Mto Bog Compressor Foundation

This document is a bill of quantities (BOQ) for the construction of foundations for a BOG compressor at a refrigerated LPG terminal in Tanjung Sekong. It provides details of the concrete work required, including pile foundations, pile caps, and individual foundations. The work includes excavation, formwork, rebar, and concrete. Reinforcing details are also provided in an accompanying bar bending schedule.

Uploaded by

Bacti Bactiar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views25 pages

Mto Bog Compressor Foundation

This document is a bill of quantities (BOQ) for the construction of foundations for a BOG compressor at a refrigerated LPG terminal in Tanjung Sekong. It provides details of the concrete work required, including pile foundations, pile caps, and individual foundations. The work includes excavation, formwork, rebar, and concrete. Reinforcing details are also provided in an accompanying bar bending schedule.

Uploaded by

Bacti Bactiar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 25

BILL OF QUANTITY (BOQ)

Proyek Pembangunan Terminal LPG Refrigerated


TANJUNG SEKONG

BOG COMPRESSOR FOUNDATION

Harga sat (Rp) Sub-Total (Rp)


No Item Pekerjaan Qty Sat Total Harga (Rp)
Material Upah + alat Material Upah + alat

BOG COMPRESSOR FOUNDATION 347.16 M2


I PEKERJAAN TIANG PANCANG
A CONCRETE SPUN PILE Ø450mm 42.00 UNIT
1 CSP Bottom Ø450mm p: 12000mm 42.00 Ea -
2 CSP Middle Ø450mm p: 12000mm 42.00 Ea -
3 CSP Middle Ø450mm p: 6000mm 42.00 Ea -

II PEKERJAAN STRUKTUR BETON


A PILE HEAD TREATHMENT Ø450mm 42.00 UNIT
1 Formwork/Bekisting 2.06 m2 -
2 Pembesian Ø10-150 503.57 Kg -
3 Pembesian Ø13 914.57 Kg -
4 Cor beton K-300 2.68 m3 -
B PONDASI C201A/B + FUTURE (8000x6000)mm 3.00 Unit
1 Galian Tanah 190.65 m3 -
2 Polyethylene Sheet Thk. 0.15mm 152.52 m2 -
3 Lantai Kerja Thk. 50mm 7.63 m3 -
4 Formwork/Bekisting -
- Formwork/Bekisting (Anchore Box) 13.37 m2 -
- Formwork/Bekisting (Batako/Hebel) 4.86 m2 -
- Formwork/Bekisting (Triplek/Plywood) 125.59 m2 -
5 Pembesian Ø10-200 110.20 kg -
6 Pembesian Ø19-200 11,799.92 kg -
7 Cor beton K-300 198.88 m3 -

Page 1 of 25
BILL OF QUANTITY (BOQ)
Proyek Pembangunan Terminal LPG Refrigerated
TANJUNG SEKONG

BOG COMPRESSOR FOUNDATION

Harga sat (Rp) Sub-Total (Rp)


No Item Pekerjaan Qty Sat Total Harga (Rp)
Material Upah + alat Material Upah + alat

8 Timbunan kembali 10.22 m3 -


9 Grouting Thk. 75mm 1.64 m3 -
C PONDASI C301A/B + FUTURE (8000x6000)mm 3.00 Unit
1 Galian Tanah 190.65 m3 -
2 Polyethylene Sheet Thk. 0.15mm 152.52 m2 -
3 Lantai Kerja Thk. 50mm 7.63 m3 -
4 Formwork/Bekisting -
- Formwork/Bekisting (Anchore Box) 13.37 m2 -
- Formwork/Bekisting (Batako/Hebel) 4.86 m2 -
- Formwork/Bekisting (Triplek/Plywood) 124.38 m2 -
5 Pembesian Ø10-200 110.20 kg -
6 Pembesian Ø19-200 11,692.40 kg -
7 Cor beton K-300 198.88 m3 -
8 Timbunan kembali 10.22 m3 -
9 Grouting Thk. 75mm 8.00 m3 -
D PONDASI (3400x2900)mm 6.00 Unit
1 Galian Tanah 40.18 m3 -
2 Polyethylene Sheet Thk. 0.15mm 66.96 m2 -
3 Lantai Kerja Thk. 50mm 3.35 m3 -
4 Formwork/Bekisting 34.92 m2 -
5 Pembesian Ø10-200 12.93 kg -
6 Pembesian Ø19-200 4,004.68 kg -
7 Cor beton K-300 35.50 m3 -
8 Timbunan kembali 30.91 m3 -

