12-04-2023
Classification : Based on Mobility
     Construction Equipment                                                                                                                                       Cranes
     Management
                                                                                                                                             Mobile
                                                                                                                                                                                          Tower Cranes
                                                                                                                                             Cranes
     CMT 522
     Session 9 - Cranes
                                                                                                                   Telescopic            Lattice Boom
                                                                                                 Crawler                                                Rough                                        Bottom
                                                                                                                   boom truck                Truck                  All Terrain   Top Slewing
                                                                                                 mounted                                                Terrain                                      Slewing
                                                                                                                    mounted                Mounted
                                                                               Aritra Halder
                                                                                                     | Aritra Halder | Assistant Professor
                                               Assistant Professor | School of Construction
Classification : Based on Structure                                                            Derrick Cranes
•   Derrick Crane
•   Mobile Crane
•   Hydraulic Crane
•   Overhead Crane (Gantry Crane)
•   Traveller Cranes
•   Tower Cranes
                                                                                               • Derricks have two major components.
                                                                                               (1) Guyed Masts
                                                                                               (2) Boom hinged at the base
                                                                                               • The boom angle can be adjusted by the guy ropes.
                                                                                               • The boom can move both horizontally and vertically.
       | Aritra Halder | Assistant Professor                                                         | Aritra Halder | Assistant Professor
                                                                                                                                                                                                                        1
                                                                                                                                                                                                              12-04-2023
Mobile Crane                                                                                                 Hydraulic Crane
                                                Truck Mounted Crane                 Truck Mounted Crane
        Crawler Mounted Crane
                                                  (Telescopic Boom)                    (Lattice Boom)
                                                                                                              • All operations are hydraulically operated which use an incompressible fluid to transfer
• Crawler mounted crane can operate in inaccessible terrain when bearing capacity of soil is adequate.          stress from point to point.
• Telescopic boom truck mounted crane is used when work is for limited duration and requires quick            • They use outriggers for maintaining balance of the crane during lifting operations.
  movement from one location to another.                                                                      • The hydraulic power is used to lift the load, the extension and retraction of boom and
• Lattice boom truck mounted crane is has lighter weight w.r.t telescopic boom, but requires additional         outriggers.
  effort to assemble.                                                                                         • Hydraulic cranes can carry massive loads, easy to operate, mobile and maneuverable.
        | Aritra Halder | Assistant Professor                                                                        | Aritra Halder | Assistant Professor
Overhead (Gantry Crane)                                               • Two basic components :               Traveller Crane
                                                                        structural bridge support on
                                                                        elevated tracks & hoist trolley or
                                                                        lifting block.
                                                                      • Widely used in casting yards,
                                                                        steel plants, power houses, docks
                                                                        and shipyards etc.
                                                                      • Provides freedom from floor
                                                                        obstruction; the gantry girder
                                                                        moves in longitudinal axis, the
                                                                        hoist moves in transverse axis,
                                                                        the load hook moves in vertical
                                                                        axis.
                                                                      • Can carry massive loads without
                                                                        risk of toppling.                     • The Girders are supported on legs instead of overhead gantry tracks, these legs move on
                                                                                                                floor.
                                                                                                              • No need of additional gantry erection, hence are popular in shipyards and casting yards for
                                                                                                                container and segment lifting and movement.
        | Aritra Halder | Assistant Professor                                                                        | Aritra Halder | Assistant Professor
                                                                                                                                                                                                                       2
                                                                                                                                                                                                         12-04-2023
Goliath Crane (video)                                                                       Tower Crane                                                             CAT
                                                                                                                                                                    head
                                                                                             Counter
                                                                                                                                                   Saddle Jib
                                                                                               Jib
                                                                                                                                                                                        Trolley
                                                                                                                               Operator’s
                                                                                               Ballast                           Cabin
                                                                                                                                 Slewing Ring
                                                                                                                                                                       •   Restrictive Site Conditions
                                                                                                                        Mast                                           •   Great lift height and reach
                                                                                                                                                                       •   No need for mobility
                                                                                                                                                                       •   Imposed noise limits
                                                                                                                        Top Slewing Tower Crane
                                                                                                                                                                            Opt for tower crane
                                                                                                                                  Under Carriage                   Bottom Slewing Tower Crane
        | Aritra Halder | Assistant Professor                                                            | Aritra Halder | Assistant Professor
Differences between top slewing and bottom slewing tower crane                              Fixed Base Tower Cranes                                             • The crane is mounted on a fixed
                                                                                                                                                                  concrete base with anchor bolts.
                                                                                                                                                                • At times static rail mounted
                                                                                                                                                                  undercarriage is also used.
