INSPECTION & TESTING REQUIREMENTS                                                     REVISION:           09/98       CODE NUMBER:                    PAGE
SAUDI ARAMCO FORM-175                                                                 REPLACES:           12/94               091900                     1 of 1
SCOPE:         COATING: SHOP APPLIED; For Tanks, Piping, Pipelines (and               PURCHASE ORDER NUMBER:
               Associated Appurtenances & Fittings) Structures, ,Process Equipment;
               Internal & External; Onshore, Offshore and/or Subsea.
TEST and INSPECTION PER:                  SAES-H-001 & -002, SAES H-100 & -           ITEM NUMBER(s):
               101, PO Requirements and Specifications As Noted Below
       (1) VISUAL INSPECTION / WITNESSING BY INSPECTOR (Note 1 & 2)
           (2) CERTIFICATES / RECORDS TO BE CHECKED BY INSPECTOR (Note 1)
LINE
 NO               (3) CERTIFICATES / DATA TO BE PROVIDED BY VENDOR / SUPPLIER / MANUFACTURER
                          Pre-Fabrication / Pre-Production Requirements                                  Specification Details / Notes:
01
02     X          X    Abrasive Type, Performance and Storage                         SAES-H-100 & SIS-05-59-00
03
                          In-Process Inspection & Testing Requirements
04
05                     Surface Preparation:                                           SAES-H-100.
06                     I. Pre-Blast Check;                                            See SAES-H-100 for hand brush details when/if used.
07     X                   a) Solvent or Detergent Cleaning before Abrasive Blast     If required shall be per SAES-H-100 & SSPC-SP1.
08     X          X        b) Temperature & Dew Point
09     X                   c) Surface condition                                       Removal of Rough Welds, cut-offs, weld spatter, and arc strikes.
10
11                     II. Equipment;
                                                                                      Free of oil, moisture and contamination. As a minimum, t he inspector shall check
12     X          X        a) Compressed Air Supply Blotter Test
                                                                                      and approve air quality at the start, mid-point of each 8 hour shift.
13     X                   b) Operational ‘Deadman’ Remote Control Valve Used
14     X                   c) Adequate Lighting Used (If required)
15     X                   d) Interior Coating Personal Gear (If applicable)          See SAES-H-100 for details.
16     X               III. Cleaning; Spent Abrasive Removal
17     X               IV. Primer on Abrasive Cleaned Surfaces
18
19     X               Storage of Paints / Thinners, Dates of Manufacture, Leakage    See SAES-H-100 for details.
20     X               Paint & Coatings Preparation                                   See SAES-H-100.
21
22                     Paint & Coatings Application:                                  SAES-H-100.
23     X          X        a) Atmospheric Conditions & Substrate Temperature
24     X                   b) Substrate Surface Inspection
25     X                   c) Stripe Coating Performed (If applicable)
26     X                   d) Paints filtered through a 30 to 60-mesh screen
27     X                   e) Continuous Agitation During Coating Process
28     X          X        f) Wet & Dry Film Coating Thickness’ Readings              Dry Film to be checked in accordance with SSPC-PA2.
29     X                   g) Recoating Intervals Adhered To.                         Note: Contrasting colors may be required for primer, intermediate and top coats.
30
                           Final Inspection & Testing Requirements
31
32                     “Internal/Immersion” Coatings (if applicable):                 Note: SAES-H-100 general requirements differ slightly for this application.
33     X                   a) Paint Thickness Near (2m) Anode Connections             Per SAES-H-100.
34     X          X        b) Holiday Testing                                         SAES-H-100: Those not Cathodically protected shall be holiday inspected.
35     X                   c) Repair Procedure for Immersion Coatings                 SAES-H-100.
36
37         X           Paint Certification                                            Review paint documentation (cert’s, data sheets,etc)
38     X               Visual Inspection of Finished Coatings                         SAES-H-100: See specification for details of acceptance and rejection criteria.
Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC, AOC Inspection Offices.
(2) 100% witnessing by Manufacturer Inspector, Random by Company Inspector unless otherwise specified by the responsible Inspection Office.