Page 2 of 25
BILL OF QUANTITY (BOQ)
Proyek Pembangunan Terminal LPG Refrigerated
TANJUNG SEKONG

BOG COMPRESSOR FOUNDATION

Harga sat (Rp) Sub-Total (Rp)


No Item Pekerjaan Qty Sat Total Harga (Rp)
Material Upah + alat Material Upah + alat

9 Grouting Thk. 75mm 16.01 m3 -


Total Pekerjaan Struktur Beton - - -

Page 3 of 25
PT. WIJAYA KARYA
Divisi Industrial Plant
Proyek Pembangunan Terminal LPG Refrigerated
Tanjung Sekong
FORM BAR BENDING SCHEDULE
Lokasi : BOG COMPRESSOR FOUNDATION
Drawing Reff. :

Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
A PILE HEAD TREATHMENT
1 Tul. PHT 450mm (Pondasi BOG Compressor)
a Tul. Utama 10 Dia. 13
340 10 13 1.04 2.090 420 914.57 12 5 1.550 84.0 84 0.0 Waste 1

1750

Tinggi Bentang = 1850 mm


Jumlah Unit = 42 Bh

b Sengkang Dia. 10 - 150


26 10 0.62 0.748 1092 503.57 12 16 0.032 68.3 69 9.0 Waste 2

748

Panjang Bentang = 1750 mm


Jumlah Unit = 42 Pcs
Weight Btg
TOTAL D 10 = 503.567 Kg 69 Pcs
D 13 = 914.567 Kg 84 Pcs
B PONDASI
1 C201A/B & FUTURE
a Tul. Utama Atas Arah X Dia. 19 - 200

7900 31 19 2.23 9.550 93 1,976.64 12 1 2.450 93.0 93 0.0 Waste 3

825 825

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
a Tul. Utama Atas Arah X Dia. 19 - 200

7300 18 19 2.23 8.950 54 1,075.62 12 1 3.050 54.0 54 0.0 Waste 4

825 825

Panjang Bentang X = 7400 mm


Panjang Bentang Y = 3300 mm
Jumlah Unit = 3 Pcs
a Tul. Utama Atas Arah X Dia. 19 - 200

1700 13 19 2.23 3.350 39 290.77 12 3 1.950 13.0 13 0.0 Waste 5

825 825

03/18/2024Page 4 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
825 825

Panjang Bentang X = 1800 mm


Panjang Bentang Y = 2270 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

5900 41 19 2.23 7.550 123 2,066.77 12 1 4.450 123.0 123 0.0 Waste 6

825 825

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

3200 14 19 2.23 4.850 42 453.35 12 2 2.300 21.0 21 0.0 Waste 7

825 825

Panjang Bentang X = 2600 mm


Panjang Bentang Y = 3300 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

5470 10 19 2.23 7.170 30 478.72 12 1 4.830 30.0 30 0.0 Waste 8

850 850

Panjang Bentang X = 1800 mm


Panjang Bentang Y = 5570 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

3200 16 19 2.23 4.850 48 518.11 12 2 2.300 24.0 24 0.0 Waste 9

825 825

Panjang Bentang X = 3000 mm


Panjang Bentang Y = 3300 mm
Jumlah Unit = 3 Pcs

03/18/2024Page 5 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
c Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 3.850 18 154.23 12 3 0.450 6.0 6 0.0 Waste 10