      Top Slewing Tower Crane                       Bottom Slewing Tower Crane                                                                                  • Many of them can
                                                                                                                                                                  independently increase their
                                                                                                                                                                  heights by climbing mechanism.
• Transport, setting and dismantling            • Self erecting and towable between job                                                                         • The free standing height is
  procedures are time consuming and               sites.                                                                                                          around 200 ft for small sizes and
  costly.                                                                                                                                                         400 ft for large sizes.
                                                • Suitable for short term service and                                                                           • To extend the height beyond
• Suitable for long term service and              low rise buildings                                                                                              free standing limit, lateral
  higher building heights.                                                                                                                                        bracing is provided.
                                                • The ballasts are placed entirely on the
                                                                                                                                                                • To counter wind load, special
• The ballasts are partly placed on the           base.                                                                                                           braking is used. During non
  counter jib and partly at the base.           • Both the tower and the jib assembly                                                                             working hours ‘weathervane’
                                                                                                                                                                  mechanism is used.
• The base is fixed, only the jibs, CAT           rotate relative to the base chassis.                                                                          • Weathervane allows the crane
  head and the cabin is allowed to rotate                                                                                                                         to slew freely with the wind to
                                                                                                                                                                  minimize the area exposed to
                                                                                                                                                                  wind.
        | Aritra Halder | Assistant Professor                                                            | Aritra Halder | Assistant Professor
                                                                                                                                                                                                                  3
                                                                                                                                                                                                                                          12-04-2023
Climbing Tower Crane                                                  • This crane is used for high rises          Climbing Tower Crane - Video
                                                                        where maximum braced height
                                                                        limit is exceeded.
                                                                      • The completed floors act as bases
                                                                        for the crane to climb upwards.
                                                                      • The movement is through hydraulic
                                                                        rams and latches.
                                                                      • In most cases, building core (lift
                                                                        shaft) is used as the base for the
                                                                        crane.
                                                                      • The design load for building should
                                                                        consider the climbing crane load.
                                                                      • The removal is done by external
                                                                        cranes like Derrick or mobile cranes.
                                                                      • The downside is the delay in
                                                                        finishing of elevator fixing activity
                                                                        which is usually on the critical path.
                                                                      • The lift shaft getting engaged by
                                                                        the tower crane also limits the
                                                                        formwork choice for the core walls.
      | Aritra Halder | Assistant Professor                                                                                    | Aritra Halder | Assistant Professor
                                                                      Factors of selecting a tower crane
Other Types of cranes                                                  Weight, dimension, lift radii of
                                                                                                                   Crane Safety
                                                                        heaviest loads
                                                                                                                   • Factors of accident-
                                                                       Maximum free standing height of the
                                                                        crane                                        – Human Factor: Skill of the operator, experience and signaling errors, fatigue.
  No CAT head or                                                       Maximum braced height of the crane
  pendant.                                                             Crane climbing arrangement                   – Project Factor: Presence of power lines, congestion, crane overlapping, visibility interruptions, overloading.
  Reduces the risk of                                                  Weight of the crane supported by the
                                                                                                                     – Environmental Factor: Wind, Severe weather, maintenance, safety rules.
  overlapping and clash.                                                structure
  Flexible in terms of                                 Flat Top        Available headroom
  height restriction.                                                  Area that must be reached                  • Crane Safety Program-
                                                                       Hoist speed of the crane                     –   Equipment Inspection
                                                                       Length of the cable the hoist drum           –   Hazard analysis
                                                                        can carry                                    –   Crane Location
                                                                                                                     –   Crane Movements
                                              Jib pinned at base,      ** while calculating the load, 5% safety     –   Lift Definitions
                                              angle of inclination      margin should be applied.
                                                                                                                     –   Responsibility matrix and line of control
                                              controlled by cables.                                                  –   Investigation procedures
                       Luffing Jib                                                                                   –   Training and responsibility distribution among – (1) Rigging Personnel, (2) Crane Operator, (3) Lift Director.
      | Aritra Halder | Assistant Professor                                                                                    | Aritra Halder | Assistant Professor
                                                                                                                                                                                                                                                   4
                                                                                                                        12-04-2023
Load analysis from table                     Load Analysis
     | Aritra Halder | Assistant Professor       | Aritra Halder | Assistant Professor
Tower Crane Erection Video
                                                                                         Thank You!
                                                                                                      Contact Me
                                                                                                          at
                                                                                                 ahalder@nicmar.ac.in
                                                                                                    +91-8504017164
                                                         | Aritra Halder | Assistant Professor
     | Aritra Halder | Assistant Professor