6 Professional Fundamentals

Case Study 1 – Creating a Project

Background

You are a project manager working for a general contractor, and your firm is using P6 Professional to manage
the renovation of an apartment building. Following a meeting with the project team, you have been assigned to
create the project and its Work Breakdown Structure.

Objectives

1. Create a new project using the information in the following table:

Project Data Item Value

EPS RENO – Renovation Projects

Project ID RENOxx-1 (xx=Student ID)

Project Name RENO – Creating a Project

Project Planned Start 05-Mar-29

Responsible Manager Studentxx

2. Funding for the project has been approved. Add a Notebook topic, Project Status, indicating that the
project budget was approved on 03-Dec-28 by Daphne Coombs, VP of Property Development. The
budget is $190,000.

Copyright © 2021, Oracle and/or its affiliates. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners.
3. Create a WBS for the newly created project using the information in the table below:

Parent WBS Element WBS Code WBS Name

RENOxx-1 DESIGN Design

RENOxx-1 FOUND Foundation

RENOxx-1 STRUCTURE Structure

Structure FLOORS Floors

Structure LOAD Load-Bearing Walls

Structure ROOF Roof

RENO-1 UTILITY Utility Systems

RENO-1 EXETERIOR Exterior Finishes

Exterior Finishes BRICK Brick

Exterior Finishes ROOF Roof

Exterior Finishes DOORS Doors & Windows

RENO-1 INTERIOR Interior Finishes

Interior Finishes CARP Carpentry

Interior Finishes FLOORS Floors & Carpeting

Interior Finishes PLUMB Plumbing & Lighting Fixtures

Interior Finishes PAINT Paint

Copyright © 2021, Oracle and/or its affiliates. Oracle and Java are registered trademarks of Oracle and/or its affiliates. Other names may be trademarks of their respective owners. 2
4. Add activities to the project as detailed in the table below:

WBS Element Activity ID Activity Name Activity Type Original Duration

Design

A1000 Start project Start Milestone 0d

A1010 Design renovations Task Dependent 15d

A1020 Review and approve Task Dependent 5d


designs

Foundation

A1040 Excavate foundation Task Dependent 5d

A1050 Install drainage Task Dependent 5d


system

A1060 Inspect and repair Task Dependent 10d


foundation

A1070 Backfill and compact Task Dependent 3d

Structure

A1080 Erect protective Task Dependent 4d


fencing

A1090 Remove interior Task Dependent 4d


finished surfaces

A1100 Rebuild chimney Task Dependent 5d