B 3 19 2.23 3.850 18 154.23 12 3 0.450 6.0 6 0.0


600 600 600 600
A B
2650 2650

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 1.950 18 78.12 12 6 0.300 3.0 3 0.0

825 825 B 3 19 2.23 1.950 18 78.12 12 6 0.300 3.0 3 0.0


600 600
A B
525 525

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
e Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8
550 550 550
75 A 75 75 B 75 75 C 75 B 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8

Panjang Bentang X = 8000 mm C 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8
Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
f Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0

B 3 19 2.23 0.830 18 33.25 12 14 0.380 1.3 2 8.6


500 500
A B C D
830 830 830 830 C 3 19 2.23 0.830 18 33.25 12 14 0.380 1.3 2 8.6

Panjang Bentang X = 8000 mm D 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
g Tul. Utama Bawah Arah X Dia. 19 - 200
19 19 2.23 9.550 57 1,211.49 12 1 2.450 57.0 57 0.0

825 825

7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 3450 mm
Jumlah Unit = 3 Pcs
h Tul. Utama Bawah Arah X Dia. 19 - 200
6 19 2.23 9.550 18 382.57 12 1 2.450 18.0 18 0.0

825 825

7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 975 mm
Jumlah Unit = 3 Pcs
i Tul. Utama Bawah Arah X Dia. 19 - 200
3 19 2.23 9.550 9 191.29 12 1 2.450 9.0 9 0.0

03/18/2024Page 6 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg

825 825

7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 375 mm
Jumlah Unit = 3 Pcs
a Tul. Utama Bawah Arah Y Dia. 19 - 200
A 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8
550 550
75 A 75 75 B 75 B 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8

C 3 19 2.23 1.900 18 76.11 12 6 0.600 3.0 3 0.0 Waste 8


825 825
600 600 600 600
C D 3 19 2.23 4.850 18 194.29 12 2 2.300 9.0 9 0.0 Waste 8
475 3650 675
E 3 19 2.23 2.100 18 84.13 12 5 1.500 3.6 4 4.8 Waste 8
Panjang Bentang X = 450 mm
Panjang Bentang Y = 6000 mm
Jumlah Unit = 6 Pcs
b Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0

B 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0


500 500
A B
830 830

Panjang Bentang X = 450 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 6 Pcs
c Tul. Utama Bawah Arah X Dia. 19 - 200
4 19 2.23 7.550 12 201.64 12 1 4.450 12.0 12 0.0

825 825

5900

Panjang Bentang X = 475 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
15 19 2.23 7.550 45 756.14 12 1 4.450 45.0 45 0.0

825 825

5900

Panjang Bentang X = 2650 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
e Tul. Utama Bawah Arah X Dia. 19 - 200
15 19 2.23 7.550 45 756.14 12 1 4.450 45.0 45 0.0

825 825

5900

Panjang Bentang X = 2650 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
f Tul. Utama Bawah Arah X Dia. 19 - 200

03/18/2024Page 7 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
4 19 2.23 7.550 12 201.64 12 1 4.450 12.0 12 0.0

825 825

5900

Panjang Bentang X = 475 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
g Tul. Utama Atas Arah X 3 Dia. 10

7900 3 10 0.62 8.000 9 44.39 12 1 4.000 9.0 9 0.0 Waste 4


50 50
3 10 0.62 8.000 9 44.39 12 1 4.000 9.0 9 0.0 Waste 4
50 50
7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
h Tul. Utama Atas Arah X 3 Dia. 10

5900 3 10 0.62 6.000 9 33.29 12 2 - 4.5 5 6.0 Waste 4


50 50
3 10 0.62 6.000 9 33.29 12 2 - 4.5 5 6.0 Waste 4
50 50
5900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
i Tul. Vertical Dia. 10 - 1000
300 8 10 0.62 2.948 24 43.62 12 4 0.208 6.0 6 0.0 Waste 9

1024 1024

300
300
Tinggi = 1200 mm
Panjang Bentang X = 8000 mm
Jumlah Unit = 3 Pcs
Weight Btg
TOTAL D 10 = 110.201 Kg 6 Pcs
D 19 = 11,799.923 Kg 494 Pcs

1 C301A/B & FUTURE


a Tul. Utama Atas Arah X Dia. 19 - 200

7900 31 19 2.23 9.550 93 1,976.64 12 1 2.450 93.0 93 0.0 Waste 3

825 825

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
a Tul. Utama Atas Arah X Dia. 19 - 200

03/18/2024Page 8 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
6700 18 19 2.23 8.350 54 1,003.51 12 1 3.650 54.0 54 0.0 Waste 4

825 825

Panjang Bentang X = 6800 mm


Panjang Bentang Y = 3300 mm
Jumlah Unit = 3 Pcs
a Tul. Utama Atas Arah X Dia. 19 - 200

1700 12 19 2.23 3.350 36 268.40 12 3 1.950 12.0 12 0.0 Waste 5

825 825

Panjang Bentang X = 1800 mm


Panjang Bentang Y = 2200 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

5900 41 19 2.23 7.550 123 2,066.77 12 1 4.450 123.0 123 0.0 Waste 6

825 825

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

3200 14 19 2.23 4.850 42 453.35 12 2 2.300 21.0 21 0.0 Waste 7

825 825

Panjang Bentang X = 2450 mm


Panjang Bentang Y = 3300 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

5400 10 19 2.23 7.100 30 474.05 12 1 4.900 30.0 30 0.0 Waste 8

850 850

Panjang Bentang X = 1800 mm


Panjang Bentang Y = 5500 mm
Jumlah Unit = 3 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

3200 13 19 2.23 4.850 39 420.97 12 2 2.300 19.5 20 6.0 Waste 9

825 825

Panjang Bentang X = 2250 mm


Panjang Bentang Y = 3300 mm
Jumlah Unit = 3 Pcs
c Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 3.850 18 154.23 12 3 0.450 6.0 6 0.0 Waste 10

B 3 19 2.23 3.850 18 154.23 12 3 0.450 6.0 6 0.0


600 600 600 600
A B
2650 2650

03/18/2024Page 9 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 1.950 18 78.12 12 6 0.300 3.0 3 0.0

825 825 B 3 19 2.23 1.950 18 78.12 12 6 0.300 3.0 3 0.0


600 600
A B
525 525

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
e Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8
550 550 550
75 A 75 75 B 75 75 C 75 B 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8

Panjang Bentang X = 8000 mm C 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8
Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
f Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0

B 3 19 2.23 0.830 18 33.25 12 14 0.380 1.3 2 8.6


500 500
A B C D
830 830 830 830 C 3 19 2.23 0.830 18 33.25 12 14 0.380 1.3 2 8.6

Panjang Bentang X = 8000 mm D 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
g Tul. Utama Bawah Arah X Dia. 19 - 200
19 19 2.23 9.550 57 1,211.49 12 1 2.450 57.0 57 0.0

825 825

7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 3450 mm
Jumlah Unit = 3 Pcs
h Tul. Utama Bawah Arah X Dia. 19 - 200
6 19 2.23 9.550 18 382.57 12 1 2.450 18.0 18 0.0

825 825

7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 975 mm
Jumlah Unit = 3 Pcs
i Tul. Utama Bawah Arah X Dia. 19 - 200
3 19 2.23 9.550 9 191.29 12 1 2.450 9.0 9 0.0

825 825

7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 375 mm

03/18/2024Page 10 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
Jumlah Unit = 3 Pcs
a Tul. Utama Bawah Arah Y Dia. 19 - 200
A 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8
550 550
75 A 75 75 B 75 B 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3 Waste 8

C 3 19 2.23 1.800 18 72.11 12 6 1.200 3.0 3 0.0 Waste 8


825 825
600 600 600 600
C D 3 19 2.23 4.650 18 186.28 12 2 2.700 9.0 9 0.0 Waste 8
375 3450 975
E 3 19 2.23 2.400 18 96.14 12 5 - 3.6 4 4.8 Waste 8
Panjang Bentang X = 450 mm
Panjang Bentang Y = 6000 mm
Jumlah Unit = 6 Pcs
b Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0

B 3 19 2.23 1.330 18 53.28 12 9 0.030 2.0 2 0.0


500 500
A B
830 830

Panjang Bentang X = 450 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 6 Pcs
c Tul. Utama Bawah Arah X Dia. 19 - 200
4 19 2.23 7.550 12 201.64 12 1 4.450 12.0 12 0.0

825 825

5900

Panjang Bentang X = 475 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
15 19 2.23 7.550 45 756.14 12 1 4.450 45.0 45 0.0

825 825

5900

Panjang Bentang X = 2650 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
e Tul. Utama Bawah Arah X Dia. 19 - 200
15 19 2.23 7.550 45 756.14 12 1 4.450 45.0 45 0.0

825 825

5900

Panjang Bentang X = 2650 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
f Tul. Utama Bawah Arah X Dia. 19 - 200
4 19 2.23 7.550 12 201.64 12 1 4.450 12.0 12 0.0

825 825

5900

Panjang Bentang X = 475 mm

03/18/2024Page 11 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
g Tul. Utama Atas Arah X 3 Dia. 10

7900 3 10 0.62 8.000 9 44.39 12 1 4.000 9.0 9 0.0 Waste 4


50 50
3 10 0.62 8.000 9 44.39 12 1 4.000 9.0 9 0.0 Waste 4
50 50
7900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
h Tul. Utama Atas Arah X 3 Dia. 10

5900 3 10 0.62 6.000 9 33.29 12 2 - 4.5 5 6.0 Waste 4


50 50
3 10 0.62 6.000 9 33.29 12 2 - 4.5 5 6.0 Waste 4
50 50
5900

Panjang Bentang X = 8000 mm


Panjang Bentang Y = 6000 mm
Jumlah Unit = 3 Pcs
i Tul. Vertical Dia. 10 - 1000
300 8 10 0.62 2.948 24 43.62 12 4 0.208 6.0 6 0.0 Waste 9

1024 1024

300
300
Tinggi = 1200 mm
Panjang Bentang X = 8000 mm
Jumlah Unit = 3 Pcs
Weight Btg
TOTAL D 10 = 110.201 Kg 6 Pcs
D 19 = 11,692.405 Kg 489 Pcs

03/18/2024Page 12 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
1 C301A/B, C301A/B & FUTURE
a Tul. Utama Atas Arah X Dia. 19 - 200

3300 16 19 2.23 4.050 96 865.30 12 2 3.900 48.0 48 0.0 Waste 3

375 375

Panjang Bentang X = 3400 mm


Panjang Bentang Y = 2900 mm
Jumlah Unit = 6 Pcs
b Tul. Utama Atas Arah Y Dia. 19 - 200

2800 18 19 2.23 3.550 108 853.28 12 3 1.350 36.0 36 0.0 Waste 3

375 375

Panjang Bentang X = 3400 mm


Panjang Bentang Y = 2900 mm
Jumlah Unit = 6 Pcs
c Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 2.100 18 84.13 12 5 1.500 3.6 4 4.8

375 375 B 3 19 2.23 2.100 18 84.13 12 5 1.500 3.6 4 4.8


300 300
A B
1425 1425

Panjang Bentang X = 3400 mm


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
A 3 19 2.23 0.800 18 32.05 12 15 - 1.2 2 9.6
800
B 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3
550
75 75

Panjang Bentang X = 3400 mm


Panjang Bentang Y = 450 mm
Jumlah Unit = 6 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
18 19 2.23 1.875 216 901.35 12 6 0.750 36.0 36 0.0

375 375

1125

Panjang Bentang X = 3400 mm


Panjang Bentang Y = 1225 mm
Jumlah Unit = 12 Pcs
d Tul. Utama Bawah Arah Y Dia. 19 - 200
A 3 19 2.23 1.850 18 74.11 12 6 0.900 3.0 3 0.0

375 375 B 3 19 2.23 1.850 18 74.11 12 6 0.900 3.0 3 0.0


300 300
A B
1175 1175

Panjang Bentang X = 450 mm


Panjang Bentang Y = 2900 mm
Jumlah Unit = 6 Pcs

03/18/2024Page 13 of 25
Raw material
φ Weigth/M Length Total QTY
NO BAR SHAPE Qty (mm) (Kg) (m)
Cut total Remark
Length/btg (m) waste per bgt (m) pembulatan (btg) sisa waste (m)
pcs kg (pcs) btg
d Tul. Utama Bawah Arah Y Dia. 19 - 200
A 3 19 2.23 0.800 18 32.05 12 15 - 1.2 2 9.6
800
B 3 19 2.23 0.700 18 28.04 12 17 0.100 1.1 2 11.3
550
75 75

Panjang Bentang X = 450 mm


Panjang Bentang Y = 2900 mm
Jumlah Unit = 6 Pcs
d Tul. Utama Bawah Arah X Dia. 19 - 200
10 19 2.23 3.550 120 948.09 12 3 1.350 40.0 40 0.0

375 375

2800

Panjang Bentang X = 1700 mm


Panjang Bentang Y = 2900 mm
Jumlah Unit = 12 Pcs
i Tul. Vertical Dia. 10 - 1000
2 10 0.62 1.748 12 12.93 12 6 1.512 2.0 2 0.0 Waste 9
300

424 424

300
300

Tinggi = 600 mm
Panjang Bentang X = 1700 mm
Jumlah Unit = 6 Pcs
TOTAL D 10 = 12.932 Kg 2 Pcs
D 19 = 4,004.682 Kg 304 Pcs

Weight Btg
TOTAL D 10 = 613.768 Kg 75 Pcs
D 13 = 914.567 Kg 84 Pcs
D 19 = 11,799.923 Kg 494 Pcs

SUB TOTAL 13,328.258 Kg

Prepared By Cheked By

03/18/2024Page 14 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

135.65 1.55 130.20 135.65 84.00 130.20

1.36 0.03 2.21 1.36 69.00 2.21

507.09 2.45 227.85 507.09 93.00 227.85

366.55 3.05 164.70 366.55 54.00 164.70

56.42 1.95 25.35 56.42 13.00 25.35

03/18/2024Page 15 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

1,218.16 4.45 547.35 1,218.16 123.00 547.35

107.49 2.30 48.30 107.49 21.00 48.30

322.48 4.83 144.90 322.48 30.00 144.90

122.85 2.30 55.20 122.85 24.00 55.20

03/18/2024Page 16 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

6.01 0.45 2.70 6.01 6.00 2.70

6.01 0.45 2.70 6.01 6.00 2.70

2.00 0.30 0.90 2.00 3.00 0.90

2.00 0.30 0.90 2.00 3.00 0.90

0.45 0.10 0.20 0.45 2.00 0.20

0.45 0.10 0.20 0.45 2.00 0.20

0.45 0.10 0.20 0.45 2.00 0.20

0.13 0.03 0.06 0.13 2.00 0.06

1.69 0.38 0.76 1.69 2.00 0.76

1.69 0.38 0.76 1.69 2.00 0.76

0.13 0.03 0.06 0.13 2.00 0.06

310.80 2.45 139.65 310.80 57.00 139.65

98.15 2.45 44.10 98.15 18.00 44.10

49.07 2.45 22.05 49.07 9.00 22.05

03/18/2024Page 17 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

0.45 0.10 0.20 0.45 2.00 0.20

0.45 0.10 0.20 0.45 2.00 0.20

4.01 0.60 1.80 4.01 3.00 1.80

46.07 2.30 20.70 46.07 9.00 20.70

13.35 1.50 6.00 13.35 4.00 6.00

0.13 0.03 0.06 0.13 2.00 0.06

0.13 0.03 0.06 0.13 2.00 0.06

118.85 4.45 53.40 118.85 12.00 53.40

445.67 4.45 200.25 445.67 45.00 200.25

445.67 4.45 200.25 445.67 45.00 200.25

03/18/2024Page 18 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste
118.85 4.45 53.40 118.85 12.00 53.40

22.19 4.00 36.00 22.19 9.00 36.00

22.19 4.00 36.00 22.19 9.00 36.00

- - - - 5.00 -

- - - - 5.00 -

0.77 0.21 1.25 0.77 6.00 1.25

507.09 2.45 227.85 507.09 93.00 227.85

03/18/2024Page 19 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste
438.66 3.65 197.10 438.66 54.00 197.10

52.08 1.95 23.40 52.08 12.00 23.40

1,218.16 4.45 547.35 1,218.16 123.00 547.35

107.49 2.30 48.30 107.49 21.00 48.30

327.16 4.90 147.00 327.16 30.00 147.00

102.38 2.30 46.00 102.38 20.00 46.00

6.01 0.45 2.70 6.01 6.00 2.70

6.01 0.45 2.70 6.01 6.00 2.70

03/18/2024Page 20 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

2.00 0.30 0.90 2.00 3.00 0.90

2.00 0.30 0.90 2.00 3.00 0.90

0.45 0.10 0.20 0.45 2.00 0.20

0.45 0.10 0.20 0.45 2.00 0.20

0.45 0.10 0.20 0.45 2.00 0.20

0.13 0.03 0.06 0.13 2.00 0.06

1.69 0.38 0.76 1.69 2.00 0.76

1.69 0.38 0.76 1.69 2.00 0.76

0.13 0.03 0.06 0.13 2.00 0.06

310.80 2.45 139.65 310.80 57.00 139.65

98.15 2.45 44.10 98.15 18.00 44.10

49.07 2.45 22.05 49.07 9.00 22.05

03/18/2024Page 21 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

0.45 0.10 0.20 0.45 2.00 0.20

0.45 0.10 0.20 0.45 2.00 0.20

8.01 1.20 3.60 8.01 3.00 3.60

54.08 2.70 24.30 54.08 9.00 24.30

- - - - 4.00 -

0.13 0.03 0.06 0.13 2.00 0.06

0.13 0.03 0.06 0.13 2.00 0.06

118.85 4.45 53.40 118.85 12.00 53.40

445.67 4.45 200.25 445.67 45.00 200.25

445.67 4.45 200.25 445.67 45.00 200.25

118.85 4.45 53.40 118.85 12.00 53.40

03/18/2024Page 22 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

22.19 4.00 36.00 22.19 9.00 36.00

22.19 4.00 36.00 22.19 9.00 36.00

- - - - 5.00 -

- - - - 5.00 -

0.77 0.21 1.25 0.77 6.00 1.25

03/18/2024Page 23 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

416.63 3.90 187.20 416.63 48.00 187.20

108.16 1.35 48.60 108.16 36.00 48.60

13.35 1.50 6.00 13.35 4.00 6.00

13.35 1.50 6.00 13.35 4.00 6.00

- - - - 2.00 -

0.45 0.10 0.20 0.45 2.00 0.20

60.09 0.75 27.00 60.09 36.00 27.00

6.01 0.90 2.70 6.01 3.00 2.70

6.01 0.90 2.70 6.01 3.00 2.70

03/18/2024Page 24 of 25
Waste Sebelum Pemakaian Waste Setelah Pemakaian
Jumlah Berat
Pemakaian Jumlah Berat
Panjang / Btg Jumlaj Pjg Waste Panjang / Btg Jumlaj Pjg
Waste Waste

- - - - 2.00 -

0.45 0.10 0.20 0.45 2.00 0.20

120.18 1.35 54.00 120.18 40.00 54.00

1.86 1.51 3.02 1.86 2.00 3.02

Total west sebelum diambil 9,634.89 kg


Total west sesudah diambil 9,634.89 kg

persentase west 72.29 %

03/18/2024Page 25 of 25